01 91 00 - VA Mark-up.docx

DOCX document 136 KB Posted

Attached to
Y1DZ--659-22-405 | Install Campus Generator | Salisbury VAMC
Solicitation number
36C24626B0011
Issued by

About this file

This is a General Commissioning Requirements specification (Section 01 91 00) establishing the construction phase commissioning process and procedures for the Install Campus Generator project at Salisbury VAMC. The specification defines commissioning as a systematic process of verifying that building systems perform interactively according to construction documents and the VA's operational needs, encompassing system documentation, equipment startup, control system calibration, testing and balancing, performance testing, and training.

The commissioning scope includes comprehensive systems across multiple divisions: building exterior closure, specialties (medical gas systems, laboratory equipment), conveying systems, fire suppression, plumbing (domestic water, hot water, sewerage, medical gases, chemical waste), HVAC (chillers, boilers, terminal units, energy recovery), electrical (distribution systems, emergency power generation, lighting controls), communications, electronic safety and security, renewable energy sources, and site utilities. The Contractor must appoint a Commissioning Agent and Commissioning Manager, with all commissioning activities coordinated through designated representatives. Key responsibilities include developing a comprehensive Commissioning Plan, Pre-Functional Checklists, Systems Functional Performance Test Procedures, conducting startup and checkout with documented results, maintaining a Commissioning Issues Log, providing operator training with recorded demonstrations, and compiling a final Commissioning Report. The specification requires test equipment calibration within six months of use, trending and alarming protocols for direct digital control systems with defined operational parameters, no sampling for Pre-Functional Checklists but sampling allowed for functional performance testing as determined by the Commissioning Agent, and coordination with the VA's Contracting Officer's Representative for all contractual matters and dispute resolution. Training modules must cover system design basis, operations, maintenance, emergencies, adjustments, troubleshooting, and repairs, delivered by factory-authorized instructors with documented participant evaluations and video recordings of each training module.

View the file

Other files

File Type Posted
36C24626B0011 0003.docx DOCX document
08 71 00.docx DOCX document
RFIs_Response_Rev2.docx DOCX document
01 91 00 VA Mark up.docx DOCX document
659-22-405 M-801-Blt 2.pdf PDF
36C24626B0011 0002.docx DOCX document
659-22-405_Install Campus Generator_Site Visit Sign In Sheet_03.17.2026.docx.pdf PDF
01 33 23 - SHOP DRAWINGS PRODUCT DATA SAMPLES.docx DOCX document
01 32 16.15 - PROJECT SCHEDULES - Small Projects – DesignBidBuild.docx DOCX document
36C24626B0011 0001.docx DOCX document
01 91 00 - GEN_COMMISSIONING REQUIR.docx DOCX document
01 45 00 - QUALITY CONTROL.docx DOCX document
36C24626B0011_2_Solicitation.docx DOCX document
659-22-405_Bid Set Specifications_Rev 1_.docx DOCX document
657-22-405 Salisbury Emergency Generator Bid Set_.pdf PDF
Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

659-22-405: Install Campus Generator Salisbury VAMC

GENERAL COMMISSIONING REQUIREMENTS

Section 01 91 00

GENERAL COMMISSIONING REQUIREMENTS

PART 1 - GENERAL

COMMISSIONING DESCRIPTION

This Section 01 91 00 GENERAL COMMISSIONING REQUIREMENTS shall form the basis of the construction phase commissioning process and procedures. The Commissioning Agent shall add, modify, and refine the commissioning procedures, as approved by the Department of Veterans Affairs (VA), to suit field conditions and actual manufacturer's equipment, incorporate test data and procedure results, and provide detailed scheduling for all commissioning tasks.

Various sections of the project specifications require equipment startup, testing, and adjusting services. Requirements for startup, testing, and adjusting services specified in the Division 7, Division 21, Division 22, Division 23, Division 26, Division 27, Division 28, and Division 31 series sections of these specifications are intended to be provided in coordination with the commissioning services and are not intended to duplicate services. The Contractor shall coordinate the work required by individual specification sections with the commissioning services requirements specified herein.

Where individual testing, adjusting, or related services are required in the project specifications and not specifically required by this commissioning requirements specification, the specified services shall be provided and copies of documentation, as required by those specifications shall be submitted to the VA and the Commissioning Agent to be indexed for future reference.

Where training or educational services for VA are required and specified in other sections of the specifications, including but not limited to Division 7, Division 8, Division 21, Division 22, Division 23, Division 26, Division 27, Division 28, and Division 31 series sections of the specification, these services are intended to be provided in addition to the training and educational services specified herein.

Commissioning is a systematic process of verifying that the building systems perform interactively according to the construction documents and the VA’s operational needs. The commissioning process shall encompass and coordinate the system documentation, equipment startup, control system calibration, testing and balancing, performance testing and training. Commissioning during the construction and post-occupancy phases is intended to achieve the following specific objectives according to the contract documents:

Verify that the applicable equipment and systems are installed in accordance with the contact documents and according to the manufacturer's recommendations.

Verify and document proper integrated performance of equipment and systems.

Verify that Operations & Maintenance documentation is complete.

Verify that all components requiring servicing can be accessed, serviced and removed without disturbing nearby components including ducts, piping, cabling or wiring.

Verify that the VA’s operating personnel are adequately trained to enable them to operate, monitor, adjust, maintain, and repair building systems in an effective and energy-efficient manner.

Document the successful achievement of the commissioning objectives listed above.

