About this file
This document contains an asbestos re-inspection report and related federal contract opportunity for renovating Buildings 2 and 3. The asbestos re-inspection report identifies locations and quantities of asbestos-containing materials throughout Buildings 2 and 3 at the Charles George VA Medical Center, with recommendations to restrict disturbance of identified materials. The related federal contract opportunity is a request for proposals to provide all labor, materials and equipment for Project 637-20-903 to renovate Buildings 2 and 3 in accordance with specifications and drawings. A site visit will be held on August 6, 2021, with questions due by August 12th and proposals due by September 1, 2021. The contract will be awarded in accordance with FAR Part 15 to a verified service-disabled veteran-owned small business, which must perform a minimum of 15% of the construction work. The estimated value of the construction is between $250,000 and $500,000.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Homogenous Area Asbestos-Containing Material Location Description Current
Condition Potential for Disturbance
Estimated Quantity
A2-002, 003 Weston Insulation on Steam Lines Floor/Wall/Ceiling Chases TSI - F not visible LPD unknown
A2-004 Weston
Hard Elbows & Fitting on Steam Lines Floor/Wall/Ceiling Chases TSI - F G LPD 10 LF
A2-005, 007 Weston Insulation on Hot & Cold Water Lines Floor/Wall/Ceiling Chases TSI - F G LPD 100 LF
A2-006, 008 Weston
Hard Elbows & Fitting on HW & CW Lines Floor/Wall/Ceiling Chases TSI - F G LPD 40 Fittings
A2-013 Weston Insulation Debris Crawlspace -- -- -- --
A-01 Black Mastic/Felt Underlayer On Original Wood Flooring Kitchen Area MISC - NF not visible LPD 250 SF
A2-018 Weston Ashphalt Shingles, Felt, & Mastics Roof MISC - NF G LPD 1700 SF
ASBESTOS RE-INSPECTION
(Assumed remaining in floor, wall, & ceiling chases)
Visible Throughout Basement - Restrict disturbance of TSI materials.
(Assumed remaining in floor, wall, & ceiling chases)
Visible Throughout Basement Restrict disturbance of TSI materials.
(Assumed remaining in floor, wall, & ceiling chases)
BUILDING 2
Comments/Reccomendations
CHARLES GEORGE VAMC
ASHEVILLE, NORTH CAROLINA
Visible Throughout Basement - Restrict disturbance of TSI materials.
(Assumed remaining in floor, wall, & ceiling chases)
Crawlspace floor is currently covered with plastic. No visible TSI debris was found during visual survey during pipe TSI repairs in 2011.
Discovered 11/2014 in Buildings #5 and #6
Assumed ACM Until Tested
SURF = Surfacing F= Friable SF = Square Feet G = Good LPD = Low Potential for Disturbance MISC = Miscellaneous Material NF = Non-friable LF = Linear Feet D = Damaged PD = Potential for Disturbance TSI = Thermal System Insulation CF = Cubic Feet SD = Significantly Damaged PSD = Potential of Significant Disturbance
NOTE : Quantities Listed are for inspection purposes only. Quantities should be field verified for all other uses.
Affinity Project #12124IN
December 2020
Homogenous Area Asbestos-Containing Material Location Description Current
Condition Potential for Disturbance
Estimated Quantity
A3-001, 005 Weston Steam Line Insulation Floor/Wall/Ceiling Chases TSI - F not visible LPD unknown
A3-002 Weston
Hard Elbows & Fittings on Steam Lines Floor/Wall/Ceiling Chases TSI - F not visible LPD unknown
A3-008 Weston Mastic Under New Sheet Flooring Kitchen - Unit B MISC - NF G LPD 80 SF
A3-012 Weston Ashphalt Shingles, Felt, & Mastics Roof MISC - NF G LPD 2,500 SF
A3-01-01 Alpha 12" x 12" Tan Floor Tile Kitchen - Unit A -- -- -- 120 SF
A-01 Black Mastic/Felt Underlayer on Original Wood Flooring Kitchen - Unit B MISC - NF not visible LPD 250 SF
ASBESTOS RE-INSPECTION
All visible pipe insulation is fiberglass (Assumed remaining in floor, wall, & ceiling chases) All visible pipe insulation is fiberglass (Assumed remaining in floor, wall, & ceiling chases)
Assumed Under New Flooring
BUILDING 3
Comments/Reccomendations
CHARLES GEORGE VAMC
ASHEVILLE, NORTH CAROLINA
Assumed ACM Until Tested
Material Has Been Removed as of 12/12/19
Discovered 11/2014. Has Been Removed From Unit A as of
12/12/19.
SURF = Surfacing F= Friable SF = Square Feet G = Good LPD = Low Potential for Disturbance MISC = Miscellaneous Material NF = Non-friable LF = Linear Feet D = Damaged PD = Potential for Disturbance TSI = Thermal System Insulation CF = Cubic Feet SD = Significantly Damaged PSD = Potential of Significant Disturbance
NOTE : Quantities Listed are for inspection purposes only. Quantities should be field verified for all other uses.
Affinity Project #12124IN
December 2020