S06 Attachment I - Initial Drawing Package Reformatted.pdf
PDF 21 MB Posted
- Attached to
- N045--Upgrade HVAC Phase V Federal contract opportunity
- Solicitation number
- 36C24622B0008
About this file
This file is an attachment to a federal contract solicitation for HVAC upgrade services. The solicitation number is 36C24622B0008 and is being issued by the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 6 for HVAC upgrade work at Phase V locations. The solicitation seeks contractors to provide HVAC upgrade and maintenance services and the attachment contains initial drawing packages of the locations and systems requiring work. Responses are due based on the standard solicitation timeline and the agency intends to award a firm-fixed price contract for the work outlined.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| S06 OF 1419 Certified Bid Abstract - HVAC Phase V.pdf | ||
| 36C24622B0008 0004.docx | DOCX document | |
| 36C24622B0008 0003.docx | DOCX document | |
| 36C24622B0008 0002.docx | DOCX document | |
| S06 36C24622B0008 Attachment II Questions and Answers.xlsx | XLSX spreadsheet | |
| S06 637-19-102 HVAC Ph 5 31 Mar 2022 Site Visit Attendees Sign In Sheet.pdf | ||
| 36C24622B0008 0001.docx | DOCX document | |
| S02 Attachment VI Statement of Requirements 25 Mar 2022.pdf | ||
| S02 Attachment IV - Bid Item Cost Breakdown WS.xlsx | XLSX spreadsheet | |
| S02 Attachment III - Wage Det NC20220043 25 Feb 2022.pdf | ||
| S02 Attachment II - Drawing Package.pdf | ||
| 36C24622B0008.docx | DOCX document | |
| S02 Attachment V - Campus Map.pdf | ||
| S02 Attachment I - Specification Package.pdf |
Show all 14
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1 2 3 4 5
D C
B A
D C
B A
1 2 3 4 5 6
6" th re e in ch es o ne fo ot
6" th re e qu ar te rs in ch o ne fo ot
6" on e in ch o ne fo ot on e an d on e ha lf in ch es o ne fo ot on e ha lf in ch o ne fo ot
6" th re e ei gh th s in ch o ne fo ot on e ei gh th in ch o ne fo ot on e qu ar te r i nc h on e fo ot
PROJECT NUMBER
BUILDING NUMBER
DRAWING NUMBER
PROJECT TITLE
LOCATION
ISSUE DATE CHECKED DRAWN
DRAWING TITLE
APPROVED
FULLY SPRINKLERED
OFFICE OF
CONSTRUCTION
AND FACILITIES
MANAGEMENT
U.S. Department of Veterans Affairs
PHASEARCHITECT/ENGINEER OF RECORD
A/E:
STAMP
HARRELL DESIGN GROUP PC
8016 TOWER POINT DRIVE
CHARLOTTE, NC 28227
704-814-1346 POC: LEE HARRELL PE, LEED AP, QCxP
PRESIDENT
COPYRIGHT © 2021
WWW.HARRELLDG.COM
637-19-102
APRIL 16, 2021
HDG PROJECT: 19037Revision Number Revisions: Date:
CHARLES GEORGE VA MEDICAL CENTER
UPGRADE HVAC, B-47 PHASE 5CONSTRUCTION
DOCUMENTS 100%
H D E S I G N G R O U P , P C
ARRE L L
GI001
COVER SHEET
INDEX OF DRAWINGS
DRAWING NO. TITLE
GI001
NOT TO SCALE
RICEVILLE RD.
VICINITY MAP
COVER SHEET
UT
LENN RD .
R D .
MT N .
ALB
KC
L B
E U
D
R I
EG
Y
K P
CHIEF OF STAFF,
ASSOCIATE DIRECTOR,
INFECTION CONTROL COORDINATOR,
SAFETY MANAGER,
M & O FOREMAN,
AFGE,
APPROVED:
APPROVED:
APPROVED:
APPROVED:
APPROVED:
REVIEWED:
Rice vil le Roa d
Tunnel Road (HWY 70)
N
MD101 FIRST FLOOR DEMOLITION PLAN
MD102
MH101 FIRST FLOOR DUCT PLAN
MH102 SECOND FLOOR DUCT PLAN
MH103 ROOF PLAN
MH104 ROOF PLAN
MH301 MECHANICAL ROOM FLOOR PLAN
MH302 MECHANICAL ROOM FLOOR PLAN
MP101
MP102
MH501 DETAILS
MH502 DETAILS
SECOND FLOOR DEMOLITION PLAN
MH001 LEGENDS, ABBREVIATIONS AND GENERAL NOTES
MH503
MH504
DETAILS
DETAILS
MH601 SCHEDULES
EG001 LEGENDS, GENERAL NOTES, AND SCHEDULES
EE101 FIRST FLOOR ELECTRICAL PLAN
EE102 SECOND FLOOR ELECTRICAL PLAN
EE103 ELECTRICAL ROOF PLAN
EE501 ELECTRICAL DETAILS
EE701 PANEL BOARD SCHEDULES
EE601 BLDG #47 RISER DIAGRAM
EE702
FIRST FLOOR PIPING PLAN
SECOND FLOOR PIPING PLAN
MI701 CONTROLS SCHEMATICS
MI702 CONTROLS SCHEMATICS AND POINTS
MP103 OVERALL FIRST FLOOR PIPING PLAN
AE402 ROOF DETAILS
AE401 DETAILS
AE106 ROOF PLAN
AE105 SECOND FLOOR PLAN
AE104 FIRST AND SECOND FLOOR PLANS
AE103 FIRST FLOOR PLANS
AE101 BASEMENT BOILER ROOM FLOOR PLAN
FA100 GENERAL NOTES AND LEGENDS
FP100 BASEMENT FIRE PROTECTION PLANS
FP101 FIRST FLOOR FIRE PROTECTION PLAN
FP102 SECOND FLOOR FIRE PROTECTION PLAN
EE100 BASEMENT ELECTRICAL PLAN
EE502 ELECTRICAL DETAILS
EE602 ACA EXPANSION RISER DIAGRAM
PANEL BOARD SCHEDULES
AE403 ROOF DETAILS
AE107 ROOF PLAN
FA103 ROOF FIRE ALARM PLAN
FP001 FIRE PROTECTION GENERAL NOTES, SYMBOLS, LEGENDS & DETAILS
Jonathan M. Carr, AIA, NCARB, CDT
2021.04.21 21:28:18 -04'00'
PROJECT LIMITS
PR
O
JE
C
T
LI
M
IT
S
PR
O
JE
C
T
LI
M
IT
S
6' -2
"5' -0
1' -2
" 7' -2
1'-6 1/4"
6'-0" 2'-0" 1'-9"
BF152
BOILER ROOM
FMS
SERVICE DRIVE
COVERED LOADING DOCK
2'-4 1/4"
2'-0" 2'-10 3/4" 4'-0"
2' -4
1 2 3 4 5
D C
B A
D C
B A
1 2 3 4 5 6
6" th re e in ch es o ne fo ot
6" th re e qu ar te rs in ch o ne fo ot
6" on e in ch o ne fo ot on e an d on e ha lf in ch es o ne fo ot on e ha lf in ch o ne fo ot
6" th re e ei gh th s in ch o ne fo ot on e ei gh th in ch o ne fo ot on e qu ar te r i nc h on e fo ot
PROJECT NUMBER
BUILDING NUMBER
DRAWING NUMBER
PROJECT TITLE
LOCATION
ISSUE DATE CHECKED DRAWN
DRAWING TITLE
APPROVED
FULLY SPRINKLERED
OFFICE OF
CONSTRUCTION
AND FACILITIES
MANAGEMENT
U.S. Department of Veterans Affairs
PHASEARCHITECT/ENGINEER OF RECORD
A/E:
STAMP
HARRELL DESIGN GROUP PC
8016 TOWER POINT DRIVE
CHARLOTTE, NC 28227
704-814-1346 POC: LEE HARRELL PE, LEED AP, QCxP
PRESIDENT
COPYRIGHT © 2021
WWW.HARRELLDG.COM
637-19-102
APRIL , 2021
HDG PROJECT: 19037Revision Number Revisions: Date:
CHARLES GEORGE VA MEDICAL CENTER
UPGRADE HVAC, B-47 PHASE 5CONSTRUCTION
DOCUMENTS %
H D E S I G N G R O U P , P C
ARRE L L
AE101
BASEMENT BOILER ROOM
FLOOR PLAN
C1
AE101
GG
2 2
1 6" HIGH CONCRETE MECHANICAL EQUIPMENT PAD. SEE D4/AE401 FOR
PAD ANCHOR DETAIL.
2 EQUIPMENT - SEE MECHANICAL DRAWINGS
2 2
1 2 3
R
Q
P
NOT IN PROJECT SCOPE
2021.04.21 20:14:07 -04'00'
10 1D163
CORRIDOR
1G107A
AUD EXAM
SURGERY
N/A
FIRE UTIL
FMS
1G106
ENT EXAM
SURGERY
1G105
ENT EXAM
SURGERY
1G104
ENT EXAM
SURGERY
1G103
ENT EXAM
SURGERY
1D170
CORRIDOR
1G116A
BOOTH
AUDIO
PR
O
JE
C
T
LI
M
IT
S
PROJECT LIMITS
PROJECT LIMITS
PROOJECT L MI STS
NN
FF
AA
RERE UTUT
FMFM
ILIL
SS
1G1G
AA
UDUD
SS
7A E
UR
XA
GE
MM
RYRY
1D1D
COCO
RRRRRIDOROR
TST
IMM
T L
T
ECECE
O J
O J
O
PRPRP
PROJECT LIMITMITSS
1G1GG11G11
BB
6A6A
OOOO
AA
THTH
DUD OO
PR
O
JE
C
T
LI
M
IT
S
PROJECT LIMITS
PROJECT LIMITS
1C118
HAC
MINOR SURG
1C109
TLT
MINOR SURG
1C110
CONTROL
MINOR SURG
1C119
CONTROL
MINOR SURG
1C122
TLT
MINOR SURG
STAIR#3
1C113 D.R.
