36C24623Q1012 0001.docx

DOCX document 20 KB Posted

Attached to
N041--SPD AHU Replacement Salisbury Federal contract opportunity
Solicitation number
36C24623Q1012
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 6

About this file

This document contains responses to questions regarding solicitation number 36C24623Q1012 for an SPD AHU replacement project at the Salisbury VAMC. The solicitation requires replacement of an air handling unit and associated coils and piping. Responses indicate the new unit must maintain temperature between 66-76 degrees Fahrenheit and humidity between 20-30% with 4 air changes per hour. The project will be performed between 7am-5pm Monday through Friday and on weekends as needed. The contractor will be responsible for commissioning. Crane setup locations and site access will be discussed after award. Schneider Electric controls are required and Delta Controls will not be acceptable. The response deadline was extended to September 20, 2023 at 10:00 AM EST for quotes to be digitally submitted to the named contracting specialist.

View the file

Other files for this federal contract opportunity

Other files attached to N041--SPD AHU Replacement Salisbury, newest first.
File Type Posted
36C24623Q1012 0002.docx DOCX document
Wage Determination No. 2015-4423.txt TXT text file
AHU-4B - Drawing.doc DOC document
36C24623Q1012_1.pdf PDF
6e97dc31-2c97-4b97-a446-d5b34b8e518e_2_Technical Data Sheet.doc DOC document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

5. PROJECT NUMBER (if applicable)

CODE

7. ADMINISTERED BY

2. AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER

3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE OF PAGES

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED

BPA NO.

1. CONTRACT ID CODE

FACILITY CODE

CODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV. 11/2016)

is required to sign this document and return ___________ copies to the issuing office.

is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

Contractor

16C. DATE SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER

16A. NAME AND TITLE OF CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 30

PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer) Department of Veterans Affairs Network Contracting Office 6 100 Emancipation Drive Hampton

VA

23667 Department of Veterans Affairs Network Contracting Office 6 100 Emancipation Drive Hampton

VA

23667 To all Offerors/Bidders

36C24623Q1012 09-12-2023

X X X

09/20/2023 10:00 AM EST

X The purpose of this amendment is to post RFI responses and to extend the response due date to September 20, 2023 @ 10:00 AM EST All quotes to be digitally submitted to the Contract Specialist, erica.manglona@va.gov

Sean Cosby Please see the following RFI’s for SPD AHU Replacement, Salisbury VAMC Solicitation# 36C24623Q1012:

1. How long can the unit be down to change this out? Over a weekend about 48 hours.

2. What is the insulation specification for duct and piping? Same as existing

3. What is the controls sequence for this AHU? Maintain a temp of 55 degrees.

4. Please provide a specification on the AHU to include the performance specifications for the unit. Per the MCP for SPD they require positive air flow, humidity between 20-30%, temperature between 66-76 degrees Fahrenheit, and 4 ACH (air changes per hour)

5. Will the new unit be hooked to the existing electrical disconnect or VFD? yes

6. Will a new duct smoke detector be required to be installed? No If so, how many and what location?

7. Please provide a piping specification. Same as existing

8. Please provide a steam trap specification. It is our understanding that the VA now only uses forged steel steam traps. yes

9. Is test and balance required? yes

10. Is pre demolition test and balance required? Not required

11. With the lead time for AHU’s at 52 weeks in many cases the duration of this project is not possible. Contracting question

12. Please provide a more generic requirement on the AHU. A cut sheet of a unit vendor seems to show favoritism to a certain vendor. Contracting question

13. What are the days of the week and work hours this work can be performed? 7am-5pm Monday -Friday and weekends and/or after hours as needed.

14. Is the buy American act applicable to this solicitation? Contracting question

15. Please provide as-built drawings of the AHU, piping, and duct. The unit that is there now we installed as a temporary unit so we don’t have as built drawing. We can provide the following: Steam supply is 2”, steam return is 2”, condensate is 1 ¼”, CW supply is 1 ½”, CW return is 1 ½”, power is 200/60/3.

16. Will ECM motors be accepted? yes

17. The stated COVID-19 requirements in the solicitation include contractor’s release of employees’ medical information. Contractors are not permitted by law to disclose medical records of its employees, including vaccines. The requirement also states that mandatory COVID-19 screenings are being enforced at the VAMC entrances, however, it is our experience that those have ceased. Previous COVID-19 requirements permitted the Contractor to certify compliance rather than providing employee medical information. Given the President’s proclamation that the COVID-19 pandemic is over, and the known changes in VA processes, please clarify the VA’s current COVID-19 requirements, if any, and the method by which the Contractor may comply absent revealing employee medical information. This requirement is now over.

18. Will the hydronic piping be sized the same as the coil connection sizes shown on the product drawing? 2” Steam piping inlet and 2” Condensate Return outlet in two coils (Steam coil + Combination coil)? 1-1/2” Chilled water supply and return piping? yes

19. Can you provide a coil connection detail for all three coils? yes

20. Can our on-site superintendent also serve as SSHO and CQC manager? Contracting question

21. Will Commissioning be required and if so, will the VA hire the Commissioning Agent directly or will the contractor be responsible? Contractor will be responsible.

22. Can you please provide the crane set up location? Will be discussed after award of contract.

23. Can you please provide site access? Access will be provided.

24. Can you please provide working hours? 7am-5pm Monday -Friday and weekends and/or after hours as needed.

25. Can you please provide the brand of controls will be applied to the new AHU> Schneider Electric

26. Will Delta Controls be an acceptable brand? No, Schneider Electric

File details come from the government source that posted it. Updated .