- Attached to
- Z2DA--Project 652-203, Construct New EP Laboratory Federal contract opportunity
- Solicitation number
- 36C24620R0035
About this file
This presolicitation notice is for a construction project to build a new electrophysiology laboratory at the Hunter Holmes McGuire VA Medical Center in Richmond, Virginia. The Department of Veterans Affairs will solicit fixed-price bids for construction services including labor, materials, equipment and supervision. The period of performance is 580 calendar days from notice to proceed, with an estimated value between $2 million and $5 million. The project is set aside exclusively for qualified Service-Disabled Veteran-Owned Small Businesses. The solicitation including specifications and drawings will be available on or around February 23, 2020 via SAM.gov. Bids are due at least 30 days after issuance. A site visit will be scheduled upon solicitation release.
36C24620R0035 0006 6-Mechanical.pdf
View the file
Other files for this federal contract opportunity
Show all 31
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
MECHANICAL
ABBREVIATION, NOTES & SYMBOLS
M-001
ARFPB
NO. DESCRIPTION DATE
B
A
C
D
E
F
1 2 3 4 5 6 87 9
97 8654321
MILLER-REMICK LLC
PROFESSIONAL ENGINEER
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE
WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE
PROFESSIONAL ENGINEER.
Miller-Remick LLC
1010 KINGS HIGHWAY SOUTH
CHERRY HILL, NEW JERSEY 08034
PHONE: (856)429-4000
FAX: (856)429-5002
M.E.P. & Structural Engineering
A Service Disabled Veteran Owned Small Business
MR PROJECT NO: 0500-0019
B
A
C
D
E
F
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
BID DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Phase
ENGINEER OF RECORDCONSULTANT CONSTRUCT NEW EP LAB 652-CSI-203
Project Director
2019-12-17
HUNTER HOLMES MCGUIRE VAMC
RICHMOND, VA
UP
M.9
K.9
AREA OF SCOPE
AREA OF SCOPE
1D-119
1D-118 1D-117 1D-116
1D-122
1D-121
1D-120C1D-5
1G-149
1G-148
C1G-16
S2H-1
1G-155
C1G-19
1G-156
1G-1451G-1441G-143
C1D-6
1G-153
1G-152
1G-154
C1G-16
NURSE
1D-124
1D-123
Ll
Mm
M.6
Q
P
N
M.9
L
201918171615 17.7 18.2 18.5
AREA OF SCOPE
1G-145
1G-152
1G-144
NURSE
C1G-16
181716 17.7 18.2
P
N
M.9
NO. DESCRIPTION DATE
B
A
C
D
E
F
1 2 3 4 5 6 87 9
97 8654321
PLAN
NORTH
ACTUAL
NORTH
MILLER-REMICK LLC
PROFESSIONAL ENGINEER
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE
WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE
PROFESSIONAL ENGINEER.
Miller-Remick LLC
1010 KINGS HIGHWAY SOUTH
CHERRY HILL, NEW JERSEY 08034
PHONE: (856)429-4000
FAX: (856)429-5002
M.E.P. & Structural Engineering
A Service Disabled Veteran Owned Small Business
MR PROJECT NO: 0500-0019
B
A
C
D
E
F
KEYPLAN
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
BID DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Phase
ENGINEER OF RECORDCONSULTANT CONSTRUCT NEW EP LAB 652-CSI-203
Project Director
2019-12-17
AREA-G
AREA-D
NEW AREA
HUNTER HOLMES MCGUIRE VAMC
RICHMOND, VA
MECHANICAL
DEMOLITION PLAN
LEVEL 1
MD111
ARFPB
K.9
AREA OF SCOPE
AREA OF SCOPE
AREA 'G'
AREA 'D'
Ll
Mm
M.6
Q
P
N
M.9
L
201918171615 17.7 18.2 18.5
AREA
OF SCOPE
181716 17.7 18
P
N
M.9
NO. DESCRIPTION DATE
B
A
C
D
E
F
1 2 3 4 5 6 87 9
97 8654321
PLAN
NORTH
ACTUAL
NORTH
MILLER-REMICK LLC
PROFESSIONAL ENGINEER
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE
WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE
PROFESSIONAL ENGINEER.
Miller-Remick LLC
1010 KINGS HIGHWAY SOUTH
CHERRY HILL, NEW JERSEY 08034
PHONE: (856)429-4000
FAX: (856)429-5002
M.E.P. & Structural Engineering
A Service Disabled Veteran Owned Small Business
MR PROJECT NO: 0500-0019
B
A
C
D
E
F
KEYPLAN
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
BID DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Phase
ENGINEER OF RECORDCONSULTANT CONSTRUCT NEW EP LAB 652-CSI-203
Project Director
2019-12-17
AREA-G
AREA-D
NEW AREA
HUNTER HOLMES MCGUIRE VAMC
RICHMOND, VA
MECHANICAL
DEMOLITION PLAN - PHASE 1 & 2
LEVEL 1 - INTERSTITIAL
MD111.i
ARFPB/JS
1G-144
NURSE
1G-147
1G-148
C1G-16
TLT
TLT
CORRIDOR
201918
Q
P
N
Nn
17.7
1G-153
1G-154 1G-156
1G-155
C1G-18
1G-152
1G-152H
1G-151
PREP/REC
BAY
IV PREP
C1G-15
CORRIDOR
C1G-16A
CORRIDOR
1G-152G
PREP/REC
BAY
S2H-1
STAIRS
P
N
191817.7
M.9
1G-152
18.5
1G-147
1G-148
C1G-16
TLT
TLT
CORRIDOR
NURSE
NO. DESCRIPTION DATE
B
A
C
D
E
F
1 2 3 4 5 6 87 9
97 8654321
PLAN
NORTH
ACTUAL
NORTH
MILLER-REMICK LLC
PROFESSIONAL ENGINEER
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE
WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE
PROFESSIONAL ENGINEER.
Miller-Remick LLC
1010 KINGS HIGHWAY SOUTH
CHERRY HILL, NEW JERSEY 08034
PHONE: (856)429-4000
FAX: (856)429-5002
M.E.P. & Structural Engineering
A Service Disabled Veteran Owned Small Business
MR PROJECT NO: 0500-0019
B
A
C
D
E
F
KEYPLAN
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
BID DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Phase
ENGINEER OF RECORDCONSULTANT CONSTRUCT NEW EP LAB 652-CSI-203
Project Director
2019-12-17
AREA-G
AREA-D
NEW AREA
HUNTER HOLMES MCGUIRE VAMC
RICHMOND, VA
MECHANICAL
DEMOLITION PLANS - PHASE 3 & 4
LEVEL 1
MD112
ARFJS
AREA OF SCOPE
M.6
Q
P
N
M.9
2019181716 17.7 18.2 18.5
M.9
AREA OF SCOPE
191817 17.7 18.2 18.5
P
N
M.9
NO. DESCRIPTION DATE
B
A
C
D
E
F
1 2 3 4 5 6 87 9
97 8654321
PLAN
NORTH
ACTUAL
NORTH
MILLER-REMICK LLC
PROFESSIONAL ENGINEER
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE
WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE
PROFESSIONAL ENGINEER.