MINOR SURG
1C112
OFFICE
MINOR SURG
C1
CO
MI
C R S
PROJECT LIMITS
PR
O
JE
C
T
LI
M
IT
S
1C
M
OF
MIN
FIC
OR
E
SURG
1C1
MIN
D.R
OR SURG
PROJECT LIMMITS
1C
M
C1
CO
MI
TS
MM
I
NT
NO
NT
NO
T
MIN
T
MIN
LL
TT
RO
R S
RO
R S
LT
OR
LT
OR
ECEC
L U
L U
SS
O J
RG
UR
PR
G 1C1
CO
MI
NT
NO
RO
R S L
UR
ST
RG
AIR#R#
1C1
MI
HA
NO
C
R S C
R SURG
C
M
C
M
T
NO
T
OR SURGRG
PROJECT LIMITS
PR
O
JE
C
T
LI
M
IT
S
PROJECT LIMITS
PR
O
JE
C
T
LI
M
IT
S
1C169
TLT
MINOR SURG
1C168
DRESS RM
MINOR SURG
S
MI
M
M
1C152
EXAM
MINOR SURG
1C166
SPD
MINOR SURG
1C160A
TOILET
MINOR SURG
1C160
STAFF LOCKER
MINOR SURG
1H159
OFFICE
PROSTHETICS
1H160
OFFICE
PROSTHETICS
1H161
OFFICE
PROSTHETICS
1H153
STORAGE
PROSTHETICS
1C156
MINOR PRO
MINOR SURG
1C154
VASCULAR
MINOR SURG
1C157
EXAM RM
MINOR SURG
1H1
O P
FF
RO
C
ST
S
HE
C
TA
FF
MI
LO
O
CK
R S
ER
URG
FF
RO
C
STHETICS
T M
1H1
O P
FF
RO
CE
STHETIC
1C
S
M
SP
NO
R R
M
SURG
SS
M
C152
EX
MIN
AM
OR S
M
UR
PR
O
JE
C
T
LI
M
IT
S
PROJECT LIMITS
PROJECT LIMITS
PR
O
JE
C
T
LI
M
IT
S
PPROROJEJE
CTCT
H1
O P
H1
O P
LILI
FF
RO
FF
RO
MITMIT
C
ST
C
ST
SS
SS
HEHE
C
TA
C
TA
TICTIC
FF
MIN
FF
MIN
SS
LO
O
LO
O
CK
R S
CK
R S
ER
UR
ER
URGG
11H1
O P
H1
O P
FF
RO
FF
RO
CE
ST
CE
ST
SS
HEHE
ITIT
TICTIC
LI
M
LI
M
SS
C T
C T
JEJE
R
O R
O
PP
1C1C16
T M
T M
0A
OI
IN
ET
OR SURG
GG
H1
O
PR
H1
O
PR
FF
RO
FF
RO
CE
ST
CE
STHEHETICTIC
1C1C
SS
M
SP
NO
D R
D
R SUSURGRG
1H1H
TS
ST
PR
ST
PR
M
OR
OS
OR
OS
T L
AG
TH
AG
TH
C1
EC
E
ET
E
ET
T
MIN
O J
ICIC
LT
OR
PR
SS
SURG
1C
D
RE
M
SS
NO
R R
M
SURG
SS
M
S
MMIMIII
PROJECTCT LIMLIMMITMITSS
C1C152
EX
MIN
EX
MIN
AM
OR
AM
OR S
MM
URUR
M
G
M
PR
O
JE
C
T
LI
M
IT
S
PROJECT LIMITS
PROJECT LIMITS
PR
O
JE
C
T
LI
M
IT
S
4' -0
4'
-2
ALIGN NEW
PAD WITH
EXISTING
1D166
SWITCHGEAR
FMS
1 2 3 4 5
D C
B A
D C
B A
1 2 3 4 5 6
6" th re e in ch es o ne fo ot
6" th re e qu ar te rs in ch o ne fo ot
6" on e in ch o ne fo ot on e an d on e ha lf in ch es o ne fo ot on e ha lf in ch o ne fo ot
6" th re e ei gh th s in ch o ne fo ot on e ei gh th in ch o ne fo ot on e qu ar te r i nc h on e fo ot
PROJECT NUMBER
BUILDING NUMBER
DRAWING NUMBER
PROJECT TITLE
LOCATION
ISSUE DATE CHECKED DRAWN
DRAWING TITLE
APPROVED
FULLY SPRINKLERED
OFFICE OF
CONSTRUCTION
AND FACILITIES
MANAGEMENT
U.S. Department of Veterans Affairs
PHASEARCHITECT/ENGINEER OF RECORD
A/E:
STAMP
HARRELL DESIGN GROUP PC
8016 TOWER POINT DRIVE
CHARLOTTE, NC 28227
704-814-1346 POC: LEE HARRELL PE, LEED AP, QCxP
PRESIDENT
COPYRIGHT © 2021
WWW.HARRELLDG.COM
637-19-102
APRIL , 2021
HDG PROJECT: 19037Revision Number Revisions: Date:
CHARLES GEORGE VA MEDICAL CENTER
UPGRADE HVAC, B-47 PHASE 5CONSTRUCTION
DOCUMENTS %
H D E S I G N G R O U P , P C
ARRE L L
11 12 13 14 15 16 17 18 19 2015 16 17 18 19
D
C
B
A
20876
H
G
F
E
D
C
B
9 10
J
8 9 10
L
K
J
14 15 16 17
C
131211109874321
EXISTING SERVICE DRIVE
AREAWAY
V.9
5.63.9
S.9
U.2
P
M
JN
O
Q
R
AM
BU
LA
TO
R Y
C
AR
E
EN
TR
AN
C E
M
EC
H C
H
AS
E #1
M
EC
H C
H
AS
E #2
M
EC
H C
H
AS
E #4
M
EC
H C
H
AS
E #3
M
EC
H C
H
AS
E #5
MECH CHASE
#1
MECH CHASE
#6
PATIENT VISITOR ENTRANCE
CARDIO / PULMONARY
IMAGING
WARD 1-EAST
PHARMACY
In -p at ie nt P ha rm ac y
A cc es s
EN
T
AU
D
IO
LO
G Y
MINOR SURGERY
D/W
REF
A
DN
MEZZANINE
STATION
N U
R
SE
S
ST
AT
IO
N
STATION
STATION
STATION
STATION
STATION
STATION
STATION
STATION
STATION
STATION
1K141B
STORE ROOM
HAS
1G100A
OFFICE
CHAPLAIN
1D113A
RADIOGRAHIC
IMAGING
1A179
MALE TLT
FMS
1E124
CORRIDOR
1E115
CORRIDOR
1E121
NUTRITION
ONCOLOGY
1E115
CORRIDOR
1E115
CORRIDOR
1E126
DIRTY RM
ONCOLOGY
1E110
CORRIDOR
1E111
INFUSION CENTER
ONCOLOGY
1E103
TLT
ONCOLOGY
1E104
TLT
ONCOLOGY
1E122
TLT
ONCOLOGY
1E117
WAITING
ONCOLOGY/PALLIATIVE
1E100
CLERKS
ONCOLOGY
1E101
OFFICE
ONCOLOGY
1E102
OFFICE
ONCOLOGY
1E105
EXAM
ONCOLOGY
1E106
EXAM
ONCOLOGY
1E107
EXAM
ONCOLOGY
1E108
EXAM
ONCOLOGY
1E109
EXAM
ONCOLOGY
1W101B
TOILET
FMS
1W101A
TOILET
FMS
1A101D
TELE
1A161A
CLEAN ROOM
MINOR SURGERY
1A173A
OFFICE
PODIATRY
BF127
WAREHOUSE
BMS
1A100
VESTIBULE
1A127
VEST
HAS
1A130
PHARM
1B101
WAITING
PRIME CARE
1B111A
EXAM
PRIME CARE
1B112A
EXAM
PRIME CARE
1D102
WAITING
IMAGING
1K100
WAITTING
CARD/PLMNRY
1K110
EXAM
CARD/PLMNRY
1K141A
STORE ROOM
CANTEEN
1K142
OFFICE
PAT ADVOCATE
1K143
OFFICE
PAT ADVOCATE
1J100
WAITTING
PRIME CARE
1C120A
EXAM ROOM
MINOR SURG
1F126A
OFFICE
PHARM
1F127
OFFICE
PHARM
1H119
EXAM
PMRS
1D131
CHAPLAIN
SOCIAL WORKS
1D132
SOCIAL WORKER
SOCIAL WORKS
1F114
IRM
DATA CLT
1F120
HAC
1F137
CACI
PHARM
1D141
ULTRASOUND
IMAGING
1W156
HALL
1W153
CORRIDOR
1W151
CORRIDOR
1W132
TOILET
FMS
1W124
TOILET
FMS
1W116
TOILET
FMS
1W108
TOILET
FMS
1W154
CORRIDOR
1W153
HALL
1W121A
RN
PRIME CARE
1W121
MD
PRIME CARE
1W102
CLERKS STN
PRIME CARE
1W137
HAC
FMS
1W136
SOIL
PRIME CARE
1W152
CORRIDOR
1W103
LEAD CLERK
PRIME CARE
1W101
WAITING RM
PRIME CARE
1W104
EXAM
PRIME CARE
1W105
EXAM
PRIME CARE
1W107
PHARM D
PHARM
1W110
RN
PRIME CARE
1W109
RN
PRIME CARE
1W111
NURSE MGR
PRIME CARE
1W115
MD
PRIME CARE
1W117
RN
PRIME CARE
1W120
RN
PRIME CARE
1W113
FA CL
FMS
1W114
MD
PRIME CARE
1W118
RN
PRIME CARE
1W119
MD
PRIME CARE
1W123
ANEMIA
PRIME CARE
1W122
PHARM D
PHARM
1W126
PHARM D
PHARM
1W125
PHARM D
PHARM
1W127
RN
PRIME CARE
1W128
MD
PRIME CARE
1W150
CLEAN
PRIME CARE
1W149
MD
PRIME CARE
1W148
MD
PRIME CARE
1W147
ELEC CL
FMS
1W145
RN
PRIME CARE
1W144
ID
PRIME CARE
1W143
RN CLST
PRIME CARE
1W142
RN CLST
PRIME CARE
1W141
TOILET
FMS
1W140
RN CLST
PRIME CARE
1W139
DIET
PRIME CARE
1W135
DATA
OI&T
1W134
CONF/TEACH
PRIME CARE
1W129
RN
PRIME CARE
1W138
STAFF LOUNGE
PRIME CARE
1W133
EDUC
PRIME CARE
1W130
PA
PRIME CARE
1W131
MD
PRIME CARE
1H113A 1G131
PMRS
1D139
IRM
DATA CLOSET
1D108
DRESSING RM
IMAGING1D106
WAITING
IMAGING
1D109
OFFICE
IMAGING
1J204
CLST
PRIME CARE
1J206
NURSE STN
PRIME CARE
1J205A
TLT
FMS
1J209A
TLT
FMS
1A238
CORRIDOR
ED
1A229
LOBBY/VEND
ED
1A231
MALE
ED
1A232
WAITING
ED
1A232
WAITING
ED
1A228
RECEPTION
ED
1A234
EXAM
ED
1A227
NURSE STN #2
ED
1A237
CORRIDOR
ED
1A214
MED
ED
1A240B
ALCOVE #3
ED
1A239A
ALCOVE #1
ED
1A240A
ALCOVE #2
ED
1A239
CORRIDOR
ED
1A241
CORRIDOR
ED
1A213
MED
ED
1A240
CORRIDOR
ED
1A200
NURSE STN #1
ED
1A217
RAD
ED
1A230
FEMALE
ED
1A236
CORRIDOR
ED1A208A
ANTE RM
ED
1A212
STAFF
ED
1A201
OBS 1
ED
1A202
OBS 2
ED
1A203
OBS 3
ED
1A204
OBS 4
ED
1A205
OBS 5
ED
1A206
OBS 6
ED
1A207
OBS 7
ED
1A208
OBS 8
ED
1A209
OBS 9
ED
1A210
OBS 10
ED
1A211
OBS 11
ED
1A220
HAC
FMS
1H125
RECEPTION
PMRS
1H131
EXAM
PMRS
1G132
OFFICE
OTHER
1G131
EXAM/OFFICE
OTHER
1G130
EXAM/OFFICE
OTHER
1G129
EXAM/OFFICE
OTHER1G137
WAITING
OTHER
1G125
EXAM/OFFICE
OTHER
1G127
EXAM/OFFICE
OTHER
1G126
EXAM/OFFICE
OTHER
1G124
EXAM/OFFICE
OTHER
1G128
SPINAL CORD INJURY
PMRS
1H113B
STORAGE
PMRS
1D143
MEDICAL SUPPLIES
IMAGING
1H117
WAITING
PMRS
1H139
EXAM
PMRS
1H138
EXAM
PMRS
1H136
OFFICE
PMRS
1H132
BATH
PMRS
1H127
WORK AREA
PMRS
1H129
KITCHEN
PMRS
1H126
WORK STM
PMRS
1H128
BREAK ROOM
PMRS
1H130
EXAM
PMRS
1H133
EXAM
PMRS
1H149
1H135
CK-IN
PMRS
1H140
WAITING
PMRS
1E135A
STORAGE
PMRS
1H142
OFFICE
PMRS
1H141
OFFICE
PMRS
1H144
OFFICE
PMRS
1H118
EXAM
PMRS
1H118A
STORAGE
PMRS
1H122A
RECEPTION
PMRS
1H122
OFFICE
PMRS
1H121
OFFICE
PMRS
1H120
OFFICE
PMRS
1H123
OFFICE
PMRS
1H124
OFFICE
PMRS
1H143
OFFICE
PMRS
1H116
EXAM
PMRS
1H115
EXAM
PMRS
1H112
OFFICE
CHAPLIN
1H111
OFFICE
CHAPLIN
1F107
OFFICE
PHARM
1F108
OFFICE
PHARM
1F105
STORAGE
PHARM
1F130
CONF RM
PHARM
1C156
MINOR PRO
MINOR SURG 1C169
TLT
MINOR SURG
1C168
DRESS RM
MINOR SURG
1C170
SOIL UTIL
MINOR SURG
1C171
EXAM
MINOR SURG
1C147
EXAM
MINOR SURG
1C148
EXAM
MINOR SURG
1C152
EXAM
MINOR SURG
1C154
VASCULAR
MINOR SURG
1C150
BREAK ROOM
MINOR SURG
1C149
STORAGE
MINOR SURG
1C144
MEDS
MINOR SURG
1C104
RECEPT
MINOR SURG
1C142
HAC
FMS
1C129
EXAM-17
MINOR SURG
1C132
STORAGE
MINOR SURG
1C134
EXAM-16
MINOR SURG
1C137
EXAM-15
MINOR SURG
1C138
EXAM-14
MINOR SURG
1C140
EXAM-13
MINOR SURG
1C139
EXAM-12
MINOR SURG
1C135
EXAM-11
MINOR SURG
1C133
EXAM-10
MINOR SURG
1C130
EXAM-9
MINOR SURG
1C128
EXAM-8
MINOR SURG
1C127
EXAM-7
MINOR SURG
1C125
EXAM-6
MINOR SURG
1C122
SOILED UTIL
MINOR SURG
1C117
URODYNAMICS
MINOR SURG
1C116
BIOPSY RM
MINOR SURG
1C107
EXAM-2
MINOR SURG1C
PR
IN
T
RO
OM
M
IN
OR
S
UR
G
1C106
EXAM-1
MINOR SURG
1C123
EXAM-5
MINOR SURG
1C118
HAC
MINOR SURG
1C109
TLT
MINOR SURG
1C110
CONTROL
MINOR SURG
1C119
CONTROL
MINOR SURG
1C122
TLT
MINOR SURG
1C120
CAST RM
MINOR SURG
STAIR#3
1C119
CYSTO
MINOR SURG1C113
D.R.