The commissioning process does not take away from or reduce the responsibility of the Contractor to provide a finished and fully functioning product.

CONTRACTURAL RELATIONSHIPS

For this construction project, the Department of Veterans Affairs contracts with a Contractor to provide construction services. The contracts are administered by the VA Contracting Officer and the COR as the designated representative of the Contracting Officer. On this project, the authority to modify the contract in any way is strictly limited to the authority of the Contracting Officer.

In this project, only two contract parties are recognized and communications on contractual issues are strictly limited to VA COR and the Contractor. It is the practice of the VA to require that communications between other parties to the contracts (Subcontractors and Vendors) be conducted through the COR and Contractor. It is also the practice of the VA that communications between other parties of the project (Commissioning Agent and Architect/Engineer) be conducted through the COR.

Whole Building Commissioning is a process that relies upon frequent and direct communications, as well as collaboration between all parties to the construction process. By its nature, a high level of communication and cooperation between the Commissioning Agent and all other parties (Architects, Engineers, Subcontractors, Vendors, third party testing agencies, etc.) is essential to the success of the Commissioning effort.

With these fundamental practices in mind, the commissioning process described herein has been developed to recognize that, in the execution of the Commissioning Process, the Commissioning Agent must develop effective methods to communicate with every member of the construction team involved in delivering commissioned systems while simultaneously respecting the exclusive contract authority of the Contracting Officer and COR. Thus, the procedures outlined in this specification must be executed within the following limitations:

No communications (verbal or written) from the Commissioning Agent shall be deemed to constitute direction that modifies the terms of any contract between the Department of Veterans Affairs and the Contractor.

Commissioning Issues identified by the Commissioning Agent will be delivered to the COR and copied to the designated Commissioning Representatives for the Contractor and subcontractors on the Commissioning Team for information only in order to expedite the communication process. These issues must be understood as the professional opinion of the Commissioning Agent and as suggestions for resolution.

In the event that any Commissioning Issues and suggested resolutions are deemed by the COR to require either an official interpretation of the construction documents or require a modification of the contract documents, the Contracting Officer or COR will issue an official directive to this effect.

All parties to the Commissioning Process shall be individually responsible for alerting the COR of any issues that they deem to constitute a potential contract change prior to acting on these issues.

Authority for resolution or modification of design and construction issues rests solely with the Contracting Officer or COR, with appropriate technical guidance from the Architect/Engineer and/or Commissioning Agent.

RELATED WORK

Section 01 00 00 GENERAL REQUIREMENTS.

Section 01 32 16.01 ARCHITECTURAL AND ENGINEERING CPM SCHEDULES Section 01 32.16.15 PROJECT SCHEDULES (SMALL PROJECTS – DESIGN/BID/BUILD) Section 01 32.16.16 NETWORK ANALYSIS SCHEDULES (DESIGN-BUILD ONLY) Section 01 32.16.17 NETWORK ANALYSIS SCHEDULES-MAJOR DESIGN/BUILD PROJECTS Section 01 33 23 SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES Section 01 81 13 SUSTAINABLE CONSTRUCTION REQUIREMENTS Section 07 08 00 FACILITY EXTERIOR CLOSURE COMMISSIONING.

Section 21 08 00 COMMISSIONING OF FIRE PROTECTION SYSTEMS.

Section 22 08 00 COMMISSIONING OF PLUMBING SYSTEMS.

Section 23 08 00 COMMISSIONING OF HVAC SYSTEMS.

Section 26 08 00 COMMISSIONING OF ELECTRICAL SYSTEMS.

Section 27 08 00 COMMISSIONING OF COMMUNICATIONS SYSTEMS.

Section 28 08 00 COMMISSIONING OF ELECTRONIC SAFETY AND SECURITY SYSTEMS.

Section 33 08 00 COMMISSIONING OF SITE UTILITIES.

SUMMARY

This Section includes general requirements that apply to implementation of commissioning without regard to systems, subsystems, and equipment being commissioned.

The commissioning activities have been developed to support the VA requirements to meet guidelines for Federal Leadership in Environmental, Energy, and Economic Performance.

The commissioning activities have been developed to support the United States Green Building Council’s (USGBC) LEED ™ rating program and to support delivery of project performance in accordance with the VA requirements developed for the project to support the following credits:

Commissioning activities and documentation for the LEED™ section on “Energy and Atmosphere” and the prerequisite of “Fundamental Building Systems Commissioning.”

Commissioning activities and documentation for the LEED™ section on “Energy and Atmosphere” requirements for the “Enhanced Building System Commissioning” credit.

Activities and documentation for the LEED™ section on “Measurement and Verification” requirements for the Measurement and Verification credit.

The commissioning activities have been developed to support the Green Buildings Initiative’s Green Globes rating program and to support delivery of project performance in accordance with the VA requirements developed for the project.