Miller-Remick LLC
1010 KINGS HIGHWAY SOUTH
CHERRY HILL, NEW JERSEY 08034
PHONE: (856)429-4000
FAX: (856)429-5002
M.E.P. & Structural Engineering
A Service Disabled Veteran Owned Small Business
MR PROJECT NO: 0500-0019
B
A
C
D
E
F
KEYPLAN
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
BID DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Phase
ENGINEER OF RECORDCONSULTANT CONSTRUCT NEW EP LAB 652-CSI-203
Project Director
2019-12-17
AREA-G
AREA-D
NEW AREA
HUNTER HOLMES MCGUIRE VAMC
RICHMOND, VA
MECHANICAL
DEMOLITION PLANS - PHASE 3 & 4
LEVEL 1 - INTERSTITIAL
MD112.i
ARFPB/JS
M.4
18.2
M.1
K.9
P A R K
P O S
IT
IO
N
P A R K
P O S
IT
IO
N
E C C
C C M
S C M
T C M
A D D
IT
IO
N A L
L
IV
E
D
IS
P L A Y
F O R
L D
(R E A R
M O U N T
(O P T
IO
N
1G-152 1G-154
1G-153
1G-155
1G-156
NURSE
OBSERVATION
CONTROL
SPEC PRO/
CARDIAC
EQUIP
STORAGE
SUPPLY
STORAGE
RECOVERY
1G-145
1D-116
1D-117
1D-118
C1D-9
C1D-10
S2H-1
STAIRS
CONTROL
ROOM
EQUIP RM
CORRIDOR
1D-122
SPECIAL
PROCEDURE
SPECIAL
PROCEDURE
SCRUB
1D-119
1D-121
UPS
ROOM
STERILE
STORAGE
1D-120
STORAGE
1G-144
1G-142
C1G-22
SCRUB
1G-152H
1G-151
PREP/REC
BAY
IV PREP
C1G-15
CORRIDOR
C1G-16A
CORRIDOR
1G-152G
PREP/REC
BAY
AREA OF SCOPE
AREA OF SCOPE
C1G-16
CORRIDOR
1D-124
C1D-6
CORRIDOR
1D-123
TOILET
C1G-16
CORRIDOR
C1G-19
CORRIDOR
1D-124
HAC
1918171615 17.7 18.517.1 18.3 20
1G-144
1G-142
NURSE
1G-145
1G-147
1G-148
C1G-16
TLT
TLT
CORRIDOR
SOILED
1D-123
S2H-1
1D-124
STAIRS
SCRUB
HAC
AREA
OF SCOPE
1D-121
UPS
ROOM
1D-122
STERILE
STORAGE
181716 17.7 1817.1
P
N
Nn
M.6
Q
P
N
Nn
M
L
M.6
NO. DESCRIPTION DATE
B
A
C
D
E
F
1 2 3 4 5 6 87 9
97 8654321
PLAN
NORTH
ACTUAL
NORTH
MILLER-REMICK LLC
PROFESSIONAL ENGINEER
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE
WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE
PROFESSIONAL ENGINEER.
Miller-Remick LLC
1010 KINGS HIGHWAY SOUTH
CHERRY HILL, NEW JERSEY 08034
PHONE: (856)429-4000
FAX: (856)429-5002
M.E.P. & Structural Engineering
A Service Disabled Veteran Owned Small Business
MR PROJECT NO: 0500-0019
B
A
C
D
E
F
KEYPLAN
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
BID DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Phase
ENGINEER OF RECORDCONSULTANT CONSTRUCT NEW EP LAB 652-CSI-203
Project Director
2019-12-17
AREA-G
AREA-D
NEW AREA
HUNTER HOLMES MCGUIRE VAMC
RICHMOND, VA
MECHANICAL
NEW WORK PLANS - PHASE 1 & 2
LEVEL 1
MH111
K.9
Ll
Mm
M.6
Q
P
N
M.9
L
201918171615 17.7 18.2 18.5
AREA
OF SCOPE
181716 17.7 18
P
N
M.9
NO. DESCRIPTION DATE
B
A
C
D
E
F
1 2 3 4 5 6 87 9
97 8654321
PLAN
NORTH
ACTUAL
NORTH
MILLER-REMICK LLC
PROFESSIONAL ENGINEER
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE
WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE
PROFESSIONAL ENGINEER.
Miller-Remick LLC
1010 KINGS HIGHWAY SOUTH
CHERRY HILL, NEW JERSEY 08034
PHONE: (856)429-4000
FAX: (856)429-5002
M.E.P. & Structural Engineering
A Service Disabled Veteran Owned Small Business
MR PROJECT NO: 0500-0019
B
A
C
D
E
F
KEYPLAN
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
BID DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Phase
ENGINEER OF RECORDCONSULTANT CONSTRUCT NEW EP LAB 652-CSI-203
Project Director
2019-12-17
AREA-G
AREA-D
NEW AREA
HUNTER HOLMES MCGUIRE VAMC
RICHMOND, VA
MECHANICAL
NEW WORK PLANS - PHASE 1
LEVEL 1 INTERSTITIAL
MH111.i
S2H-11D-124
STAIRS
1D-122
HAC
1D-121
UPS
ROOM
STERILE
STORAGE
1G-152
1G-144
1G-142
NURSE
RECOVERY
G
-1
1G-147
1G-148
C1G-16
TLT
TLT
CORRIDOR
S O
IL
E
D
C1G-18
NURSE
STATION
1G-155
1G-156
1G-152F
1G-152C
PREP &
RECOVERY
PREP &
RECOVERY
TRANSITIONAL
BAY
PREP/REC
BAY
1G-152H
1G-151
PREP/REC
BAY
IV PREP
C1G-15
CORRIDOR
C1G-16A
CORRIDOR
1G-152G
PREP/REC
BAY
C1G-16B
CORRIDOR
1G-152E
PREP/REC
BAY
1G-152D
PREP/REC
BAY
1G-162
NOURISHMENT
AREA OF SCOPE
AREA OF SCOPE
C1G-19
CORRIDOR
2019181716 17.7 18.2 18.5
M.6
Q
P
N
M.9M.9
G
-1
S O
IL
E
D
1G-144
1G-154
1G-153
CLEAN
SUPPLY
LINEN
S2H-11D-124
STAIRS
1D-122
HAC
PS
OM
STERILE
STORAGE
1G-147
1G-148
C1G-16
TLT
TLT
CORRIDOR
C1G-18
NURSE
STATION
1G-152C
TRANSITIONAL
BAY
C1G-16B
CORRIDOR
1G-152
PREP/RE
BAY
NOURISHMENT
1G-15
PREP
RECOV
1G-152B
PREP/REC
BAY
1G-152A
PREP/REC
BAY
1G-151
IV PREP
AREA OF SCOPE
191817 17.7 18.2 18.5
M.9
M.6
P
N
M.9
NO. DESCRIPTION DATE
B
A
C
D
E
F
1 2 3 4 5 6 87 9
97 8654321
PLAN
NORTH
ACTUAL
NORTH
MILLER-REMICK LLC
PROFESSIONAL ENGINEER
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE
WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE
PROFESSIONAL ENGINEER.
