This document contains a government file related to a federal construction contract opportunity to renovate spaces at a Department of Veterans Affairs medical center. The project entails renovating approximately 8,430 gross square feet in the basement level of Building 1 at the VA Medical Center in Fayetteville, North Carolina. The solicitation number is 36C24622B0002 and is anticipated to be a total service-disabled veteran-owned small business set-aside with a NAICS code of 236220 and size standard of $39.5 million. The solicitation material will be available on or around November 16, 2021 and prospective offerors are encouraged to register on sam.gov and vetbiz.gov if applicable. Questions must be submitted by email to the contracting specialist by the specified date. The high-level work includes renovations to mechanical, electrical and plumbing systems as well as architectural finishes.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C24622B0002 0004.docx | DOCX document | |
| Attch. A - Wage Determination NC20210025 9.10.21.pdf | ||
| Decon Photos Set 2.pdf | ||
| Decon Photos Set 1.pdf | ||
| 36C24622B0002 0002.docx | DOCX document | |
| Decon Photos Set 3.pdf | ||
| 36C24622B0002 0001.docx | DOCX document | |
| Attachment A - Itemized Schedule of Values Cost Breakdown.xlsx | XLSX spreadsheet | |
| Drawings.pdf | ||
| 36C24622B0002.docx | DOCX document | |
| Specifications.pdf |
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
5. PROJECT NUMBER (if applicable)
CODE
7.
ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER
3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE OF
PAGES
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO.
1. CONTRACT ID CODE
FACILITY CODE
CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE
OF YOUR
ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office.
is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERE
D CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES
SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR
OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendmen t, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED
STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER
16A. NAME AND TITLE OF
CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30
PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF
SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer) 565-19-102 Department of Veterans Affairs Network Contracting Office 6 201 Hay Street, Suite 305 Fayetteville NC 28301
To all Offerors/Bidders
36C24622B0002 01-06-2022
X
X Purpose of this amendment is to further clarify Government responses to Industry questions. Clarified responses are in Red.
The purpose of this amendment is to provide Government additional responses (In Red font) to Industry’s Request for Information (RFI).
All bids must be received prior to the bid opening time.
Send all bid documents via email to Guy.Brooks@va.gov.
36C24622B0002 0003 Renovate SPS/SPD Fayetteville VAMC Government Responses to Industry Questions
| Question |
| RFI Response |
| 1. Submission requirements PDF page 11 of 66 Note #2 states ‘copies of all subcontractor quotes are required'. Is note #2 requiring all general contractors to provide copies of all the subcontractor and vendor quotes received on this RFP to be submitted with our proposal to the VA? What if we only create internal takeoff price estimates without external quotes? Considering most subcontractor/vendor quotes are received within the last hours of the proposal period. Often, sub/vender pricing is verbal with formal proposals provided after the bid time crunch. This request is not fully compliable. The nature of the bid time crunch needed to complete a price proposal, sub/vendor quotes are going to inadvertently left out or possibly forgotten given the amount of sub/vendor pricing received in a short period of time on bid day. Please provide clarification and understanding on this request. We do request that this requirement be waived while submitting our proposal. |
| Subcontractor quotes are required. The subcontractors’ quotes can be estimates but all quotes must be present for a proper evaluation of price. |
| 2. Pre-Bid conference note states ' All potential bidders, subcontractors, and suppliers are required to attend this pre-bid conference to submit a bid. We understand that general contractors are required to attend the site walk and that is trackable by the VA. But are you requesting that all Subcontractors, suppliers, and vendors to attend the site walk as well? Some (but not all) Subs/vendors/suppliers chose to attend site visits. But, It's not possible for all subcontractors, vendors, or suppliers to attend. Also, this requirement for subs/vendors/suppliers attendance is not trackable for the VA. We do request that this requirement for lower tier subcontractors/vendors to be waived as a requirement in order to submit a proposal. |
