About this file

This document is a comprehensive Submittal Log for a federal contract to replace and upgrade elevators in Buildings 15, 47, and 62 at the Charles George VA Medical Center in Asheville, NC. The submittal log details an extensive list of required documentation across multiple specification sections, including preconstruction submittals, shop drawings, product data, samples, test reports, certifications, and operational manuals for various construction disciplines such as demolition, concrete, structural steel, electrical systems, HVAC, plumbing, and fire detection.

Key technical areas requiring detailed submittals include elevator modernization (both traction and hydraulic), seismic restraints, special inspections, construction waste management, commissioning requirements, asbestos abatement, lead-based paint removal, and comprehensive electrical and mechanical system documentation. The log provides a structured framework for contractors to track and submit required documentation, with specific requirements for each specification section, ensuring thorough review and compliance with contract specifications for this VA medical center renovation project.

View the file

Other files for this federal contract opportunity

Other files attached to N059--Replace and Upgrade Elevators Bldg. 15, 47, and 62 (CONST), newest first.
File Type Posted
Attachment VIII RFI Responses.pdf PDF
Attachment X SOW.pdf PDF
36C24625B0014 0004.pdf PDF
Attachment IX Addendum 02 Specs and Drawings (2).pdf PDF
36C24625B0014 0003.pdf PDF
36C24625B0014 0002.pdf PDF
36C24625B0014 0001.pdf PDF
Attachment VII Contractor Site Visit Attendance Sheet.pdf PDF
36C24625B0014.pdf PDF
Attachment II Bid Specifications Addendum 01 - 10-30-24.pdf PDF
Attachment I Bid Specifications.pdf PDF
Attachment VI - Bid Cost Breakdown.xlsx XLSX spreadsheet
Attachment V - Campus Map.pdf PDF
Attachment III Bid Drawings.pdf PDF
Attachment IV Wage Determination.pdf PDF
Show all 15

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Replace and Upgrade Elevators Bldg. 15, 47, and 62

637-23-101

Charles George VAMC - Asheville, NC

Bid Documents Preliminary Submittal Log

TO DATE SENT

DATE

RETURNED

N O

E X

C E

P T

IO

N

T A

K E

N

M A

K E

C O

R R

E C

T

IO

N S

A S

O

T E

D

R E

V

IS

E A

D

R

S U

B M

IT

R E

J E

C T

E D

S U

B M

IT

S

P E

C

IF

IE

D

IT

M

N O

T R

E V

IE

W

E D

00 01 10 Table of Contents

N/A

00 01 15 List of Drawing Sheets

N/A

00 11 21 Request for Proposal to Design Build

N/A

01 00 00 General Requirements

N/A

01 32 16.15 Project Schedules (Small Projects - Design/Bid/Build)

Interim Schedule

01 33 23 Shop Drawings, Product Data, and Samples

Preconstruction Submittals

Shop Drawings

Product Data

Samples

Design Data

Test Reports

Certificates

Manufacturer's Instructions

Manufacturer's Field Reports

Operation and Maintenance Data

Closeout Submittals

01 35 26 Safety Requirements

N/A

01 42 19 Reference Standards

N/A

01 45 00 Quality Control

Preconstruction Submittals

Design Data

Test Reports

01 45 29 Testing Laboratory Services

N/A

01 45 35 Special Inspections

TBD

PROJECT NAME:

SUBMITTAL PROJECT NO.:

OWNER:

CONTRACTOR:

