Base Offer Cost Breakdown Worksheet - Bldg 2-3.xlsx
XLSX spreadsheet 22 KB Posted
- Attached to
- Z2AZ--Renovate Buildings 2&3
- Solicitation number
- 36C24621R0115
About this file
This document contains a cost breakdown worksheet and related federal contract opportunity for renovations to Buildings 2 and 3 at the Charles George VA Medical Center in Asheville, North Carolina. The cost breakdown worksheet provides estimates for various construction tasks involved in renovating both buildings, including selective demolition, wall and floor work, HVAC and electrical upgrades, and final cleanup. The total estimated cost for renovating Building 2 is listed as TBD, while the total estimated cost for Building 3 is also listed as TBD, with an estimated combined total for both buildings of TBD. The related federal contract opportunity is a request for proposals to complete the renovations in accordance with provided specifications and drawings. Interested parties must visit the site on August 6th, with any questions due by August 12th and final proposals due by September 1st. The contract will be awarded in accordance with FAR Part 15 and has been set aside solely for SDVOSB contractors, who must perform a minimum of 15% of construction work. The required products and services include all labor, materials, tools and equipment to complete the renovations to Buildings 2 and 3 at the Charles George VA Medical Center in Asheville, North Carolina.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Table 1
| Proposal - Renovate Buildings 2 & 3 | |||
| CONSTRUCTION COST ESTIMATE | DATE PREPARED | SHEET | |
| PROJECT | Renovate Buildings 2 and 3 | 1 of 2 | |
| LOCATION | Asheville VAMC | ||
| COMPANY NAME | |||
| SOLICITATION | 36C24621R0115 |
| DESCRIPTION | QUANTITY | LABOR | MATERIAL | TOTAL | |||
| Building 2 | NO. UNITS | UNIT MEAS. | PER UNIT | TOTAL | PER UNIT | TOTAL | |
| Project Mobilization | ea | ||||||
| Entry Landing and Stairs | sf | ||||||
| ADA Lift | ea | ||||||
| Dumpster | ea | ||||||
| Selective Demo | sf | ||||||
| Rework walls openings (frame/rough hang) | sf | ||||||
| Encapsulate Lead Paint | jb | ||||||
| Doors | ea | ||||||
| Spot patch floors | sf | ||||||
| Sound Panels | sf | ||||||
| Refinish Wood Floors | sf | ||||||
| Ceramic Tile, floors | sf | ||||||
| Ceramic Tile, walls | sf | ||||||
| Suspended Ceiling | sf | ||||||
| Wall prep | sf | ||||||
| Paint (incl prime and 2 coats) | sf | ||||||
| Fire Alarm Devices | ea | ||||||
| Replace Plumbing fixtures | ea | ||||||
| Install 100-amp panel | ea | ||||||
| Rework HVAC, extend ceiling ducts - 2nd fl | ea | ||||||
| Add electrical outlets | ea | ||||||
| Data outlets | ea | ||||||
| Install lighting | ea | ||||||
| 80-gal Water Heater | ea | ||||||
| Phone/Data panel/connections | ea | ||||||
| Project Clean-up - General | ea | ||||||
| Project De-Mobilization | ea | ||||||
| Final Inspection/Closeout Docs | ea | ||||||
| Coil, furnace, heat pump | ea | ||||||
| Subtotal | $ - 0 |
Overhead
Subtotal
Profit
Bonds
| Bldg. 2 TOTAL | $ - 0 | ||
| Proposal - Renovate Buildings 2 & 3 | |||
| CONSTRUCTION COST ESTIMATE | SHEET | ||
| PROJECT | Renovate Buildings 2 and 3 | 2 of 2 | |
| LOCATION | Asheville VAMC |
| DESCRIPTION | QUANTITY | LABOR | MATERIAL | TOTAL | |||
| Building 3 | NO. UNITS | UNIT MEAS. | PER UNIT | TOTAL | PER UNIT | TOTAL | |
| Project Mobilization | ea | ||||||
| Entry Landing and Stairs | sf | ||||||
| ADA Lift | ea | ||||||
| Dumpster | ea | ||||||
| Selective Demo | sf | ||||||
| Rework walls openings (frame/rough hang) | sf | ||||||
| Encapsulate Lead Paint | jb | ||||||
| Doors | ea | ||||||
| Spot patch floors | sf | ||||||
| Refinish Wood Floors | sf | ||||||
| Ceramic Tile, floors | sf | ||||||
| Ceramic Tile, walls | sf | ||||||
| Suspended Ceiling | sf | ||||||
| Wall prep | sf | ||||||
| Paint (incl prime and 2 coats) | sf | ||||||
| Fire Alarm Devices | ea | ||||||
| Replace Plumbing fixtures | ea | ||||||
| Rework HVAC, extend ceiling ducts - 2nd fl | ea | ||||||
| Install 150-amp panel | ea | ||||||
| Add electrical outlets | ea | ||||||
| Data outlets | ea | ||||||
| Install lighting | ea | ||||||
| 80-gal Water Heater | ea | ||||||
| Phone/Data panel/connections | ea | ||||||
| Project Clean-up - General | ea | ||||||
| Project De-Mobilization | ea | ||||||
| Final Inspection/Closeout Docs | ea | ||||||
| Coil, furnace, heat pump | ea | ||||||
| tree damage repair | ea | ||||||
| Subtotal | $ - 0 |
Overhead
Subtotal
Profit
Bonds
| Bldg. 3 TOTAL |
| Bldg. 2 TOTAL |
Building 2 and Building 3 Total $ - 0