This architectural floor plan depicts the second floor of Building 05, detailing a renovation project focused on replacing flooring in multiple rooms. The document includes detailed drawing notes for two specific areas marked in red, outlining a comprehensive flooring replacement process. Rooms targeted include Office Med Records (202), File Rooms (201, 210, 100N), Corridors (212, 209A), and surrounding spaces.

The renovation work involves a multi-step process: removing existing carpets, steam radiators, and other fixtures; cleaning and preparing concrete surfaces; installing primer; and applying new Luxury Vinyl Tile (LVT) flooring. Specific requirements include abrading bare concrete, using abrasive blasting or mechanical methods, installing 1/4-inch rubber cove base at wall/floor joints, and following manufacturer's installation instructions. The plan includes scale measurements, room labels, and indicates 2-hour rated walls in the floor layout, with consultants and engineering details listed at the top of the document.

View the file

Other files for this federal contract opportunity

Other files attached to Replace Flooring Bldg. 5 Level 2, newest first.
File Type Posted
36C24625Q0911 - Amendment 0002.pdf PDF
Questions and Responses - Flooring 8.29.2025.pdf PDF
Drawings - Rev B.pdf PDF
52.232-18 Availability of Funds - Flooring.pdf PDF
36C24625Q0911 Amendment 0001 - Replace Flooring B5 L2.pdf PDF
Site Visit Sign-In Sheet 8.13.2025.pdf PDF
SOW - Final.pdf PDF
36C24625Q0911 - Solicitation Flooring B5.pdf PDF
Specs - Final.pdf PDF
VA Wage Determination 2.28.2025.pdf PDF
36C24625Q0911 - PreSol Flooring B5.pdf PDF
Show all 11

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ROOM

204A

ROOM

STAIR

OFFICE MED

RECORDS

TOILET

CLOSET

203A

FILE ROOM

FILE ROOM

100N

CORRIDOR

ROOM

211 FILE ROOM

CORRIDOR

209A

STAFF

TOILET

100S

BREAK ROOM

FILE ROOM

STAFF

TOILET

206 ROOM

?ATTIC ABOVE

AUDITORIUM

CEILING

CORRIDOR

206A

UPPER PART

OF STAGE

TR

201B

05-AE102

G12

05-AE102

G14

2-HR RATED WALL

2-HR RATED WALL

2-HR RATED WALL

FEC

05-AE102

G7

05-AE102

G9

SITE KEY PLAN

BLDG 05

ROOM

204A

ROOM

STAIR

OFFICE

MED

RECORDS

TOILET

CLOSET

203A

FILE

ROOM

FILE

ROOM

100N

CORRIDOR

ROOM

FILE

ROOM

CORRIDOR

209A

STAFF

TOILET

100S

BREAK

ROOM

FILE

ROOM

STAFF

TOILET

206 ROOM

ATTIC ABOVE AUDITORIUM CEILING

CORRIDOR

206A

UPPER

PART

OF

STAGE

OFFICE

201B

D1

D3 D4

ACT @ 8' - 8"

EXIST CLG

ACT @ 8' - 8"

EXIST CLG

2-HR RATED WALL

D5

TR

201B

201B

9'

/8

11' - 0 3/4" (+/-)

N1

N3 N4 N5 N6

2-HR RATED WALL

N7

FEC

1. ICRA BARRIERS ARE NOT SHOWN ON DEMO AND NEW WORK PLANS FOR CLARITY.

REFER TO ICRA PLANS FOR CONCEPTUAL LAYOUT. ICRA BARRIERS SHALL REMAIN IN

PLACE UNTIL NEW WORK IS COMPLETE.

2. CONTRACTOR IS RESPONSIBLE FOR ALL EQUIPMENT AND FURNITURE MOVES PRIOR TO

DEMOLITION START AND DURING CONSTRUCTION.

