Attachment B - Cost Breakdown by Division.xlsx
XLSX spreadsheet 24 KB Posted
- Attached to
- Z2DA--590-24-115 Public Address System Amendment 0001 Federal contract opportunity
- Solicitation number
- 36C24626B0008
About this file
This is a cost breakdown template for a base offer submission on a Public Address System installation project at VA Medical Center in Hampton, Virginia. The spreadsheet is designed for offerors to enter labor costs, material costs, and calculate totals across 24 construction divisions organized by the MasterFormat standard. These divisions include General Requirements, Concrete, Masonry, Metals, Electrical, Communications, Electronic Safety & Security, and other relevant construction categories. Offerors must itemize costs by division, then apply overhead, profit, and bond percentages to derive the total base offer cost. The template includes fields for the offeror's name, street address, city, state, and zip code, as well as the project number (590-24-115) and project location information. Equipment costs must be separately broken out within Division 11.
The solicitation (36C24626B0008) is an Invitation for Bid issued by the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 6 for removal, replacement, and installation of a new Public Address System. Amendment 0001 posted a site visit attendance log, answers to received questions, and a VA Security Training Agreement requirement. The cost breakdown template itself contains no populated pricing data, serving solely as the submission format for contractors responding to this invitation for bid. Contractors must complete all applicable divisions with their labor and material costs to prepare their competitive proposals.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 36C24626B0008 0001.docx | DOCX document | |
| Attachment A - Site Visit Log 03.04.2026.pdf | ||
| Attachment C - VA Privacy Training Agreement.doc | DOC document | |
| 36C24626B0008_2 FINAL.docx | DOCX document | |
| Attachment A - Wage Determintation VA20260022.pdf | ||
| Attachment E - Brand Name Justification for Public Address System - FINAL Redacted.pdf | ||
| Attachment D - Site Visit.docx | DOCX document | |
| Attachment C - 590-24-115 Public Address Specs_26_01_23.pdf | ||
| Attachment B - 590-24-115 Public Address Drawings_26_01_16.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Base Offer
Base Offer Cost Breakdown
Project Number: 590-24-115 Edward L Roy: VA assigned project #
| Date: | |
| Project Title | Public Address System |
Edward L Roy: VA assigned Project Title
| Project Location | VA Medical Center, Hampton, Va. | ||
| Offeror Name | |||
| Offeror Street | |||
| Offeror City | State | Zip |
Item Description Labor Cost Edward L Roy: Enter all Labor Costs by Division
| Material Cost | |
| Edward L Roy: Enter all Material Costs by Division | Total Cost |
Edward L Roy: This Column is the sum of the Division's Labor and Material Costs
| Division 1 | General Requirements | $ - 0 | $ - 0 | $ - 0 |
| Division 2 | Existing Conditions | - 0 | - 0 | - 0 |
| Division 3 | Concrete | - 0 | - 0 | - 0 |
| Division 4 | Masonry | - 0 | - 0 | - 0 |
| Division 5 | Metals | - 0 | - 0 | - 0 |
| Division 6 | Wood and Plastic | - 0 | - 0 | - 0 |
| Division 7 | Thermal & Moisture Protect | - 0 | - 0 | - 0 |
| Division 8 | Doors and Windows | - 0 | - 0 | - 0 |
| Division 9 | Finishes | - 0 | - 0 | - 0 |
| Division 10 | Specialties | - 0 | - 0 | - 0 |
| Division 11 | Equipment*** | - 0 | - 0 | - 0 |
| Division 12 | Furnishings | - 0 | - 0 | - 0 |
| Division 13 | Special Construction | - 0 | - 0 | - 0 |
| Division 14 | Conveying Equipment | - 0 | - 0 | - 0 |
| Division 21 | Fire Suppression | - 0 | - 0 | - 0 |
| Division 22 | Plumbing | - 0 | - 0 | - 0 |
| Division 23 | HVAC | - 0 | - 0 | - 0 |
| Division 26 | Electrical | - 0 | - 0 | - 0 |
| Division 27 | Communications | - 0 | - 0 | - 0 |
| Division 28 | Electronic Safety & Security | - 0 | - 0 | - 0 |
| Division 31 | Earthwork | - 0 | - 0 | - 0 |
| Division 32 | Exterior Improvements | - 0 | - 0 | - 0 |
| Division 33 | Utilities | - 0 | - 0 | - 0 |
| Division 34 | Transportation Subtotal | - 0 | - 0 | - 0 |
| Division Subtotals : | $ - 0 | $ - 0 | $ - 0 |
Overhead % 0.00% Edward L Roy: Enter Overhead % here. This % will be multiplied by the Division Total Cost Subtotal (cell F36).
Edward L Roy: Date Offer Prepared/Submitted
| - 0 | |||
| Profit % | 0.00% | ||
| Edward L Roy: Enter Profit % here.This % will be multiplied by the sum of the Division Total Cost subtotal (cell F36) plus the calculated Overhead (cell F38). | - 0 | ||
| Bond % | 0.00% |
Edward L Roy: Enter Bond % here. This % will be multiplied by the sum of the Division Total Cost Subtotal (cell F36), the amount of calculated Overhead (cell F38) and the amount of calculated Profit (cell F39).
Edward L Roy: Enter all Labor Costs by Division
| - 0 | ||
| Overhead/Profit Subtotals : | $ - 0 |
Edward L Roy: Sum of Overhead, Profit and Bond %.
Edward L Roy: Enter all Material Costs by Division Edward L Roy: This Column is the sum of the Division's Labor and Material Costs Total Base Offer Cost $ - 0 $ - 0 $ - 0
*** Breakout the cost of equipment
File details come from the government source that posted it. Updated .