MINOR SURG
1C112
OFFICE
MINOR SURG
1C1681C167
1C102
RECEPT
MINOR SURG
1C101
WAITING
MINOR SURG1C166
SPD
MINOR SURG
1C160A
TOILET
MINOR SURG
1C157
EXAM RM
MINOR SURG
1C160
STAFF LOCKER
MINOR SURG
1G136
FML TLT
FMS
1D160
RADIOGRAPHIC RM
IMAGING
1D159
RADIOGRAPHIC RM
IMAGING
1D158
OFFICE
IMAGING
1D162A
TLT
IMAGING
1D162
DESSING RM
IMAGING1D157
STORE ROOM
IMAGING
1D161
RADIOGRAPHIC RM 1
IMAGING
1D163
RADIOGRAPHIC RM 2
IMAGING
1D156
OFFICE
IMAGING
1D164
FLUORO RM 3
IMAGING1D155
OFFICE
IMAGING
1D154
C/T TA CTL
IMAGING
1D171
TECH IMAGING WORK ROOM
IMAGING
1D165C
STORAGE
IMAGING
1D165B
TLT
IMAGING
1D165A
TLT
IMAGING
1D165
DRESS RM
IMAGING
1D153
C/T TA SCAN
IMAGING
1D166
FLUOROSCOPIC RM 4
IMAGING
1D152
STORAGE
IMAGING
1G1O9
AUD EXAM
SURGERY
1G110
AUD EXAM
SURGERY
1G100B
CPE RESIDENTS
CHAPLAIN
1G100
MAIN CHAPEL
CHAPLAIN
1D152B
ELEC UTIL
FMS
1D152A
PHONE UTIL
FMS
1G108A
HC TLT
AUDIO
1G108
AUD INSTR CALIB
SURGERY
1D163
CORRIDOR
1G107A
AUD EXAM
SURGERY
1G107B
AUD EXAM
SURGERY
1D174
ELEC UTIL
FMS
N/A
FIRE UTIL
FMS
1G106A
TLT
SURGERY
1G105A
TLT
SURGERY
1G106
ENT EXAM
SURGERY
1G105
ENT EXAM
SURGERY
1G104
ENT EXAM
SURGERY
1G118
CONTROL
AUDIO
1G118A
BOOTH
AUDIO
1G103
ENT EXAM
SURGERY
1D
CO
RR
ID
OR
1G117A
BOOTH
AUDIO
1G116A
BOOTH
AUDIO
1G117
CONTROL
AUDIO
1G116
CONTROL
AUDIO
1G111
AUD EXAM
SURGERY
1G112
AUD EXAM
SURGERY
1G113
AUD EXAM
SURGERY
1G114
AUD EXAM
SURGERY
1D
CO
RR
ID
OR
1G115
AUD OFFICE
SURGERY
1G102
AUDIO RECEPTION
SURGERY
1G101
AUDIO WAITING
SURGERY
1H110
OFFICE
CHAPLIN
1G135
MAILE TLT
FMS
1G119
ENT EXAM
SURGERY
1G120
ENT EXAM
SURGERY
1G121
ENT EXAM
SURGERY
1G122
ENT EXAM
SURGERY
1D141
CORRIDOR
1D118
CORRIDOR
1G134
EQUIP STORE
PMRS
TG133D
ELECT UTIL
FMS
TG133C
PHONE UTIL
FMS
TG133B
ELEC UTIL
FMS
TG133A
HAC
FMS
1G131
STORAGE
PMRS
1G123
EXAM/OFFICE
OTHER
1H113
KITCHEN
PMRS
1H114
EXAM
PMRS
N/A
FIRE UTIL
FMS
N/A
FIRE UTIL
FMS
1H156
CHIEF
PROSTHETICS
1H158
STORAGE
PROSTHETICS
1H159
OFFICE
PROSTHETICS
1C
CO
RR
ID
OR
1H160
OFFICE
PROSTHETICS1H152
OFFICE
PROSTHETICS
1H155
BREAK ROOM
PROSTHETICS 1H161
OFFICE
PROSTHETICS
1H154
OFFICE
PHROSTHETICS
1H151
OFFICE
PROSTHETICS
1H150
WAITING
PROSTHETICS
1H153
STORAGE
PROSTHETICS
1H157
LAB
PROSTHETICS
STR #5
1H148
MALE TLT
FMS
1H147
FML TLT
FMS
1F129
OFFICE
PHARM
1F111
MED PREP
PHARM
1F125
CLINIC PHARM
PHARM
1F126
OFFICE
PHARM
1F128
CONF RM
PHARM
1F121
OFFICE
PHARM
1F122
OFFICE
PHARM
1F123
OFFICE
PHARM
1F124
BREAK ROOM
PHARM
1B
CO
RR
ID
OR
1C126
CORRIDOR
1F104
WINDOWS
PHARM
1F101
WAITING
PHARM
1F103
RECEPTION
PHARM
1F102
RESEARCH ROOM
PHARM
1F113
VAULT
PHARM
1F109
MED PREP
PHARM
1F117
TECH OFFICE
PHARM
1F119
RO CLOSET
1F138
SUPPLY
PHARM
1F139
CASE MGR
PSYCH
1H140A
ELEC EQUIP
FMS
1H146
HAC
FMS
1H145
TLT
FMS
TA137B
ELEC EQUIP
FMS
TA137C
FIRE EQUIP
FMS
TA137A
ELEC EQUIP
FMS
1E120
HAC
FMS
STR #4
1E113
STAFF BREAK ROOM
ONCOLOGY
1E114
EXAM ROOM
PALLATIVE CARE
1E116
OFFICE
N&FS1E114A
TLT
PALL CARE
1E123
TLT
ONCOLOGY
1E116A
TLT
N&FS
1E117A
TLT
ONCOLOGY
1E129
OFFICE
PALLATIVE CARE
1E128
EXAM / TRMT
PALLATIVE CARE
1E127
OFFICE
ONCOLOGY
1E113A
TLT
ONCOLOGY
1E123A
FIRE UTIL
FMS
1E113C
PHONE UTIL
FMS
1E113B
FIRE UTIL
FMS
1E112
ELECT UTIL
FMS
1E125
CLEAN RM
ONCOLOGY
1E119
TRIAGE
ONCOLOGY
1E118
CLERK
PALL CARE
1B193
CORRIDOR
1B
CO
RR
ID
OR
1F131
SOILED LINEN
FMS
1F132
TRASH
FMS
1F134
CLERK
PHARM
1F133
DEC AFFS
HAS
1F136
ELECT UTIL
FMS
1F135
CART STOR
N&FS
ST
R
TA101C
ELEC UTIL
FMS
STR #1
1D103
TOILET
FMS
1B
CO
RR
ID
OR
1K125
WORK ROOM
CARD/PLMNRY
1K144
ELECT
FMS
1K
HA
C
FM
S
1K121
OFFICE
CARD/PLMNRY
1K120
OFFICE
CARD/PLMNRY
1K119
CLEAN UTILITY
CARD/PLMNRY
1K118
EXAM
CARD/PLMNRY
1B189
ELECT
FMS
1K114
OFFICE
CARD/PLMNRY
1K113
OFFICE
CARD/PLMNRY
1K109
EXAM
CARD/PLMNRY
1K117
EXAM
CARD/PLMNRY
1K122
EXAM
CARD/PLMNRY
1K124
EQ/GAS STORE
CARD/PLMNRY
1B187
CORRIDOR
1K129
OFFICE
CARD/PLMNRY
1K132
ECHO
CARD/PLMNRY
1K126
EXAM
CARD/PLMNRY
1K127
EXAM
CARD/PLMNRY
1K116
EXAM
CARD/PLMNRY
1K115
EXAM
CARD/PLMNRY
1K112
EXAM
CARD/PLMNRY
1K111
EXAM
CARD/PLMNRY
1K128
BREAK ROOM
CARD/PLMNRY
1K
6A
TL
T/
DR
ES
S
CA
RD
/P
LM
NR
Y
1B
CO
RR
ID
OR
1B
CO
RR
ID
OR
1K130
EXAM
CARD/PLMNRY
1K131
EXAM
CARD/PLMNRY
1B216
CORRIDOR
1K108
EXAM
CARD/PLMNRY
1K133
EXAM
CARD/PLMNRY
1K134
EKG
CARD/PLMNRY
1K105
RECEPT
CARD/PLMNRY
1K107
OFFICE
CARD/PLMNRY
1K106
SUB-WAIT
CARD/PLMNRY
1K141
VENDING
CANTEEN
1K138
OFFICE
FISCAL
1K137
CASHIER
FISCAL
1K140
WAITING
FISCAL
1K104
CONSULT
CARD/PLMNRY1K103
WATING
CARD/PLMNRY
1K135
EXAM
CARD/PLMNRY
1K136
STRESS TEST
CARD/PLMNRY
1K136A
OFFICE
CARD/PLMNRY
1K136B
STORAGE
CARD/PLMNRY 1K139
TRAVEL CK
FISCAL1K101
FML TLT
FMS
1D130B
TOILET
FMS
1D128A
MRI COMPUTER RM
IMAGING
1D130A
TOILET
FMS
1D
M
RI
C
ON
TR
OL
IM
AG
IN
G
1D130
MRI 2 COMPUTER RM
IMAGING
1D129
MRI 2 SCANNER
IMAGING
1D127
MRI SCANNER
IMAGING
1D101
TOILET
FMS
1D105
RECEPT / WAITTING
IMAGING
1D104
CONF RM
IMAGING
1D113
RADIOGRAHIC
IMAGING
1D107
OFFICE
IMAGING
1D124
OFFICE
IMAGING
1D125
OFFICE
IMAGING
1D126
BREAK RM
IMAGING1D
IV
C
ON
SE
NT
IM
AG
IN
G
1D118
NUC MED CAMERA 1
IMAGING
1D116A
DECAY CLOSET
IMAGING
1D116
RADIO PHARMACY
IMAGING
1D115
DOSE ADMIN
IMAGING
1D122
CORRIDOR
1D117
TOILET
IMAGING
1D119
NUC MED CAMERA 2
IMAGING
1D120
NUC MED CAMERA 3
IMAGING
1D121
NM READ / PROC
IMAGING
1D141A
TLT
IMAGING
1D123
LOCKERS
IMAGING
1D111
ELEC EQUIP
FMS
1D135
CORRIDOR
1D112
HAC
FMS
1D122
UPTAKE ROOM
IMAGING
1D114
STAFF LOUNGE
IMAGING
1D
CO
RR
ID
OR
1D169
DIV / ANGIO
IMAGING
1D170
DVI CONTROL
IMAGING
1D167
C/T PQ SCANNER
IMAGING
1D151
PHYSICIAN
IMAGING
1D168
C/T CONTROL
IMAGING
1D132
ELEC
FMS
1D131
ELEC EQUIP
FMS
1D133
FIRE EQUIP
FMS
1D148
CORRIDOR
TD149
ELEC EQUIP
FMS
N/A
FIRE EQUIP
FMS
1D150
OFFICE
IMAGING
1D148
OFFICE
IMAGING
1D147
OFFICE
IMAGING
1D146
OFFICE
IMAGING
1D145
RADIOLOGIST
IMAGING
1D142
ULTRASOUND
IMAGING
1D144
COMP ROOM
FMS
1D138
OFFICE
IMAGING
1D140
UTIL
IMAGING
1D137
OFFICE
IMAGING
1D136
OFFICE
IMAGING
1D135
OFFICE
IMAGING
1D134
OFFICE
IMAGING
1B163
NS
PRIME CR
1B166
SOIL UTL
PRIME CR
1B165
CLEAN UTL
PRIME CR
1B167
HC TLT
FMS
1B
CO
RR
ID
OR
1B
CO
RR
ID
OR
1B161
BREAK ROOM
PRIME CARE
1B162
HAC
FMS
1B168
EXAM
PRIME CARE
1B174
OFFICE
EXEC
1B175
OFFICE
EXEC
1B177
VESTIBULE
EXEC
1B176
OFFICE
EXEC
1B173
OPTICAL
SHOP
TC158D
EC
FMS
TC158A
EC
FMS
TC158C
EC
FMS
1J113
EXAM
PRIME CARE
1J112
EXAM
PRIME CARE
1D133
NURSE
NURSING
1J111
EXAM
PRIME CARE
1J110
EXAM
PRIME CARE
1D134
CHIEF NURSE
EXEC OFFICE
1J118B
EXAM
PRIME CARE
TC158B
PHONE
FMS
1J118A
EXAM
PRIME CARE
C1C6
CORRIDOR
C 1C
CO
RR
ID
OR
C 1C
CO
RR
ID
OR
1J106
HAS SUPER
HAS
1J105
EXAM
PRIME CARE
1J115
CLEAN UTIL
PRIME CARE
1J118C
EXAM
PRIME CARE
1J116
MED RM
PRIME CARE
1J114
NURSES STATION
PRIME CARE
1J117
STAFF TLT
FMS
1J108
MALE TLT
FMS
1J107
FML TLT
FMS1J104
RECEPTION
PRIME CARE
1J103
WAITTING
PRIME CARE
1J101
FML TLT
FMS
1A168
OFFICE
CPAC
1A169
OFFICE
CPAC
1J201
CONF ROOM
PRIME CARE1J200
WAITING ROOM
PRIME CARE
1J202
RECEPTION
PRIME CARE
1J205
EXAM
PRIME CARE
1J207
OFFICE
PRIME CARE
1J208
OFFICE
PRIME CARE
1J203
OFFICE
PRIME CARE
1J209
EXAM
PRIME CARE
1J109
BREAK ROOM
PRIME CARE
1J210
EXAM/PROCEDURE
PRIME CARE
1J142
EXAM RM
PRIME CARE
1J142A
TLT
FMS
1J210A
TLT
FMS
1D166
SWITCHGEAR
FMS
1D167
ELECTRICAL
FMS
1J126
SOILD UTL
FMS
1J141
EXAM
PRIME CARE
1J140
EXAM RM
PRIME CARE
1J136
EXAM RM
PRIME CARE
1J133
EXAM RM
PRIME CARE
1J135
EXAM RM
PRIME CARE
1J134
EXAM RM
PRIME CARE1J119
EXAM RM
PRIME CARE
1J120
EXAM RM
PRIME CARE
1J128
EXAM RM
PRIME CARE
1J127
EXAM
PRIME CARE
1J121
EXAM RM
PRIME CARE
1J139
EXAM RM
PRIME CARE
C 1C
CO
RR
ID
OR
C 1C
CO
RR
ID
OR
C 1C
CO
RR
ID
OR
1J137
EXAM RM
PRIME CARE
1J132
EXAM RM
PRIME CARE
1J129
EXAM RM
PRIME CARE
1J124
EXAM RM
PRIME CARE
1J122
EXAM RM
PRIME CARE
1J125
EXAM RM
PRIME CARE
C 1C
CO
RR
ID
OR
1J143A
TLT
FMS
1J143
EXAM
PRIME CARE
C1C1
CORRIDOR
1J138
EXAM
PRIME CARE
1J131
EXAM
PRIME CARE
1J130
EXAM
PRIME CARE
1J123
EXAM
PRIME CARE
1J157
PHY EXTEND
PRIME CARE
1J146
PHYSICIAN
PRIME CARE
1J158
HAC
FMS
1J156
PHYSICIAN
PRIME CARE
1J155
PHYSICIAN
PRIME CARE
1J154
PHYSICIAN
PRIME CARE
1J153
PHYSICIAN
PRIME CARE
1J152
PHYSICIAN
PRIME CARE
1J151
PHYSICIAN
PRIME CARE
1J150
PHYSICIAN
PRIME CARE
1J149
PHYSICIAN
PRIME CARE
1J148
AA ACOS
PRIME CARE 1J145
VESTIBULE
FMS
1J147
PHYSICIAN
PRIME CARE
1A163
SIGNAL
FMS
1A162
ELECTRICAL
FMS
1A170
OFFICE
PODIATRY
1A171
OFFICE
PODIATRY
1A167
OFFICE
PODIATRY1A172
OFFICE
PODIATRY
1A166
OFFICE
PODIATRY
1A165
RECEPTIONIST
MH
1A173
OFFICE
PODIATRY
1A215
STOR/SWING SPACE
ED
1A216
CLEAN
LINEN
1A222
NURSE MGR
ED
1J144
CHIEF
ED
1A218A
SAFE
ACS-ER
1A221
TLT/SHOWER
ACS-ER
1A219
SOILED LINEN
ED
1A218
BREAK ROOM
ED
1B184
VESTIBULE
1B144
OFFICE
PRIME CARE
1B145
OFFICE
PRIME CARE
1B146
OFFICE
PRIME CARE
1B147
OFFICE
PRIME CARE
1B148
OFFICE
PATIENT ADVOCATE
1B150
OFFICE
PRIME CARE
1B151
OFFICE
PRIME CARE
1B152
OFFICE
PRIME CARE
1B153
OFFICE
PRIME CARE
1B154
OFFICE
PRIME CARE
1B155
EXAM
PRIME CARE
1B156
EXAM
PRIME CARE
1B157
EXAM
PRIME CARE
1B158
EXAM
PRIME CARE
1B160
EXAM
PRIME CARE
1B149
OFFICE
PRIME CARE
1B159
EXAM
PRIME CARE
1B
CO
RR
ID
OR
1B171
CORRIDOR
1B142
OFFICE
PRIME CARE
1B141
OFFICE
PRIME CARE
1B140
WORK ROOM
PRIME CARE
1B138
OFFICE
PRIME CARE
1B136
WORK ROOM
PRIME CARE
1B143
OFFICE
PRIME CARE
1B130
OFFICE
PRIME CARE
1B129
OFFICE
PRIME CARE
1B131
OFFICE
PRIME CARE
1B128
OFFICE
PRIME CARE
1B127
MED STORE
PRIME CARE
1B134
SIGNAL
FMS
1B135
ELECTRICAL
FMS
1B180
CORRIDOR
1B126
EXAM #7
PRIME CARE
1B164
ASSESS
PRIME CARE
1B111
EXAM
PRIME CARE1B110
EXAM #2
PRIME CARE
1B114
EXAM #15
PRIME CARE
1B109
EXAM #1
PRIME CARE
1B112
EXAM
PRIME CARE
1B116
EXAM #13
PRIME CARE
1B117
EXAM #12
PRIME CARE
1B118
EXAM #11
PRIME CARE
1B119
EXAM #10
PRIME CARE
1B120
EXAM #9
PRIME CARE
1B121
EXAM #8
PRIME CARE
1B125
EXAM #6
PRIME CARE
1B113
EXAM #3
PRIME CARE
1B124
EXAM #5
PRIME CARE
1B115
EXAM #14
PRIME CARE
1B123
HC TLT
PRIME CARE
1B122
EXAM #4
PRIME CARE
1B124
CORRIDOR
STR #2
1B107
CORRIDOR
1B169
OFFICE
HAS
1B102
RECEPT/CONTROL
HAS
1B107
EXAM ROOM
PRIME CARE
1B106
EXAM ROOM
PRIME CARE
1B104
EXAM ROOM
PRIME CARE
1B105
EXAM ROOM
PRIME CARE
1B103
EXAM
TELEHEALTH
1B107A
HC TLT
PRIME CARE
1B108
WORK ROOM
PRIME CARE
1A161
CORRIDOR
1A161
EXAM ROOM
PODIATRY
1A160
EXAM ROOM
PODIATRY
1A
CO
RR
ID
OR
1A171
PATIENT SAFETY
COS
1A
CO
RR
ID
OR
1A108A
RECEPT
HAS
1A106
ELEV LOBBY
1A107
CORRIDOR
1A105
CORRIDOR
1A113
WAITING
1A102
GALLERY
ACS-PRIM CARE
1A104
GALLERY
CANTEEN
1A103
LOBBY
1A101
VESTIBULE
1A121
CORRIDOR
1A123
OFFICE
GERI-PACT
1A122
OFFICE
GERI/PACT
1A124
MALE HC TLT
EMS
1A125
AOD
HAS
1A149
CORRIDOR
1A146
OFFICE
PRE-OP
1A147
OFFICE
PRE-OP
1A148
OFFICE
PRE-OP
1A126
OFFICE
PRE-OP
1A145
OFFICE
PRE-OP
1A144
OFFICE
PRE-OP
1A143
OFFICE
PRE-OP
1A142
OFFICE
PRE-OP
1A109
HC TLT
EMS
1A110A
OFFICE
VOLUNTARY
1A111
OFFICE
GERI/PACT
1A112
CONF ROOM
GERI/PACT
1A113
EXAM
GERI/PACT
1A114
SUPPLY
GERI/PACT
1A115
EXAM
GERI/PACT
1A116
EXAM
GERI/PACT
1A117
EXAM
GERI/PACT
1A
CO
RR
ID
OR
1A118
EXAM
GERI/PACT
1A119
HAC
FMS
1A139
OFFICE
TELEHEALTH
1A140
OFFICE
TELEHEALTH
1A141
OFFICE
TELEHEALTH
1A150
CORRIDOR
1A131
OFFICE
TELEHEALTH
1A132
OFFICE
TELEHEALTH
1A133
OFFICE
TELEHEALTH
1A134
OFFICE
TELEHEALTH
1A223
HC TLT/SHOWER
ED
1A224
EXAM/SECURITY
ED
1A225
EXAM
ED
1A226
LIFE SUPPORT
ED
1A233
VEST
ED
1A235
VEST
ED
1A135
SOCIAL WORK
GERI/PACT
STR #11A137
SIGNAL
FMS
1A136
ELECTRICAL
FMS
PRIMARY CARE 1
ELEV. #1
ELEV. #2
ELEV. #?
ELEV. #?
ELEV. #?EL
EV
EL
EV
1W106
STICK (POC)
PRIME CARE
1W155
HALL
1W146
MD
PRIME CARE
CARDO/PLMNRY
PO
DI
AT
RY
W
OM
EN
'S
H
EA
LT
H
ELEV. #3
PRIMARY CARE 3
PROCESSING
ENTRANCE
EMERGENCY
21 22 23 24 25 26
G
H
J
K
L
M
N
O
P
Q
R
S
26252423
22212019
T
U
V
7.4
5 6
NO WORK EXCEPT BRINGING DUCT INTO CEILING OF 1A112
AE103
FIRST FLOOR PLANS
1 2
N
11 12
K
L
7 8
J
K
O
P
11 12 13 14 15 16 17 18 19 2015 16 17 18 19
D
C
B
A
20876
H
G
F
E
D
C
B
9 10
J
8 9 10
L
K
J
14 15 16 17
C
131211109874321
EXISTING SERVICE DRIVE
AREAWAY
V.9
5.63.9
S.9
U.2
P
M
N
O
Q
R
REF
A
DN
ELEV. #1
ELEV. #2
ELEV. #3
21 22 23 24 25 26
G
H
J
K
L
M
N
O
P
Q
R
S
26252423
22212019
T
U
V
7.4
5 6
D3
AE103
C2
AE103
C1
AE103
GG
A. xx
M
D4
AE103
5.6 7.4
V.9
U.2
S.9
1. 14" HIGH CONCRETE ELECTRICAL EQUIPMENT PAD. SEE D3/AE401 FOR
PAD ANCHOR DETAIL.
2. REMOVE EXISTING GRID AND TILES TO INSTALL NEW DUCT. REINSTALL
CEILING GRID AND TILES, REPLACING ANY DAMAGED OR MISMATCHED
TILES OR CEILING GRID.
2 2
NOT IN PROJECT SCOPE
2021.04.21 20:14:36 -04'00'
2A250
LAB
2B256
OFFICE
2B251B
STOR.
2B257
2B258
CATH
STAFF
TOILET
2A251A
STOR.
2A252
SURG.
