This document contains responses to questions regarding solicitation number 36C24623Q1012 for the replacement of an air handling unit at the Salisbury VA Medical Center. The solicitation involves the replacement of an existing temporary air handling unit that provides heating, ventilation and air conditioning for a secure psychiatric unit. The new unit must condition air within specified temperature and humidity ranges while providing a minimum air change rate. Additional requirements include steam and chilled water coils sized to match existing piping connections. Controls will be provided by either Schneider Electric or Siemens. Digital quotes for the project are due by September 25, 2023. Work is to occur during normal business hours and on weekends as needed to complete the project within a four month period of performance.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 36C24623Q1012 0001.docx | DOCX document | |
| 36C24623Q1012_1.pdf | ||
| 6e97dc31-2c97-4b97-a446-d5b34b8e518e_2_Technical Data Sheet.doc | DOC document | |
| Wage Determination No. 2015-4423.txt | TXT text file | |
| AHU-4B - Drawing.doc | DOC document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
5. PROJECT NUMBER (if applicable)
CODE
7. ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER
3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE OF PAGES
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO.
1. CONTRACT ID CODE
FACILITY CODE
CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office.
is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER
16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30
PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer) Department of Veterans Affairs Network Contracting Office 6 100 Emancipation Drive Hampton
VA
23667 Department of Veterans Affairs Network Contracting Office 6 100 Emancipation Drive Hampton
VA
23667 To all Offerors/Bidders
36C24623Q1012 09-18-2023
X X X
09/25/2023 @ 10:00 AM EST
X The purpose of this amendment is to post RFI responses and to extend the response due date to September 25, 2023 @10:00 AM EST All quotes to be digitally submitted to the Contract Specialist, erica.manglona@va.gov
Sean Cosby
1. How long can the unit be down to change this out? Over a weekend about 48 hours.
1. What is the insulation specification for duct and piping? Steam for low and medium pressure 1 ½” fiberglass, CW foam 1 ½”, duct 2”wrapped
1. What is the controls sequence for this AHU? Per the MCP for SPD they require positive air flow, humidity between 20-30%, temperature between 66-76 degrees Fahrenheit, and 4 ACH (air changes per hour
1. Please provide a specification on the AHU to include the performance specifications for the unit. Per the MCP for SPD they require positive air flow, humidity between 20-30%, temperature between 66-76 degrees Fahrenheit, and 4 ACH (air changes per hour)
1. Will the new unit be hooked to the existing electrical disconnect or VFD? yes
1. Will a new duct smoke detector be required to be installed? No If so, how many and what location?
1. Please provide a piping specification. Steam supply is 2”, steam return is 2”, condensate is 1 ¼”, CW supply is 1 ½”, CW return is 1 ½”
1. Please provide a steam trap specification. It is our understanding that the VA now only uses forged steel steam traps. Yes
1. Is test and balance required? Yes
1. Is pre demolition test and balance required? Not required
1. With the lead time for AHU’s at 52 weeks in many cases the duration of this project is not possible. The period of performance for installation is 4 months, based on lead times the POP can be adjusted. Correspondence with the Contractor after the AHU is ordered will dictate the final timeline.
1. Please provide a more generic requirement on the AHU. A cut sheet of a unit vendor seems to show favoritism to a certain vendor. Please reference Technical Data Sheet as a reference for salient characteristics in the type of AHU to be included in proposals. Not brand specific.
1. What are the days of the week and work hours this work can be performed? 7am-5pm Monday -Friday and weekends and/or after hours as needed.
1. Is the buy American act applicable to this solicitation? Yes
1. Please provide as-built drawings of the AHU, piping, and duct. The unit that is there now we installed as a temporary unit so we don’t have as built drawing. We can provide the following: Steam supply is 2”, steam return is 2”, condensate is 1 ¼”, CW supply is 1 ½”, CW return is 1 ½”, power is 200/60/3.
1. Will ECM motors be accepted? Yes
1. The stated COVID-19 requirements in the solicitation include contractor’s release of employees’ medical information. Contractors are not permitted by law to disclose medical records of its employees, including vaccines. The requirement also states that mandatory COVID-19 screenings are being enforced at the VAMC entrances, however, it is our experience that those have ceased. Previous COVID-19 requirements permitted the Contractor to certify compliance rather than providing employee medical information. Given the President’s proclamation that the COVID-19 pandemic is over, and the known changes in VA processes, please clarify the VA’s current COVID-19 requirements, if any, and the method by which the Contractor may comply absent revealing employee medical information. This requirement is now over.
1. Will the hydronic piping be sized the same as the coil connection sizes shown on the product drawing? 2” Steam piping inlet and 2” Condensate Return outlet in two coils (Steam coil + Combination coil)? 1-1/2” Chilled water supply and return piping? Yes
1. Can you provide a coil connection detail for all three coils? Yes, please see Technical Data Sheet for specifications, as provided in the original solicitation.
1. Can our on-site superintendent also serve as SSHO and CQC manager? Yes, but the government will only provide payment on the Site Superintendent roll.
1. Will Commissioning be required and if so, will the VA hire the Commissioning Agent directly or will the contractor be responsible? Yes, the Contractor will be responsible for hiring the Commissioning Agent.
1. Can you please provide the crane set up location? Will be discussed after award of contract. This item will be determined based on date of need, after award and lead time has been established for POP.
1. Can you please provide site access? Access will be provided.
1. Can you please provide working hours? 7am-5pm Monday -Friday and weekends and/or after hours as needed.
1. Can you please provide the brand of controls will be applied to the new AHU> Either Schneider Electric or Siemens would be acceptable in a proposal.
1. Will Delta Controls be an acceptable brand? Either Schneider Electric or Siemens would be acceptable in a proposal.