23 07 11-2 Transmittal Package HVAC Insulation.pdf
PDF 693 KB Posted
- Attached to
- 4130--557-25-1-5151-0012, Replacement of Chiller 2, Chiller 4, and Chiller 5 (VA-25-00009689)
- Solicitation number
- 36C24725Q0203
About this file
This is a transmittal package for HVAC insulation submittals for the Carl Vinson VA Medical Center in Dublin, Georgia, containing an ENG Form 4025-R submittal form and detailed insulation specifications. The package was submitted by Greenland Enterprises (contractor) and Covan's Insulation Company (supplier) for contract W912HP-16-C-0018.
The submittal includes comprehensive insulation charts and thickness schedules for various pipe services and ductwork. Key specifications include: fiberglass insulation for heating hot water and condensate drain pipes, polyisocyanurate for chilled water pipes, calcium silicate for steam pipes, Armaflex for domestic cold water, and 2-inch fiberglass for general ductwork. The package details specific thickness requirements based on pipe diameters, ranging from 1 inch to 3 inches, and includes finishing requirements such as aluminum jacketing, ASJ jackets with PVC fitting covers, and location-specific requirements for areas above and below 7 feet. Accessories specifications include aluminum bands, seals, tapes, fasteners, adhesives, and mastics required for proper installation.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Additional clarification questions.docx | DOCX document | |
| 23 07 11-3 Transmittal Package_ Pipe Insulation.pdf | ||
| 36C24725Q0203 0003.docx | DOCX document | |
| 36C24725Q0203 0002.docx | DOCX document | |
| Cogen Plant Spec Combined 051616_COR Approval with boiler tests.pdf | ||
| 23 64 00-1 transmittal Package water cooled chillers.pdf | ||
| Chiller Plant Design.pdf | ||
| Site Visit December16th.pdf | ||
| 36C24725Q0203 0001.docx | DOCX document | |
| 36C24725Q0203.docx | DOCX document | |
| 36C24725Q0203_1.docx | DOCX document |
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
TRANSMITTAL OF SHOP DRAWINGS, EQUIPMENT DATA, MATERIAL SAMPLES, OR
MANUFACTURER'S CERTIFICATES OF COMPLIANCE
For use of this form, see ER 415-1-10; the proponent agency is CECW-CE.
SECTION I - REQUEST FOR APPROVAL OF THE FOLLOWING ITEMS (This section will be initiated by the contractor)
DATE TRANSMITTAL NO.
TO: FROM: CONTRACT NO. CHECK ONE:
THIS IS A NEW TRANSMITTAL
THIS IS A RESUBMITTAL OF
TRANSMITTAL ___________
SPECIFICATION SEC. NO. (Cover only one section with each transmittal) PROJECT TITLE AND LOCATION 01-Main Register THIS TRANSMITTAL IS FOR: (Check one)
FIO GA DA CR DA/CR DA/GA
ITEM
NO.
(See
Note 3) a.
DESCRIPTION OF SUBMITTAL ITEM
(Type size, model number/etc.)
b.
SUBMITTAL
TYPE CODE
(See Note 8) c.
NO.
OF
COPIES
d.
CONTRACT REFERENCE
DOCUMENT
SPEC.
PARA. NO.
e.
DRAWING
SHEET NO.
f.
CONTRACTOR
REVIEW
CODE
g.
VARIATION
Enter "Y" if requesting a variation
(See Note 6) h.
USACE
ACTION
CODE
(Note 9) i.
REMARKS I certify that the above submitted items have been reviewed in detail and are correct and in the strict conformance with the contract drawings and specifications except as otherwise stated.
NAME AND SIGNATURE OF CONTRACTOR
SECTION II - APPROVAL ACTION
ENCLOSURES RETURNED (List by item No.) NAME, TITLE AND SIGNATURE OF APPROVING AUTHORITY DATE
ENG FORM 4025-R, MAR 2012 REPLACES EDITION OF MAR 95, WHICH IS OBSOLETE.
04/17/2017 23 07 11-2
23 07 11
W912HP-16-C-0018 NA
SFO - VA Geographic District ROs 69A Hagood Avenue Charleston, SC 29403-5107
GREENLAND ENTERPRISES, INC.
2713 MAGRUDER BLVD STE A
HAMPTON, VA 23666-1572
FY16 VAMC Dublin GA Boiler Plant Rebuild Dublin, GA
X
X
23 Insulation Chart SD-03 0 1.4 A
24 Insulation Thickness Schedule SD-03 0 1.4 A
Nestor Morales
ITEM:
SUBMITTALS NO.: DATE:
SECTION:
Architect:
General Contractor
Mechanical Contractor:
Supplier(s):
Manufacturer(s):
Submitted by: Jose C Colon
Notes:
Carl Vinson VA Medical Center
Dublin, Georgia 31021
Product Data / Shop Drawings (Catalog Cut) Submittal Form
HVAC, Plumbing, and Ductwork Insulation
March 24, 2017230711-01-00
220711 and 230711
SUBMITTAL NOTES:
SWWB Design
The Corporate Center, Suite 621-A
233 12th Street
Columbus, GA 31901
Greenland Enterprises
2000 Aerial Center Parkway, Suite 104
Morrisville, NC 27560
Ivey Mechanical Company, LLC
4554 Stonegate Industrial Blvd, Suite C
Stone Mountain. GA 30083
Covan's Insulation Co., Inc.