| Only Prime Contractors who intend to submit a bid must attend the Site Visit. |
| 3. Construction Wage Rate Requirements. A Davis Bacon Wage Determination is not included with this RFP. Please provide. |
| See Attachment A |
| 4. 2.6 Bid Guarantee. The amount of the bid bond is not stated. We assume the amount is standard 20%. |
| 2.6 52.228-1(c) states, “The amount of the bid guarantee shall be 20 percent of the bid price or $3,000,000, whichever is less.” |
| 5. 2.6 Bid Guarantee required for submission of Bids. Will a scanned copy of the original bid bond be acceptable to be included in the proposal since this is an electronic submission? Do you want a hard copy of the original bid bond mailed to your office before or after the bid? |
| Yes, scanned copy is acceptable to be included in the electronic submission. |
| 6. As a result of the effect of COVID-19 throughout the U.S., and the resulting Federal, State, and local governments’ responses/requirements of safe distancing and potential advocations of working remotely and/or complete organization closures, please advise how the Government intends to address delays resulting there as it pertains to the current solicitation schedule for this and all future projects. |
| Delays will be handled on a case-by-case basis. |
| 7. Is this project tax exempt, and will the CO/COR provide the necessary tax exempt certificates |
| Refer to FAR clauses 52.229-2, 52.229-3, & 52.229-12 IBR in the IFB |
| 8. After award, the Contracting Officer will provide a NTP to the awardee. What is the approximant duration between issuing the award and issuing the NTP? |
| 15-30 days |
| 9. For planning the preliminary project schedule, what is the anticipated award date? |
| Anticipated award date on/around January 31, 2022 |
| 10. What is the anticipated duration between issuance of contract award and issuance of the NTP? |
| See Response #8 |
| 11. How many calendar days should be included in the critical-path schedule for owner and A/E review and respond to RFIs? |
| A/E and VA review to take up to 14 days. Contractor to provide a reasonable number at any given time so the A/E and VA aren’t overloaded. |
| 12. How many calendar days should be included in the critical-path method schedule for owner and A/E submittal review? |
| A/E and VA review to take up to 14 days. Contractor to provide a reasonable number at any given time so the A/E and VA aren’t overloaded. |
| 13. Will the owner provide as-built drawings for the existing structures/work area of the project? |
| See the structural drawings as included in the design package. The VA could potentially provide additional drawings if necessary. |
| 14. We anticipate certain construction activities to generate high levels of noise. Please confirm that only the Contracting Officer can suspend work via written notification to the Contractor. |
| Not confirmed. There are times when the station leadership asks for noise to cease for various reasons. Contractors have typically worked very well with our facility by breaking up loud activities into more manageable durations. |
| 15. Is AISC (American Iron and Steel Certification) required for the structural steel fabrication and/or erection for this project? Can this requirement be waived for this proposal? |
| If the specs and/or drawings state it is required, then it is required. |
| 16. Please provide the existing roof warranty, manufactures data, and POC. |
| The roof is out of warranty. |
| 17. Please provide seismic bracing details for pipe and systems support. |
| See structural drawings for seismic category. See specification section 13 05 41. |
| 18. Please confirm that the owner will provide fire watch during the period of time that the fire suppression system is not in service. |
| Refer to spec Section 01 35 26.1.14 |
| 19. Please provide time duration at the owner expects for AHU to be offline, the specification on indicate the work hours and not the timeframe allowable for service interruption to the air handlers. |
| Downtime to be coordinated closely with the COR and limited to a long weekend to changeover systems. |
| 20. Please confirm that the owner will be contracting directly with a third-party commissioning agent per spec section 01 91 00 for commissioning the project and that the Contractor is only to include participation/coordination with the Commissioning Agent. |
| Refer to 01 91 00 1.10 A. |
| 21. Who is the owners' service provider for the fire alarm system? Can you please provide contract information? |
| The current fire alarm system is Edwards Electronic Systems, Inc. (EES). |
| 22. Due to the unprecedented and unpredictable material price increases occurring in the nation, will the CO/VA/Owner allow a fixed price contract with economic price adjustments per FAR 16.203 to be used as the basis for contract award? |