Miller-Remick LLC
1010 KINGS HIGHWAY SOUTH
CHERRY HILL, NEW JERSEY 08034
PHONE: (856)429-4000
FAX: (856)429-5002
M.E.P. & Structural Engineering
A Service Disabled Veteran Owned Small Business
MR PROJECT NO: 0500-0019
B
A
C
D
E
F
KEYPLAN
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
BID DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Phase
ENGINEER OF RECORDCONSULTANT CONSTRUCT NEW EP LAB 652-CSI-203
Project Director
2019-12-17
AREA-G
AREA-D
NEW AREA
HUNTER HOLMES MCGUIRE VAMC
RICHMOND, VA
MECHANICAL
NEW WORK PLANS - PHASE 3 & 4
LEVEL 1
MH112
M.6
Q
P
N
M.9
2019181716 17.7 18.2 18.5
AREA OF SCOPE
M.9
191817 17.7 18.2 18.5
P
N
M.9
NO. DESCRIPTION DATE
B
A
C
D
E
F
1 2 3 4 5 6 87 9
97 8654321
PLAN
NORTH
ACTUAL
NORTH
MILLER-REMICK LLC
PROFESSIONAL ENGINEER
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE
WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE
PROFESSIONAL ENGINEER.
Miller-Remick LLC
1010 KINGS HIGHWAY SOUTH
CHERRY HILL, NEW JERSEY 08034
PHONE: (856)429-4000
FAX: (856)429-5002
M.E.P. & Structural Engineering
A Service Disabled Veteran Owned Small Business
MR PROJECT NO: 0500-0019
B
A
C
D
E
F
KEYPLAN
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
BID DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Phase
ENGINEER OF RECORDCONSULTANT CONSTRUCT NEW EP LAB 652-CSI-203
Project Director
2019-12-17
AREA-G
AREA-D
NEW AREA
HUNTER HOLMES MCGUIRE VAMC
RICHMOND, VA
MECHANICAL
NEW WORK PLANS - PHASE 3 & 4
LEVEL 1 INTERSTITIAL
MH112.i
M.4
N
Nn
M.9
17.7 18.2 18.3
M
L
NO. DESCRIPTION DATE
B
A
C
D
E
F
1 2 3 4 5 6 87 9
97 8654321
PLAN
NORTH
ACTUAL
NORTH
MILLER-REMICK LLC
PROFESSIONAL ENGINEER
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE
WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE
PROFESSIONAL ENGINEER.
Miller-Remick LLC
1010 KINGS HIGHWAY SOUTH
CHERRY HILL, NEW JERSEY 08034
PHONE: (856)429-4000
FAX: (856)429-5002
M.E.P. & Structural Engineering
A Service Disabled Veteran Owned Small Business
MR PROJECT NO: 0500-0019
B
A
C
D
E
F
KEYPLAN
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
BID DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Phase
ENGINEER OF RECORDCONSULTANT CONSTRUCT NEW EP LAB 652-CSI-203
Project Director
2019-12-17
AREA-G
AREA-D
NEW AREA
HUNTER HOLMES MCGUIRE VAMC
RICHMOND, VA
MECHANICAL
ROOF PLAN - PHASE 1
M-121
JSJS
1G-122
SERVICE BAY 'C'
MECHANICAL
1G-126
SERVICE BAY 'E'
ELECTRICAL
1G-123
SERVICE BAY
ELECTRICAL
1G-127
SERVICE BAY
C1G-5
CORRIDOR
C1G-12
CORRIDOR
C1G-8
CORRIDOR
C1G-6
CORRIDOR
ASSOC. CHIEF
1D-129
PSYCHOLOGY
PSYCHOLOGY
1D-129A
SVC
PSYCHOLOGICAL
1D-125A
TESTING
MALE
1D-123
TOILET
PSYCHOLOGICAL
1D-125
TESTING
MECHANICAL
1D-153
SERVICE BAY 'W'
ELECTRICAL
1D-154
SERVICE BAY
C1D-1
CORRIDOR
C1D-3
CORRIDOR
MALE
1D-155
TOILET
FEMALE
1D-156
TOILET
NO. DESCRIPTION DATE
B
A
C
D
E
F
1 2 3 4 5 6 87 9
97 8654321
PLAN
NORTH
ACTUAL
NORTH
MILLER-REMICK LLC
PROFESSIONAL ENGINEER
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE
WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE
PROFESSIONAL ENGINEER.
Miller-Remick LLC
1010 KINGS HIGHWAY SOUTH
CHERRY HILL, NEW JERSEY 08034
PHONE: (856)429-4000
FAX: (856)429-5002
M.E.P. & Structural Engineering
A Service Disabled Veteran Owned Small Business
MR PROJECT NO: 0500-0019
B
A
C
D
E
F
KEYPLAN
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
BID DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Phase
ENGINEER OF RECORDCONSULTANT CONSTRUCT NEW EP LAB 652-CSI-203
Project Director
2019-12-17
HUNTER HOLMES MCGUIRE VAMC
RICHMOND, VA
MECHANICAL
NEW WORK PIPING PLANS
LEVEL 1 - MECHANICAL ROOMS
MP111
JSJS
BAY-C & E
BAY-W
1G-122
SERVICE BAY 'C'
MECHANICAL
1G-126
SERVICE BAY 'E'
ELECTRICAL
1G-123
SERVICE BAY
ELECTRICAL
1G-127
SERVICE BAY
ELECTRICAL
1D-154
SERVICE BAY
NO. DESCRIPTION DATE
B
A
C
D
E
F
1 2 3 4 5 6 87 9
97 8654321
PLAN
NORTH
ACTUAL
NORTH
MILLER-REMICK LLC
PROFESSIONAL ENGINEER
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE
WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE
PROFESSIONAL ENGINEER.