TYPICAL PLAN NOTES

1. THE WORK OF THIS CONTRACT MAY REQUIRE PARTIAL REMOVAL OR DISASSEMBLY OF

EXISTING CEILINGS AND/OR WALLS FOR ACCESS TO SPACES WHERE NEW ITEMS ARE

REQUIRED TO BE INSTALLED OR EXISTING ITEMS ARE REQUIRED TO BE

DEMOLISHED. EXAMPLES OF ITEMS INCLUDE TELECOMMUNICATIONS, PLUMBING,

ELECTRICAL, MECHANICAL, FIRE PROTECTION, STRUCTURAL, ETC. THE CONTRACTOR

SHALL BE RESPONSIBLE FOR THOROUGHLY REVIEWING THE CONSTRUCTION

DOCUMENTS AND FOR DETERMINING THE EXTENT OF REMOVAL OR DISASSEMBLY

WORK NECESSARY TO PERFORM THE WORK OF THIS PROJECT IN ACCORDANCE WITH

THE CONSTRUCTION DOCUMENTS.

2. THE CONTRACTOR SHALL FIELD-VERIFY AND DOCUMENT THE EXISTING CONDITIONS OF

CEILING OR WALL SURFACES TO BE REMOVED OR DISASSEMBLED PRIOR TO BEGINNING

THE WORK.

3. THE CONTRACTOR SHALL CAREFULLY REMOVE, OR DISASSEMBLE, EACH EXISTING

CEILING OR WALL SURFACE IN A MANNER THAT MINIMIZES DAMAGE TO ADJACENT

EXISTING SURFACES.

4. AFTER THE WORK HAS BEEN COMPLETED, THE CONTRACTOR SHALL REPLACE, PATCH,

AND FINISH THE EXISTING SURFACE TO THE CONDITION IT WAS IN PRIOR TO REMOVAL.

ACCESS TO EXISTING CONCEALED AREA NOTES

CORRIDOR

EXTENT OF

DEMOLITION

CORRIDOR

C3.1 N8 N9

Drawing File Number:

Building:

Drawing Number:

Project Title / VA Project Number:

Project Location:

Issue Date:

Checked By: Drawn By:

Drawing Title:

FULLY

SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

A

Submission:

Revisions: Date:

/8

/4

/8

/2

/4

-1

/2

2345678910111213141516

B

C

D

E

F

G

H

J

K

1234561516

ENGINEER OF RECORD: CONSULTANTS:

CIVIL

148 S. QUEEN ST. SUITE 201

MARTINSBURG, WV 25401

(304) 266-3115

COORDINATING PROFESSIONAL

10360 ELLISON CIRCLE

OMAHA, NE 68134

(402) 991-5520

ARCHITECT:

421 KING ST. SUITE 301

ALEXANDRIA, VA 22314

703-772-4213

PROFESSIONAL SEAL:

891011121314

MEP / FP / TELECOM

1600 BALTIMORE SUITE 300

KANSAS CITY, MO 64108

(816) 842-8437

ENVIRONMENTAL

1197 FARNSWORTH RD, UNIT E

PO BOX 283

WATERVILLE, OH 43566

DWG #: of

12/23/2024658-22-700

CSKJ

EHRM INFRASTRUCTURE UPGRADES

SALEM VAMC

100% CONSTRUCTION DOCUMENTS

BLDG 05 - OVERALL SECOND FLOOR

PLAN / DEMOLITION AND NEW WORK

PLANS

05-AE102

-2

-7

-A

E

/0

/2

.p d f

1970 ROANOKE BLVD

SALEM, VA 24153

1/8" = 1'-0"A14

BLDG 05 - OVERALL SECOND FLOOR PLAN

TRUE

NORTH

N

PLAN

NORTH

N

1" = 30'-0"F4

CABLE ANALYSIS - SECOND FLOOR

1" = 30'-0"

0 30' 60'20'10'

1/8"=1'-0"

0 4' 8' 16'12'

1/4" = 1'-0"G14

DEMOLITION - OFFICE 201B

1/4" = 1'-0"G12

NEW WORK - TR 201B

1/4"=1'-0"

0 2' 4' 8'6'

1/4"=1'-0"

0 2' 4' 8'6'

78 148

KEYNOTES - DEMOLITION

D1 REMOVE EXISTING DOOR AND FRAME

D2 REMOVE EXISTING INTERIOR WALL PARTITION

D3 REMOVE EXISTING FLOOR FINISH AND PREPARE SUBSURFACE TO RECEIVE NEW FLOORING

AS SCHEDULED. REMOVE EXISTING WALL BASE AND PREP WALLS FOR NEW FINISH

D4 REMOVE EXISTING CEILING, LIGHT FIXTURES AND ALL ITS ASSOCIATED ITEMS

D5 REMOVE PORTION OF EXISTING WALL FOR FIRE EXTINGUISHER CABINET (FEC). COORDINATE

SIZE OF OPENING WITH SELECTED FEC.

KEYNOTES - NEW WORK

N1 PROVIDE DOOR AND FRAME AS SCHEDULED

N2 PROVIDE INTERIOR PARTITION AS SCHEDULED

N3 PROVIDE STATIC DISSPATIVE TILE (SDT-1) FLOOR AND WALL BASE

N4 PROVIDE NEW LIGHT FIXTURES

N5 NO CEILING IN TELECOM ROOMS

N6 PROVIDE 4' X 8' FIRE RETARDANT TREATED (FRT) AC GRADE 3/4" TRADE SIZE BACKBOARD

PAINTED WHITE W/ TWO COATS ON THREE WALLS (SIDES & REAR) - DO NOT PAINT OVER FRT

LABELS

N7 PROVIDE CLEAN AGENT FIRE EXTINGUISHER WITH SEMI-RECESSED CABINET. SEE DETAILS

ON SHEET AE302.

N8 PROVIDE CHASE WALLS TO ENCLOSE VERTICAL CONDUITS / COORDINATE CHASE

CLEARANCE WITH NO. OF CONDUITS AND AND LOCATION BASED ON FIELD VERIFICATION OF

EXISTING STRUCTURAL AND REINFORCING ELEMENTS

N9 PROVIDE WALL PAINT AND WALL BASE TO MATCH ADJACENT EXISTING COLORS AND

FINISHES

1/4" = 1'-0"G9

DEMOLITION - CORRIDOR 212

1/4" = 1'-0"G7

NEW WORK - CORRIDOR 212

Submission:

FINAL BID DOCUMENTS

VHASAMSwitzW Text Box

VHASAMSwitzW Text Box

VHASAMSwitzW Text Box

REPLACE B5 L2 FLOORING

WORK AREAS

A. Rooms with carpet to demolish and replace with new LVT flooring 204A 203A 203A 100N

B. Rooms with bare concrete to install new LVT flooring

VHASAMSwitzW Text Box

REPLACE B5 L2 FLOORING

DRAWING NOTES

DRAWING NOTES

1. Remove all steam radiators, steam pipe and other items mounted on walls and floor. Reserve and store safely for reinstallation.

2. Remove all tile at wall base.

3. Remove all carpet and all layers of tile or other flooring to bare concrete.

4. Clean all floor areas, remove grease, oils and other penetrating materials, and achieve a dry dust free condition prior to primer and leveling course application.

5. Abrade bare clean concrete using abrasive blasting or mechanical abrasion, then clean and dry the surface.

6. Install primer and self leveling concrete to a max thickness of 1/4 inch on all floors.

7. Install Luxury Vinyl Tile (LVT) per specs and manufacturer's instructions.

8. Install 4-inch rubber cove base at all wall / floor joints.

9. Re-install all steam radiators, steam pipe and other items removed prior to removal of base and flooring.