OPER. 2
2A229
LOCKER ROOM
2A201B
DENTAL REC
2A202
MALE
HC TOILET
2A203
FEMALE
HC TOILET
CHASE #2
1A151
CORRIDOR
1A121
CORRIDOR
1A123
OFFICE
GERI-PACT
1A122
OFFICE
GERI/PACT
1A124
MALE HC TLT
EMS
1A125
AOD
HAS
1A109
HC TLT
EMS
1A110A
OFFICE
VOLUNTARY
1A111
OFFICE
GERI/PACT
1A112
CONF ROOM
GERI/PACT
1A113
EXAM
GERI/PACT
1A114
SUPPLY
GERI/PACT
1A115
EXAM
GERI/PACT
C
A1 O
RR DOR
1A 212
AAOD
HAS
1A
MA
LE
HC
E T
MS
LT
1A
A O
G
HC
FF
E
TL
EM
C
RI-
T S
EE
APACTCT
1A
C
O
RR DOR
1 0A0A
FFFF
OLOL
CECE
UNUNTARY
A O
FF
GE
IC
RI/
E
PACT
A
G
EX
ER
AM
RI/PACT
G
A1A S
G
UPPLPL
I/PRI/P C
YY
ACAC
T C
A1
ON
G
F
ER
PROJECT LIMITS
PROJECT LIMITS
E
1A121
CORRIDOR
1A123
OFFICE
GERI-PACT
1A122
OFFICE
GERI/PACT
1A124
MALE HC TLT
EMS
1A125
AOD
HAS
1A109
HC TLT
EMS
1A110A
OFFICE
VOLUNTARY
1A111
OFFICE
GERI/PACT
1A112
CONF ROOM
GERI/PACT
1A113
EXAM
GERI/PACT
1A114
SUPPLY
GERI/PACT
1A115
EXAM
GERI/PACT
1A1A122
AAODDODD
HAHHAH SSSS
1A11A1
MAMMAMA
12121212
LELELELE
HCHHCH
EEEE
C TTC TT
MSMSMSMS
LTLTLTLT
1A1A1A1A
AAAA
OOOO
GG
00090
HCHCHCHC
23232323
FFFFFFFF
GEEGEE
TLTLTLTL
EMEMEMEM
CCCC
RI-RIRI-RI
TT
SSSS
EE
PAACTT
1A11A1
CC
12121212
OOOO
RRRRRRRR DODODODORRRR
1111A1A1
OO
VV
0A0
FFF
OOLOL
CCECE
UUNUNTAATAARYRYRYRY
1AAAA
OO
2222222
FFFFFFFF
GEGEGEGE
ICICICIC
RI/RI/RI/RI/
EE
PAACTT
AAAA
GG
15151515
EXEXEXEX
EEEE
AMAMAMAM
RI/PRI/PRI/PRI/PACAACA TTTT
G
A1A
SS
G
14141414
UPPUPUP
ERERERER
P
PLL
RI/PI/P C
RO
Y
ACA
JE
TT
TCT
A1A
OO
GG
LIMLIML
FFF
ERER
MIT
CECE
I/PI/P
S
P
ACAC
RORO
TTTT
JE TCT LIMMITS
CC
A1A
ONON
GG
F
ERER
RORO
I/PI/P
OMOM
ACACTT
AAAA
GG
13131313
EXEXEXEX
EEEE
AMAM
RI/PRI/PACA TT
PROJECT LIMITS
PROJECT LIMITS
DEMO EXISTING CEILING AT NEW PARTITION.
REPAIR CEILING AT NEW PARTITION.
MTL RUNNER TRACK
UNDERSIDE OF STRUCTURE
16 GAUGE 4" MTL STUDS, 16" O.C. MAX
MTL RUNNER TRACK
STOP GWB 5/8" ABOVE FLOOR.
INSTALL CONTINUOUS SEALANT
5/8" GWB ON ONE SIDE OF 4" MTL STUDS.
5/8" GWB ONE SIDE (TYPE X)
EXISTING FLOOR SLAB
16 GAUGE 4" MTL STUDS, 16" O.C. MAX
NEW RUBBER BASE TO MATCH EXISTING
PAINT GWB TO MATCH EXISTING. FINISH GWB
TO LEVEL 5 FINISH.
PROVIDE FRAMING
FOR ACCESS PANELS
PAINT EXISTING CEILING IF HARD CEILING. CUT AND MODIFY ACT
CEILING AND INSTALL NEW WALL MOULDING ON NEW WALL.
2A251A
STOR.
NEW DUCT CHASE
1 2 3 4 5
D C
B A
D C
B A
1 2 3 4 5 6
6" th re e in ch es o ne fo ot
6" th re e qu ar te rs in ch o ne fo ot
6" on e in ch o ne fo ot on e an d on e ha lf in ch es o ne fo ot on e ha lf in ch o ne fo ot
6" th re e ei gh th s in ch o ne fo ot on e ei gh th in ch o ne fo ot on e qu ar te r i nc h on e fo ot
PROJECT NUMBER
BUILDING NUMBER
DRAWING NUMBER
PROJECT TITLE
LOCATION
ISSUE DATE CHECKED DRAWN
DRAWING TITLE
APPROVED
FULLY SPRINKLERED
OFFICE OF
CONSTRUCTION
AND FACILITIES
MANAGEMENT
U.S. Department of Veterans Affairs
PHASEARCHITECT/ENGINEER OF RECORD
A/E:
STAMP
HARRELL DESIGN GROUP PC
8016 TOWER POINT DRIVE
CHARLOTTE, NC 28227
704-814-1346 POC: LEE HARRELL PE, LEED AP, QCxP
PRESIDENT
COPYRIGHT © 2021
WWW.HARRELLDG.COM
637-19-102
APRIL , 2021
HDG PROJECT: 19037Revision Number Revisions: Date:
CHARLES GEORGE VA MEDICAL CENTER
UPGRADE HVAC, B-47 PHASE 5CONSTRUCTION
DOCUMENTS %
H D E S I G N G R O U P , P C
ARRE L L
AE104
FIRST AND SECOND FLOOR PLANS
N
O
24 25
N
O
B2
AE104
GG
A. XX
FIRST FLOOR PLAN
SECOND FLOOR PLAN
D2
AE104
1. NEW PARTITION.
2. DEMOLISH EXISTING CEILING AT NEW PARTITION. REPAIR CEILING AT
NEW PARTITION AND PAINT.
3. 24"X24" ACCESS PANEL, MOUNTED 12" ABOVE FLOOR TO BOTTOM OF
PANEL DOOR OPENING. CENTER ON NEW DUCT.
4. NEW DUCT - SEE DRAWING MH103.
5. CLOSE DOORS DURING CONSTRUCTION. PROVIDE CLASS IV ICRA
MEASURES DURING CONSTRUCTION.
6. SAW CUT PORTIONS OF ELEVATED SLAB FOR DUCT PENETRATIONS.
DO NOT CUT THRU BEAMS, JOISTS OR OTHER STRUCTURAL MEMBERS.
ONLY SAW CUT THE ELEVATED SLAB. INSTALL FIRE DAMPER PER
MANUFACTURER REQUIREMENTS.
7. CONTRACTOR MAY ONLY USE THIS ROOM FOR STAGING FOR WORK IN
THIS ROOM.
8. CEILING GRID AND TILE TO BE REMOVED FOR INSTALLATION OF NEW
DUCT. REINSTALL GRID AND TILE AFTER DUCT INSTALLATION IS
COMPLETE.
EXISTING SERVICE DRIVE
AREAWAY
REF
DN
ELEV. #1
ELEV. #2
ELEV. #3
NOT IN PROJECT SCOPE
5 5
DOES NEW PARTITION GET INSTALLED ON TOP
OF EXISTING FLOORING?
2021.04.21 20:15:00 -04'00'
TU
-5
-2
TU-5-2
TU
-5
-1
PROJECT LIMITS
TU
-5
-2
TU-5-2
TU-5-13
TU
-5
-1
STAFF
SUR OFF
2B217
STAFF
SUR OFF
2B214
CLEAN
2B202
ENDO #1
2B203
SOIL
2B201A
CLEAN UP
2B204
ENDO #2
2B205
STORAGE
ROOM
2B210
PHYS.
OFFICE
2B208
OFFICE
2B209
CHANGE
2B206
HC TLT.
2B207
H
AC
2B
NURSE
SUB-STATION
2B201
PROJECT LIMITS
PR
O
JE
C
T
LI
M
IT
S
PR
O
JE
C T
LI
M
IT
S
PR
O
JE
C
T
LI
M
IT
S
PR
O
JE
C T
LI
M
IT
S
PROJECT LIMITS
1 2 3 4 5 6
D C
B A
1 2 3 4 5 6
PROJECT NUMBER
BUILDING NUMBER
DRAWING NUMBER
PROJECT TITLE
LOCATION
ISSUE DATE CHECKED DRAWN
DRAWING TITLE
APPROVED
FULLY SPRINKLERED
OFFICE OF
CONSTRUCTION
AND FACILITIES
MANAGEMENT
U.S. Department of Veterans Affairs
PHASEARCHITECT/ENGINEER OF RECORD
A/E:
STAMP
HARRELL DESIGN GROUP PC
8016 TOWER POINT DRIVE
CHARLOTTE, NC 28227
704-814-1346 POC: LEE HARRELL PE, LEED AP, QCxP
PRESIDENT
COPYRIGHT © 2021
WWW.HARRELLDG.COM
637-19-102
APRIL , 2021
HDG PROJECT: 19037Revision Number Revisions: Date:
CHARLES GEORGE VA MEDICAL CENTER
UPGRADE HVAC, B-47 PHASE 5CONSTRUCTION
DOCUMENTS %
H D E S I G N G R O U P , P C
ARRE L L
AE105
SECOND FLOOR PLAN
GG
A. XX
D2
AE105
NOT IN PROJECT SCOPE
1. REMOVE EXISTING GRID AND TILES TO INSTALL NEW DUCT. REINSTALL
CEILING GRID AND TILES, REPLACING ANY DAMAGED OR MISMATCHED
TILES OR CEILING GRID.
2021.04.21 20:15:31 -04'00'
FIRST FLOOR ROOF
H
G
J
L
K
J
P
M
JN
O
FIRST FLOOR ROOF
H
G
J
L
K
J
P
M
JN
O
32 32 74 5 6 74 5 6 12111098 1211109811
1 2 3 4 5
D C
B A
D C
B A
1 2 3 4 5 6
6" th re e in ch es o ne fo ot
6" th re e qu ar te rs in ch o ne fo ot
6" on e in ch o ne fo ot on e an d on e ha lf in ch es o ne fo ot on e ha lf in ch o ne fo ot
6" th re e ei gh th s in ch o ne fo ot on e ei gh th in ch o ne fo ot on e qu ar te r i nc h on e fo ot
PROJECT NUMBER
BUILDING NUMBER
DRAWING NUMBER
PROJECT TITLE
LOCATION
ISSUE DATE CHECKED DRAWN
DRAWING TITLE
APPROVED
FULLY SPRINKLERED
OFFICE OF
CONSTRUCTION
AND FACILITIES
MANAGEMENT
U.S. Department of Veterans Affairs
PHASEARCHITECT/ENGINEER OF RECORD
A/E:
STAMP
HARRELL DESIGN GROUP PC
8016 TOWER POINT DRIVE
CHARLOTTE, NC 28227
704-814-1346 POC: LEE HARRELL PE, LEED AP, QCxP
PRESIDENT
COPYRIGHT © 2021
WWW.HARRELLDG.COM
637-19-102
APRIL 16, 2021
HDG PROJECT: 19037Revision Number Revisions: Date:
CHARLES GEORGE VA MEDICAL CENTER
UPGRADE HVAC, B-47 PHASE 5CONSTRUCTION
DOCUMENTS 100%
H D E S I G N G R O U P , P C
ARRE L L
AE106
ROOF PLAN
GG
A. DUCT AND PIPE SIZES SHOWN ON DRAWING INCLUDE DUCT OR PIPE
AND INSULATION.
B. COORDINATE EXACT ROOF OPENING WITH SUBCONTRACTOR AND
COORDINATION DRAWINGS PRIOR TO CUTTING OPENINGS.
1. RE-ROOF THIS AREA. SEE SPECS FOR WORK. RE-ROOF AND REPAIR
EXISTING ROOF IN THIS AREA TO MAINTAIN EXISTING FACTORY
WARRANTY, IF IN EFFECT. REMOVE EXISTING ROOFING AND
INSULATION TO ALLOW NEW CURB TO BE SET.