| No, contract award will be a Firm-Fixed Price (FFP). |
| 23. Can we use our own breakdown sheet in lieu of VA provided spreadsheet provided it mirrors and includes the divisional breakdowns as the VA? |
| Yes. |
| 24. Who is the owner's BMS operator/vendor for the building? Is there a vendor who operates the DDC and BMS controls operation of the HVAC systems for this building and the campus wide BMS (Building management system)? |
| The FNC VAMC has its own BAS/DDC technician. We have several controls contractors currently working onsite and welcome other capable companies. Please follow the site tailored spec section (Section 23 09 23 Direct Digital Control Systems for HVAC) as it spells out what we need and expect. |
| 25. Would the VA accept an alternative to Stonhard Epoxy flooring? Stonhard is a proprietary company and does not sell product/ only installs themselves. |
| Must meet the specs and should be equivalent or better than the identified epoxy flooring. |
| 26. T401 key note 6 provides for (3) 4” fire/smoke assy in slab, are these in the deck above to first floor? |
| No, in floor slab. See Riser 5/T-601 |
| 27. FA101 near room 114 ANTE there is a key note #2 relating to a duct detector and it remote indicator, what is the meaning or intent for the key note. |
| Omit Key note 2. |
| 28. E-401 key note 3 show a 100A disconnect but the schedule indicates a 20A feed, which is correct? It references 3 disconnects in 2 separate locations on detail 2. |
| Defer to Equipment Schedule. |
29. G-005 phasing plans shows Room 121 in phase 1A to be a newly constructed room, however, on E-401 panel “SPS-OIT” is shown. When you go to E-602 the panel is indicated as an existing panel and on the one-line E-601 it is not shown. With the room being new, the panel should be new or relocated. In either case, the existing panel needs to be identified. Additionally, the panel is not identified as being relocated thus indicating new. Please confirm new or relocated, the panel the new or relocated panel is being fed from, and the feeder size. If new can you please show on the one-line diagram?
Panel "SPS-OIT" is a new panel fed from Panel "ECBD-1" in Electrical Room EB-4. There is no existing panel "SPS-OIT". Feeder is 3-3 AWG, 1-3 AWG NEU, 1-8 AWG EG, IN 1-1/4" C.
| 30. Network cabling, please confirm our scope of work as we are not providing the Nurse call, Intercom, Physical Access Control or CCTV system. And that the security contractor is responsible for all of their cabling, connectivity, etc. required for those systems. |
| All network cabling is the responsibility of the contractor. Nurse call is NOT included. Intercom, PACS and CCTV are included. See T-601 for additional information. |
| 31. PAMN, T-102 note 3 calls for a new microphone console for SPS Chief office 118. Please provide brand and model of required station. |
| The basis of design for the new microphone console for SPS Chief office 118: Biamp Vocia DS-10 Desk Paging Station 10 or equal. Submittal required. |
| 32. The new loudspeakers for the PAMN system are to tie into existing system. Please identify existing system brand and model. Is any additional programming to system required? |
| Coordinate with COR for existing system brand, Refer to specification section 27 51 16 for programming information. |
| 33. Can the project superintendent and QC manager have collateral duties? |
| Yes. |
34. Please provide product data sheets for the owner furnished equipment – P001 Equipment schedule.
Equipment not yet finalized/purchased.
| 35. For the temporary trailer, who is responsible for installing data wire to connect the controllers to existing CCURE system? |
| Data wire to be provided and installed by contractor, see riser 5/T-601 |
| 36. For the temporary trailer, who is responsible for installing door hardware for the access control doors? |
| Contractor determined. Can be either trailer supplier or GC. |
37. For the IP Aiphone based video intercom system, is this supposed to be a standalone network for the video intercom or will this be hooked into the existing VA network?
See specification Section 27 51 23 for additional information.
| 38. Specification Item 1.1, Item "E" calls for "Automatic loading and unloading with power doors". Automatic cart loading/unloading is not discussed anywhere else in the specification, and we believe this may be an error. Manual loading is typical for this type of lift (only one company manufactures this type of unit for automatic loading/unloading). Please confirm if this should be bid with manual loading/unloading or if the specification is accurate and we need to bid with automatic loading. |
| Cart washer loading is manual - confirm with equipment supplier and VA. VA is purchasing equipment direct. |
ATTACHMENTS:
A – WD NC20210025 9.10.21
B – C – D –