CONSULTANT ACTION

DATE

RETURNED REMARKSS

P

E C

IF

IC

A T

IO

S

C T

IO

N

S U

B M

IT

T

A L

N U

M B

E R

R E

S U

B M

IT

ITEM DESCRIPTION

DATE

RECEIVED

5/14/2025

1. SD-01 Preconstruction Submittals;

2. SIOR Letter of Acceptance;

3. Special Inspections Project Manual;

4. Special Inspections Agency's Written Practices

5. NDT Procedures and Equipment’ Calibration Records;

6. SD-06 Test Reports;

7. Special Inspections

8. Daily Reports;

9. Special Inspections; Biweekly Reports;

10. SD-07 Certificates;

11. Fabrication Plant

12. AC472 Accreditation;

13. Certificate of Compliance;

14. Special Inspector of Record Qualifications;

15. Special Inspector Qualifications;

16. Qualification Records for NDT technicians;

17. SD-11 Closeout Submittals;

18. Interim Final Report of Special Inspections;

19. Comprehensive Final Report of Special Inspections;

01 74 19 Construction Waste Management

In accordance with Section 01 33 23, SHOP DRAWINGS, PRODUCT DATA, and SAMPLES, furnish the following

Demolition Debris Management Plan

Designated Manager responsible for instructing personnel, supervising, documenting and administer over meetings relevant to the Waste Management Plan

Monthly summary of construction and demolition debris diversion and disposal, quantifying all materials generated at the work site and disposed of or diverted from disposal through recycling

Target waste diversion rate by material and an overall diversion rate

Final report documenting the results of implementation of the preconstruction waste management plan

01 91 00 General Commissioning Requirements

Preliminary Commissioning Plan

Final Commissioning Plan

Systems Functional Performance Test Procedure

Pre-Functional Checklists

Test and Inspection Reports

Corrective Action Documents

Preliminary Commissioning Report

Final Commissioning Report

Data for Commissioning

02 41 00 Demolition

N/A

02 82 11 Traditional Asbestos Abatement

Pre-Start Meeting Submittals

Submittals During Abatement

Submittals at Completion of Abatement

02 82 13.19 Asbestos Floor Tile and Mastic Abatement

Pre-Start Meeting Submittals

Submittals During Abatement

Submittals at Completion of Abatement

02 82 13.21 Abestos Roofing Abatement

Pre-Start Meeting Submittals

Submittals During Abatement

Submittals at Completion of Abatement

02 83 33.13 Lead-Based Paint Removal and Disposal

Shop Drawings

Product Data

Samples

Manufacturer's Literature & Data

Test Reports: Submit testing laboratory reports

Certificates: Certify completed lead training

Qualifications: Substantiate qualifications comply with Record Documents

03 30 00 Cast-in-Place Concrete

Shop Drawings

Product Data

Samples

Mill Test Reports

Manufacturer's Certificates

Testing Agency for Concrete Mix Design

Test Report for Concrete Mix Designs

Shoring and Reshoring Sequence

Test Reports

05 12 00 Structural Steel Framing

Shop Drawings

Product Data

Samples

Sustainable Construction Submittals

Test Reports

Certificates

Qualifications

Delegated Design Drawings and Calculations: Signed and sealed by responsible Architect/Engineer

Record Surveys

05 50 00 Metal Fabrications

Shop Drawings

Product Data

Samples

Manufacturer's Literature & Data

Manufacturer's Certificates

Design calculations for specified live loads including dead loads

Furnish setting drawings and instructions for installation of anchors to be preset into concrete and masonry work, and for the positioning of items having anchors to be built into concrete or masonry construction.

07 01 50.19 Preparation for Re-roofing

Shop Drawings

Product Data

Samples

Manufacturer's Literature & Data

Photographs

Field Inspection Reports

Infrared Roof Moisture Survey Report

07 84 00 Firestopping

Shop Drawings

Product Data

Samples

Sustainable Design Submittals

Installer Qualifications

Inspector Qualifications

Manufacturer's literature, data, and installation instructions for types of firestopping and smoke stopping used

List of FM, UL, or WH classification number of systems installed

Certified laboratory test reports for ASTM E814 tests for systems not listed by FM, UL, or WH proposed for use

Submit certificates from manufacturer attesting that firestopping materials comply with the specified requirements