2. DUCT - SEE MECHANICAL DRAWINGS
3. EQUIPMENT - SEE MECHANICAL DRAWINGS
8-1/2" DIA AND 7" DIA
PIPE
28"X16" DUCT44"X16" DUCT
14"X14" DUCT
12"X12" DUCT
22"X16" DUCT
24"X16" DUCT
FIRST FLOOR ROOF
SECOND FLOOR ROOF
SECOND
FLOOR
ROOF FIRST
FLOOR
ROOF
SIXTH FLOOR ROOF
SIXTH FLOOR ROOF SIXTH FLOOR ROOF
PENTHOUSE ROOF
FIRST
FLOOR
ROOF
FIRST FLOOR ROOF
FIRST FLOOR ROOF
FIRST
FLOOR
ROOF
LOWER
ROOF
FIRST
FLOOR
ROOF
HIGHER
ROOF
11 12 13 14 15 16 17 18 19 2015 16 17 18 19
D
C
B
A
20876
H
G
F
E
D
C
B
9 10
J
8 9 10
L
K
J
14 15 16 17
C
1312111098
V.9
5.63.9
S.9
U.2
P
M
JN
O
Q
R
A
21 22 23 24 25 26
G
H
J
K
L
M
N
O
P
Q
R
S
26252423
T
U
V
7.4
5 6
D1
AE106
2021.04.21 20:15:59 -04'00'
SECOND FLOOR ROOF
SECOND
FLOOR
ROOF
FIRST
FLOOR
ROOF
FIRST
FLOOR
ROOF
G
H
J
K
L
M
N
O
P
SECOND FLOOR ROOF
SECOND
FLOOR
ROOF
FIRST
FLOOR
ROOF
FIRST
FLOOR
ROOF
G
H
J
K
L
M
N
O
P
16 17 18 1916 17 18 19 2120 2120 2222 26252423 26252423
1 2 3 4 5
D C
B A
D C
B A
1 2 3 4 5 6
6" th re e in ch es o ne fo ot
6" th re e qu ar te rs in ch o ne fo ot
6" on e in ch o ne fo ot on e an d on e ha lf in ch es o ne fo ot on e ha lf in ch o ne fo ot
6" th re e ei gh th s in ch o ne fo ot on e ei gh th in ch o ne fo ot on e qu ar te r i nc h on e fo ot
PROJECT NUMBER
BUILDING NUMBER
DRAWING NUMBER
PROJECT TITLE
LOCATION
ISSUE DATE CHECKED DRAWN
DRAWING TITLE
APPROVED
FULLY SPRINKLERED
OFFICE OF
CONSTRUCTION
AND FACILITIES
MANAGEMENT
U.S. Department of Veterans Affairs
PHASEARCHITECT/ENGINEER OF RECORD
A/E:
STAMP
HARRELL DESIGN GROUP PC
8016 TOWER POINT DRIVE
CHARLOTTE, NC 28227
704-814-1346 POC: LEE HARRELL PE, LEED AP, QCxP
PRESIDENT
COPYRIGHT © 2021
WWW.HARRELLDG.COM
637-19-102
APRIL 16, 2021
HDG PROJECT: 19037Revision Number Revisions: Date:
CHARLES GEORGE VA MEDICAL CENTER
UPGRADE HVAC, B-47 PHASE 5CONSTRUCTION
DOCUMENTS 100%
H D E S I G N G R O U P , P C
ARRE L L
AE107
ROOF PLAN
GG
20"X20" DUCT
18"X18" DUCT
9" PIPE AND 7-1/4" PIPE
46"X20" DUCT
38"X20" DUCT
1. RE-ROOF THIS AREA. SEE SPECS FOR WORK. RE-ROOF AND REPAIR
EXISTING ROOF IN THIS AREA TO MAINTAIN EXISTING FACTORY
WARRANTY, IF IN EFFECT. REMOVE EXISTING ROOFING AND
INSULATION TO ALLOW NEW CURB TO BE SET.
2. DUCT - SEE MECHANICAL DRAWINGS
3. EQUIPMENT - SEE MECHANICAL DRAWINGS
FIRST FLOOR ROOF
SECOND FLOOR ROOF
SECOND
FLOOR
ROOF FIRST
FLOOR
ROOF
SIXTH FLOOR ROOF
SIXTH FLOOR ROOF SIXTH FLOOR ROOF
PENTHOUSE ROOF
FIRST
FLOOR
ROOF
FIRST FLOOR ROOF
FIRST FLOOR ROOF
FIRST
FLOOR
ROOF
LOWER
ROOF
FIRST
FLOOR
ROOF
HIGHER
ROOF
11 12 13 14 15 16 17 18 19 2015 16 17 18 19
D
C
B
A
20876
H
G
F
E
D
C
B
9 10
J
8 9 10
L
K
J
14 15 16 17
C
1312111098
V.9
5.63.9
S.9
U.2
P
M
JN
O
Q
R
A
21 22 23 24 25 26
G
H
J
K
L
M
N
O
P
Q
R
S
26252423
T
U
V
7.4
5 6
D1
AE107
A. DUCT AND PIPE SIZES SHOWN ON DRAWING INCLUDE DUCT OR PIPE
AND INSULATION.
B. COORDINATE EXACT ROOF OPENING WITH SUBCONTRACTOR AND
COORDINATION DRAWINGS PRIOR TO CUTTING OPENINGS.
2021.04.21 20:16:29 -04'00'
PAINT CHAMFER
FEDERAL SAFETY
YELLOW
CONCRETE EQUIPMENT PAD,
WITH #3@10" OC EACH WAY AT
MID-DEPTH; ALL OTHER PADS
UP TO 12" THICK WITH #4@12"
OC EACH WAY AT MID-DEPTH
FLOOR SLAB, SEE
STRUCTURAL DRAWINGS FOR
TYPE
#4 DOWEL ANCHORS EPOXIED
INTO FLOOR EVERY 16" OC MAX
TOP OF PAD TO
BE PLUMB AND
LEVEL
PAINT CHAMFER
FEDERAL SAFETY
YELLOW
CONCRETE EQUIPMENT PAD,
WITH #3@10" OC EACH WAY AT
MID-DEPTH; ALL OTHER PADS
UP TO 12" THICK WITH #4@12"
OC EACH WAY AT MID-DEPTH
FLOOR SLAB, SEE
STRUCTURAL DRAWINGS FOR
TYPE
#4 DOWEL ANCHORS EPOXIED
INTO FLOOR EVERY 16" OC MAX
TOP OF PAD TO
BE PLUMB AND
LEVEL
1 2 3 4 5
D C
B A
D C
B A
1 2 3 4 5 6
6" th re e in ch es o ne fo ot
6" th re e qu ar te rs in ch o ne fo ot
6" on e in ch o ne fo ot on e an d on e ha lf in ch es o ne fo ot on e ha lf in ch o ne fo ot
6" th re e ei gh th s in ch o ne fo ot on e ei gh th in ch o ne fo ot on e qu ar te r i nc h on e fo ot
PROJECT NUMBER
BUILDING NUMBER
DRAWING NUMBER
PROJECT TITLE
LOCATION
ISSUE DATE CHECKED DRAWN
DRAWING TITLE
APPROVED
FULLY SPRINKLERED
OFFICE OF
CONSTRUCTION
AND FACILITIES
MANAGEMENT
U.S. Department of Veterans Affairs
PHASEARCHITECT/ENGINEER OF RECORD
A/E:
STAMP
HARRELL DESIGN GROUP PC
8016 TOWER POINT DRIVE
CHARLOTTE, NC 28227
704-814-1346 POC: LEE HARRELL PE, LEED AP, QCxP
PRESIDENT
COPYRIGHT © 2021
WWW.HARRELLDG.COM
637-19-102
APRIL 16, 2021
HDG PROJECT: 19037Revision Number Revisions: Date:
CHARLES GEORGE VA MEDICAL CENTER
UPGRADE HVAC, B-47 PHASE 5CONSTRUCTION
DOCUMENTS 100%
H D E S I G N G R O U P , P C
ARRE L L
AE401
DETAILS
GG
1 XX
CUT EDGE SEALANT
TPO CUSTOM
CURB FLASHING
TPO MEMBRANE
2" MIN. HAND WELD AT JOINING LAP OF CURB
FLASHING (TYP.)
CURB
CUT EDGE SEALANT
VERTICAL T-JOINT COVER - TYP.
FLASHING MEMBRANE
RAISED CURB
RIGID INSULATION
COUNTERFLASHING
TREATED WOOD NAILER
1'' MINIMUM BELOW TOP OF CURB
SEALING MATERIAL - MUST BE CONTINUOUS ON TOP OF THE
CURB
BASE OF UNIT EXTENDS 1/2'' MINIMUM BEYOND TOP OF CURB
MECHANICAL UNIT, HOOD, ETC.
PRESSURE TREATED
WOOD NAILER
SEALING MATERIAL
SEAM PLATES
AND FASTENERS
ROOF INSULATION
FLASHING
MEMBRANE
REMOVABLE SHEET METAL
COUNTERFLASHING
GASKETED
FASTENERS
PREMANUFACTURED
RAISED CURB
FLASHING DETAIL
CURB SECTION
FULLY ADHERED TPO
ROOFING SYSTEMWOOD NAILERS AND
CANT STRIP
COVER BOARD
COMPOSITE SLAB
CURB ISOMETRIC
B4
MH504
A6
MH504
C6
MH504B4
MH504
Jonathan M. Carr, AIA, NCARB, CDT
2021.04.21 20:16:57 -04'00'
C
B A
D C
B A
1 2 3 4 5 6
6" th re e in ch es o ne fo ot
6" th re e qu ar te rs in ch o ne fo ot
6" on e in ch o ne fo ot on e an d on e ha lf in ch es o ne fo ot on e ha lf in ch o ne fo ot
6" th re e ei gh th s in ch o ne fo ot on e ei gh th in ch o ne fo ot on e qu ar te r i nc h on e fo ot
PROJECT NUMBER
BUILDING NUMBER
DRAWING NUMBER
PROJECT TITLE
LOCATION
ISSUE DATE CHECKED DRAWN
DRAWING TITLE
APPROVED
FULLY SPRINKLERED
OFFICE OF
CONSTRUCTION
AND FACILITIES
MANAGEMENT
U.S. Department of Veterans Affairs
PHASEARCHITECT/ENGINEER OF RECORD
A/E:
STAMP
HARRELL DESIGN GROUP PC
8016 TOWER POINT DRIVE
CHARLOTTE, NC 28227
704-814-1346 POC: LEE HARRELL PE, LEED AP, QCxP
PRESIDENT
COPYRIGHT © 2021
WWW.HARRELLDG.COM
637-19-102
APRIL 16, 2021
HDG PROJECT: 19037Revision Number Revisions: Date:
CHARLES GEORGE VA MEDICAL CENTER
UPGRADE HVAC, B-47 PHASE 5CONSTRUCTION
DOCUMENTS 100%
H D E S I G N G R O U P , P C
ARRE L L
AE402
ROOF DETAILS
GG
SUBSTRATE
TPO MEMBRANE
INSULATION
WELDED SPLICE
2" (51 mm) MIN. 1/
2"
1" (1 m m m m
R O
U N
D P
EN
ET
R
AT
IO
N
SUBSTRATE
INSULATION
8" (2 m m ) M
IN
ACCEPTABLE BONDING ADHESIVE
STAINLESS STEEL CLAMPING RING NOTE:
1. REMOVE ALL EXISTING FLASHING, LEAD, ETC.
PIPE SURFACE MUST BE FREE OF ALL RUST,
GREASE, INSULATION, ETC.
3. PIPE MUST BE ANCHORED TO ENSURE
STABILITY.
4. NO WRINKLES OR FOLDS PERMITTED UNDER
CLAMPING RING.
5. DO NOT USE WHEN SERVICE LINE TEMP.
EXCEEDS 160 °F. REFER TO UT- P-6 & UT-P-7.
6. ACCEPTABLE BONDING ADHESIVE REQUIRED
BETWEEN MEMBRANE AND INSULATION FOR
ADHERED SYSTEMS.
ACCEPTABLE BONDING
ADHESIVE (SEE NOTE #6)
FIRESTONE FASTENER AND HD OR HD PLUS SEAM PLATE @
12" (305 mm) O.C. MAX.
TPO FLASHING (UNSUPPORTED) OR TPO
MEMBRANE AS FLASHING
TPO MEMBRANE AS FLASHING
CONTINUOUS BEAD OF AP SEALANT
SUBSTRATE
INSULATION
SUBSTRATE
PE
N
ET
R
AT
IO
N (H
O T
ST
AC
K)
1/2
1" (1
3 m m
- 2 5 m m)
WELDED SPLICE
2" (51 mm) MIN.
8" (2 m m ) M
IN
INSULATION
TPO MEMBRANE
ACCEPTABLE BONDING ADHESIVE
NOTES:
1. REMOVE ALL EXISTING FLASHING, LEAD, ETC.
PIPE SURFACE MUST BE FREE OF ALL RUST,
GREASE, INSULATION, ETC.
3. PIPE MUST BE ANCHORED TO ENSURE STABILITY.
4. NO WRINKLES OR FOLDS UNDER CLAMPING RING.
5. ACCEPTABLE BONDING ADHESIVE REQUIRED
BETWEEN MEMBRANE AND INSULATION FOR
ADHERED SYSTEMS.
6. FASTENER AND HD SEAM PLATE REQUIRE FOR MAS
ONLY.
7. WHEN REINFORCEMENT OF TPO MEMBRANE IS
EXPOSED, CUT EDGE SEALANT APPLICATION.
ACCEPTABLE BONDING ADHESIVE
FASTENER AND SEAM PLATE @
12" (305 mm) O.C. MAX. (SEE NOTE #6)
TPO FLASHING (UNSUPPORTED) OR TPO
MEMBRANE AS FLASHING
TPO FLASHING (UNSUPPORTED)
CONTINUOUS BEAD OF
TEMPERATURE OR HIGH GRADE
SEALANT
FIELD FABRICATED METAL HOOD BY OTHERS
(REQUIRED)
INSULATED METAL SLEEVE BY
OTHERS
CONTINUOUS BEAD OF
FIRESTONE AP SEALANT
STAINLESS STEEL CLAMPING
RING
FASTENER AND SEAM PLATE
AT 12" (300 mm) O.C. MAX.
WELDED SPLICE 2" (50 mm) MIN.
TPO CUSTOM PIPE BOOT
ULTRAPLY TPO MEMBRANE
T-JOINT PATCH AT BASE FLASHING OVERLAP (SEE
NOTE #5)
CUT EDGE SEALANT (SEE NOTE #8)
8" (2 m m ) M
IN
WELDED SPLICE 2" (50 mm) MIN.