534 Corbin Rd
Honea Path, SC 29654
Blake Malone (864) 980-8396
HiTherm,Owens Corning, Industrial Insulation
Group, LLC, Armacell, Speedline Corp, ITW
Insulation Systems, GTA, Specialty
Construction Brands, This package was submitted under submittal/section 2307110100 HVAC, Plumbing, and Ductwork Insulation
Covan’s Insulation Company, Inc.
PO Box 169
534 Corbin Rd
Honea Path, SC 29654
Phone: (864) 369-7100 Fax: (864) 369-7111
Email: covan@covansinsulation.com
Website: www.covansinsulation.com
Pipe & Duct Insulation
Submittal
Project: Co-Gen Project Carl Vinson VA
Medical Center
Finish Below 7ft Finish Above 7ft
Boiler Room Steam Calcium Silicate N/A
All Domestic Cold Water Armaflex No Finish No Finish 0.25
All Domestic Hot Water Fiberglass ASJ w/ PVC fittings ASJ w/ PVC fittings 0.23
Outdoor Cooling Water Fiberglass 0.23
Accessories Type
1/2" Aluminum Bands Mechanical Fastener
1/2" Aluminum Seals Mechanical Fastener
3" ASJ Tape Facing & Jacket
3" FSK Tape Facing & Jacket Seals longitudinal seams on FSK duct finish for complete vapor barrier
Midwest Fasteners Spindles Mechanical Fastener
Midwest Fasteners 12ga Washers Mechanical Fastener
Midwest Fastener Hanger Adhesive Adhesive
Childers CP-85 Adhesive Adhesive
Childers CP-30 Mastic Mastic
Armaflex 520 Adhesive Adhesive
Insulation Chart for Carl Vinson VA Medical Center
Insulation TypeDuct Service Finish
2-1/2" long galvinized pin adhered to duct for securing of fiberglass board
12ga washer fits on to spindle to secure fiberglass board
Class B, Adhere gavanized spindle to duct
Class B, Adhere Fiberglass insulation to duct
MIL-C-19565, Vapor Barrier Compound for indoor use
Class 1, Adhesive for Armaflex installation
All other Heating Hot Water and
Condensate Drain
Factory applied ASJ jacket with PVC fitting covers
Notes:
1/2" Wide Aluminum, 0.020" Thick
1/2" Wide Aluminum, 0.020" Thick
Seals longitudinal seams on ASJ pipe finish for complete vapor barrier
Accessories
K Value @ 75F
Supply Duct in Chiller Room Fiberglass Board Exposed duct will be finished with a 0.024 aluminum jacket
0.23
All Aluminum Jacket
Location
K Value @ 75FInsulation TypePipe Service
0.23
All Aluminum Jacket
Factory applied ASJ jacket with
PVC fitting covers
0.165 aged 180 days
Factory applied ASJ jacket with
PVC fitting covers Aluminum Jacket 0.23
Boiler Room Chilled Water Polyisocyanurate Aluminum Jacket
Boiler Room Heating Hot Water and
Condensate Drain Fiberglass
Fiberglass
Service Pipe ᴓ Thickness Type
Ductwork 2" Fiberglass
(excludes lined duct and general exhaust)
Chilled Water ≤1-1/4" 1-1/2" Polyisocyanurate
Chilled Water ≥1-1/2" 2" Polyisocyanurate
Heating Hot Water ≤1-1/4" 1-1/2" Fiberglass
Heating Hot Water ≥1-1/2" 2" Fiberglass
Condensate Drain ≤1-1/4" 1-1/2" Fiberglass
Condensate Drain ≥1-1/2" 2" Fiberglass
Domestic Cold All 1" Armaflex
Domestic Hot ≤1-1/4" 1-1/2" Fiberglass
Domestic Hot ≥1-1/2" 2" Fiberglass
Steam ≤1-1/4" 2-1/2" Mineral Fiber
Steam ≥1-1/2" 3" Mineral Fiber
Cooling Water (Exterior) All 1" Fiberglass
Drain (Exterior Cooling Tower) All 1" Fiberglass
Insulation Thickness Schedule
| 23 07 11-2 (183) HVAC Insulation |
| 4410 Procurement Log |
| Insulation Schedule_REV01 |
23 07 11-2 Transmittal HVAC Insulation