ACRONYMS

List of Acronyms

Acronym

Meaning

A/E
Architect / Engineer Design Team
AHJ
Authority Having Jurisdiction
ASHRAE
Association Society for Heating Air Condition and Refrigeration Engineers
BOD
Basis of Design
BSC
Building Systems Commissioning
CCTV
Closed Circuit Television
CD
Construction Documents
CMMS
Computerized Maintenance Management System
CO
Contracting Officer (VA)
COR
Contracting Officer’s Representative (see also VA-RE)
COBie
Construction Operations Building Information Exchange
CPC
Construction Phase Commissioning
Cx
Commissioning
CxA
Commissioning Agent
CxM
Commissioning Manager
CxR
Commissioning Representative
DPC
Design Phase Commissioning
FPT
Functional Performance Test
GBI-GG
Green Building Initiative - Green Globes
HVAC
Heating, Ventilation, and Air Conditioning
LEED
Leadership in Energy and Environmental Design
NC
Department of Veterans Affairs National Cemetery
NCA
Department of Veterans Affairs National Cemetery Administration
NEBB
National Environmental Balancing Bureau
O&M
Operations & Maintenance
OPR
Owner’s Project Requirements
PFC
Pre-Functional Checklist
PFT
Pre-Functional Test
SD
Schematic Design
SO
Site Observation
TAB
Test Adjust and Balance
VA
Department of Veterans Affairs
VAMC
VA Medical Center
VA CFM
VA Office of Construction and Facilities Management
VACO
VA Central Office
VA PM
VA Project Manager
VA-RE
VA COR
USGBC
United States Green Building Council

DEFINITIONS

Acceptance Phase Commissioning: Commissioning tasks executed after most construction has been completed, most Site Observations and Static Tests have been completed and Pre-Functional Testing has been completed and accepted. The main commissioning activities performed during this phase are verification that the installed systems are functional by conducting Systems Functional Performance tests and Owner Training.

Accuracy: The capability of an instrument to indicate the true value of a measured quantity.

Back Check: A back check is a verification that an agreed upon solution to a design comment has been adequately addressed in a subsequent design review Basis of Design (BOD): The Engineer’s Basis of Design is comprised of two components: the Design Criteria and the Design Narrative, these documents record the concepts, calculations, decisions, and product selections used to meet the Owner’s Project Requirements (OPR) and to satisfy applicable regulatory requirements, standards, and guidelines.

Benchmarks: Benchmarks are the comparison of a building’s energy usage to other similar buildings and to the building itself.. For example, ENERGY STAR Portfolio Manager is a frequently used and nationally recognized building energy benchmarking tool.

Building Information Modeling (BIM): Building Information Modeling is a parametric database which allows a building to be designed and constructed virtually in 3D, and provides reports both in 2D views and as schedules. This electronic information can be extracted and reused for pre-populating facility management CMMS systems. Building Systems Commissioning (BSC): NEBB acronym used to designate its commissioning program.

Calibrate: The act of comparing an instrument of unknown accuracy with a standard of known accuracy to detect, correlate, report, or eliminate by adjustment any variation in the accuracy of the tested instrument.

CCTV: Closed circuit Television. Normally used for security surveillance and alarm detections as part of a special electrical security system.

COBie: Construction Operations Building Information Exchange (COBie) is an electronic industry data format used to transfer information developed during design, construction, and commissioning into the Computer Maintenance Management Systems (CMMS) used to operate facilities. See the Whole Building Design Guide website for further information (http://www.wbdg.org/resources/cobie.php) Commissionability: Defines a design component or construction process that has the necessary elements that will allow a system or component to be effectively measured, tested, operated and commissioned Commissioning Agent (CxA): The qualified Commissioning Professional who administers the Cx process by managing the Cx team and overseeing the Commissioning Process. Where CxA is used in this specification it means the Commissioning Agent, members of his staff or appointed members of the commissioning team. Note that LEED uses the term Commissioning Authority in lieu of Commissioning Agent.

Commissioning Checklists: Lists of data or inspections to be verified to ensure proper system or component installation, operation, and function. Verification checklists are developed and used during all phases of the commissioning process to verify that the Owner’s Project Requirements (OPR) is being achieved.

Commissioning Design Review: The commissioning design review is a collaborative review of the design professionals design documents for items pertaining to the following: owner’s project requirements; basis of design; operability and maintainability (O&M) including documentation; functionality; training; energy efficiency, control systems’ sequence of operations including building automation system features; commissioning specifications and the ability to functionally test the systems.

Commissioning Issue: A condition identified by the Commissioning Agent or other member of the Commissioning Team that adversely affects the commissionability, operability, maintainability, or functionality of a system, equipment, or component. A condition that is in conflict with the Contract Documents and/or performance requirements of the installed systems and components. (See also – Commissioning Observation).

Commissioning Manager (CxM): A qualified individual appointed by the Contractor to manage the commissioning process on behalf of the Contractor.

Commissioning Observation: An issue identified by the Commissioning Agent or other member of the Commissioning Team that does not conform to the project OPR, contract documents or standard industry best practices. (See also Commissioning Issue) Commissioning Plan: A document that outlines the commissioning process, commissioning scope and defines responsibilities, processes, schedules, and the documentation requirements of the Commissioning Process.

Commissioning Process: A quality focused process for enhancing the delivery of a project. The process focuses upon verifying and documenting that the facility and all of its systems, components, and assemblies are planned, designed, installed, tested, can be operated, and maintained to meet the Owner's Project Requirements.

Commissioning Report: The final commissioning document which presents the commissioning process results for the project. Cx reports include an executive summary, the commissioning plan, issue log, correspondence, and all appropriate check sheets and test forms.

Commissioning Representative (CxR): An individual appointed by a sub-contractor to manage the commissioning process on behalf of the sub-contractor.

Commissioning Specifications: The contract documents that detail the objective, scope and implementation of the commissioning process as developed in the Commissioning Plan.

Commissioning Team: Individual team members whose coordinated actions are responsible for implementing the Commissioning Process.

Construction Phase Commissioning: All commissioning efforts executed during the construction process after the design phase and prior to the Acceptance Phase Commissioning.