07 92 00 Joint Sealants

Shop Drawings

Product Data

Samples

Sustainable Design Submittals

Installer Qualifications

Contractor Certification

Manufacturer's installation instructions for each product used

Cured samples of exposed sealants for each color

Manufacturer's Literature & Data

Manufacturer Warranty

08 11 13 Hollow Metal Doors and Frames

Shop Drawings

Product Data

Samples

Manufacturer's Literature & Data

Sustainable Construction Submittals

Test Reports

Qualifications

08 14 00 Interior Wood Doors

Shop Drawings

Product Data

Samples

Manufacturer's Literature & Data

Sustainable Construction Submittals

Test Reports

Operation and Maintenance Data

08 71 00 Door Hardware

Shop Drawings

Product Data

Samples

Hardware Schedule

Ligature Resistant Door Alarm Riser Diagram

Samples and Manufacturer's Literature

Certificate of Compliance and Test Reports

09 51 00 Acoustical Ceilings

Shop Drawings

Product Data

Samples

Submittal Drawings

Manufacturer's Literature & Data

Sustainable Construction Submittals

Certificates

Qualifications

Operation and Maintenance Data

09 91 00 Painting

Shop Drawings

Product Data

Samples

Sustainable Design Submittals

Painter qualifications

Manufacturer's Literature & Data

Sample Panels

Sample of Identity Markers if used

Manufacturers' Certificates indicating compliance with specified requirements 13 05 41 Seismic Restraint Requirements for Non-Structural ComponentsBracing and Signed and Sealed Anchorage Drawings and

Calculations for all Non-Structural Elements Requiring Seismic

Restraint

Seismic Protection of Piping Data

Seismic Protection of Suspended Ductwork and Suspended

Electrical and Communication Cables Data

14 21 10.1 & 2 Modernization of Traction Elevator (S4-S5), (P1-P3)

Shop Drawings

Product Data

Samples

Evidence of Full Compliance with Contract Requirements for

Proposed Items

Name of Manufacturer, Type or Style Designation, and

Applicable Data of Elevator Equipment

Complete Construction Drawings of Elevator Car Enclosure

Complete Dimensioned Detail of Vibration Isolating

Foundations for Traction Hoisting Machines

Detailed Dimensioned Drawings

Cut Sheets & Drawings

Certificates

14 24 10.1 & 2 &3 Modernization of Hydraulic Elevator (ACA, Bldg 15, Bldg 62)

Shop Drawings

Product Data

Samples

Evidence of Full Compliance with Contract Requirements for

Proposed Items

Name of Manufacturer, Type or Style Designation, and

Applicable Data of Elevator Equipment

Complete Construction Drawings of Elevator Car Enclosure

Complete Dimensioned Detail of Vibration Isolating

Foundations for Traction Hoisting Machines

Detailed Dimensioned Drawings

Cut Sheets & Drawings

Certificates

21 13 13 Wet-Pipe Sprinkler Systems

Shop Drawings (Signed by NICET Level III or Level IV Sprinkler

Technician or Stamped by Registered Fire Protection Engineer)

Product Data

Samples

Qualifications

Manufacturer's Data Sheets

Calculation Sheets

Valve Charts

Final Document Submittals (As-built Drawings & Testing and

Maintenance Instructions)

Material and Testing Certificate

Operations & Maintenance Manuals

22 05 11 Common Work Results for Plumbing

Shop Drawings

Product Data

Samples

Phasing Plan/Schedule

Documentation Proving Equivalent Performance, Design

Standards and Drawings

Certification that all Manufacturers have Reviewed Drawings &

Specifications

Manufacturer's Literature & Data

Coordination/Shop Drawings

Rigging Plan

Plumbing Maintenance Data & Operating Instructions System Readiness Checklist

Training Plans, Trainer Qualifications and Instructor

Qualifications

22 05 12 General Motor Requirements for Plumbing Equipment

Shop Drawings

Product Data

Samples

Motor Submittals with Drive Equipment

Documentation Proving Equivalent Performance, Design

Standards and Drawings

Manufacturer's Literature & Data

Operating & Maintenance Manuals

Certification

System Readiness Checklist

Training Plans and Instructor Qualifications

22 07 11 Plumbing Insulation

Shop Drawings

Product Data

Samples

Manufacturer's Literature & Data

Complete Operating & Maintenance Manuals

System Readiness Checklist

22 08 00 Commissioning of Plumbing Systems

List of Submittals Provided by Commissioning Agent

22 13 00 Facility Sanitary and Vent Piping

Shop Drawings

Product Data

Samples

Manufacturer's Literature & Data

Detailed Shop Drawing of Clamping Device and Extensions

Complete Operating & Maintenance Manuals

System Readiness Checklist

Training Plans and Instructor Qualifications

22 14 29 Sump Pumps

Shop Drawings

Product Data

Samples

Manufacturer's Literature & Data

Certified Copies of all the Factory and Construction Site Test

Data Sheets & Reports

Complete Operating & Maintenance Manuals

System Readiness Checklist

Training Plans and Instructor Qualifications

23 05 11 Common Work Results for HVAC

Shop Drawings

Product Data

Samples

Manufacturer's Literature & Data

Phasing Plan/Schedule

If equipment is submitted which differs in arrangement from that shown, provide documentation proving equivalent performance, design standards and drawings that show the rearrangement of all associated systems

Prior to submitting shop drawings for approval, Contractor shall certify in writing that manufacturers of all major items of equipment have each reviewed contract documents, and have jointly coordinated and properly integrated their equipment and controls to provide a complete and efficient installation

Submittals and shop drawings for interdependent items, containing applicable descriptive information, shall be furnished together

Mock-ups

Coordination/Shop Drawings

Manufacturer's Literature & Data

Rigging Plan

HVAC Maintenance Data & Operating Instructions

Copies of Approved HVAC Equipment Submittals to the TAB &

Cx Subcontractor

System Readiness Checklist

Training Plans and Instructor Qualifications

23 05 41 Noise and Vibration Control for HVAC Piping & Equipment

Shop Drawings

Product Data

Samples

Manufacturer's Literature & Data

Seismic Restraint Provisions and Bolting

Isolator manufacturer shall furnish with submittal load calculations for selection of isolators, including supplemental bases, based on lowest operating speed of equipment supported

Seismic Requirements: Submittals are required for all equipment an-chors, supports and seismic restraint

23 05 93 Testing, Adjusting,and Balacing for HVAC

Shop Drawings

Product Data

Samples

Submit Names and Qualifications of TAB Agency and TAB

Specialists within 60 Days after the Notice to Proceed

For use by the Resident Engineer staff, submit one complete set of applicable AABC,NEBB or TABB publications that will be the basis of TAB work

Design Review Report

Systems Inspection Report on Equipment and Installation

Duct Air Leakage Test Report

Systems Readiness Report

Intermediate & Final TAB Reports Covering Flow Balance and

Adjustments, Performance Tests, Vibration Tests & Sound

Tests

Include in final reports uncorrected installation deficiencies noted during TAB and applicable explanatory comments on test results that differ from design requirements

Include in each report the critical path for each balanced branch

(air and hydronic). Every branch shall have at least one terminal device damper 100% open.

Prior to Request for Final or Partial Final Inspection, Submit

Completed Test & Balance Report for the Area with Noted

Critical Paths

23 07 11 HVAC and Boiler Plant Insulation

Shop Drawings

Product Data

Samples

23 08 00 Commissioning of HVAC Systems

List of Submittals Provided by Commissioning Agent

23 23 00 Refrigerant Piping

Shop Drawings

Product Data

Samples

Layout of refrigerant piping and accessories, including flow capacities, valves locations, and oil traps slopes of horizontal runs, floor/wall penetrations, and equipment connection details.

Characteristic Curves

Certification

Design Manual

23 31 00 HVAC Ducts and Casings

Shop Drawings

Product Data

Samples

Manufacturer's Literature and Data

Coordination Drawings

23 81 43 Air-Source Unitary Heat Pumps

Shop Drawings

Product Data

Samples

Manufacturer's Literature and Data

Certification

Performance Rating

System Readiness Checklists

26 05 11 Requirements for Electrical Installations

Shop Drawings

Product Data

Samples

The submittals shall include the following:

1. Information that confirms compliance with contract requirements. Include the manufacturer's name, model or catalog numbers, catalog information, technical data sheets, shop drawings, manuals, pictures, nameplate data, and test reports as required.

2. Submittals are required for all equipment anchors and supports. Submittals shall include weights, dimensions, center of gravity, standard connections, manufacturer's recommendations and behavior problems (e.g., vibration, thermal expansion, etc.) associated with equipment or piping so that the proposed installation can be properly reviewed. Include sufficient fabrication information so that appropriate mounting and securing provisions may be designed and attached to the equipment.

3. Elementary and interconnection wiring diagrams for communication and signal systems, control systems, and equipment assemblies. All terminal points and wiring shall be identified on wiring diagrams.

4. Parts list which shall include information for replacement parts and ordering instructions, as recommended by the equipment manufacturer.

Maintenance and Operation Manuals 26 05 19 Low-Voltage Electrical Power Conductors and Cables

SUBMITTALS in Section 26 05 11, REQUIREMENTS FOR

ELECTRICAL INSTALLATIONS

Shop Drawings

Certifications

26 05 26 Grounding and Bonding for Electrical Systems

SUBMITTALS in Section 26 05 11, REQUIREMENTS FOR

ELECTRICAL INSTALLATIONS

Shop Drawings

Test Reports

Certifications

26 05 33 Raceway and Boxes for Electrical Systems

SUBMITTALS in Section 26 05 11, REQUIREMENTS FOR

ELECTRICAL INSTALLATIONS

Shop Drawings

Certifications

26 05 73 Overcurrent Protective Device Coordination Study

SUBMITTALS in Section 26 05 11, REQUIREMENTS FOR

ELECTRICAL INSTALLATIONS

Product Data

Complete Study

Certifications

26 08 00 Commissioning of Electrical Systems

The commissioning process requires review of selected

Submittals that pertain to the systems to be commissioned. The

Commissioning Agent will provide a list of submittals that will be reviewed by the Commissioning Agent. This list will be reviewed and approved by the VA prior to forwarding to the

Contractor. Refer to Section 01 33 23 SHOP DRAWINGS, PRODUCT DATA, and SAMPLES for further details.

The commissioning process requires Submittal review simultaneously with engineering review. Specific submittal requirements related to the commissioning process are specified in Section 01 91 00 GENERAL COMMISSIONING

REQUIREMENTS.

26 22 00 Low-Voltage Transformers

SUBMITTALS in Section 26 05 11, REQUIREMENTS FOR

ELECTRICAL INSTALLATIONS

Shop Drawings

Manuals

Certifications

26 24 16 Panelboards

SUBMITTALS in Section 26 05 11, REQUIREMENTS FOR

ELECTRICAL INSTALLATIONS

Shop Drawings

Manuals

Certifications

26 27 26 Wiring Devices

SUBMITTALS in Section 26 05 11, REQUIREMENTS FOR

ELECTRICAL INSTALLATIONS

Shop Drawings

Manuals

Certifications

26 29 21 Enclosed Switches and Circuit Breakers

SUBMITTALS in Section 26 05 11, REQUIREMENTS FOR

ELECTRICAL INSTALLATIONS

Shop Drawings

Manuals

Certifications

26 51 00 Interior Lighting

SUBMITTALS in Section 26 05 11, REQUIREMENTS FOR

ELECTRICAL INSTALLATIONS

Shop Drawings

Manuals

Certifications

27 31 31 Voice Communications Switching and Routing Equipment -

Extension On-Site Survey

Environmental Requirements

System Data Base Survey Report

Needs Analysis Report

Voice Traffic Management System Submittals

Proof of Performance Test Plan

OEM Training Certificates

Closeout Submittals

Maintenance Material Submittals

28 31 00 Fire Detection and Alarm

Drawings

Manuals

Maintenance and Operating Manual

Certifications

File details come from the government source that posted it. Updated .