Miller-Remick LLC
1010 KINGS HIGHWAY SOUTH
CHERRY HILL, NEW JERSEY 08034
PHONE: (856)429-4000
FAX: (856)429-5002
M.E.P. & Structural Engineering
A Service Disabled Veteran Owned Small Business
MR PROJECT NO: 0500-0019
B
A
C
D
E
F
KEYPLAN
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
BID DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Phase
ENGINEER OF RECORDCONSULTANT CONSTRUCT NEW EP LAB 652-CSI-203
Project Director
2019-12-17
HUNTER HOLMES MCGUIRE VAMC
RICHMOND, VA
MECHANICAL
NEW WORK PIPING PLAN
LEVEL 1 INTERSTITIAL
MP111.i
JSJS
BAY-C & E
BAY-W
1D-116
SPECIAL
PROCEDURE
NO. DESCRIPTION DATE
B
A
C
D
E
F
1 2 3 4 5 6 87 9
97 8654321
PLAN
NORTH
ACTUAL
NORTH
MILLER-REMICK LLC
PROFESSIONAL ENGINEER
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE
WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE
PROFESSIONAL ENGINEER.
Miller-Remick LLC
1010 KINGS HIGHWAY SOUTH
CHERRY HILL, NEW JERSEY 08034
PHONE: (856)429-4000
FAX: (856)429-5002
M.E.P. & Structural Engineering
A Service Disabled Veteran Owned Small Business
MR PROJECT NO: 0500-0019
B
A
C
D
E
F
KEYPLAN
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
BID DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Phase
ENGINEER OF RECORDCONSULTANT CONSTRUCT NEW EP LAB 652-CSI-203
Project Director
2019-12-17
AREA-G
AREA-D
NEW AREA
HUNTER HOLMES MCGUIRE VAMC
RICHMOND, VA
MECHANICAL
SECTIONS
M-301
NO. DESCRIPTION DATE
B
A
C
D
E
F
1 2 3 4 5 6 87 9
97 8654321
MILLER-REMICK LLC
PROFESSIONAL ENGINEER
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE
WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE
PROFESSIONAL ENGINEER.
Miller-Remick LLC
1010 KINGS HIGHWAY SOUTH
CHERRY HILL, NEW JERSEY 08034
PHONE: (856)429-4000
FAX: (856)429-5002
M.E.P. & Structural Engineering
A Service Disabled Veteran Owned Small Business
MR PROJECT NO: 0500-0019
B
A
C
D
E
F
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
BID DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Phase
ENGINEER OF RECORDCONSULTANT CONSTRUCT NEW EP LAB 652-CSI-203
Project Director
2019-12-17
HUNTER HOLMES MCGUIRE VAMC
RICHMOND, VA
MECHANICAL
DETAILS
M-501
DETAILS
M-502
ARFPB
NO. DESCRIPTION DATE
B
A
C
D
E
F
1 2 3 4 5 6 87 9
97 8654321
MILLER-REMICK LLC
PROFESSIONAL ENGINEER
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE
WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE
PROFESSIONAL ENGINEER.
Miller-Remick LLC
1010 KINGS HIGHWAY SOUTH
CHERRY HILL, NEW JERSEY 08034
PHONE: (856)429-4000
FAX: (856)429-5002
M.E.P. & Structural Engineering
A Service Disabled Veteran Owned Small Business
MR PROJECT NO: 0500-0019
B
A
C
D
E
F
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
BID DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Phase
ENGINEER OF RECORDCONSULTANT CONSTRUCT NEW EP LAB 652-CSI-203
Project Director
2019-12-17
SECTION A-A
A
A
C US
1B
1A
C US
2 5B 4 3
A
5B
5A
A
MECHANICAL
DETAILS
M-503
ARFPB
NO. DESCRIPTION DATE
B
A
C
D
E
F
1 2 3 4 5 6 87 9
97 8654321
MILLER-REMICK LLC
PROFESSIONAL ENGINEER
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE
WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE
PROFESSIONAL ENGINEER.
Miller-Remick LLC
1010 KINGS HIGHWAY SOUTH
CHERRY HILL, NEW JERSEY 08034
PHONE: (856)429-4000
FAX: (856)429-5002
M.E.P. & Structural Engineering
A Service Disabled Veteran Owned Small Business
MR PROJECT NO: 0500-0019
B
A
C
D
E
F
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
BID DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Phase
ENGINEER OF RECORDCONSULTANT CONSTRUCT NEW EP LAB 652-CSI-203
Project Director
2019-12-17
1G-155
1G-156
1G-152H
1G-162
1G-151
C1G-16
C1G-18
1D-116 1D-117
1D-118
1D-119
1D-121
C1D-16
1G-147
C1D-10
S2H-1
1G-145
1G-154
STAIRS
CLEAN
SUPPLY
SOILED
SCRUB
CORRIDOR
CONTROL
ROOM
SPECIAL
PROCEDURE
EQUIP RM
TLT
STORAGE
SPECIAL
PROCEDURE
CORRIDOR
PREP &
RECOVERY
PREP &
RECOVERY
PREP/REC
BAY
IV PREP
NURSE
STATION
NOURISHMENT
1G-153
LINEN
1D-122
STERILE
STORAGE
1D-120
UPS
ROOM
1G-148
HAC
1G-146
TLT
C1G-15
CORRIDOR
C1G-16A
CORRIDOR
1G-152G
PREP/REC
BAY
1G-152F
PREP/REC
BAY
1G-152E
PREP/REC
BAY
1G-152D
PREP/REC
BAY
TRANSITIONAL BAY
1G-152B
PREP/REC
BAY
1G-152A
PREP/REC
BAY
C1G-16B
CORRIDOR
1G-152C
NO. DESCRIPTION DATE
B
A
C
D
E
F
1 2 3 4 5 6 87 9
97 8654321
PLAN
NORTH
ACTUAL
NORTH
MILLER-REMICK LLC
PROFESSIONAL ENGINEER
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE
WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE
PROFESSIONAL ENGINEER.
Miller-Remick LLC
1010 KINGS HIGHWAY SOUTH
CHERRY HILL, NEW JERSEY 08034
PHONE: (856)429-4000
FAX: (856)429-5002
M.E.P. & Structural Engineering
A Service Disabled Veteran Owned Small Business
MR PROJECT NO: 0500-0019
B
A
C
D
E
F
KEYPLAN
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
BID DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Phase
ENGINEER OF RECORDCONSULTANT CONSTRUCT NEW EP LAB 652-CSI-203
Project Director
2019-12-17
AREA-G
AREA-D
NEW AREA
HUNTER HOLMES MCGUIRE VAMC
RICHMOND, VA
MECHANICAL
AIRFLOW DIAGRAM
M-601
ARFPB
SCHEDULES
M-701
ARFPB
NO. DESCRIPTION DATE
B
A
C
D
E
F
1 2 3 4 5 6 87 9
97 8654321
MILLER-REMICK LLC
PROFESSIONAL ENGINEER
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE
WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE
PROFESSIONAL ENGINEER.
Miller-Remick LLC
1010 KINGS HIGHWAY SOUTH
CHERRY HILL, NEW JERSEY 08034
PHONE: (856)429-4000
FAX: (856)429-5002
M.E.P. & Structural Engineering
A Service Disabled Veteran Owned Small Business
MR PROJECT NO: 0500-0019
B
A
C
D
E
F
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
BID DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Phase
ENGINEER OF RECORDCONSULTANT CONSTRUCT NEW EP LAB 652-CSI-203
Project Director
2019-12-17
HUNTER HOLMES MCGUIRE VAMC
RICHMOND, VA
GPM °F LBS/HR PSIG PSIG PSIG LBS/HR LBS/HR
500-CSG-1 ROOF EP LAB 500-RTU-1
UNFIRED STEAM
GENERATOR
RO WATER 0.72 50 290 15 20 10 290 1 600 DRI STEEM 200S
CAPACITY
EACH
CLEAN STEAM GENERATOR SCHEDULE
MARK LOCATION
AREA
AND/OR
BLDG
SERVED
ENT HEAT
EXCHANGER
ENT CONTROL
VALVE
TRAPS
BASIS OF DESIGN
OR APPROVED EQUAL
SOURCE
OF
MAKEUP
FLOW EWT
SYSTEM
AND/OR
SERVICE
TYPE
NOTES:
1. PROVIDE OUTDOOR, WEATHER PROOF ENCLOSURE WITH ROOF CURB AND FREEZE PROTECTION HEATER.
2. PROVE 120 V CIRCUIT, 13.5 AMP, 20 A MOCP FOR UNIT POWER SUPPLY.
WATER
CONDITIONS
PRODUCED
STEAM
FLOW
PRODUCED
STEAM
PRESS
STEAM PRESSURE
CONTROL
VALVE
QTY
1/2"-NPT
S25P
1/2"-NPT
25P
NOTES:
1. CAST IRON PILOT-OPERATED REGULATOR (MODULATING) REDUCED PORT W/ YELLOW PILOT
2. CAST IRON (OR BRONZE) SPRING LOADED SAFETY RELIEF VALVE REQUIRED IN CONFORMANCE WITH ASME SECTION VIII, DIVISION 1. REFER TO SEPARATE SRV SCHEDULE.
3. CAST IRON PILOT-OPERATED REGULATOR (MODULATING) FULL PORT W/ YELLOW PILOT
GENERAL NOTES:
(1) THE DOWNSTREAM PRESSURE SENSING LOCATION WILL BE TEN (10) PIPE DIAMETERS OF CLEAR PIPE RUN AFTER THE REGULATOR.
(2) INCREASE OR DECREASE PIPE SIZE AFTER NOISE DIFFUSER OUTLET CONNECTION TO MATCH ENGINEER'S RECOMMENDATION.
SEE NOTES 2,3D4
PRESSURE REDUCING VALVE SCHEDULE
BASIS OF DESIGN
SPIRAX SARCO S25P
SPIRAX SARCO 25P
3.48 61 SEE NOTES 1,2
BLDG. 500 60 20 300 385 616.5
MAX. FLOW
(LB/HR)
500-PRV-A BLDG. 500 60 20 150 158
REQ'D. FLOW
(LB/HR)
MIN.
(Cv)
500-PRV-B
REGULATOR
SIZE/MODEL
NOISE
DIFFUSER
FINAL
dBA
REMARKSMARK LOCATION
INLET
PRESSURE
(PSIG)
OUTLET
PRESSURE
(PSIG)
MIN MAX
CFM CFM IN WG IN x IN IN x IN
RG-1 RETURN REGISTER 0 1220 0.051 SIDE WALL 24x16 N/A 15 NONE WHITE TITUS 350FL
RG-2 PERFORATED 0 1000 0.006 CEILING 24x24 N/A 20 NONE WHITE TITUS 8F
EG-1
EXHAUST
REGISTER
0 175 0.060 CEILING 22x22 N/A 15 NONE WHITE TITUS 45F
AIR DEVICE SCHEDULE (RETURN AND EXHAUST)
MARK TYPE
PANEL/FRAME
SIZE
NECK SIZE
AIR FLOW MAX
APD NCMOUNTING DAMPER FINISH
BASIS OF DESIGN
OR
APPROVED EQUAL
DIAMETER
CFM IN IN BHP HP
500-SF-1A 500-AHU-1 EP LAB SUPPLY 12,890 5.95 PLENUM SWSI,CW,HOR 27 DIRECT 1849 21.03 25 3 480 1800 VFD LAU DDPG2 270-9 NOTE 1
500-SF-1B 500-AHU-1 EP LAB SUPPLY 12,890 5.95 PLENUM SWSI,CW,HOR 27 DIRECT 1849 21.03 25 3 480 1800 VFD LAU DDPG2 270-9 NOTE 1
500-RF-1A 500-AHU-1 EP LAB RETURN 11,850 1.7 PLENUM SWSI,CW,HOR 27 DIRECT 1432 8.75 10 3 480 1200 VFD LAU DDPG2 270-12 NOTE 1
500-RF-1B 500-AHU-1 EP LAB RETURN 11,850 1.7 PLENUM SWSI,CW,HOR 27 DIRECT 1432 8.75 10 3 480 1200 VFD LAU DDPG2 270-12 NOTE 1
500-EF-1 AREA D ROOF
EP LAB
TOILETS
EXHAUST 255 0.75
ROOFTOP
CENTRIFUGAL
DOWNBLAST 14 DIRECT 1725 0.13 1/4 1 120 1750 ECM
GREENHECK
G-097-VG/4/A
NOTES 1, 2
NOTES:
BASIS OF DESIGN
OR
APPROVED EQUAL
MOTOR ELECTRICAL
REMARKSSPEED
CONTROL
FAN
RPM
DRIVE PHASE
MARK LOCATION
TYPE
FAN
RPM
1. PROVIDE FAN WITH BACKDRAFT DAMPER.
NOMINAL
POWER
2. PROVIDE 12-IN. HIGH ROOF CURB. NEMA 3R DISCONNECT SWITCH TO BE PROVIDED BY ELECTRICAL CONTRACTOR.
ARRANGEMENT,
ROTATION, AND
DISCHARGE
FAN SCHEDULE
AREA
AND/OR
BLDG
SERVED
SYSTEM
AND/OR
SERVICE
AIR
FLOW
VOLT
TSP
SUPPLY MIN OA RETURN PREFILTER AFTER FILTER FINAL FILTER
CFM CFM CFM
500-AHU-1 ROOF EP LAB EP LAB
COMMERCIAL
PACKAGED
12,890 2,000 11,850 500-SF-1A & B 500-RF-1A & B 500-PF-1 500-AF-1 500-FF-1 500-SHC-1 500-CWCC-1 500-H-1 YORK/JCI SOLUTION XTO-69X105
1. PROVIDE UNIT WITH SURFACE DECONTAMINATION UV LIGHTS AFTER COOLING COIL.
2. PROVIDE WITH 24" HIGH ROOF CURB
3. PROVIDE WITH PIPE CHASES FOR STEAM, CHILLED WATER, AND HUMIDIFIER CONNECTIONS
4. PROVIDE SINGLE POINT OF CONNECTION FOR ALL 480V. 3Ø AND ALL 120 V POWER. 120 V TO BE SIZED FOR LIGHTS, RECEPTICAL AND 5 AMPS OF CONTROL POWER.
5. AIR HANDLER SHALL BE CAPABLE OF A MAXIMUM AIR FLOW OF 15,400 CFM.
6. INTERNAL LINER TO BE 304L STAILESS STEEL FOR ALL SECTIONS.
NOTES:
COOLING
COIL
RETURN OR
RELIEF FAN
LOCATION
AREA
AND/OR
BLDG
SERVED
ROOFTOP AIR HANDLING UNIT SCHEDULE
BASIS OF DESIGN
AIR FLOW
PREHEAT
COIL
MARK HUMIDIFIERTYPE
SUPPLY
FAN
AIR FILTRATION
INITIAL CHANGEOVER
IN IN
1-PF-1 500-AHU-1 EP LAB 12,890 8 0.27 0.5 SIDE ACCESS -----
1-AF-1 500-AHU-1 EP LAB 12,890 11 0.34 0.6 SIDE ACCESS -----
1-FF-1 500-AHU-1 EP LAB 12,890 14 0.65 1.3 SIDE ACCESS
BASIS OF DESIGN
OR
APPROVED EQUAL
HOUSING
TYPE
AIR FILTER SCHEDULE
MARK LOCATION
AREA AND/OR
BLDG SERVED
AIR FLOW
CFM
MERV
RATING
APD
NOTE:
1. ALL FILTERS SHALL BE REPLACED AFTER VA ACCEPTANCE AND PRIOR TO OCCUPANCY.
Db Wb Db Wb FLOW EWT LWT WPD
CFM FPM IN WG °F °F °F °F MBH MBH GPM °F °F FT
500-CWCC-1 EP LAB 500-AHU-1 12890 450 0.95 72.1 61.9 50.2 49.9 512 369 85.1 45 57 10.7 0 -----
CHILLED WATER COOLING COIL SCHEDULE
MARK
TOTAL
CAPACITY
MAX FACE
VELOCITY
SENSIBLE
CAPACITY
LAT
AREA AND/OR
BLDG SERVED
SYSTEM
AND/OR
SERVICE
CHILLED WATER
% GLYCOL
BASIS OF DESIGN
OR
APPROVED EQUAL
NOTE:
1. THE COOLING COIL FIN SPACING SHALL NOT EXCEED 132 FINS PER FOOT [400 FINS PER METER].
AIR
FLOW
EAT
APD
EAT LAT FLOW EWT LWT WPD
CFM FPM IN WG °F °F MBH GPM °F °F FT
500-HWC-1-1 EP LAB 500-AVS-1 REHEAT 2300 650 0.12 50 80 75.9 5.1 180 150 9.2 ---
500-HWC-1-2 EP LAB 500-AVS-2 REHEAT 2300 650 0.12 50 80 75.9 5.1 180 150 9.2
MARK
APD
TEMPERATURES HOT WATERTOTAL MIN
CAPACITYAREA AND/OR
BLDG SERVED
SYSTEM
AND/OR
SERVICE
APPLICATION
BASIS OF DESIGN
OR APPROVED EQUAL
HOT WATER HEATING COIL SCHEDULE
AIR
FLOW
MAX FACE
VELOCITY
EAT LAT
ENT CONT
VALVE
ENT
COIL
FLOW
CFM FPM IN WG °F °F MBH PSIG PSIG LBS/HR MARK LBS/HR
500-SHC-1 ROOF EP LAB 500-AHU-1 PREHEAT 12890 550 0.2 45 55 142 15 5 148 1-TP7 300 ----
AREA
AND/OR
BLDG SERVED
APPLICATION
SYSTEM
AND/OR
SERVICE
TEMPERATURES
STEAM TRAP
STEAM HEATING COIL SCHEDULE
MARK LOCATION REMARKS
MAX
FACE
VELOCITY
STEAM
APD
TOTAL
MIN
CAPACITY
AIR
FLOW
IN Ø CFM CFM IN WG
500-AVS-1
EP LAB
INTERSTICE
1D-116
PROCEEDURE
VENTURI 14 2300 690 0.6
2 POSITION
CONSTANT VOL
500-AVS-2
EP LAB
INTERSTICE
1D-119
PROCEEDURE
VENTURI 14 2300 690 0.6
2 POSITION
CONSTANT VOL
500-AVR-1
EP LAB
INTERSTICE
1D-116
PROCEEDURE
VENTURI 14 1900 -- 0.6 VAV
500-AVR-2
EP LAB
INTERSTICE
1D-119
PROCEEDURE
VENTURI 14 1900 -- 0.6 VAV
DESIGN
AIR FLOW
SIZE
AIR FLOW CONTROL VALVE SCHEDULE
TYPE REMARKSMARK LOCATION
SYSTEM
AND/OR
SERVICE
MIN UNOCC
AIR FLOW
APD AT
MAX AIR
FLOW APPLICATION
CONTROL
TYPE
LAT
Db Wb DEWPOINT DEWPOINT
PRESS ENT
VALVE
PRESS ENT
HEATER
FLOW CAPACITY
CFM °F °F °F °F PSIG PSIG LBS/HR LBS/HR
500-SH-1 ROOF 500-AHU-1
UNIT-MOUNTED
DISPERSION TUBE
12,630 50 36.5 12.8 31 500-CSG-1 15 5 160 MODULATING 320
DRISTEEM
ULTRA-SORB MODEL XV
MARK LOCATION HUMIDIFIER TYPE
AIR
FLOW
STEAM
STEAM HUMIDIFER SCHEDULE
EAT
SYSTEM
AND/OR
SEVICE
BASIS OF DESIGN
TRAP
CONTROL
TYPE
SOURCE
MAX UNOCC
CFM CFM
HEAT
CFM
ENT
TEMP
LVG
TEMP
ENT
TEMP
LVG
TEMP
GPM
MAX DP
FT
500-TUS-1
EP LAB
INTERSTICE
1D-117
EQUIPMENT
16 2960 0
VAV SINGLE DUCT,
SHUT OFF
VAV 0 -- -- -- -- -- -- -- ----
500-TUS-2
EP LAB
INTERSTICE
1D-118 CONTROL
ROOM
7 390 160
VAV SINGLE DUCT,
REHEAT
VAV REHEAT 160 50 75 180 150 0.3 2
500-TUS-3
EP LAB
INTERSTICE
1D-121
UPS ROOM
14 1850 0
VAV SINGLE DUCT,
SHUT OFF
VAV 0 -- -- -- -- -- -- --
500-TUS-4
EP LAB
INTERSTICE
1D-120 & 122
STORAGE
5 380 160
VAV SINGLE DUCT,
REHEAT
VAV REHEAT 160 50 75 180 150 0.3 2
500-TUS-5
EP LAB
INTERSTICE
C1G-16
CORRIDOR
7 380 160
VAV SINGLE DUCT,
REHEAT
VAV REHEAT 160 50 75 180 150 0.3 2
500-TUS-6
EP LAB
INTERSTICE
1G-152 & 1G-153
RECOVERY
6 300 120
VAV SINGLE DUCT,
REHEAT
VAV REHEAT 120 50 75 180 150 0.2 2
500-TUS-7
EP LAB
INTERSTICE
1G-154
RECOVERY
5 160 70
VAV SINGLE DUCT,
REHEAT
VAV REHEAT 70 50 75 180 150 0.1 2
500-TUS-8
EP LAB
INTERSTICE
1G-155, 1G-156
RECOVERY
6 220 90
VAV SINGLE DUCT,
REHEAT
VAV REHEAT 90 50 75 180 150 0.2 2
500-TUS-9
EP LAB
INTERSTICE
1G-157
RECOVERY
5 170 70
VAV SINGLE DUCT,
REHEAT
VAV REHEAT 70 50 75 180 150 0.1 2
500-TUS-TEMP-9
EP LAB
INTERSTICE
(E)1G-156 10 920 370
VAV SINGLE DUCT,
REHEAT
VAV REHEAT 370 50 75 180 150 0.7 2 RETURN TO COR ONCE REMOVED
500-TUS-10
EP LAB
INTERSTICE
1G-158, 1G-159, 1G-160
RECOVERY
6 300 120
VAV SINGLE DUCT,
REHEAT
VAV REHEAT 120 50 75 180 150 0.2 2
500-TUS-11
EP LAB
INTERSTICE
1G-16A & 1G-164
NURSE STATION
10 820 330
VAV SINGLE DUCT,
REHEAT
VAV REHEAT 330 50 75 180 150 0.6 2
500-TUS-12
EP LAB
INTERSTICE
1G-146 4 100 40
VAV SINGLE DUCT,
REHEAT
VAV REHEAT 40 50 75 180 150 0.1 2
500-TUR-1
EP LAB
INTERSTICE
1D-117
EQUIPMENT
16 2960 0
VAV SINGLE DUCT,
SHUT OFF
VAV TRACKING -- -- -- -- -- -- -- --
500-TUR-2
EP LAB
INTERSTICE
1D-118 CONTROL
ROOM
8 590 0
VAV SINGLE DUCT,
SHUT OFF
VAV TRACKING -- -- -- -- -- -- -- --
500-TUR-3
EP LAB
INTERSTICE
1D-121
UPS ROOM
14 1850 0
VAV SINGLE DUCT,
SHUT OFF
VAV TRACKING -- -- -- -- -- -- -- --
500-TUR-4
EP LAB
INTERSTICE
1CD-16
CORRIDOR
10 780 0
VAV SINGLE DUCT,
SHUT OFF
VAV TRACKING -- -- -- -- -- -- -- --
500-TUR-5
EP LAB
INTERSTICE
1G-154
RECOVERY
5 160 0
VAV SINGLE DUCT,
SHUT OFF
VAV TRACKING -- -- -- -- -- -- -- --
500-TUR-6
EP LAB
INTERSTICE
1G-157
RECOVERY
5 170 0
VAV SINGLE DUCT,
SHUT OFF
VAV TRACKING -- -- -- -- -- -- -- --
500-TUR-7
EP LAB
INTERSTICE
1G-16A & 1G-164
NURSE STATION
12 1540 0
VAV SINGLE DUCT,
SHUT OFF
VAV TRACKING -- -- -- -- -- -- -- --
SINGLE DUCT AIR TERMINAL UNIT SCHEDULE
MARK LOCATION
AREA
AND/OR
ROOM
SERVED
TYPE
CONTROL
SEQUENCE
PD OF
ENTIRE BOX
AT MAXIMUM
CFM
REHEAT
WATER
REMARKS
AIRSIZE
(IN Ø)
AIR FLOW
PANEL
FRAME SIZE
NECK
SIZE
DUCT
SIZE
MIN MAX
CFM CFM IN WG
SD-1 SUPPLY DIFFUSER 20 100 0.060 CEILING 12x12 4 4 20 NONE WHITE TITUS TMS-AA LOUVERED FACE
SD-2 SUPPLY DIFFUSER 105 160 0.070 CEILING 12x12 6 6 20 NONE WHITE TITUS TMS-AA LOUVERED FACE
SD-3 SUPPLY GRILL 545 675 0.110 SIDE WALL 18x10 N/A 10x8 23 NONE WHITE TITUS TMS-AA 45 DEG. DOUBLE DEFLECTION
SD-4 SUPPLY DIFFUSER 1100 0.111 CEILING 24x24 15 22x8 32 NONE WHITE TITUS TMS-AA LOUVERED FACE
SD-5 LAMINAR FLOW 190 190 0.250 CEILING 48x24 8 8 30
FACE
OPERATED
STAINLESS
STEEL
PRECISION AIR SEE NOTE 9 & 10
SD-6 LAMINAR FLOW 190 190 0.250 CEILING 48x24 8 8 30
FACE
OPERATED
STAINLESS
STEEL
PRECISION AIR SEE NOTE 9 & 10
NOTES:
1. SEE FLOOR PLAN FOR THROW PATTERN.
2. SEE DETAIL FOR DAMPER IN BRANCH DUCT SERVING EACH DIFFUSER.
3. PROVIDE SQUARE TO ROUND ADAPTER.
4. INSTALL ALL AIR DEVICES IN ACCORDANCE WITH MANUFACTURERS RECOMMENDATIONS.
5. MAX NC RATING BASED ON 10dB ROOM ABSORBTION.
6. REFER TO ARCHITECTURAL REFLECTED CEILING PLAN FOR CEILING TYPE.
7. THROW VALUE IN FEET FOR 100 FPM TERMINAL VELOCITY.
8. PROVIDE FLEXIBLE DUCT WHERE SHOWN ON DRAWINGS AT DIFFUSER NECK SIZE,
9. 2" HEPA MEDIA, MINIMUM OF ONE INDICATING LIGHT FOR PRESSURE DROP FILTER CHAGE OUT NOTIFICATION PER ROOM.
10. SIDE END OVAL CONNECTION, 16.5" X 3.25"
FINISH
AIR DEVICE SCHEDULE (SUPPLY)
REMARKSDAMPER
AIR FLOW
IN
MOUNTING
IN x IN
TYPE
MAX
APD
BASIS OF
DESIGN OR
APPROVED
EQUAL
IN x IN
NCMARK
TT
FT
T
PC
R A
V
S A
V
PDS
MECHANICAL
CONTROLS
M-801
ARFPB
NO. DESCRIPTION DATE
B
A
C
D
E
F
1 2 3 4 5 6 87 9
97 8654321
MILLER-REMICK LLC
PROFESSIONAL ENGINEER
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE
WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE
PROFESSIONAL ENGINEER.
Miller-Remick LLC
1010 KINGS HIGHWAY SOUTH
CHERRY HILL, NEW JERSEY 08034
PHONE: (856)429-4000
FAX: (856)429-5002
M.E.P. & Structural Engineering
A Service Disabled Veteran Owned Small Business
MR PROJECT NO: 0500-0019
B
A
C
D
E
F
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
BID DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Phase
ENGINEER OF RECORDCONSULTANT CONSTRUCT NEW EP LAB 652-CSI-203
Project Director
2019-12-17
E le c tr ic
P n e u m a ti c
E le c tr ic
P n e u m a ti c
S ta tu s
T e m p e ra tu re
P re s s u re
H u m id it y
F lo w
C u rr e n t
D a ta
E q u ip m e n t
S ta tu s
L o w
L im it
H ig h L im it
S c h e d u le
S ta rt /S to p
L e a d /L a g
T e m p e ra tu re
C o n tr o l
E n th a lp y E c o n o m iz e r
P re s s u re
/V o lu m e C o n tr o l
H u m id it y C o n tr o l
H u m id it y R e s e t
V a lu e
O p p e ra ti n g S p e e d
S ta tu s
F a u lt
A m p s
A c tu a l a n d P re c e n t o f
F u ll
C a p a c it y A m p s
HOA On/Off (GLOBAL FOR UNIT) HS ● ● ●
Return Air Temperature TT-1 ● 80 ● ●
Return Air Humidity MT-1 ● 20 65 ● ●
Outside Air Temperature TT-2 ● ● ●
USE OF BAS GLOBAL VALUE IS
ACCEPTABLE ILO LOCAL POINT
Outside Air Humidity MT-2 ● ● ●
USE OF BAS GLOBAL VALUE IS
ACCEPTABLE ILO LOCAL POINT
Mixed Air Temperature TT-3 ● 45 ●
Preheat Coil Leaving Temperature TT-4 ● 45 85 ●
Freezstat TSL-1 ● ● 34 ●
Cooling Coil Leaving Temperature TT-5 ● 62 ●
Supply Air Temperature TT-6 ● 66 ● ●
Return Fan On/Off SST-1 ● ● ●
Return Air Flow FT-1 ● ●
Return Fan Speed SC-1 ● ● ●
Return Fan VFD COMM ● ● ● ● ● ●
Supply Fan On/Off SST-2 ● ● ●
Supply Fan On/Off SST-3 ● ● ●
Supply Air Flow FT-2 ● ●
Supply Air Flow FT-3 ● ●
Supply Fan Speed SC-2 ● ● ●
Supply Fan Speed SC-3 ● ● ●
Supply Fan VFD COMM ● ● ● ● ● ●
Supply Fan VFD COMM ● ● ● ● ● ●
Supply Fan Isolation Damper ZC-2 C ● ●
Supply Fan Isolation Damper ZC-3 C ● ●
Supply Fan Damper End Switch ZS-2 ● ● ●
Supply Fan Damper End Switch ZS-3 ● ● ●
MIN OA Air Flow FT-5 ● ●
Min OA dampers ZC-10 C ● ● ●
Supply High Pressure PSH-1 8 ●
Economizer Outside Air Damper ZC-7 C ● ● ● ●
Economizer Exhaust Air Damper ZC-9 C ● ● ● ●
Return Air Smoke Damper ZC-6 C ● ● ● ●
Return Air End Switch ZS-6 ● ● ●
Supply Air Smoke Damper ZC-5 C ● ●
Smoke Damper End Switch ZS-5 ● ● ●
Preheat Glycol Control Valve TC-1 O ● ● ●
Preheat Steam Control Valve TC-2 C ● ● ●
Cooling Coil Chilled Water Valve TC-3 C ● ● ●
Pre Filter Pressure Drop PDS-1 ● 0.5 ●
Intermediate Filter Pressure Drop PDS-2 ● 0.8 ●
Start/Stop 1-EF-1 SST-1 ● ● ●
Status 1-EF-1 CS-1 ● ● ● ●
POINTS SUMMARY (NOT INCLUDING TERMINAL CONTROLS)
SYSTEM COMPONENT P
o in t
ID
D e v ic e F a il
P o s it io n
O
O p e n
(C
C lo s e d
System Outputs
Application/Function
Digital Communications
G ra p h ic
D is p la y
T re n d in g
POINTS SUMMARY 1-EF-1
System Inputs System Software/Control
Binary Analog Binary Analog Alarm Processing
Remark
MECHANICAL
CONTROLS
M-802
ARFPB
NO. DESCRIPTION DATE
B
A
C
D
E
F
1 2 3 4 5 6 87 9
97 8654321
MILLER-REMICK LLC
PROFESSIONAL ENGINEER
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE
WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE
PROFESSIONAL ENGINEER.
Miller-Remick LLC
1010 KINGS HIGHWAY SOUTH
CHERRY HILL, NEW JERSEY 08034
PHONE: (856)429-4000
FAX: (856)429-5002
M.E.P. & Structural Engineering
A Service Disabled Veteran Owned Small Business
MR PROJECT NO: 0500-0019
B
A
C
D
E
F
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
BID DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Phase
ENGINEER OF RECORDCONSULTANT CONSTRUCT NEW EP LAB 652-CSI-203
Project Director
2019-12-17
| M-001 |
| M-001 |