Contract Documents (CD): Contract documents include design and construction contracts, price agreements and procedure agreements. Contract Documents also include all final and complete drawings, specifications and all applicable contract modifications or supplements.

Construction Phase Commissioning (CPC): All commissioning efforts executed during the construction process after the design phase and prior to the Acceptance Phase Commissioning.

Coordination Drawings: Drawings showing the work of all trades that are used to illustrate that equipment can be installed in the space allocated without compromising equipment function or access for maintenance and replacement. These drawings graphically illustrate and dimension manufacturers’ recommended maintenance clearances. On mechanical projects, coordination drawings include structural steel, ductwork, major piping and electrical conduit and show the elevations and locations of the above components.

Data Logging: The monitoring and recording of temperature, flow, current, status, pressure, etc. of equipment using stand-alone data recorders.

Deferred System Test: Tests that cannot be completed at the end of the acceptance phase due to ambient conditions, schedule issues or other conditions preventing testing during the normal acceptance testing period.

Deficiency: See “Commissioning Issue”.

Design Criteria: A listing of the VA Design Criteria outlining the project design requirements, including its source. These are used during the design process to show the design elements meet the OPR.

Design Intent: The overall term that includes the OPR and the BOD. It is a detailed explanation of the ideas, concepts, and criteria that are defined by the owner to be important. The design intent documents are utilized to provide a written record of these ideas, concepts and criteria.

Design Narrative: A written description of the proposed design solutions that satisfy the requirements of the OPR.

Design Phase Commissioning (DPC): All commissioning tasks executed during the design phase of the project.

Environmental Systems: Systems that use a combination of mechanical equipment, airflow, water flow and electrical energy to provide heating, ventilating, air conditioning, humidification, and dehumidification for the purpose of human comfort or process control of temperature and humidity.

Executive Summary: A section of the Commissioning report that reviews the general outcome of the project. It also includes any unresolved issues, recommendations for the resolution of unresolved issues and all deferred testing requirements.

Functionality: This defines a design component or construction process which will allow a system or component to operate or be constructed in a manner that will produce the required outcome of the OPR.

Functional Test Procedure (FTP): A written protocol that defines methods, steps, personnel, and acceptance criteria for tests conducted on components, equipment, assemblies, systems, and interfaces among systems.

Industry Accepted Best Practice: A design component or construction process that has achieved industry consensus for quality performance and functionality. Refer to the current edition of the NEBB Design Phase Commissioning Handbook for examples.

Installation Verification: Observations or inspections that confirm the system or component has been installed in accordance with the contract documents and to industry accepted best practices.

Integrated System Testing: Integrated Systems Testing procedures entail testing of multiple integrated systems performance to verify proper functional interface between systems. Typical Integrated Systems Testing includes verifying that building systems respond properly to loss of utility, transfer to emergency power sources, re-transfer from emergency power source to normal utility source; interface between HVAC controls and Fire Alarm systems for equipment shutdown, interface between Fire Alarm system and elevator control systems for elevator recall and shutdown; interface between Fire Alarm System and Security Access Control Systems to control access to spaces during fire alarm conditions; and other similar tests as determined for each specific project. Issues Log: A formal and ongoing record of problems or concerns – and their resolution – that have been raised by members of the Commissioning Team during the course of the Commissioning Process.

Lessons Learned Workshop: A workshop conducted to discuss and document project successes and identify opportunities for improvements for future projects.

Maintainability: A design component or construction process that will allow a system or component to be effectively maintained. This includes adequate room for access to adjust and repair the equipment. Maintainability also includes components that have readily obtainable repair parts or service.

Manual Test: Testing using hand-held instruments, immediate control system readouts or direct observation to verify performance (contrasted to analyzing monitored data taken over time to make the ‘observation’).

Owner’s Project Requirements (OPR): A written document that details the project requirements and the expectations of how the building and its systems will be used and operated. These include project goals, measurable performance criteria, cost considerations, benchmarks, success criteria, and supporting information.

Peer Review: A formal in-depth review separate from the commissioning review processes. The level of effort and intensity is much greater than a typical commissioning facilitation or extended commissioning review. The VA usually hires an independent third-party (called the IDIQ A/E) to conduct peer reviews.

Precision: The ability of an instrument to produce repeatable readings of the same quantity under the same conditions. The precision of an instrument refers to its ability to produce a tightly grouped set of values around the mean value of the measured quantity.

Pre-Design Phase Commissioning: Commissioning tasks performed prior to the commencement of design activities that includes project programming and the development of the commissioning process for the project Pre-Functional Checklist (PFC): A form used by the contractor to verify that appropriate components are onsite, correctly installed, set up, calibrated, functional and ready for functional testing.

Pre-Functional Test (PFT): An inspection or test that is done before functional testing. PFT’s include installation verification and system and component start up tests.

Procedure or Protocol: A defined approach that outlines the execution of a sequence of work or operations. Procedures are used to produce repeatable and defined results.

Range: The upper and lower limits of an instrument’s ability to measure the value of a quantity for which the instrument is calibrated.

Resolution: This word has two meanings in the Cx Process. The first refers to the smallest change in a measured variable that an instrument can detect. The second refers to the implementation of actions that correct a tested or observed deficiency.

Site Observation Visit: On-site inspections and observations made by the Commissioning Agent for the purpose of verifying component, equipment, and system installation, to observe contractor testing, equipment start-up procedures, or other purposes.

Site Observation Reports (SO): Reports of site inspections and observations made by the Commissioning Agent. Observation reports are intended to provide early indication of an installation issue which will need correction or analysis.

Special System Inspections: Inspections required by a local code authority prior to occupancy and are not normally a part of the commissioning process.

Static Tests: Tests or inspections that validate a specified static condition such as pressure testing. Static tests may be specification or code initiated.

Start Up Tests: Tests that validate the component or system is ready for automatic operation in accordance with the manufactures requirements.

Systems Manual: A system-focused composite document that includes all information required for the owners operators to operate the systems.

Test Procedure: A written protocol that defines methods, personnel, and expectations for tests conducted on components, equipment, assemblies, systems, and interfaces among systems.

Testing: The use of specialized and calibrated instruments to measure parameters such as: temperature, pressure, vapor flow, air flow, fluid flow, rotational speed, electrical characteristics, velocity, and other data in order to determine performance, operation, or function.

Testing, Adjusting, and Balancing (TAB): A systematic process or service applied to heating, ventilating and air-conditioning (HVAC) systems and other environmental systems to achieve and document air and hydronic flow rates. The standards and procedures for providing these services are referred to as “Testing, Adjusting, and Balancing” and are described in the Procedural Standards for the Testing, Adjusting and Balancing of Environmental Systems, published by NEBB or AABC.

Thermal Scans: Thermographic pictures taken with an Infrared Thermographic Camera. Thermographic pictures show the relative temperatures of objects and surfaces and are used to identify leaks, thermal bridging, thermal intrusion, electrical overload conditions, moisture containment, and insulation failure.

Training Plan: A written document that details, in outline form the expectations of the operator training. Training agendas should include instruction on how to obtain service, operate, startup, shutdown and maintain all systems and components of the project.

Trending: Monitoring over a period of time with the building automation system.

Unresolved Commissioning Issue: Any Commissioning Issue that, at the time that the Final Report or the Amended Final Report is issued that has not been either resolved by the construction team or accepted by the VA. Validation: The process by which work is verified as complete and operating correctly:

First party validation occurs when a firm or individual verifying the task is the same firm or individual performing the task.

Second party validation occurs when the firm or individual verifying the task is under the control of the firm performing the task or has other possibilities of financial conflicts of interest in the resolution (Architects, Designers, General Contractors and Third Tier Subcontractors or Vendors).

Third party validation occurs when the firm verifying the task is not associated with or under control of the firm performing or designing the task.

Verification: The process by which specific documents, components, equipment, assemblies, systems, and interfaces among systems are confirmed to comply with the criteria described in the Owner’s Project Requirements.

Warranty Phase Commissioning: Commissioning efforts executed after a project has been completed and accepted by the Owner. Warranty Phase Commissioning includes follow-up on verification of system performance, measurement and verification tasks and assistance in identifying warranty issues and enforcing warranty provisions of the construction contract.

Warranty Visit: A commissioning meeting and site review where all outstanding warranty issues and deferred testing is reviewed and discussed.

Whole Building Commissioning: Commissioning of building systems such as Building Envelope, HVAC, Electrical, Special Electrical (Fire Alarm, Security & Communications), Plumbing and Fire Protection as described in this specification.

SYSTEMS TO BE COMMISSIONED

Commissioning of a system or systems specified for this project is part of the construction process. Documentation and testing of these systems, as well as training of the VA’s Operation and Maintenance personnel, is required in cooperation with the VA and the Commissioning Agent.

The following systems will be commissioned as part of this project:

Systems To Be Commissioned

System

Description

Building Exterior Closure

Foundations (excluding structural)
Standard, special, slab-on-grade, vapor barriers, air barriers
Basements
Basement walls, crawl spaces, waterproofing, drainage
Superstructure
Floor construction, roof construction, sunshades, connections to adjacent structures
Exterior Closure
Exterior walls, exterior windows, exterior doors, louvers, grilles and sunscreens,
Roofing
Roof system (including parapet), roof openings (skylights, pipe chases, ducts, equipment curbs, etc.)
Note:
The emphasis on commissioning the above building envelope systems is on control of air flow, heat flow, noise, infrared, ultraviolet, rain penetration, moisture, durability, security, reliability, constructability, maintainability, and sustainability.

Specialties

Patient Bed Service Walls
Medical gas certification and cross check, electrical connections

Equipment

Parking Control Equipment
Barriers
Laboratory Fume Hoods
Fume Hood Certification
Biological Safety Cabinets
Cabinet Certification
Packaged Incinerators
Combustion Testing, Cycle Certification

Conveying Equipment

Electric Dumbwaiters
Interface with other systems (Fire Alarm, etc.) [ASTM testing and certification by others]
Elevators
Interface with other systems (fire alarm, etc.) [ASTM testing and certification by others]
Escalators
Interface with other systems (fire alarm, etc.) [ASTM testing and certification by others]
Material Delivery Systems
Interface with other systems (fire alarm, elevators, etc.)
Pneumatic Tube Systems
Interface with other systems (fire alarm, etc.)

Fire Suppression

Fire Pump
Fire Pump, jockey pump, fire pump controller/ATS
Fire Sprinkler Systems
Wet pipe system, dry pipe system, pre-action system, special agent systems

Plumbing

Domestic Water Distribution
Booster pumps, backflow preventers, water softeners, potable water storage tanks
Domestic Hot Water Systems
Water heaters**, heat exchangers, circulation pumps, point-of-use water heaters*
Sewerage Pump Systems
Sewage ejectors
Wastewater Pump Systems
Sump pumps
Sanitary Waste Interceptors
Grease interceptors, acid neutralizers
General Service Air Systems
Packaged compressor systems, air dryers, filtration
Medical Air Systems
Packaged medical air compressor units. Outlet certification, cross-connection verification
Medical Vacuum Systems
Packaged medical vacuum units, outlet certification, cross-connection verification
Dental Air Systems
Packaged dental air compressor units, outlet certification, cross-connect verification
Dental Evacuation and Vacuum Systems
Packaged Dental Evacuation units, packaged dental vacuum units, outlet certification, cross-connection verification
Waste Anesthesia Gas Systems
Packaged Waste Anesthesia Gas units, outlet certification, cross-connection verification
Medical Gas Systems (other than Medical Air Systems)
Medical gas (oxygen, nitrogen, nitrous oxide, etc.) tank/manifold systems, outlet certification, cross-connection verification
Chemical Waste Systems
Chemical storage tanks, neutralization systems, ventilation, process control
Reverse-Osmosis Systems
Packaged Reverse-Osmosis systems
Water De-Alkalizing Systems
Package Water De-Alkalizing systems

HVAC

Noise and Vibration Control
Noise and vibration levels for critical equipment such as Air Handlers, Chillers, Cooling Towers, Boilers, Generators, etc. will be commissioned as part of the system commissioning
Direct Digital Control System**
Operator Interface Computer, Operator Work Station (including graphics, point mapping, trends, alarms), Network Communications Modules and Wiring, Integration Panels. [DDC Control panels will be commissioned with the systems controlled by the panel]
Chilled Water System**
Chillers (centrifugal, rotary screw, air-cooled), pumps (primary, secondary, variable primary), VFDs associated with chilled water system components, DDC Control Panels (including integration with Building Control System)
Condenser Water System**
Cooling Towers, Fluid Coolers, heat exchangers/economizers, pumps, VFDs associated with condenser water system components, DDC control panels.
Steam/Heating Hot Water System**
Boilers, boiler feed water system, economizers/heat recovery equipment, condensate recovery, water treatment, boiler fuel system, controls, interface with facility DDC system.
HVAC Air Handling Systems**
Air handling Units, packaged rooftop AHU, Outdoor Air conditioning units, humidifiers, DDC control panels
HVAC Ventilation/Exhaust Systems
General exhaust, toilet exhaust, laboratory exhaust, isolation exhaust, room pressurization control systems
HVAC Energy Recovery Systems**
Heat Wheels, Heat Recovery Loops, AHU Integrated Heat Recovery
HVAC Terminal Unit Systems**
VAV Terminal Units, CAV terminal units, fan coil units, fin-tube radiation, unit heaters
Decentralized Unitary HVAC Systems*
Split-system HVAC systems, controls, interface with facility DDC
Unitary Heat Pump Systems**
Water-source heat pumps, controls, interface with facility DDC
Humidity Control Systems
Humidifiers, de-humidifiers, controls, interface with facility DDC
Hydronic Distribution Systems
Pumps, DDC control panels, heat exchangers,
Facility Fuel Systems
Boiler fuel system, generator fuel system
Geothermal Energy Direct Use Heating **
Geothermal well, ground heat exchanger, geothermal pumps, heat exchanger, valves, instrumentation
Solar Energy Heating Systems **
Solar collectors, heat exchangers, storage tanks, solar-boosted domestic hot water heater, pumps, valves, instrumentation
Facility Fuel Gas Systems
Witness Natural gas piping pressure testing, natural gas compressors and storage, propane storage
Smoke Evacuation System
Atrium smoke evacuation, other smoke evacuation and smoke management systems, controls, interface with other systems (fire alarm), emergency operation.

Electrical

Medium-Voltage Electrical Distribution Systems
Medium-Voltage Switchgear, Medium-Voltage Switches, Underground ductbank and distribution, Pad-Mount Transformers, Medium-Voltage Load Interrupter Switches,
Grounding & Bonding Systems
Witness 3rd party testing, review reports
Electric Power Monitoring Systems
Metering, sub-metering, power monitoring systems, PLC control systems
Electrical System Protective Device Study
Review reports, verify field settings consistent with Study
Secondary Unit Substations
Medium-voltage components, transformers, low-voltage distribution, verify breaker testing results (injection current, etc)
Low-Voltage Distribution System
Normal power distribution system, Life-safety power distribution system, critical power distribution system, equipment power distribution system, switchboards, distribution panels, panelboards, verify breaker testing results (injection current, etc)
Emergency Power Generation Systems
Generators, Generator paralleling switchgear, automatic transfer switches, PLC and other control systems
Lighting & Lighting Control** Systems
Emergency lighting, occupancy sensors, lighting control systems, architectural dimming systems, theatrical dimming systems, exterior lighting and controls
Cathodic Protection Systems
Review 3rd party testing results.
Lightning Protection System
Witness 3rd party testing, review reports

Communications

Grounding & Bonding System
Witness 3rd party testing, review reports
Structured Cabling System
Witness 3rd party testing, review reports
Master Antenna Television System
Witness 3rd party testing, review reports
Public Address & Mass Notification Systems
Witness 3rd party testing, review reports
Intercom & Program Systems
Witness 3rd party testing, review reports
Nurse Call & Code Blue Systems
Witness 3rd party testing, review reports
Security Emergency Call Systems
Witness 3rd party testing, review reports
Duress Alarm Systems
Witness 3rd party testing, review reports

Electronic Safety and Security

Grounding & Bonding
Witness 3rd party testing, review reports
Physical Access Control Systems
Witness 3rd party testing, review reports
Access Control Systems
Witness 3rd party testing, review reports
Security Access Detection Systems
Witness 3rd party testing, review reports
Video Surveillance System
Witness 3rd party testing, review reports
Electronic Personal Protection System
Witness 3rd party testing, review reports
Fire Detection and Alarm System
100% device acceptance testing, battery draw-down test, verify system monitoring, verify interface with other systems.

Renewable Energy Sources

Geothermal Energy Electrical Generation Systems **
Geothermal well, DC-AC Inverters, storage batteries, turbine generator modules, switchgear, combiner boxes, instrumentation, monitoring and control systems
Solar Energy Electrical Power Generation Systems **
Solar collector modules, DC-AC inverter, storage batteries, combiners, Switchgear, instrumentation, monitoring and control systems
Wind Energy Electrical Power Generation Systems **
Wind Turbines, DC-AC inverter, storage batteries, combiners, switchgear, instrumentation, monitoring and control systems

Site Utilities

Water Utilities
City Water Service Entrance, Backflow Prevention, Pressure Control, Booster Pumps, Irrigation Systems
Sanitary Sewerage Utilities
City Sanitary Connection, Waste Treatment Systems
Storm Drainage Utilities
City Storm Water Connection, Site Storm Water Distribution
Energy Distribution Utilities
Connection to Third Party Energy (Steam, High Temp Hot Water, Chilled Water) Supply Systems, Metering, Pressure Control

Transportation

Active Traffic Barrier Systems
Witness 3rd party testing

Integrated Systems Tests

Loss of Power Response
Loss of power to building, loss of power to campus, restoration of power to building, restoration of power to campus.
Fire Alarm Response
Integrated System Response to Fire Alarm Condition and Return to Normal

Table Notes

** Denotes systems that LEED requires to be commissioned to comply with the LEED Fundamental Commissioning pre-requisite.

COMMISSIONING TEAM

The commissioning team shall consist of, but not be limited to, representatives of Contractor, including Project Superintendent and subcontractors, installers, schedulers, suppliers, and specialists deemed appropriate by the Department of Veterans Affairs (VA) and Commissioning Agent.

Members Appointed by Contractor:

Contractor’ Commissioning Manager: The designated person, company, or entity that plans, schedules and coordinates the commissioning activities for the construction team.

Contractor’s Commissioning Representative(s): Individual(s), each having authority to act on behalf of the entity he or she represents, explicitly organized to implement the commissioning process through coordinated actions.

Members Appointed by VA:

Commissioning Agent: The designated person, company, or entity that plans, schedules, and coordinates the commissioning team to implement the commissioning process. The VA will engage the CxA under a separate contract.

User: Representatives of the facility user and operation and maintenance personnel.

A/E: Representative of the Architect and engineering design professionals.

VA'S COMMISSIONING RESPONSIBILITIES

Assign operation and maintenance personnel and schedule them to participate in commissioning team activities including, but not limited to, the following:

Coordination meetings.

Training in operation and maintenance of systems, subsystems, and equipment.

Testing meetings.

Witness and assist in Systems Functional Performance Testing.

Demonstration of operation of systems, subsystems, and equipment.

Provide the Construction Documents, prepared by Architect and approved by VA, to the Commissioning Agent and for use in managing the commissioning process, developing the commissioning plan, systems manuals, and reviewing the operation and maintenance training plan.

CONTRACTOR'S COMMISSIONING RESPONSIBILITIES

Appoint an individual, company or firm to act as the Commissioning Agent. Shall submit to the Government for Approval. Government may provide a short list of approve venders at contractor’s request.

The Contractor shall assign a Commissioning Manager to manage commissioning activities of the Contractor, and subcontractors.

The Contractor shall ensure that the commissioning responsibilities outlined in these specifications are included in all subcontracts and that subcontractors comply with the requirements of these specifications.

The Contractor shall ensure that each installing subcontractor shall assign representatives with expertise and authority to act on behalf of the subcontractor and schedule them to participate in and perform commissioning team activities including, but not limited to, the following:

Participate in commissioning coordination meetings.

Conduct operation and maintenance training sessions in accordance with approved training plans.

Verify that Work is complete and systems are operational according to the Contract Documents, including calibration of instrumentation and controls.

Evaluate commissioning issues and commissioning observations identified in the Commissioning Issues Log, field reports, test reports or other commissioning documents. In collaboration with entity responsible for system and equipment installation, recommend corrective action.

Review and comment on commissioning documentation.

Participate in meetings to coordinate Systems Functional Performance Testing.

Provide schedule for operation and maintenance data submittals, equipment startup, and testing to Commissioning Agent for incorporation into the commissioning plan.

Provide information to the Commissioning Agent for developing commissioning plan.

Participate in training sessions for VA's operation and maintenance personnel.

10. Provide technicians who are familiar with the construction and operation of installed systems and who shall develop specific test procedures to conduct Systems Functional Performance Testing of installed systems.

COMMISSIONING AGENT’S RESPONSIBILITIES

Organize and lead the commissioning team.

Prepare the commissioning plan. See Paragraph 1.11-A of this specification Section for further information.

Review and comment on selected submittals from the Contractor for general conformance with the Construction Documents. Review and comment on the ability to test and operate the system and/or equipment, including providing gages, controls and other components required to operate, maintain, and test the system. Review and comment on performance expectations of systems and equipment and interfaces between systems relating to the Construction Documents.

At the beginning of the construction phase, conduct an initial construction phase coordination meeting for the purpose of reviewing the commissioning activities and establishing tentative schedules for operation and maintenance submittals; operation and maintenance training sessions; TAB Work; Pre-Functional Checklists, Systems Functional Performance Testing; and project completion.

Convene commissioning team meetings for the purpose of coordination, communication, and conflict resolution; discuss status of the commissioning processes. Responsibilities include arranging for facilities, preparing agenda and attendance lists, and notifying participants. The Commissioning Agent shall prepare and distribute minutes to commissioning team members and attendees within five workdays of the commissioning meeting.

Observe construction and report progress, observations and issues. Observe systems and equipment installation for adequate accessibility for maintenance and component replacement or repair, and for general conformance with the Construction Documents.

Prepare Project specific Pre-Functional Checklists and Systems Functional Performance Test procedures.

Coordinate Systems Functional Performance Testing schedule with the Contractor.

Witness selected systems startups.

Verify selected Pre-Functional Checklists completed and submitted by the Contractor.

Witness and document Systems Functional Performance Testing.

Compile test data, inspection reports, and certificates and include them in the systems manual and commissioning report.

Review and comment on operation and maintenance (O&M) documentation and systems manual outline for compliance with the Contract Documents. Operation and maintenance documentation requirements are specified in Paragraph 1.25, Section 01 00 00 GENERAL REQUIREMENTS.

Review operation and maintenance training program developed by the Contractor. Verify training plans provide qualified instructors to conduct operation and maintenance training.

Prepare commissioning Field Observation Reports.

Prepare the Final Commissioning Report.

Return to the site at 10 months into the 12 month warranty period and review with facility staff the current building operation and the condition of outstanding issues related to the original and seasonal Systems Functional Performance Testing. Also interview facility staff and identify problems or concerns they have operating the building as originally intended. Make suggestions for improvements and for recording these changes in the O&M manuals. Identify areas that may come under warranty or under the original construction contract. Assist facility staff in developing reports, documents and requests for services to remedy outstanding problems.

Assemble the final commissioning documentation, including the Final Commissioning Report and Addendum to the Final Commissioning Report.

COMMISSIONING DOCUMENTATION

Commissioning Plan: A document, prepared by Commissioning Agent, that outlines the schedule, allocation of resources, and documentation requirements of the commissioning process, and shall include, but is not limited, to the following:

Plan for delivery and review of submittals, systems manuals, and other documents and reports. Identification of the relationship of these documents to other functions and a detailed description of submittals that are required to support the commissioning processes. Submittal dates shall include the latest date approved submittals must be received without adversely affecting commissioning plan.

Description of the organization, layout, and content of commissioning documentation (including systems manual) and a detailed description of documents to be provided along with identification of responsible parties.

Identification of systems and equipment to be commissioned.

Schedule of Commissioning Coordination meetings.

Identification of items that must be completed before the next operation can proceed.

Description of responsibilities of commissioning team members.

Description of observations to be made.

Description of requirements for operation and maintenance training.

Schedule for commissioning activities with dates coordinated with overall construction schedule.

Process and schedule for documenting changes on a continuous basis to appear in Project Record Documents.

Process and schedule for completing prestart and startup checklists for systems, subsystems, and equipment to be verified and tested.

Preliminary Systems Functional Performance Test procedures.

Systems Functional Performance Test Procedures: The Commissioning Agent will develop Systems Functional Performance Test Procedures for each system to be commissioned, including subsystems, or equipment and interfaces or interlocks with other systems. Systems Functional Performance Test Procedures will include a separate entry, with space for comments, for each item to be tested. Preliminary Systems Functional Performance Test Procedures will be provided to the VA, Architect/Engineer, and Contractor for review and comment. The Systems Performance Test Procedure will include test procedures for each mode of operation and provide space to indicate whether the mode under test responded as required. Each System Functional Performance Test procedure, regardless of system, subsystem, or equipment being tested, shall include, but not be limited to, the following:

Name and identification code of tested system.

Test number.

Time and date of test.

Indication of whether the record is for a first test or retest following correction of a problem or issue.

Dated signatures of the person performing test and of the witness, if applicable.

Individuals present for test.

Observations and Issues.

Issue number, if any, generated as the result of test.

Pre-Functional Checklists: The Commissioning Agent will prepare Pre-Functional Checklists. Pre-Functional Checklists shall be completed and signed by the Contractor, verifying that systems, subsystems, equipment, and associated controls are ready for testing. The Commissioning Agent will spot check Pre-Functional Checklists to verify accuracy and readiness for testing. Inaccurate or incomplete Pre-Functional Checklists shall be returned to the Contractor for correction and resubmission.

Test and Inspection Reports: The Commissioning Agent will record test data, observations, and measurements on Systems Functional Performance Test Procedure. The report will also include recommendation for system acceptance or non-acceptance. Photographs, forms, and other means appropriate for the application shall be included with data. Commissioning Agent Will compile test and inspection reports and test and inspection certificates and include them in systems manual and commissioning report.

Corrective Action Documents: The Commissioning Agent will document corrective action taken for systems and equipment that fail tests. The documentation will include any required modifications to systems and equipment and/or revisions to test procedures, if any. The Commissioning Agent will witness and document any retesting of systems and/or equipment requiring corrective action and document retest results.

Commissioning Issues Log: The Commissioning Agent will prepare and maintain Commissioning Issues Log that describes Commissioning Issues and Commissioning Observations that are identified during the Commissioning process. These observations and issues include, but are not limited to, those that are at variance with the Contract Documents.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .