36C24622B0002 0004.docx

DOCX document 25 KB Posted

Attached to
Y1DA--Renovate SPS/SPD (construction) (VA-22-00010727)
Solicitation number
36C24622B0002
Issued by

About this file

This document contains an amendment to a federal solicitation as well as details of the related federal contract opportunity. The amendment provides answers to additional questions from industry regarding project drawings and specifications for a renovation project. Specifically, it clarifies that no energy recovery is required for one air handling unit, specifies the size of luxury vinyl tile, and details the existing floor finishes to be repaired in certain corridors. The related federal contract opportunity is for renovation work at a Department of Veterans Affairs medical center involving approximately 8,430 square feet in one building wing. The project entails renovating spaces for surgical, procedural and dental clinics. The solicitation is set aside for total small business owned by service-disabled veterans. The estimated value is $39.5 million. Interested parties are directed to register on relevant websites in preparation for the solicitation's planned release in November 2021.

View the file

Other files

File Type Posted
36C24622B0002 0003.docx DOCX document
Attch. A - Wage Determination NC20210025 9.10.21.pdf PDF
Decon Photos Set 2.pdf PDF
Decon Photos Set 1.pdf PDF
36C24622B0002 0002.docx DOCX document
Decon Photos Set 3.pdf PDF
36C24622B0002 0001.docx DOCX document
Attachment A - Itemized Schedule of Values Cost Breakdown.xlsx XLSX spreadsheet
Drawings.pdf PDF
36C24622B0002.docx DOCX document
Specifications.pdf PDF
Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

5. PROJECT NUMBER (if applicable)

CODE

7.

ADMINISTERED BY

2. AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER

3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE OF

PAGES

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED

BPA NO.

1. CONTRACT ID CODE

FACILITY CODE

CODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE

OF YOUR

ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV. 11/2016)

is required to sign this document and return ___________ copies to the issuing office.

is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERE

D CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES

SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

RESULT IN REJECTION OF YOUR

OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendmen t, and is received prior to the opening hour and date specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

Contractor

16C. DATE SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED

STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER

16A. NAME AND TITLE OF

CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 30

PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF

SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer) 565-19-102 Department of Veterans Affairs Network Contracting Office 6 201 Hay Street, Suite 305 Fayetteville NC 28301

To all Offerors/Bidders

36C24622B0002 01-12-2022

X X

X

The purpose of this amendment is to address additional questions from Industry:

1. On mechanical drawing M-601 schedule note 2, references Enthalpic Core Energy Recovery. The supporting schematic on page M-503 does not include or reference Enthalpic Core Energy Recovery. Please confirm that energy recovery is NOT needed on Air Handling Unit Tagged 1-AHU-SPS.

Answer: No, there is no energy recovery on this AHU.

2. The specified LVT comes both as an 18 X 18 and a 6 X 36. Please clarify which size is intended.

Answer: 6x36

3. The finish schedule indicates the flooring in two corridors to be “patch as needed”. Could you please provide more details regarding the extent, and the type of flooring in question?

Answer: Existing floor finishes occur at Corridors BB-01, BB-02 and BB-03. The design intent is to leave these floor finishes in place. Contractor to repair and or replace any damage to the floor finish created by construction activities.

4. Is there a mud bed called for at any of the floor tile locations?

Answer: See specifications.