This solicitation notice is for an upgrade to the power distribution system at the Durham VA Medical Center in Durham, North Carolina. The Department of Veterans Affairs requires a contractor to provide all labor, materials, equipment, and supervision to replace the primary switch assemblies, transformers, and distribution equipment at the Chiller Plant in Building 9. The contractor will be responsible for demolishing and removing existing components before replacing them, and for coordinating work to minimize operational impacts. The estimated construction value is between $1 million and $5 million. Responses are due approximately 28 days after issuance of the anticipated total SDVOSB set-aside solicitation on or around April 1, 2020. Interested vendors should register on the website to receive solicitation materials and any amendments.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| ATTACHMENT H PROJECT 558-18-277 BLDG 9 ASBESTOS REPORT.pdf | ||
| S06. SF30 36C24620R0041 A0003 (FE).pdf | ||
| ATTACHMENT G PROJECT 558-18-277 Attendance Sheet.pdf | ||
| 36C24620R0041-0002000.docx | DOCX document | |
| 36C24620R0041-0001000.docx | DOCX document | |
| 36C24620R0041-001.pdf | ||
| 36C24620R0041-005.pdf | ||
| 36C24620R0041-006.pdf | ||
| 36C24620R0041-002.pdf | ||
| 36C24620R0041-007.pdf | ||
| 36C24620R0041-003.pdf | ||
| 36C24620R0041-004.pdf |
Show all 12
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
5. PROJECT NUMBER (if applicable)
CODE7. ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE OF PAGES
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO. 1. CONTRACT ID CODE
FACILITY CODECODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office.is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER 16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30 PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243
(Type or print) (Type or print)
(Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code)
(If other than Item 6)
(Specify type of modification and authority)
(such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer)
1 2
0004 558-18-277
Department of Veterans Affairs Network Contracting Office 6 100 Emancipation Drive Hampton VA 23667
Department of Veterans Affairs Network Contracting Office 6 100 Emancipation Drive Hampton VA 23667
To all Offerors/Bidders
36C24620R0041
03-30-2020
X
X X
NO EXTENSIONS
1. The purpose of this Amendment is to provide clarification on a some of responses to the questions received.
2. As a result of this amendment.
a. Clarifications provided on Page 2.
Clarifications
1. The response regarding the batteries and battery charger (from spec 26 23 00) doesn’t state UPS as a requirement for the Battery System. Is this a new requirement separate from the UPS for the chiller control panel required in the SOW?
Clarification: The batteries and the battery charger are for the UPS for the chiller controller. Currently there are not any batteries or a battery charger for this system. The entire UPS system will need batteries and a battery charger.
2. New MV specification provided has a reference for metering that is not provided a part of the specifications previously provided. Will that specification be provided to be used for proper quotation of the metering requirement?
Clarification: The metering cabinet is the medium voltage interrupting switch cabinet with analog metering on the cabinet. The specification for the medium voltage interrupting switch has been provided.
3. New specification (26 13 16 MV Fusible Interrupter Switches) doesn’t address any transformer overload protection requirements. The only reference to this requirement is where the (new) switches are shown on drawings E-001 with the statement “15KV PRIM SW WITH TXF OVERLOAD PROTECTION”. Is this a requirement to be provided for this supply of MV switches or should the manufacturer comply with the new specification requirements defined in 26 13 16?
Clarification: The medium voltage interrupting switch cabinet should be fused properly. A coordination study should be provided per specification 26 05 73.
Clarifications