(SPLIT BOOT ONLY)
CONTINUOUS BEAD OF
TPO SEALANT
NOTE:
1. REMOVE ALL EXISTING FLASHING, LEAD, ETC.
PIPE SURFACE MUST BE FREE OF ALL RUST, GREASE, INSULATION, ETC.
2. PENETRATION MUST BE ANCHORED TO ENSURE STABILITY.
4. DO NOT USE WHEN SERVICE LINE TEMP. EXCEEDS 160 °F. REFER TO UT-P-6 &
UT-P-7.
5. T-JOINT PATCH REQUIRED AT SEAM OVERLAP AND VERTICAL TRANSITION.
6. FASTENER AND HD SEAM PLATE REQUIRE FOR MAS ONLY.
7. APPLY CUT EDGE SEALANT TO ANY EDGES WHERE SCRIM REINFORCEMENT IS
EXPOSED.
8. BONDING ADHESIVE REQUIRED UNDER CUSTOM PIPE BOOT VERTICAL
FLASHING.
9. ACCEPTABLE PRIMER REQUIRED UNDER FLASHING.
5.5" TPO FLASHING OR 6" FLASHING
T-JOINT PATCH AT VERTICAL TRANSITION (SEE
NOTE #5)
A. HOT DIP GALVANIZE NEW TEMPORARY STEEL.
B. CUT HOLES IN EXISTING ROOF TO INSTALL NEW POSTS
FOR UNIT FRAMES. AFTER DISMANTLING TEMPORARY
STEEL, REPAIR ROOF.
Jonathan M. Carr, AIA, NCARB, CDT
2021.04.21 20:17:25 -04'00'
CL
CONCRETE PANEL
3" ALUMINUM PANEL
DO NOT DISTURB CONTINUOUS
EXISTING REGLET
REMOVE ALUMINUM PANELS AT DUCT
PENETRATIONS. MODIFY / CUT
EXISTING PANELS TO CONFORM TO
ROUGH OPENING SIZE
NEW DUCT / INSULATION /
JACKET PENETRATING
PENTHOUSE EXTERIOR WALL
CONTINUOUS SEALANT BEAD
INSTALL CONTINUOUS BACKER
ROD & SEALANT ON INSIDE OF
PENTHOUSE
ROUGH OPENING IN CONCRETE
PANEL IS DUCT/ INSULATION /
JACKET DIMENSION PLUS 4"
AFTER REMOVAL OF TEMPORARY
DUCT, INSTALL NEW BLANKED AND
INSULATED LOUVER TO MATCH
EXISTING LOUVERS
1' -0
" M
IN
FILL ANNULAR SPACE WITH
MINERAL WOOL, CONTINUOUS.
6"
INSTALL NEW MATCHING
ALUMINUM DUCT COLLAR AROUND
DUCT. COLLAR TO MATCH
EXISTING ALUMINUM PANELS
ULTRAFL
PROTECT SPRAY FIRE PROOFING
DURING CONSTRUCTION (TYP).
REPAIR WITH 2-HOUR SPRAY IF
DAMAGED (UL P702).
PIPE
NOTES:
1. PRIME ALL NON POROUS SURFACES
WITH FLASHING PRIMER.
2. APPLY BASE AND LIQUID FLASHING PER
MANUFACTURER.
3. OVERLAP NEW AND EXISTING ROOFING
PER MANUFACTURER.
EXISTING ROOF
EXISTING ROOF INSUL.
EXISTING COVERBOARD
BASE FLASHING
LIQUID FLASHING
RO
OF
IN
G
PE
R
MA
NU
F.
RE
CO
MM
EN
DA
TI
ON
S
ROOFING PER MANUF.
RECOMMENDATIONS
REMOVE EXISTING ROOFING AND
SUBSTRATE FOR PENETRATION.
REPLACE W/ SIMILAR MATERIALS.
TOP OF EXISTING STEEL
CAP SHEET W/
GRANULAR COATING
BASE AND PLY SHEETS
COVERBOARD
PROTECT SPRAY FIRE PROOFING
DURING CONSTRUCTION (TYP).
REPAIR WITH 2-HOUR SPRAY IF
DAMAGED (UL P702).
CONTINUOUS FIRE CAULK TO
MAINTAIN ROOF RATING
STEEL TUBE
EXISTING ROOF
EXISTING ROOF INSUL.
EXISTING COVERBOARD
REMOVE EXISTING ROOFING AND
SUBSTRATE FOR PENETRATION.
REPLACE W/ SIMILAR MATERIALS.
TOP OF EXISTING STEEL
CL
BASE FLASHING AND CAP
SHEETS
CAP SHEET W/
GRANULAR COATING
BASE AND PLY SHEETS
1/4" GALV. BOLTS 6" O.C.
FIRE RETARDANT TREATED
WOOD BLOCKING, TYP.
STEEL TUBE
SEE STRUCT. DWGS
NOTES:
1. PRIME ALL NON POROUS SURFACES WITH
FLASHING PRIMER.
2. APPLY BASE AND LIQUID FLASHING PER
MANUFACTURER.
3. OVERLAP NEW AND EXISTING ROOFING PER
MANUFACTURER.
4. WOOD NAILERS MUST BE INSTALLED WITH
SUITABLE FASTENERS TO MEET APPLICABLE
BUILDING CODES (200 LBS PER LINEAR FOOT
MIN IN ANY GIVEN DIRECTION).
RO
OF
IN
G
PE
R
MA
NU
F.
RE
CO
MM
EN
DA
TI
ON
S
ROOFING PER MANUF.
RECOMMENDATIONS
CONT. BEAD OF SEALANT
PROTECT SPRAY FIRE PROOFING
DURING CONSTRUCTION (TYP).
REPAIR WITH 2-HOUR SPRAY IF
DAMAGED (UL P702).
UMBRELLA TYPE POCKET
FLASHING AT EACH TUBE
SECTION PER SMACNA
6TH EDITION, FIG. 4-16B
CANT
COVERBOARD
CONTINUOUS VAPOR
BARRIER MEMBRANE
FILL ANNULAR SPACE W/
MINERAL WOOL
EXISTING ROOF
EXISTING ROOF INSUL.
EXISTING COVERBOARD
REMOVE EXISTING ROOFING AND
SUBSTRATE FOR PENETRATION.
REPLACE W/ SIMILAR MATERIALS.
TOP OF EXISTING STEEL
BASE FLASHING AND CAP
SHEETS
CAP SHEET W/
GRANULAR COATING
BASE AND PLY SHEETS
1/4" GALV. BOLTS 6" O.C.
NOTES:
1. PRIME ALL NON POROUS SURFACES WITH
FLASHING PRIMER.
2. APPLY BASE AND LIQUID FLASHING PER
MANUFACTURER.
3. OVERLAP NEW AND EXISTING ROOFING PER
MANUFACTURER.
4. WOOD NAILERS MUST BE INSTALLED WITH
SUITABLE FASTENERS TO MEET APPLICABLE
BUILDING CODES (200 LBS PER LINEAR FOOT
MIN IN ANY GIVEN DIRECTION).
RO
OF
IN
G
PE
R
MA
NU
F.
RE
CO
MM
EN
DA
TI
ON
S
ROOFING PER MANUF.
RECOMMENDATIONS
UMBRELLA TYPE POCKET
FLASHING AT EACH TUBE
SECTION PER SMACNA
6TH EDITION, FIG. 4-16B
CANT
COVERBOARD
FIRE RETARDANT TREATED
WOOD BLOCKING, TYP.
CONTINUOUS VAPOR
BARRIER MEMBRANE
FILL ANNULAR SPACE W/
MINERAL WOOL
DUCT W/ INSULATED JACKET
SEE MECH. DWGS
CONT. BEAD OF SEALANT
BREAK METAL ANGLE.
SEE STRUCT. DRAWINGS
ROUGH OPENING IN ROOF IS
DUCT/ INSULATION / JACKET
DIMENSION PLUS 4"
CONTINUOUS FIRE CAULK TO
MAINTAIN ROOF RATING
EXISTING ROOF
EXISTING ROOF INSUL.
EXISTING COVERBOARD
REMOVE EXISTING ROOFING AND
SUBSTRATE FOR PENETRATION.
REPLACE W/ SIMILAR MATERIALS.
TOP OF EXISTING STEEL
CAP SHEET W/
GRANULAR COATING
BASE AND PLY SHEETS
NOTES:
1. PRIME ALL NON POROUS SURFACES WITH
FLASHING PRIMER.
2. APPLY BASE AND LIQUID FLASHING PER
MANUFACTURER.
3. OVERLAP NEW AND EXISTING ROOFING PER
MANUFACTURER.
4. WOOD NAILERS MUST BE INSTALLED WITH
SUITABLE FASTENERS TO MEET APPLICABLE
BUILDING CODES (200 LBS PER LINEAR FOOT
MIN IN ANY GIVEN DIRECTION).
COVERBOARD
BREAK METAL ANGLE.
SEE STRUCT. DRAWINGS
CONTINUOUS FIRE CAULK TO
MAINTAIN ROOF RATING
NO
N-
SH
RI
NK
IN
G
GR
OU
T
PE
NE
TR
AT
IO
N
PE
NE
TR
AT
IO
N
BASE FLASHING
LIQUID FLASHING
SHEET METAL PITCH PAN,
SOLDERED/WELDED WATERTIGHT
NON-SHRINK GROUTLIQUID FLASHING (MIN 2") COVERAGE
AROUND PENETRATIONS)
4" MINIMUM FLANGE SET IN LIQUID
FLASHING OVER FIELD PLIES (PRIME
FLANGE WITH PRIMER)
ROOFING PER MANUF.
RECOMMENDATIONS
A. HOT DIP GALVANIZED NEW STEEL.
B. CUT HOLES IN EXISTING ROOF TO INSTALL NEW POSTS
FOR UNIT FRAMES.
1 2 3 4 5
D C
B A
D C
B A
1 2 3 4 5 6
6" th re e in ch es o ne fo ot
6" th re e qu ar te rs in ch o ne fo ot
6" on e in ch o ne fo ot on e an d on e ha lf in ch es o ne fo ot on e ha lf in ch o ne fo ot
6" th re e ei gh th s in ch o ne fo ot on e ei gh th in ch o ne fo ot on e qu ar te r i nc h on e fo ot
PROJECT NUMBER
BUILDING NUMBER
DRAWING NUMBER
PROJECT TITLE
LOCATION
ISSUE DATE CHECKED DRAWN
DRAWING TITLE
APPROVED
FULLY SPRINKLERED
OFFICE OF
CONSTRUCTION
AND FACILITIES
MANAGEMENT
U.S. Department of Veterans Affairs
PHASEARCHITECT/ENGINEER OF RECORD
A/E:
STAMP
HARRELL DESIGN GROUP PC
8016 TOWER POINT DRIVE
CHARLOTTE, NC 28227
704-814-1346 POC: LEE HARRELL PE, LEED AP, QCxP
PRESIDENT
COPYRIGHT © 2021
WWW.HARRELLDG.COM
637-19-102
APRIL 16, 2021
HDG PROJECT: 19037Revision Number Revisions: Date:
CHARLES GEORGE VA MEDICAL CENTER
UPGRADE HVAC, B-47 PHASE 5CONSTRUCTION
DOCUMENTS 100%
H D E S I G N G R O U P , P C
ARRE L L
AE403
ROOF DETAILS
2021.04.21 20:17:57 -04'00'
A AMPERE, AMMETER
AF AMPERE FRAME
AFF ABOVE FINISHED FLOOR
AIC AMPERES INTERRUPTING CAPACITY
AT AMPERE TRIP
ATS AUTOMATIC TRANSFER SWITCH
C CONDUIT
CL CENTER LINE
CR CARD READER ACCESS
CU COPPER
DR DOOR
EC EMPTY CONDUIT
EMER EMERGENCY
EWC ELECTRIC WATER HEATER
EX EXISTING
G, GND GROUND
GF GROUND FAULT INTERRUPTER
HH HANDHOLE
HP HORSEPOWER
HS HOOD SUPPRESSION CONTROL
HZ HERTZ
IG ISOLATED GROUND
JB JUNCTION BOX
KVA KILOVOLT-AMPERES
KW KILOWATTS
LC LIGHTING CONTACTOR
LTG LIGHTING
PROVIDE FURNISH, INSTALL & CONNECT
RECPT RECEPTACLE
RL EXISTING ITEM TO BE RELOCATED
RM EXISTING ITEM TO REMAIN
RP EXISTING ITEM TO BE REPLACED
SC SECURITY CAMERA OUTLET
SN SOLID NEUTRAL
SW SWITCH
SWBD SWITCHBOARD
TV COMBINATION TV & RECEPT OUTLET
TYP TYPICAL
UG UNDER GROUND
UNO UNLESS NOTED OTHERWISE
V VOLT
LC LIGHTING CONTACTOR
WP WEATHERTIGHT GFI
WAP WIRELESS ACCESS POINT
XFMR TRANSFORMER
THIS SCHEDULE IS REPRESENTATIVE OF THOSE TYPICALLY FOUND ON THE PLANS BUT NOT ALL MAY BE UTILIZED
FIRE ALARM MANUAL PULL STATION, MOUNT AT 48" ABOVE FINISHED FLOOR. SUBSCRIPT
"K" INDICATES KEY OPERATED INSTITUTIONAL DEVICE.
ELECTRICAL SYMBOL LEGEND
FIRE ALARM COMBINATION CHIME AND STROBE DEVICE, SUBSCRIPT INDICATES CANDELA
RATING OTHERWISE 15 CANDELA. MOUNT AT A MINIMUM OF 80" ABOVE FINISHED FLOOR AND A
MINIMUM OF 6" BELOW FINISHED CEILING HEIGHT.
FIRE ALARM STROBE DEVICE, SUBSCRIPT INDICATES CANDELA RATING OTHERWISE 15
CANDELA. MOUNT AT A MINIMUM OF 80" ABOVE FINISHED FLOOR AND A MINIMUM OF 6" BELOW
FINISHED CEILING HEIGHT.
FIRE ALARM SMOKE DETECTOR, CEILING SURFACE MOUNTED.
FIRE ALARM SYSTEM DUCT DETECTOR WITH SAMPLING TUBES, FURNISHED AND WIRED BY
ELECTRICAL CONTRACTOR TO THE LOCAL FACP, INSTALL BY MECHANICAL CONTRACTOR
UNLESS OTHERWISE INDICATED.
FIRE ALARM SYSTEM DUCT DETECTOR REMOTE INDICATOR LIGHT.L
FIRE ALARM SYSTEM RELAY, CONTROL OR MONITORING TYPE AS REQUIRED.
FIRE ALARM END OF LINE RESISTOR.EOLR
RM
FIRE ALARM SPRINKLER SYSTEM FLOW SWITCH.
FIRE ALARM SPRINKLER SYSTEM TAMPER SWITCH.
FIRE ALARM SYSTEM HEAT DETECTOR.
FIRE ALARM SYSTEM SPEAKER, WALL MOUNTED.
FIRE ALARM SYSTEM SPEAKER, CEILING MOUNTED.
FIRE ALARM SYSTEM HORN/STROBE, CEILING MOUNTED.H
FIRE ALARM SYSTEM STROBE, CEILING MOUNTED.
FIRE ALARM SYSTEM DOOR HOLD OPEN DEVICE.
FIRE ALARM VOICE NOTIFICATION AMPLIFIER AND STROBE POWER SUPPLYFAVP
FIRE ALARM ADDRESSABLE VOICE COMMAND CONTROL PANEL
FIRE ALARM STANDARD ADDRESSABLE CONTROL PANEL
A. ALL WORK SHALL BE DONE ACCORDING TO THE NATIONAL ELECTRICAL CODE AND OTHER
APPLICABLE REFERENCED CODES. TAKE PARTICULAR CARE TO OBSERVE DURING BID
PREPARATION ANY POSSIBLE CODE DISCREPANCIES AND BRING TO THE ATTENTION OF
THE ENGINEER FOR RESOLUTION.
B. THE CONTRACTOR SHALL MAINTAIN, ON THE SITE, AN ADEQUATE ADMINISTRATIVE SPACE
WHERE ONE COMPLETE SET OF PLANS AND SPECIFICATIONS SHALL BE KEPT FOR THE
WORK OF ALL TRADES ON THE PROJECT. THESE PLANS AND SPECIFICATIONS SHALL BE IN
ADDITION TO THE SETS USED BY THE INSTALLING ELECTRICIAN IN CARRYING OUT THEIR
DAY-TO-DAY WORK ON THE PROJECT.
C. CONTRACTOR SHALL ALSO MAINTAIN AT THE SITE A COMPLETE SET OF ALL SHOP
DRAWINGS, EQUIPMENT CUTS, MANUFACTURER'S WIRING DIAGRAMS AND INSTALLATION
DATA. INSTALLING PERSONNEL SHALL STUDY THIS DATA BEFORE AND DURING
INSTALLATION AND ROUGH-IN SO AS TO PREPARE FOR THE PROPER FIT AND FUNCTION
UPON COMPLETION.
D. PENETRATIONS OF REQUIRED SMOKE TIGHT PARTITIONS SHALL BE SEALED USING U.L.
LISTED METHODS. COORDINATION WITH THE OWNER AND ENGINEER SHALL BE
MAINTAINED TO INSURE THAT THE INTEGRITY OF THE SMOKE BARRIER IN MAINTAINED.
E. WHERE PENETRATIONS ARE MADE THROUGH A REQUIRED FIRE-RESISTIVE WALL, FLOOR,
OR PARTITION FOR THE PURPOSE OF RUNNING CABLE OR RACEWAYS FIRE STOP PER
NFPA. COORDINATION WITH THE OWNER AND ENGINEER SHALL BE MAINTAINED TO
INSURE THAT THIS FIRE STOPPING IS ACCOMPLISHED. USE ONLY APPROVED ASSEMBLIES
SUCH AS THE FOLLOWING:
F. CONDUIT PENETRATIONS OF 1 & 2 HOUR GYPBOARD WALLS - U.L.#WL1001 CONDUIT
PENETRATIONS OF 1 & 2 HOUR CONCRETE OR BLOCK WALLS - U.L.#CAJ1001 CONDUIT
PENETRATIONS OF 1 & 2 HOUR CONCRETE FLOORS - U.L.#CAJ1001.
G. ALL ELECTRICAL MATERIALS, DEVICES, APPLIANCES AND EQUIPMENT SHALL BE U.L.
LISTED AND LABELED.
H. NEW FLOOR AND WALL SLEEVES SHALL BE HILTI-CP653 FOUR INCH SPEED SLEEVES.
I. BEFORE STARTING WORK THE CONTRACTOR SHALL PERFORM A COMPLETE
WALK-THROUGH OF THE PROJECT TO EXAMINE EXISTING EQUIPMENT, DEVICES AND THE
WORK REQUIRED. PROVIDE A REPORT OF ANY OBSERVATIONS THAT MAY AFFECT THE
WORK.
J. WHERE NEW DEVICES ARE INDICATED TO BE ADDED TO EXISTING SYSTEMS, THE NEW
DEVICES SHALL BE FULLY COMPATIBLE WITH THE EXISTING SYSTEMS AS TO MAINTAIN
ALL SYSTEM FUNCTIONS AND ALL REQUIRED FIRE ALARM CONFORMANCE LISTING,
INDEPENDENT TESTING LABORATORY LABELINGS, AND ALL EXISTING FIRE ALARM
SERVICE CONTRACTS.
FIRE ALARM SYSTEM SPEAKER/STROBE, CEILING MOUNTED.
M
F
F
FS
TS
F
GENERAL NOTES ABBREVIATIONS & ACRONYMS
FAVC
FACP
FASP
FAVA
FAAP
FIRE ALARM STROBE POWER SUPPLY
FIRE ALARM VOICE DIGITAL AMPLIFIER
FIRE ALARM ANNUNCIATION PANEL
FIRE ALARM SYSTEM HORN/STROBE, WALL MOUNTED.H
F
FIRE ALARM SYSTEM CARBON MONOXIDE DETECTORC
1 2 3 4 5
D C
B A
D C
B A
1 2 3 4 5 6
6" th re e in ch es o ne fo ot
6" th re e qu ar te rs in ch o ne fo ot
6" on e in ch o ne fo ot on e an d on e ha lf in ch es o ne fo ot on e ha lf in ch o ne fo ot
6" th re e ei gh th s in ch o ne fo ot on e ei gh th in ch o ne fo ot on e qu ar te r i nc h on e fo ot
PROJECT NUMBER
BUILDING NUMBER
DRAWING NUMBER
PROJECT TITLE
LOCATION
ISSUE DATE CHECKED DRAWN
DRAWING TITLE
APPROVED
FULLY SPRINKLERED
OFFICE OF
CONSTRUCTION
AND FACILITIES
MANAGEMENT
U.S. Department of Veterans Affairs
PHASEARCHITECT/ENGINEER OF RECORD
A/E:
STAMP
HARRELL DESIGN GROUP PC
8016 TOWER POINT DRIVE
CHARLOTTE, NC 28227
704-814-1346 POC: LEE HARRELL PE, LEED AP, QCxP
PRESIDENT
WWW.HARRELLDG.COM
637-19-102
APRIL 16, 2021
HDG PROJECT: 19037Revision Number Revisions: Date:
CHARLES GEORGE VA MEDICAL CENTER
UPGRADE HVAC, B-47 PHASE 5CONSTRUCTION
DOCUMENTS 100%
H D E S I G N G R O U P , P C
ARRE L L
FA100
GENERAL NOTES AND LEGENDS
John G. Ross, PE
2021.04.21 20:50:56 -04'00'
FIRST FLOOR ROOF
H
G
J
L
K
J
P
M
JN
O
FIRST FLOOR ROOF
H
G
J
L
K
J
P
M
JN
O
1 2 3 4 5
D C
B A
D C
B A
1 2 3 4 5 6
6" th re e in ch es o ne fo ot
6" th re e qu ar te rs in ch o ne fo ot
6" on e in ch o ne fo ot on e an d on e ha lf in ch es o ne fo ot on e ha lf in ch o ne fo ot
6" th re e ei gh th s in ch o ne fo ot on e ei gh th in ch o ne fo ot on e qu ar te r i nc h on e fo ot
PROJECT NUMBER
BUILDING NUMBER
DRAWING NUMBER
PROJECT TITLE
LOCATION
ISSUE DATE CHECKED DRAWN
DRAWING TITLE
APPROVED
FULLY SPRINKLERED
OFFICE OF
CONSTRUCTION
AND FACILITIES
MANAGEMENT
U.S. Department of Veterans Affairs
PHASEARCHITECT/ENGINEER OF RECORD
A/E:
STAMP
HARRELL DESIGN GROUP PC
8016 TOWER POINT DRIVE
CHARLOTTE, NC 28227
704-814-1346 POC: LEE HARRELL PE, LEED AP, QCxP
PRESIDENT
WWW.HARRELLDG.COM
637-19-102
APRIL 16, 2021
HDG PROJECT: 19037Revision Number Revisions: Date:
CHARLES GEORGE VA MEDICAL CENTER
UPGRADE HVAC, B-47 PHASE 5CONSTRUCTION
DOCUMENTS 100%
H D E S I G N G R O U P , P C
ARRE L L
FA103
ROOF FIRE ALARM PLAN
D1
FA103
FIRST FLOOR ROOF
SECOND FLOOR ROOF
SECOND
FLOOR
ROOF FIRST
FLOOR
ROOF
SIXTH FLOOR ROOF
SIXTH FLOOR ROOF SIXTH FLOOR ROOF
PENTHOUSE ROOF
FIRST
FLOOR
ROOF
FIRST FLOOR ROOF
FIRST FLOOR ROOF
FIRST
FLOOR
ROOF
LOWER
ROOF
FIRST
FLOOR
ROOF
HIGHER
ROOF
11 12 13 14 15 16 17 18 19 2015 16 17 18 19
D
C
B
A
20876
H
G
F
E
D
C
B
9 10
J
8 9 10
L
K
J
14 15 16 17
C
1312111098
V.9
5.63.9
S.9
U.2
P
M
JN
O
Q
R
A
21 22 23 24 25 26
G
H
J
K
L
M
N
O
P
Q
R
S
26252423
T
U
V
7.4
5 6
2021.04.21 20:51:19 -04'00'
SECOND FLOOR ROOF
SECOND
FLOOR
ROOF
FIRST
FLOOR
ROOF
FIRST
FLOOR
ROOF
G
H
J
K
L
M
N
O
P
SECOND FLOOR ROOF
SECOND
FLOOR
ROOF
FIRST
FLOOR
ROOF
FIRST
FLOOR
ROOF
G
H
J
K
L
M
N
O
P
1 2 3 4 5
D C
B A
D C
B A
1 2 3 4 5 6
6" th re e in ch es o ne fo ot
6" th re e qu ar te rs in ch o ne fo ot
6" on e in ch o ne fo ot on e an d on e ha lf in ch es o ne fo ot on e ha lf in ch o ne fo ot
6" th re e ei gh th s in ch o ne fo ot on e ei gh th in ch o ne fo ot on e qu ar te r i nc h on e fo ot
PROJECT NUMBER
BUILDING NUMBER
DRAWING NUMBER
PROJECT TITLE
LOCATION
ISSUE DATE CHECKED DRAWN
DRAWING TITLE
APPROVED
FULLY SPRINKLERED
OFFICE OF
CONSTRUCTION
AND FACILITIES
MANAGEMENT
U…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .