36C24618R0135-015.pdf
PDF 5 MB Posted
- Attached to
- SCI Expansion, 652-314 (VA-17-900410) Federal contract opportunity
- Solicitation number
- 36C24618R0135
About this file
36C24618R0135 SCI DWGS 07.pdf
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 36C24618R0135-00003000.docx | DOCX document | |
| 36C24618R0135-00002001.pdf | ||
| 36C24618R0135-00002000.docx | DOCX document | |
| 36C24618R0135-010.pdf | ||
| 36C24618R0135-006.docx | DOCX document | |
| 36C24618R0135-012.pdf | ||
| 36C24618R0135-003.docx | DOCX document | |
| 36C24618R0135-014.pdf | ||
| 36C24618R0135-002.docx | DOCX document | |
| 36C24618R0135-013.pdf | ||
| 36C24618R0135-016.pdf | ||
| 36C24618R0135-009.pdf | ||
| 36C24618R0135-017.pdf | ||
| 36C24618R0135-007.docx | DOCX document | |
| 36C24618R0135-001.docx | DOCX document | |
| 36C24618R0135-011.pdf | ||
| 36C24618R0135-005.docx | DOCX document | |
| 36C24618R0135-008.pdf | ||
| 36C24618R0135-004.docx | DOCX document | |
| 36C24618R0135-000.docx | DOCX document |
Show all 20
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
MISCELLANEOUS ABBREVIATIONS
SYMBOLS DESCRIPTION
PIPELINE ABBREVIATIONS HVAC SYMBOLS
EQUIPMENT TAG ABBREVIATIONS
DESCRIPTIONSYMBOLS
PIPELINE SYMBOLS
DOUBLE LINE SHEETMETAL
SINGLE LINE - SHEET METAL
DESCRIPTIONSYMBOLS
CHILLED WATER RETURN
CHILLED WATER SUPPLY
HOT WATER HEATING RETURN
HOT WATER HEATING SUPPLY
INVERTED ECCENTRIC REDUCER
(VENTURI FLOW STATION)
TWO-WAY MODULATING
THREE-WAY MODULATING CONTROL VALVE
SAFETY VALVE OR PRESSURE RELIEF
PRESSURE REDUCING VALVE
BALANCING COCK
WATER FLOW MEASURING DEVICE
PIPING TURNED DOWN
TWO-WAY CONTROL VALVE
MOTORIZED VALVE
AUTOMATIC AIR VENT
SECURITY SUPPLY DIFFUSER CEILING
SECURITY SMOKE EXHAUST FAN
STATIC PRESSURE SENSOR
TEMPERATURE CONTROL VALVE
SUPPLY LINEAR SLOT DIFFUSER
THERMOMETER
TEMPERATURE RISE
TURNING VANES
TEMPERATURE
STATIC PRESSURE
SMOKE DAMPER
SECURITY SUPPLY GRILLE CEILING
SECURITY SUPPLY GRILLE WALL
SHEET METAL
TRIPLE DUTY VALVE
VARIABLE AIR VOLUME
WATER TEMPERATURE DROP
VOLUME CONTROL DAMPER
WATER FLOW MEASURING DEVICE
VENTURI FLOW STATION
WATER GAUGE
HORSE POWERHP
INSULATED METAL ENCLOSURE
INVERTED ECCENTRIC REDUCER
HORIZONTAL UNIT HEATER
HOT WATER SUPPLY AND RETURNHWS&R
INTERL
IME
INV
IER
INSUL
INCL
IN
HTG
HPD
HWS
HV
HWR
DHW
HUH
INCLUDED
INVERT
INCHES
INSULATION
INTERLOCK
HIGH PRESSURE DRIP
HOT WATER SUPPLY
HOT WATER RETURN
HIGH VELOCITY
HEATING
DOMESTIC HOT WATER
W/O W/
WITH OUT
WITH
EXHAUST REGISTER
ELECTRICAL CONTRACTOR
ENTERING AIR TEMPERATURE
FINAL AIR TEMPERATURE
EXHAUST REGISTER WALL
ENTERING WATER TEMPERATURE
GRAVITY INTAKE VENTILATOR
FROMFRM
GA
GRAV
GC
GPM
GL V
GIV
HC
GV
FT HD
FLR DR
FCU
FD
FC
FAT
S/FD
GAUGE
GENERAL CONTRACTOR
GALLONS PER MINUTE
HEATING CONTRACTOR
GATE VALVE
GLOBE VALVE
GRAVITY
FAN COIL UNIT
FLEXIBLE CONNECTION
FIRE DAMPER
FEET OF HEAD
FLOOR DRAIN
SMOKE/FIRE DAMPER
FLG C
ER
FPB
FLR
EWB
EWT
ERW
EA
EMER
EAT
EDB
EC
EXH
ETR
EQUIP
FAN POWERED BOX
FLANGE CONNECTION
ENTERING WET BULB
FLOOR
ENTERING DRY BULB
EXHAUST AIR
EXISTING TO REMAIN
EXHAUST
EQUIPMENT
EMERGENCY
VAV
V
VD
VFS
WTD
WFMD
WG
WB
TV
TRANS
TR
TCV
TSTAT
TYP
UC
VALVE
WET BULB
TYPICAL
TRANSITION
THERMOSTAT
UNDERCUT
SHT MTL
STR
SP
TEMP
TA
SPS
TDV
TH
SD
SSEF
SSGC
SSGW
SHT
SLSD
STL
STRAINER
THROWAWAY
SHEET
STEEL
PIPING TURNED UP
FUNNEL DRAIN
CONTROL VALVE
A
M
MANUAL AIR VENT
(TWO POSITION TYPE)
AQUASTAT
PRESSURE TAP
LEAVING WET BULB
LEAVING DRY BULB
LEAVING WATER TEMPERATURE
LEAVING AIR TEMPERATURE
MANUAL AIR VENT
MIXED AIR TEMPERATURE
MANUFACTURER
ISOLATION VALVE STATION
LINEAR SUPPLY DIFFUSER CEILING
RETURN GRILLE
ONE THOUSAND BTU/HOUR
OUTSIDE SCREW AND YOKE
PRESSURE REDUCING VALVE
PRESSURE GAUGE WITH COCK
PRESSURE DIFFERENTIAL VALVE
MOTOR OPERATED DAMPER
PRESSURE TAP
RETURN AIR GRILLE
PLUMBING CONTRACTOR
OPPOSED BLADE DAMPER
PUMP DISCHARGE
NOT APPLICABLE
MECHANICAL EQUIPMENT ROOM
NOT TO SCALE
RETURN AIR/RELIEF AIR
RETURN REGISTER
RELIEF VALVE
BACKDRAFT DAMPERBDD
CHILLED WATER SUPPLY/RETURN
DISCH
DPR
DO
DN
DWG
DR
EF
DX
CORR
CO
CV
CIRC
CFM
DIFF
DB
DCW
EXHAUST FANS
DIRECT EXPANSION
DAMPER
DITTO
DOWN
DISCHARGE
DRAWING
DRAIN
CIRCULATOR
CONTROL VALVE
DOMESTIC COLD WATER
CUBIC FEET PER MINUTE
CLEANOUT
CORRIDOR
DIFFUSER
DRY BULB
CONTR
CLG MTD
CONN
CONT
COL
CONC
CD
CONV
CHK V
CHWS&R
CAP
CHWR
CHWS
CLG
CFH
CEILING MOUNTED
CONTRACTOR
CONNECTION
CONDENSATE DRAIN
CONVECTOR
CONTINUE
CONCRETE
COLUMN
CHILLED WATER RETURN
CHILLED WATER SUPPLY
CHECK VALVE
CUBIC FEET/ HOUR
CAPACITY
CEILING
RA
RG
RAG
RR
SCH
RV
SA
PD
PT
PG
PRV
REQD
RM
RET
SCHEDULE
SUPPLY AIR
REQUIRED
ROOM
RETURN
MER
OBD
OS&Y
PC
OA
OPNG
OPER
NA
PRD
MAV
MAT
NTS
MBH
MH
MOD
OPENING
OPERATED
OUTSIDE AIR
MANHOLE
AIR FLOW MEASURING DEVICE
AVERAGE WATER TEMPERATURE
AUTOMATIC TEMPERATURE CONTROL
ACC
AP
ATC
BC
BLW
B
BLDG
AWT
APPROX
AAV
ABV
AUTO
AFF
AFMD
AD
BALANCING COCK
AIR COOLED CHILLER
ACCESS PANEL
BUILDING
BOILER
BELOW
AUTOMATIC AIR VENT
APPROXIMATELY
ABOVE FINISHED FLOOR
ACCESS DOOR
ABOVE
AUTOMATIC
LWT
MECH
MAX
MTD
MIN
MTR
MTL
MFGR
LDB
IVS
LTG
LAT
LWB
LSDC
LF
MAXIMUM
MECHANICAL
MOUNTED
MINIMUM
MOTOR
METAL
LIGHTING
LINEAR FEET
THERMOMETER
STRAINER
PRESSURE GAUGE
UNION
ECCENTRIC REDUCER
MANUAL VOLUME CONTROL DAMPER (VD)
RISE/DROP IN DUCTWORK
(ARROW SHOWS DIRECTION OF DROP)
SMOKE DAMPER/DETECTOR
PANEL IN DUCT AND CEILING)
EXHAUST AIR DUCT DN
SUPPLY AIR DIFFUSER
ACCESS DOOR ON SIDE OF DUCT
EXHAUST REGISTER
RETURN AIR REGISTER
ACCESS DOOR ON BOTTOM OF DUCT
DETECTOR BY E.C. DAMPER BY H.C.
FIRE DAMPER AT FIRE WALL (PROVIDE ACCESS
OR HORIZONTAL DUCT ABOVE CEILING (PROVIDE
FIRE DAMPER IN VERTICAL DUCT THRU FLOOR
ACCESS PANEL IN DUCT AND WALL OR CEILING)
SUPPLY AIR REGISTER (DUCT OR WALL)
EXHAUST/RETURN AIR REGISTER (DUCT OR WALL)
COMBINATION FIRE/SMOKE DAMPER
MOTORIZED DAMPER
SUPPLY DUCT DN
RETURN AIR DUCT DN
EXHAUST AIR DUCT UP
RETURN AIR DUCT UP
SUPPLY DUCT UP
ROUND SUPPLY, RETURN OR
OVAL SUPPLY, RETURN OR
RECTANGULAR SUPPLY, RETURN OR
DIRECTION OF AIR FLOW)
DUCT W/O TURNING VANES
DUCT MOUNTED SMOKE
BY EC, INSTALLED BY HC
RELIEF DUCT WIDTH (SHOWN)XDEPTH
RELIEF DUCT WIDTH (SHOWN)XDEPTH
LOW LOSS TAKE OFF (ARROW INDICATES
RADIUS ELBOW (DUCT WIDTH 17" AND LOWER)
(ARROW INDICATES AIR FLOW DIRECTION)
BOOT CONNECTION WITH MANUAL VD
DUCT W/TURNING VANES (DUCT WIDTH OVER 18")
WALL SWITCH
DUCT/SPACE STATIC PRESSURE SENSOR
DETECTOR PROVIDED
CONICAL SPIN-IN FITTING
24"X24"24"X24"
12"X12"
DD
S
WS
M
AD
REFRIGERANT LINE
REFRIGERANT SUCTION
RL
RS
HWHS
HWHR
CHWS
CHWR
THERMAL VAV DIFFUSERTF
UNIT HEATERUH
SSDC
AIR COOLED CONDENSING UNITACCU
ACCUMULATORACCUM
AIR HANDLING UNITAHU
AIR SOURCE HEAT PUMPASHP
BASEBOARD HEATERBB
BD BAROMETRIC DAMPER
BACK DRAFT DAMPERBDD
CHILLED WATER COOLING COILCC
COMPRESSORCMPR
CONV CONVECTOR
CABINET UNIT HEATER
CP
CUH
CONDENSATE PUMP
DC DRY COOLER
EXPANSION TANKET
ELECTRIC CABINET UNIT HEATERECUH
ELECTRIC UNIT HEATEREUH
ELECTRIC WALL HEATEREWH
EVAPORATOREVAP
FINNED TUBE RADIATIONFT
FURNACEFU
GRV GRAVITY ROOF VENTILATOR
HC HOT WATER HEATING COIL
HUMIDIFIERH
RCP RADIANT CEILING PANEL
RTU ROOF TOP UNIT
SF SUPPLY FAN
SSAC SPLIT SYSTEM AIR CONDITIONING UNIT
P PUMP
PTAC PACKAGED TERMINAL AIR CONDITIONING UNIT
UNIT VENTILATORUV
CD CONDENSATE DRAIN LINE
MPS MEDIUM PRESSURE STEAM SUPPLY
MPCR MEDIUM PRESSURE CONDENSATE RETURN
PUMPED CONDENSATEPC
HRS ENERGY (HEAT) RECOVERY SUPPLY
HRR ENERGY (HEAT) RECOVERY RETURN
NAME PIPE TO BE REMOVED
NAME EXISTING PIPING TO REMAIN
TEE- OUTLET
SIDE CONNECTION
CAPPED OUTLET
TEE - OUTLET UP
12"X12"
12"/12"
RELIEF VALVE
BUTTERFLY VALVE
PIPE BREAK (SINGLE LINE)
DIRECTION OF FLOW
FLEXIBLE CONNECTION
BACKFLOW PREVENTION DEVICE
DUCT END CAP
24X12
SQUARE ELBOW WITH
TURNING VANES
RADIUS TURN ELBOW
RETURN CROSS
SECTION DN
EXHAUST CROSS
SECTION UP
SUPPLY DUCT
CROSS SECTION DN
RETURN CROSS
SECTION UP
CROSS SECTION UP
SUPPLY DUCT
ROUND DUCT SIZE (DIAMETER)
FLEXIBLE DUCT (DIAMETER SIZE)
DUCT SIZE (WIDTH X DEPTH)
24"Ø
DUCT W/ TURNING VANES
CONDENSER WATER RETURN
CONDENSER WATER SUPPLYCWS
CWR
CTD COOLING TOWER DRAIN LINE
UNDER CUT DOORUCD
BALL VALVE
(HINGED & GASKETED)
(HINGED & GASKETED)
FD
F/SD
FDFD
LPS LOW PRESSURE STEAM SUPPLY
LPCR LOW PRESSURE CONDENSATE RETURN
HPS HIGH PRESSURE STEAM SUPPLY
HPCR HIGH PRESSURE CONDENSATE RETURN
REX REMOVE EXISTING
EXISTINGEX
BACKDRAFT DAMPER
B
DUCT/WALL TEMPERATURE SENSOR, ELECTRICT
24"Ø
12"Ø
DRAWING SYMBOLS
DRAWING NUMBER WHERE DRAWN
H200
SECTION LETTER
DRAWING NUMBER WHERE DRAWNH100
DETAIL NUMBER
CONNECT TO EXISTING AT THIS POINT
DEMO/REMOVE TO THIS POINT
EQUIPMENT NUMBER1
VAV POWERED EQUIPMENT
EQUIPMENT NUMBER1
RHC NON-POWERED EQUIPMENT
CD-#
DIFFUSER/REGISTER/GRILLE TYPE
AIRFLOW QUANTITY
KEYNOTE (DEMO SCOPE)
KEYNOTE (NEW WORK SCOPE)
1. EXISTING BUILDING AUTOMATION SYSTEM (BAS) DIRECT-DIGITAL CONTROL SYSTEM IS METASYS
MANUFACTURED BY JOHNSON CONTROLS. ALL NEW DDC EQUIPMENT TO BE JOHNSON CONTROLS
METASYS SYSTEM. NAME BRAND ONLY. NO OTHER MANUFACTURER TO BE ACCEPTED.
HVAC CONTROLS
1. NOT ALL SYMBOLS ARE NECESSARILY USED.
2. COORDINATE FINAL LOCATIONS OF DIFFUSERS AND GRILLES WITH ARCHITECTURAL REFLECTED CEILING
PLANS.
3. DRAWINGS ARE DIAGRAMMATIC. CONTRACTOR TO FIELD VERIFY DUCT AND PIPE ROUTING AND
COORDINATE INTERFERENCE BETWEEN TRADES PRIOR TO INSTALLATION.
4. ROOF OPENINGS, FLASHING, AND COUNTER FLASHING BY GENERAL CONTRACTOR. LOCATION OF
OPENINGS BY HEATING CONTRACTOR.
5. DUCTWORK TO BE INSTALLED TIGHT TO UNDERSIDE OF STRUCTURE ABOVE UNLESS NOTED OTHERWISE.
6. PROVIDE ALL MATERIALS, EQUIPMENT AND PERFORM ALL LABOR REQUIRED TO INSTALL COMPLETE AND OPERABLE MECHANICAL SYSTEMS AS INDICATED ON THE DRAWINGS, AS SPECIFIED, AND AS REQUIRED BY
CODE.
7. CONTRACT DOCUMENT DRAWINGS FOR MECHANICAL WORK ARE DIAGRAMMATIC AND ARE INTENDED TO CONVEY SCOPE AND GENERAL ARRANGEMENT ONLY. CONTRACTOR SHALL BE RESPONSIBLE TO FIELD SURVEY ACTUAL SITE CONDITIONS AND ACCOMMODATE ACTUAL SITE CONDITIONS AS PART OF SCOPE OF
WORK AT NO COST TO OWNER.
8. INSTALL ALL MECHANICAL EQUIPMENT AND APPURTENANCES IN ACCORDANCE WITH MANUFACTURER'S RECOMMENDATIONS, CONTRACT DOCUMENTS, APPLICABLE BUILDING, STATE, AND LOCAL CODES, SEISMIC
REQUIREMENTS, ENERGY CODES, AND INSURANCE UNDERWRITER REQUIREMENTS.
9. COORDINATE CONSTRUCTION OF ALL MECHANICAL WORK WITH ARCHITECTURAL, STRUCTURAL, CIVIL, AND
ELECTRICAL WORK, ETC. SHOWN ON OTHER CONTRACT DOCUMENT DRAWINGS.
10. MAINTAIN A MINIMUM OF 6'-8" CLEARANCE TO UNDERSIDE OF PIPES, DUCTS, CONDUITS, SUSPENDED
EQUIPMENT, SUPPORTS, ETC., THROUGHOUT ACCESS ROUTES IN MECHANICAL ROOMS.
11. ALL TESTS SHALL BE COMPLETED AND ACCEPTED BY THE INSPECTOR BEFORE ANY MECHANICAL
EQUIPMENT OR PIPING INSULATION IS APPLIED.
12. LOCATE ALL TEMPERATURE, PRESSURE AND FLOW MEASURING DEVICES IN ACCESSIBLE LOCATIONS WITH A STRAIGHT SECTION OF PIPE OR DUCT UPSTREAM AND DOWNSTREAM, AS RECOMMENDED BY THE
MANUFACTURER FOR ACCURACY.
13. TESTING ADJUSTING AND BALANCING (TAB) AGENCY SHALL BE A MEMBER OF THE ASSOCIATED AIR BALANCING COUNCIL (AABC) OR THE NATIONAL ENVIRONMENTAL BALANCING BUREAU (NEBB). TAB FIRM SHALL HAVE A MINIMUM OF 5 YEARS EXPERIENCE ON SIMILAR PROJECTS. PERFORM TAB IN ACCORDANCE WITH THE REQUIREMENTS OF THE TAB PROCEDURAL STANDARD RECOMMENDED BY THE TAB TRADE ASSOCIATION THAT
APPROVED THE TAB FIRM'S QUALIFICATIONS.
14. WHERE TWO OR MORE ITEMS OF THE SAME TYPE OF EQUIPMENT ARE REQUIRED, THE PRODUCTS OF A
SINGLE MANUFACTURER SHALL BE USED.
15. COORDINATE ALL FINAL EQUIPMENT CONNECTIONS WITH MANUFACTURERS' CERTIFIED DRAWINGS.
COORDINATE AND PROVIDE ALL DUCTWORK AND PIPING TRANSITIONS REQUIRED FOR FINAL EQUIPMENT CONNECTIONS TO FURNISHED EQUIPMENT. FIELD VERIFY AND COORDINATE ALL DUCTWORK AND PIPING
DIMENSIONS BEFORE FABRICATION.
16. ALL CONTROL WIRE AND CONDUIT SHALL COMPLY WITH THE NATIONAL ELECTRIC CODE, DIVISION 26 OF THE
SPECIFICATIONS, ALL LOCAL CODES, AND OWNER'S INSURANCE UNDERWRITER REQUIREMENTS.
17. THE LOCATIONS AND SIZES OF ALL ITEMS SHOWN ON THE DRAWINGS OR CALLED FOR IN THE SPECIFICATIONS THAT ARE NOT DEFINITELY FIXED BY DIMENSIONS ARE APPROXIMATE ONLY. THE EXACT LOCATIONS AND SIZES NECESSARY TO SECURE THE BEST CONDITIONS AND RESULTS SHALL BE DETERMINED BY THE PROJECT SITE CONDITIONS AND SHALL HAVE THE APPROVAL OF THE ENGINEER BEFORE BEING INSTALLED. DO NOT SCALE
DRAWINGS.
18. PLAN DRAWINGS AND SECTION CUTS WHICH SPECIFICALLY IDENTIFY SERVICE ROUTE OFFSETS, ELEVATION CHANGES, OBSTRUCTIONS, ACCESS DOORS, BALANCING DEVICES, ETC. ARE SHOWN FOR CLARITY WHERE SPECIFIC KNOWN CONDITIONS EXIST. MECHANICAL CONTRACTOR SHALL COORDINATE EQUIPMENT, DUCTWORK, AND PIPING ROUTINGS WITH ALL OTHER TRADES. REQUIREMENTS NOT SPECIFICALLY IDENTIFIED SHALL NOT BE INTERPRETED AS EXCLUSION FROM CONTRACTOR'S SCOPE OF WORK. CONTRACTOR SHALL BE RESPONSIBLE FOR ACTUAL SITE CONDITIONS AND SHALL INCLUDE SUCH CONDITIONS IN SCOPE OF WORK AT NO ADDITIONAL
COST TO THE OWNER.
19. ALL MISCELLANEOUS STEEL REQUIRED TO ENSURE PROPER INSTALLATION AND SUPPORT OF MECHANICAL WORK AS SHOWN IN DETAILS FOR PIPING, DUCTWORK AND EQUIPMENT (UNLESS OTHERWISE NOTED) SHALL BE FURNISHED AND INSTALLED BY THE MECHANICAL CONTRACTOR AT NO ADDITIONAL COST TO THE OWNER.
20. ALL EQUIPMENT, PIPING, DUCTWORK, ETC., SHALL BE SUPPORTED AS DETAILED, SPECIFIED AND AS
REQUIRED TO PROVIDE A VIBRATION FREE INSTALLATION.
21. ALL OPENINGS IN FIRE RATED WALLS AND SMOKE PARTITIONS DUE TO DUCTWORK, PIPING, CONDUIT, ETC., SHALL BE FIRE STOPPED WITH APPROVED FIRESTOPPING MATERIALS.
22. REFER TO TYPICAL DETAILS FOR DUCTWORK, PIPING AND EQUIPMENT INSTALLATION.
23. UNLESS OTHERWISE SHOWN, LOCATE ALL ROOM THERMOSTATS WITH TOP AT 48" ABOVE FINISHED FLOOR IN ACCORDANCE WITH ADA REQUIREMENTS. NOTIFY THE ENGINEER OF ANY ROOMS WHERE THE ABOVE LOCATION CAN NOT BE MAINTAINED OR WHERE THERE IS A QUESTION ON LOCATION. COORDINATE FINAL LOCATIONS WITH
OWNER.
24. LOCATE ALL MECHANICAL EQUIPMENT (VAV BOXES, CABINET HEATERS, UNIT HEATERS, ETC.,) FOR UNOBSTRUCTED ACCESS TO UNIT ACCESS PANELS, FILTERS, CONTROLS AND VALVING. DO NOT LOCATE FAN
POWERED VAV BOXES ABOVE LIGHTING FIXTURES.
25. PROVIDE FLEXIBLE CONNECTIONS IN ALL DUCTWORK SYSTEMS (SUPPLY, RETURN AND EXHAUST) CONNECTED TO FANS AND OTHER EQUIPMENT WHICH REQUIRE VIBRATION ISOLATION. FLEXIBLE CONNECTIONS SHALL BE PROVIDED AT THE POINT OF CONNECTION TO THE EQUIPMENT UNLESS OTHERWISE INDICATED.
26. ALL LOUVERS SHALL BE FURNISHED AND INSTALLED BY THE GENERAL CONTRACTOR (UNLESS OTHERWISE NOTED). GENERAL CONTRACTOR SHALL COORDINATE SIZES, LOCATIONS, AND CONNECTIONS WITH MECHANICAL CONTRACTOR. DUCTWORK CONNECTIONS TO LOUVERS SHALL BE FURNISHED AND INSTALLED BY MECHANICAL
CONTRACTOR.
27. PROVIDE AN AIR VENT AT THE HIGH POINT OF EACH DROP IN HYDRONIC WATER PIPING SYSTEMS. ALL PIPING SHALL SLOPE TO LOW POINTS. PROVIDE HOSE END DRAIN VALVES AT THE BOTTOM OF ALL RISERS AND LOW
POINTS.
28. INSTALL PIPING SO THAT ALL VALVES, STRAINERS, UNIONS, TRAPS, FLANGES, AND OTHER APPURTENANCES
REQUIRING ACCESS ARE ACCESSIBLE.
29. ALL ISOLATION VALVES SHALL BE IN A LOCATION AND ELEVATION WHICH ALLOWS FOR EQUIPMENT AND BRANCH PIPING REMOVAL, WHILE MAINTAINING SERVICE UPSTREAM OF THE ISOLATION VALVE.
30. ALL BALANCING VALVES AND ISOLATION VALVES USED TO ADJUST FLOW RATES SHALL BE PROVIDED WITH
POSITION INDICATORS AND MAXIMUM ADJUSTABLE STOPS (MEMORY STOPS).
31. ALL ISOLATION VALVES (EXCEPT CONTROL VALVES), STRAINER, AND PIPING SPECIALTIES AND STRAINERS SHALL BE FULL LINE SIZE BEFORE REDUCING SIZE TO MAKE CONNECTIONS TO EQUIPMENT AND CONTROLS.
32. MECHANICAL JOINTS SUCH AS UNIONS, FLANGES, OR THREADED FITTINGS SHALL BE INSTALLED AT EACH EQUIPMENT CONNECTION, IN BYPASSES, AT FLOOR PENETRATIONS, AT CONTROL DEVICES, AND IN LONG PIPE
RUNS (100 FEET OR MORE) TO PERMIT DISASSEMBLY FOR ALTERATION AND REPAIRS.
33. MEASURE, CUT, AND INSTALL PIPE LENGTH ACCURATELY TO MINIMIZE MISALIGNMENT. INSTALL ALL PIPING
WITHOUT FORCING OR SPRINGING.
34. PROVIDE FLEXIBLE CONNECTIONS IN ALL PIPING SYSTEMS CONNECTED TO PUMPS AND OTHER EQUIPMENT WHICH REQUIRE VIBRATION ISOLATION (EXCEPT WATER COILS). FLEXIBLE CONNECTIONS SHALL BE PROVIDED AS CLOSE TO THE EQUIPMENT AS POSSIBLE OR AS INDICATED ON THE DRAWINGS.
35. PROVIDE VIBRATION ISOLATION FOR ALL MECHANICAL EQUIPMENT TO PREVENT VIBRATION TRANSMISSION
TO BUILDING STRUCTURE.
36. CONCRETE HOUSEKEEPING PADS SHALL BE FURNISHED AND INSTALLED BY THE GENERAL CONTRACTOR.
MECHANICAL CONTRACTOR SHALL PROVIDE EQUIPMENT WEIGHTS, SIZES, AND LOCATION TO GENERAL CONTRACTOR. MINIMUM CONCRETE PAD THICKNESS SHALL BE IN ACCORDANCE WITH STRUCTURAL DETAILS.
PAD SHALL EXTEND BEYOND THE EQUIPMENT FOOTPRINT A MINIMUM OF 6 INCHES ON EACH SIDE.
37. ALL DUCTWORK, PIPING, AND EQUIPMENT SUPPORTED FROM STRUCTURAL STEEL SHALL BE
COORDINATED WITH GENERAL CONTRACTOR. ALL ATTACHMENTS TO STEEL MEMBERS, BAR JOISTS, TRUSSES, OR JOIST GIRDERS SHALL BE APPROVED BY STRUCTURAL ENGINEER. WELDING TO STRUCTURAL MEMBERS
SHALL NOT BE PERMITTED.
38. MECHANICAL EQUIPMENT, DUCTWORK, AND PIPING SHALL NOT BE SUPPORTED FROM ROOF OR DECK ASSEMBLY. SUPPORTS SHALL ATTACH TO STRUCTURAL MEMBERS. COORDINATE WITH STRUCTURAL
DRAWINGS.
39. PROVIDE MANUFACTURER'S MATCHING ROOF CURBS FOR ALL ROOF MOUNTED EQUIPMENT. COORDINATE ACTUAL ROOF PITCH AND CONSTRUCTION DETAILS WITH GENERAL CONTRACTOR. PROVIDE SLOPED CURBS PER MANUFACTURER'S RECOMMENDATIONS. GENERAL CONTRACTOR SHALL INSTALL ROOF CURBS AND
FLASHING PER ROOFING MANUFACTURER'S INSTALLATION REQUIREMENTS.
40. UNLESS OTHERWISE NOTED, ALL PIPING AND DUCTWORK IS OVERHEAD, TIGHT TO UNDERSIDE OF
STRUCTURE OR SLAB, WITH SPACE FOR INSULATION.
41. PROVIDE CHAINWHEEL OPERATORS FOR ALL EXPOSED VALVES MOUNTED GREATER THAN 8'-0" ABOVE FINISHED FLOOR LEVEL. CHAIN SHALL EXTEND UNOBSTRUCTED TO 7'-0" ABOVE FLOOR LEVEL.
42. ALL PIPING AND DUCTWORK SHALL CLEAR DOORS, WINDOWS, EQUIPMENT CLEARANCES, MAINTENANCE REQUIREMENTS, CODE SETBACKS, ETC. TO ASSURE PROPER OPERATION, INSPECTION, AND MAINTENANCE.
43. ALL VALVES SHALL BE ADJUSTED FOR SMOOTH AND EASY OPERATION.
44. PROVIDE ALL 90 DEGREE SQUARE ELBOWS WITH DOUBLE RADIUS TURNING VANES UNLESS OTHERWISE INDICATED OR SPECIFIED. PROVIDE ACCESS DOORS UPSTREAM OF ALL ELBOWS CONTAINING TURNING
VANES.
45. ALL DUCTS SHALL BE BONDED ACROSS FLEXIBLE CONNECTIONS WITH FLEXIBLE COPPER GROUNDING STRAPS. GROUNDING STRAPS SHALL BE BOLTED OR SOLDERED TO BOTH THE EQUIPMENT AND THE DUCT.
46. ALL EQUIPMENT SUBMITTALS AND SHOP DRAWINGS REQUIRED BY THE SPECIFICATIONS SHALL BE
APPROVED BY ENGINEER PRIOR TO PURCHASE, FABRICATION, AND INSTALLATION.
47. ALL HEATING DEVICES AND SURFACES WITH ELEVATED TEMPERATURES WHICH CAN BE ACCESSED OR COME IN CONTACT WITH OWNER PERSONNEL SHALL BE PROTECTED, INSULATED, OR CONTROLLED TO REMAIN
BELOW 120°F.
48. PROVIDE MANUAL VOLUME DAMPERS IN ALL RUN-OUTS TO DIFFUSERS, BRANCH TAKE-OFFS FROM MAIN SUPPLY DUCT, AND IN ALL OTHER AREAS REQUIRED TO PROVIDE PROPER SYSTEM AIRFLOW BALANCING.
HVAC GENERAL NOTES HVAC DEMOLITION NOTES
HVAC PHASING NOTES
1. THE CONTRACTOR SHALL THOROUGHLY EXAMINE THE SITE PRIOR TO SUBMITTING THEIR BID. DUE TO THE NATURE OF THIS PROJECT AND THE STATE OF THE EXISTING BUILDING, IT IS IMPOSSIBLE TO
COMPLETELY RELATE THE SCOPE OF THE DEMOLITION REQUIRED TO THE CONTRACTOR THROUGH
THE CONTRACT DOCUMENTS. FAILURE TO VISIT THE SITE WILL NOT RELIEVE THE CONTRACTOR OF
THEIR DEMOLITION RESPONSIBILITIES UNDER THIS CONTRACT. IT IS THE CONTRACTOR’S
RESPONSIBILITY TO DETERMINE AND COORDINATE THE EXACT EXTENT OF DEMOLITION NECESSARY TO
PROVIDE A RENOVATED AND UPGRADED SPACE AND TO FACILITATE NEW WORK.
2. INFORMATION REGARDING THE EXISTING CONDITIONS WAS GATHERED FROM AVAILABLE EXISTING DRAWINGS, SURVEY, AND CORRESPONDENCE WITH UTILITY, STAFF, AND FACILITIES PERSONNEL.
THERE ARE NO GUARANTEES AS TO THE ACCURACY OF THIS INFORMATION AND IT IS OFFERED FOR
INFORMATION ONLY.
3. VERIFY EXISTING LOCATIONS OF EQUIPMENT, DUCTWORK, PIPING AND SYSTEM COMPONENTS PRIOR TO DEMOLITION. IF EXISTING CONDITIONS ARE DIFFERENT THAN WHAT IS INDICATED ON THE
CONTRACT DOCUMENTS, THE CONTRACTOR SHALL NOTIFY THE COR AND ARCHITECT PRIOR TO
PROCEEDING WITH THE WORK.
4. MINIMIZE DISTURBANCE AND / OR DAMAGE TO EXISTING FINISHED SURFACES AND FINISHES. WHERE
DEMOLITION OF MECHANICAL SYSTEM COMPONENTS DAMAGES EXISTING SURFACES TO REMAIN,
RESTORE THOSE SURFACES TO THE SAME CONDITION AS THE ADJACENT SURFACES. RESTORATION
MUST BE PERFORMED BY WORKMEN SKILLED IN PERFORMING SUCH WORK. ALL FIRE AND SMOKE
RATINGS SHALL BE RETAINED AS PART OF THE REPAIRS. PATCH / SEAL HOLES WEATHERTIGHT. ALL
PATCHES AND REPAIRS ARE SUBJECT TO THE REVIEW AND APPROVAL OF THE ARCHITECT.
5. ALL AREAS OF EGRESS SHALL BE KEPT OPEN AND FREE FROM DEBRIS AT ALL TIMES.
6. DO NOT REMOVE ITEMS SUPPORTING OTHER ITEMS WITHOUT PROVIDING TEMPORARY OR
PERMANENT SUPPORT. PROPERLY SUPPORT ALL EXISTING ITEMS TO REMAIN. CONTRACTOR SHALL
BE RESPONSIBLE FOR PROVIDING REQUIRED SUPPORTS FOR AFFECTED ITEMS.
7. VERIFY EXTENT OF PIPING, EQUIPMENT, COMPONENTS, AND CONTROLS TO BE RETAINED OR REUSED PRIOR TO THE DEMOLITION OF SPECIFIC SYSTEM. PROTECT ITEMS WHICH ARE TO BE REUSED ON SITE TO MINIMIZE POST-CONSTRUCTION REPAIRS. ALL ITEMS WHICH ARE DAMAGED SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR AND SHALL BE REPAIRED OR REPLACED AT NO COST TO THE
CONTRACT.
8. REFER TO PLANS FOR EXISTING PIPING, DUCTWORK, EQUIPMENT, AND SYSTEM COMPONENTS TO BE
REUSED.
9. THE OWNER RETAINS FIRST RIGHT OF REFUSAL TO ALL EQUIPMENT AND SYSTEM COMPONENTS DEMOLISHED FROM THE PROJECT PRIOR TO DISPOSAL. ALL ITEMS NOT RETAINED BY THE OWNER
SHALL BE PROMPTLY AND PROPERLY DISPOSED OF OR REMOVED FROM SITE.
10. VERIFY ALL EXISTING STRUCTURAL CONDITIONS AND NOTIFY THE STRUCTURAL ENGINEER FOR
APPROVAL TO PENETRATING EXISTING BUILDING STRUCTURAL SYSTEMS.
11. NO DEMOLITION SHALL OCCUR WHICH LEAVES THE BUILDING INTERIOR WITHOUT WEATHER
PROTECTION. ALL DEMOLITION OF EXTERIOR OR EXTERIOR SURFACES SHALL BE FOLLOWED
IMMEDIATELY BY PROTECTIVE CONSTRUCTION. CONTRACTOR SHALL PROVIDE AND INSTALL
TEMPORARY PROTECTION IN ALL OPENINGS WHERE LOUVERS, WINDOWS, OR EXTERIOR DOORS HAVE
BEEN REMOVED.
12. THE DEMOLITION OF THE MECHANICAL SYSTEMS MUST BE PERFORMED TO CORRESPOND TO THE
PHASED NATURE OF THE PROJECT. REFER TO ARCHITECTURAL PHASING PLANS FOR PROJECT
PHASING. THE CONTRACTOR IS RESPONSIBLE FOR ALL TEMPORARY WORK AND EQUIPMENT
NECESSARY TO KEEP REQUIRED SYSTEMS OPERATIONAL UNTIL THEY ARE NO LONGER NEEDED. THIS MAY INCLUDE BUT IS NOT LIMITED TO: RELOCATION OF EQUIPMENT AND ALL APPURTENANCES AND
CONTROLS, RE-PIPING OF EQUIPMENT, AND RE-DUCTING OF EQUIPMENT.
1. THE CONTRACTOR SHALL BE RESPONSIBLE FOR MAINTAINING ALL CONNECTIONS TO EXISTING AND NEW SYSTEMS AS REQUIRED TO FACILITATE PROPER CONTINUAL OPERATION OF ALL SYSTEMS AND EQUIPMENT, EXISTING OR NEW, EXCEPT WHERE IN THE CURRENT PHASE OF CONSTRUCTION.
2. THE CONTRACTOR IS RESPONSIBLE FOR ALL TEMPORARY WORK AND EQUIPMENT NECESSARY TO KEEP REQUIRED SYSTEMS OPERATIONAL UNTIL THEY ARE FULLY RENOVATED AND OPERATING OR UNTIL THEY ARE NO LONGER NEEDED AND DEMOLISHED. THIS MAY INCLUDE BUT IS NOT LIMITED TO: RELOCATION OF EQUIPMENT AND ALL APPURTENANCES AND CONTROLS, RE-PIPING OF EQUIPMENT, AND RE-DUCTING OF
EQUIPMENT.
3. IF THE NEED FOR TEMPORARY SERVICE(S) OR CONNECTIONS DICTATES WORK BE DONE OUT OF PHASE, THIS WORK SHALL BE APPROVED BY THE ARCHITECT AND THE OWNER. WORK SHALL TAKE PLACE IN SUCH A MANNER SO AS NOT TO INTERFERE WITH THE DAY-TO-DAY OPERATIONS OF THE FACILITY AS DETERMINED BY
THE OWNER.
4. REFER TO THE PROJECT SPECIFICATIONS AND ARCHITECTURAL PHASING PLANS TO DETERMINE THE PHASING OF DEMOLITION AND INSTALLATION OF MECHANICAL SYSTEM COMPONENTS. ALTHOUGH PORTIONS OF A MECHANICAL SYSTEM MAY LIE OUTSIDE A PHASED AREA ON PLAN, THOSE COMPONENTS ARE CONSIDERED TO BE “IN PHASE” IF THEIR INSTALLATION AND OPERATION IS REQUIRED FOR THE OCCUPANCY AND USE OF THE PHASED AREA. ALL “IN PHASE” MECHANICAL COMPONENTS SHALL BE INSTALLED AND MADE OPERATIONAL PRIOR TO THE COMPLETION OF THAT PHASE. COORDINATE ALL PHASING REQUIREMENTS WITH
THE GENERAL CONTRACTOR’S SCHEDULE TO ENSURE CONTINUITY OF SYSTEM OPERATION.
5. THE CONTRACTOR SHALL BE AWARE THAT THE EXISTING BUILDING(S) AND ADJACENT SITE WILL BE OCCUPIED AND IN USE 24 HOURS PER DAY, 7 DAYS A WEEK. THE CONTRACTOR SHALL CONDUCT THEIR OPERATIONS SO THAT THERE WILL BE MINIMAL INTERFERENCE WITH THE CONTINUED OPERATION OF THE EXISTING BUILDING(S) AND STAFF. ANY INTERFERENCE OR INCONVENIENCE TO BUILDING OPERATIONS SHALL
BE REVIEWED WITH THE COR AND ARCHITECT PRIOR TO COMMENCEMENT.
6. CONTRACTOR SHALL MINIMIZE SHUTDOWN TIMES DURING MECHANICAL SYSTEM SWITCHOVERS. ALL
SHUTDOWN TIMES AND THEIR DURATIONS SHALL BE COORDINATED WITH THE COR.
CONSULTANTS:
Drawing Title
Approved: Project Director
Project Title:
Location:
Date: Checked: Drawn:
Drawing Number
Building Number
Project Number
Office of Construction and Facilities Management
VA FORM 08-6231
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
FULLY SPRINKLERED
A
B
C
D
E
F
Revisions: Date0
6 " o n e e ig h th i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e h a lf i n c h o n e f o o t th re e i n c h e s o n e f o o t
6587 Hamilton Avenue Pittsburgh, Pennsylvania 15206 Ph: 412.287.7333 Fax: 412.287.7334 www.ae-works.com
AE Works Project Number:
ARCHITECTS/ENGINEERS:SEAL
H.H. MCGUIRE VAMC -
CONSTRUCT SPINAL CORD
ENHANCEMENT CENTER
652 - 314
JKG CJC
1201 Broad Rock Boulevard, Richmond, VA 23249
M001
MECHANICAL SYMBOLS, ABBREVIATIONS AND
GENERAL NOTES
09/11/2017 13030
BID DOCUMENTS
RG-2
RG-2
RG-2
RG-2
RG-2
RG-2
RG-2
RG-2
RG-2
RG-2
RG-2
RG-4
CD-3
CD-1
EG-2
CD-5
CD-1
RG-1
CD-1
EG-2
CD-1
CD-2
EQUIPMENT STORAGE
1X-137
CLEAN LINEN
1X-138
OFFICE (NM)
1X-141
SOILED WORKROOM
1X-142
EQUIPMENT STORAGE
1X-144
CLEAN WORKROOM
1X-145
MULTI-DISCIPLINARY
WORKSTATION (MDW)
1X-147
CORRIDOR
CIX-1
ELECTRICAL ROOM
1X-131
SOILED WORKROOM
1X-136
STAFF TLT
1X-132
PATIENT LAUNDRY
1X-133
STAIR 2 (EXIST.)
1V-180
STAFF BREAK ROOM
1X-134
PRIVATE PATIENT
ROOM
1X-123
PATIENT TOILET /
SHOWER
1X-124
PRIVATE PATIENT
ROOM
1X-125
PATIENT TOILET /
SHOWER
1X-126
PRIVATE PATIENT
ROOM
1X-129
PATIENT TOILET /
SHOWER
1X-130
PRIVATE PATIENT
ROOM
1X-121
PATIENT TOILET /
SHOWER
1X-122
PRIVATE PATIENT
ROOM
1X-107
PATIENT TOILET /
SHOWER
1X-108
PRIVATE PATIENT
ROOM
1X-105
PATIENT TOILET /
SHOWER
1X-106
PRIVATE PATIENT
ROOM
1X-101
PATIENT TOILET /
SHOWER
1X-102
PRIVATE PATIENT
ROOM
1X-103
PATIENT TOILET /
SHOWER
1X-104
PRIVATE PATIENT
ROOM
1X-109
PATIENT TOILET /
SHOWER
1X-110
PRIVATE PATIENT
ROOM
1X-117
PATIENT TOILET /
SHOWER
1X-118
PRIVATE PATIENT
ROOM
1X-115
PATIENT TOILET /
SHOWER
1X-116
PRIVATE PATIENT
ROOM
1X-113
PATIENT TOILET /
SHOWER
1X-114
PRIVATE PATIENT
ROOM
1X-111
PATIENT TOILET /
SHOWER
1X-112
CROSS CORRIDOR
CIX-3
CROSS CORRIDOR
CIX-4
CORRIDOR
CIX-2
PRIVATE PATIENT
ROOM
1X-119 PATIENT TOILET /
SHOWER
1X-120
CLEAN SUPPLY
1X-139
OIT
1X-143
HAC
1X-135
NOURISHMENT
1X-140
CD-6
CD-6
EG-8
RG-2
EG-8
RG-2
RG-2
EG-8
CD-6
CD-6
CD-6
CD-6
CD-6
CD-6
CD-6
CD-6
CD-6
CD-6
CD-11
CD-6
CD-6
CD-6
CD-6
CD-6
CD-6
CD-6
CD-6
CD-6
CD-6
CD-11
EG-2
EG-1
EG-1
CD-6
CD-6
CD-11
CD-6
CD-6
CD-6
CD-6
CD-6
CD-6
EG-1
CD-1
RG-1
CD-2
RG-1
16 17 19 20
21 22 23 24
VV VV
UU UU
TT TT
SS SS
WW'
XX XX
YY YY
ZZ ZZ
20.5
20.5 21.3 22.5 23.2 24.2 24.8
YY.5 YY.5
23.8
SS.5 SS.5
SS.1 SS.1
22.8
SS.7 SS.7
TT' TT'
UU' UU'
VV' VV'
21.4
XX.3 XX.3
SS.2 SS.2
XX.6 XX.6
CD-2
CD-3
CD-3
CD-3
RG-5
CD-3
RG-4
EG-5
EG-5
CD-7
EG-5
EG-5
CD-6
RG-1
TT'.8 TT'.8
WW.8 WW.8
22.9 23.7
WW'.2 WW'.2
VV'.8 VV'.8
UU'.2 UU'.2
EG-8
CD-11
CD-11
EG-8
EG-8
CD-11
EG-4
EG-4
EG-8
CD-11
EG-8
CD-11
EG-8
CD-11
3CD-3
CD-2
CD-2
CD-2
CD-2
CD-2
CD-2
CD-2
CD-2
CD-2
CD-2
CD-2
CD-11
EG-8
CD-11
EG-8
RG-2
PRIVATE PATIENT
ROOM
1X-127
PATIENT TOILET /
SHOWER
1X-128
EF
EG-8
CD-11
CD-11
EG-8
RG-2
EG-8
CD-11
CD-3
CD-3
CD-3
CD-3
CD-2
CD-2
EG-8
CD-11
4 4 4
4 4
RG-1
CD-1
PATIENT SCALE
ALCOVE
CIX-1A
MEDICATION ROOM
1X-146
CD-1
RG-1
HVAC NOTES FOR SHEET M101
1. REFER TO FACILITY'S INFECTION CONTROL AND RISK ASSESSMENT
(ICRA) FOR ADDITIONAL REQUIREMENTS.
2. ALL WORK SHALL BE SCHEDULED AND COORDINATED JOINTLY WITH
H.H. MCGUIRE VAMC. A DETAILED JOB TIMELINE SHALL BE ESTABLISHED
AND SUBMITTED FOR REVIEW AND APPROVAL.
3. REFER TO ARCHITECTURAL FOR ADDITIONAL REQUIREMENTS. REFER
TO SHEET A121 FOR DIMENSIONED LOCATION OF DIFFUSERS, REGISTERS
AND GRILLES.
4. MAINTAIN 6" MINIMUM CLEARANCE FROM RATED WALLS AND HVAC
EQUIPMENT.
5. DIFFUSERS, REGISTERS AND GRILLES ARE FED FROM THE INTERSTITIAL
LEVEL ABOVE LEVEL ONE. REFER TO SHEET M201 FOR CONTINUATION OF
DUCTWORK. DUCTWORK PENETRATING THRU INTERSTITIAL FLOOR SLAB
(WHICH IS 1-HOUR RATED) MUST BE HARD DUCTED. REFER TO DETAIL ON
SHEET M501.
6. ALL DUCTWORK DOWNSTREAM OF VAV TERMINAL BOXES TO BE LOW
PRESSURE (3" PRESSURE CLASS). DUCTWORK UPSTREAM OF VAV
TERMINAL BOXES TO BE MEDIUM PRESSURE (6" PRESSURE CLASS).
7. CONTRACTOR TO PROVIDE REMOTE OPERATORS FOR ALL MANUAL
VOLUME DAMPERS LOCATED ABOVE GYPSUM BOARD CEILINGS.
8. RUNOUT BRANCH DUCTWORK TO SUPPLY DIFFUSERS, RETURN AND
EXHAUST GRILLES TO BE THE SAME SIZE AS THE NECK SIZE ON THE AIR
DEVICE UNLESS NOTED OTHERWISE.
9. USE ALUMINUM DUCT FOR EXHAUST FROM ROOMS WITH SHOWERS.
THE ALUMINUM DUCT SHALL EXTEND A MINIMUM OF 15 FEET FROM THE
INDIVIDUAL EXHAUST GRILLES TOWARDS THE EXHAUST FAN. USE
ALUMINUM SHEET WITH ALL JOINTS AND SEAMS SEALED WITH DUCT
SEALANT OR WELDED FOR WATER TIGHTNESS AND SLOPED DUCT BACK
TOWARDS THE GRILLE.
HVAC KEY NOTES FOR SHEET M101
1 LOCATION OF BAS CONTROL PANEL.
4" ROUND DUCT DOWN TO DRYER EXHAUST CONNECTION.
TERMINATE EXHAUST DUCT WITH UPWARD EXHAUST DIRECTION
DRYER BOX. CONTRACTOR TO COORDINATE LOCATION WITH
REQUIREMENTS OF INSTALLED DRYER.
INTERLOCK OPERATION OF IN-LINE DRYER EXHAUST FAN EF-2 WITH
DRYER OPERATION.
LOCATION OF VERTICAL DUCTWORK UP TO INTERSTITIAL SPACE
FROM FIRST FLOOR CEILING SPACE THRU FIRE RATED CEILING. ANY
UNUSED PORTION OF OPENING SHALL BE SEALED TO MAINTAIN 1-HR
RATING.
LOCATION OF CO2 SENSOR.
PARTITION TO LIMIT THE TRANSFER OF SMOKE
( NO FIRE RATING )
1-HOUR FIRE RATED PARTITION
FIRE RATED PARTITION LEGEND
2-HOUR FIRE RATED PARTITION
CONSULTANTS:
Drawing Title
Approved: Project Director
Project Title:
Location:
Date: Checked: Drawn:
Drawing Number
Building Number
Project Number
Office of Construction and Facilities Management
VA FORM 08-6231
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
FULLY SPRINKLERED
A
B
C
D
E
F
Revisions: Date0
6 " o n e e ig h th i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e h a lf i n c h o n e f o o t th re e i n c h e s o n e f o o t
6587 Hamilton Avenue Pittsburgh, Pennsylvania 15206 Ph: 412.287.7333 Fax: 412.287.7334 www.ae-works.com
AE Works Project Number:
ARCHITECTS/ENGINEERS:SEAL
H.H. MCGUIRE VAMC -
CONSTRUCT SPINAL CORD
ENHANCEMENT CENTER
652 - 314
JKG CJC
1201 Broad Rock Boulevard, Richmond, VA 23249
M101
MECHANICAL - LEVEL ONE - DUCTWORK
09/11/2017 13030
BID DOCUMENTS 1/8" = 1'-0"
MECHANICAL- LEVEL ONE - DUCTWORK
NORTH
PROJECT
T T
T
T
T T
T
T
T
T T
T T
T T
T
T T
T T
T T
T
T TT T
T
T TT T
T T
T T
T T
T T
T T
T
T
T
T
RCP
RCP
RCP
RCP
RCP
RCP
RCP
RCP
EQUIPMENT STORAGE
1X-137
CLEAN LINEN
1X-138
OFFICE (NM)
1X-141
SOILED WORKROOM
1X-142
EQUIPMENT STORAGE
1X-144
MULTI-DISCIPLINARY
WORKSTATION (MDW)
1X-147
CORRIDOR
CIX-1
ELECTRICAL ROOM
1X-131
SOILED WORKROOM
1X-136
STAFF TLT
1X-132
PATIENT LAUNDRY
1X-133
STAIR 2 (EXIST.)
1V-180
STAFF BREAK ROOM
1X-134
PRIVATE PATIENT
ROOM
1X-123
PATIENT TOILET /
SHOWER
1X-124
PRIVATE PATIENT
ROOM
1X-125
PATIENT TOILET /
SHOWER
1X-126
PRIVATE PATIENT
ROOM
1X-129
PATIENT TOILET /
SHOWER
1X-130
PRIVATE PATIENT
ROOM
1X-121
PATIENT TOILET /
SHOWER
1X-122
PRIVATE PATIENT
ROOM
1X-107
PATIENT TOILET /
SHOWER
1X-108
PRIVATE PATIENT
ROOM
1X-105
PATIENT TOILET /
SHOWER
1X-106
PRIVATE PATIENT
ROOM
1X-101
PATIENT TOILET /
SHOWER
1X-102
PRIVATE PATIENT
ROOM
1X-103
PATIENT TOILET /
SHOWER
1X-104
PRIVATE PATIENT
ROOM
1X-109
PATIENT TOILET /
SHOWER
1X-110
PRIVATE PATIENT
ROOM
1X-117
PATIENT TOILET /
SHOWER
1X-118
PRIVATE PATIENT
ROOM
1X-115
PATIENT TOILET /
SHOWER
1X-116
PRIVATE PATIENT
ROOM
1X-113
PATIENT TOILET /
SHOWER
1X-114
PRIVATE PATIENT
ROOM
1X-111
PATIENT TOILET /
SHOWER
1X-112
CROSS CORRIDOR
CIX-3
CROSS CORRIDOR
CIX-4
CORRIDOR
CIX-2
PRIVATE PATIENT
ROOM
1X-119
PATIENT TOILET /
SHOWER
1X-120
CLEAN SUPPLY
1X-139
OIT
1X-143
HAC
1X-135
PATIENT SCALE
ALCOVE
CIX-1A
NOURISHMENT
1X-140
16 17
19 20
21 22 23 24
VV VV
UU UU
TT TT
SS SS
WW' WW'
XX XX
YY YY
ZZ ZZ
20.5
20.5 21.3 22.5 23.2 24.2 24.8
YY.5 YY.5
23.8
SS.5
SS.1 SS.1
22.8
SS.7 SS.7
TT' TT'
UU' UU'
VV' VV'
21.4
XX.3 XX.3
SS.2 SS.2
XX.6 XX.6
RCP
RCP
RCP
RCP
RCP
RCP
23.9
TT'.8 TT'.8
WW.8 WW.8
22.9 23.7
WW'.2 WW'.2
VV'.8 VV'.8
UU'.2 UU'.2
RCP
TO RCP-15
TO VAV-2
TO VAV-16
TO VAV-17
TO RCP-1
TO VAV-1
TO VAV-19
TO VAV-20
TO VAV-25
TO RCP-2
TO VAV-3
TO RCP-3
TO VAV-5
TO VAV-21
TO VAV-22
TO VAV-23
TO VAV-26
TO VAV-27
TO RCP-4
TO VAV-7
TO RCP-5
TO VAV-9
TO VAV-28
TO VAV-29
T O
V A
V -1
T O
R C
P -6
T O
V A
V -1
T O
R C
P -7
TO VAV-18
T O
V A
V -1
T O
R C
P -8
T O
V A
V -1
T O
R C
P -9
T O
V A
V -1
T O
R C
P -1
TO RCP-11
TO VAV-10
TO RCP-12
TO VAV-8
TO RCP-13
TO VAV-6
TO RCP-14
TO VAV-4
TO VAV-24
PRIVATE PATIENT
ROOM
1X-127
PATIENT TOILET /
SHOWER
1X-128
RCP
RCP
TO RCP-16
TO RCP-17
1 1
1 1
1 1
1 1
CLEAN WORKROOM
1X-145
MEDICATION ROOM
1X-146
HVAC NOTES FOR SHEET M102
1. REFER TO FACILITY'S INFECTION CONTROL AND RISK ASSESSMENT
(ICRA) FOR ADDITIONAL REQUIREMENTS.
2. ALL WORK SHALL BE SCHEDULED AND COORDINATED JOINTLY WITH
H.H. MCGUIRE VAMC. A DETAILED JOB TIMELINE SHALL BE ESTABLISHED
AND SUBMITTED FOR REVIEW AND APPROVAL.
3. REFER TO ARCHITECTURAL FOR ADDITIONAL REQUIREMENTS.
4. MAINTAIN 6" MINIMUM CLEARANCE FROM RATED WALLS AND HVAC
EQUIPMENT.
5. ALL BRANCH PIPING IS 3/4" UNLESS OTHERWISE NOTED.
6. PROVIDE EXPANSION LOOPS, JOINTS, Z BENDS AND PIPING OFFSETS
TO ACCOMMODATE THERMAL AND OTHER PIPING MOVEMENT.
7. FOR ALL EXPOSED PIPING IN COMMUNICATION ROOMS AND
ELECTRICAL ROOMS, PROVIDE DRIP PANS UNDER INSULATED WATER
PIPING. SLOPE DRIP PAN AT END, PUT A 1/4" CONDENSATE LINE FLUSH
TO ADJACENT FINISHED CEILING & PROVIDE AN ESCUTCHEON.
HVAC KEY NOTES FOR SHEET M102
1 3/4" HWHS & HWHR PIPES (TO SERVE RADIANT CEILING PANEL) UP TO
INTERSTITIAL LEVEL. REFER TO M202 FOR CONTINUATION.
PARTITION TO LIMIT THE TRANSFER OF SMOKE
( NO FIRE RATING )
1-HOUR FIRE RATED PARTITION
FIRE RATED PARTITION LEGEND
2-HOUR FIRE RATED PARTITION
CONSULTANTS:
Drawing Title
Approved: Project Director
Project Title:
Location:
Date: Checked: Drawn:
Drawing Number
Building Number
Project Number
Office of Construction and Facilities Management
VA FORM 08-6231
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
FULLY SPRINKLERED
A
B
C
D
E
F
Revisions: Date0
6 " o n e e ig h th i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e h a lf i n c h o n e f o o t th re e i n c h e s o n e f o o t
6587 Hamilton Avenue Pittsburgh, Pennsylvania 15206 Ph: 412.287.7333 Fax: 412.287.7334 www.ae-works.com
AE Works Project Number:
ARCHITECTS/ENGINEERS:SEAL
H.H. MCGUIRE VAMC -
CONSTRUCT SPINAL CORD
ENHANCEMENT CENTER
652 - 314
JKG CJC
1201 Broad Rock Boulevard, Richmond, VA 23249
M102
MECHANICAL - LEVEL ONE - PIPING
09/11/2017 13030
BID DOCUMENTS
1/8" = 1'-0"
MECHANICAL- LEVEL ONE - PIPING
REFER TO SHEET
M103 VIEW #2 FOR
CONTINUATION
21 22 23 24
SS
RR
22.5 23.2
SS.1
21.4 23.922.9 23.7
3" LPS
2 1/2" LPCR
2 1/2" HWHR
2 1/2" HWHS
REFER TO M202 FOR
CONTINUATION.
REFER TO M103
VIEW #1 FOR
CONTINUATION.
4" CHWR
4" CHWS
HVAC NOTES FOR SHEET M103
1. REFER TO FACILITY'S INFECTION CONTROL AND RISK ASSESSMENT
(ICRA) FOR ADDITIONAL REQUIREMENTS.
2. ALL WORK SHALL BE SCHEDULED AND COORDINATED JOINTLY WITH
H.H. MCGUIRE VAMC. A DETAILED JOB TIMELINE SHALL BE ESTABLISHED
AND SUBMITTED FOR REVIEW AND APPROVAL.
3. REFER TO ARCHITECTURAL FOR ADDITIONAL REQUIREMENTS.
4. MAINTAIN 6" MINIMUM CLEARANCE FROM RATED WALLS AND HVAC
EQUIPMENT.
5. PROVIDE INTERMEDIARY CONDENSATE TRAPS ON HORIZONTAL STEAM
SUPPLY LINES AT LEAST EVERY 100 FEET OF HORIZONTAL RUN.
HVAC KEY NOTES FOR SHEET M103
1 NEW FLOOR PENETRATION THRU EXISTING CONCRETE IN-FILLED
STRUCTURAL OPENING. REFER TO VIEW #3 FOR CONTINUATION OF
PIPING.
LOCATION OF STEAM PRESSURE REDUCING VALVE (PRV) STATION.
MOUNT WITH SADDLE SUPPORTS AND LEGS. REFER TO DETAIL ON SHEET
M505 FOR ADDITIONAL INFORMATION.
LOCATION OF STEAM METER. REFER TO DETAIL 3 ON SHEET M505.
6" VENT TO ATMOSPHERE PIPE UP FROM PRV STATION. FOLLOW PATH OF
VENT PIPE FROM EXISTING PRV STATION IN SAME MECH ROOM UP THRU
ROOF.
NOT USED.
PIPING ROUTED THRU EXISTING FIRE RATED SHEETROCK OPENING IN
CONCRETE BLOCK WALL.
ROUTE 2-1/2"MPS, 2" LPCR, 4" CHWS AND 4" CHWR PIPING THRU EXISTING
OPENING IN CONCRETE BLOCK WALL BETWEEN BASEMENT AND
CRAWLSPACE.
NEW PENETRATION THRU EXISTING FIRE RATED WALL.
2-1/2" STEAM AND 2" CONDENSATE RETURN PIPES ROUTED UP TO
MECHANICAL ROOM ON LEVEL ONE. REFER TO VIEW #1 FOR
CONTINUATION OF PIPING. PROVIDE INVERTED BUCKET STEAM TRAP (ST-
8) AT BASE OF VERTICAL STEAM SUPPLY RISER, PIPED BACK TO PUMPED
CONDENSATE RETURN PIPE PER DETAIL 10
INSTALL TWO (2) GATE VALVES WITH MIDDLE BLEED LINE TO PROVIDE
FUTURE ABILITY TO DOUBLE BLOCK STEAM LINE (WITH MIDDLE BLEED
LINE) TO ALLOW FOR MODIFICATION TO STEAM LINE.
HOT TAP OF EXISTING STEAM LINE WHILE EXISTING STEAM LINE REMAINS
UNDER FULL OPERATING CONDITIONS USING COUPON RETENTION.
DOUBLE WIRED PILOT DRILL RETAINS THE COUPON AND IS RECOVERED
WHEN HOT TAP IS COMPLETED. TAPPING SADDLE IS PLACED AGAINST
EXISTING PIPE WITH ISOLATION VALVE AND HOT TAPPING MACHINE. AFTER
THE SADDLE IS INSTALLED, THE ISOLATION VALVE IS OPENED AND THE
CUTTER AND PILOT DRILL ADVANCE. WHEN THE CUT IS COMPLETED THE
CUTTER AND PILOT DRILL ARE RETRACTED, THE VALVE IS CLOSED AND
THE HOT TAP MACHINE IS REMOVED. PROVIDE PERRY POINT VAMC
WRITTEN NOTIFICATION OF WORK AT LEAST 10 WORKING DAYS PRIOR TO
COMMENCING WORK.
HEATING HOT WATER EXPANSION LOOP. REFER TO DETAIL 2 ON SHEET
M503 FOR SIZING REQUIREMENTS.
CHEMICAL POT FEEDER LOCATION. REFER TO DETAIL 3 ON SHEET M504.
INVERTED BUCKET STEAM TRAP ST-3 PIPED BACK TO STEAM
CONDENSATE RECEIVER/PUMP IN MECH SVC BAY 1U-144.
FLOAT & THERMOSTATIC STEAM TRAP ST-1 PIPED BACK TO STEAM
CONDENSATE RECEIVER/PUMP IN MECH SVC BAY 1U-144.
FLOAT & THERMOSTATIC STEAM TRAP ST-2 PIPED BACK TO STEAM
CONDENSATE RECEIVER/PUMP IN MECH SVC BAY 1U-144.
INVERTED BUCKET STEAM TRAP ST-9, PIPED BACK INTO PUMPED
CONDENSATE PIPE.
INVERTED BUCKET STEAM TRAP ST-10, PIPED BACK INTO PUMPED
CONDENSATE PIPE.
INVERTED BUCKET STEAM TRAP ST-7 PIPED BACK TO STEAM
CONDENSATE RECEIVER/PUMP IN MECH SVC BAY 1U-144.
4" CHWS & CHWR PIPES ROUTED UP TO MECHANICAL ROOM ON LEVEL
ONE. REFER TO VIEW #1 FOR CONTINUATION OF PIPING.
ISOLATION VALVES FOR NEW CHWS & CHWR PIPING SERVING AHU-1.
PRIOR TO START OF DEMOLITION/NEW WORK CONTRACTOR TO PROVIDE
CHILLED WATER SUPPLY AND RETURN WATER FLOW MEASUREMENT AT
THIS LOCATION AND REPORT WATER FLOW AND PIPE SIZE INFORMATION
TO ARCHITECT/ENGINEER.
UPON NEW CONSTRUCTION COMPLETION CONTRACTOR SHALL BALANCE
CHILLED WATER SUPPLY AND RETURN WATER FLOW BACK TO PRE-
DEMOLITION VALUE.
RR RR
QQ QQ
PP PP
NN NN
MM MM
LL LL
KK KK
JJ JJ
HH HH
GG GG
FF FF
EE EE
2 1/2" MPS
5" MPS (EXISTING)
(EXISTING)
2 1/2" MPS
2 1/2" MPS
2" LPCR
2" LPCR
2" LPCR
4" LPCR
4" CHWS
4" CHWR
4" CHWS
4" CHWR
4" CHWR
4" CHWS
6" CHWR
(EXISTING)
6" CHWS
(EXISTING)
22 23
22 23
22 23
QQ QQ
PP PP
1 1/4" LPCR
1 1/4" MPS
(EXISTING)
(EXISTING)
EXISTING
AIR COMPRESSOR
EXISTING AHU
500-AC41
MECH SVC BAY - R
1U-144
3" LPS
2" LPCR
REFER TO M103
VIEW #2 FOR
CONTINUATION.
HWP
HWP
4" LPS
HX
HX
1" LPCR
4" CHWR
4" CHWS
2 1/2" HWHS
2 1/2" HWHR
ET
AS
2 1/2" LPS
PRV
2 1/2" MPS
2" LPCR
2 1/2" MPS
CR
2" LPCR
14 19
4" CHWR
4" CHWS
2 1/2" CHWR
2 1/2" CHWS
(EXISTING)
(EXISTING)
EXISTING
BUILDING
NEW ADDITION
EXISTING
MECH. RM.
PARTITION TO LIMIT THE TRANSFER OF SMOKE
( NO FIRE RATING )
1-HOUR FIRE RATED PARTITION
FIRE RATED PARTITION LEGEND
2-HOUR FIRE RATED PARTITION
CONSULTANTS:
Drawing Title
Approved: Project Director
Project Title:
Location:
Date: Checked: Drawn:
Drawing Number
Building Number
Project Number
Office of Construction and Facilities Management
VA FORM 08-6231
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
FULLY SPRINKLERED
A
B
C
D
E
F
Revisions: Date0
6 " o n e e ig h th i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e h a lf i n c h o n e f o o t th re e i n c h e s o n e f o o t
6587 Hamilton Avenue Pittsburgh, Pennsylvania 15206 Ph: 412.287.7333 Fax: 412.287.7334 www.ae-works.com
AE Works Project Number:
ARCHITECTS/ENGINEERS:SEAL
H.H. MCGUIRE VAMC -
CONSTRUCT SPINAL CORD
ENHANCEMENT CENTER
652 - 314
JKG CJC
1201 Broad Rock Boulevard, Richmond, VA 23249
M103
MECHANICAL - EXISTING LOWER LEVEL,
LEVEL ONE AND INTERSTITIAL - PIPING
09/11/2017 13030
BID DOCUMENTS
1/8" = 1'-0"
MECHANICAL - EXISTING INTERSTITIAL - PIPING
NORTH
PROJECT
1/16" = 1'-0"
MECHANICAL - EXISTING LOWER LEVEL/CRAWLSPACE - PIPING
1/4" = 1'-0"
MECHANICAL- EXISTING MECH RM - PIPING
26"ø
24"ø
"ø
"ø
VAV
"ø
"ø
14"ø
VAV
30"x20"
"ø
"ø
"ø
14"ø
"ø
VAV
8"ø
"ø
18"ø
8"ø
"ø
"ø
"ø
8"ø
14"ø
"ø
"ø
16"ø
8"ø
8"ø
VAV
VAV
VAV
VAV
11VAV
VAV
16"ø
57"x26" RETURN
AIR UP TO AHU-1
54"x46"
SUPPLY
AIR DOWN
FROM
AHU-1
10"ø
VAV
VAV
VAV
VAV
VAV
8"ø
VAV
VAV
VAV
VAV
VAV
VAV
VAV
10"ø
12"ø 12"ø
8"ø
12"ø
"ø
10"ø
10"ø
8"ø
12"ø
10"ø
8"ø
12"ø 8"ø
8"ø
12"ø
10"ø
10"ø 12"ø
8"ø
"ø
8"ø
12"ø
8"ø
8"ø
8"ø12"ø
12"ø
8"ø
12"ø
10"ø
8"ø
12"ø
8"ø
10"ø8"ø
8"ø
12"ø
8"ø
12"ø
8"ø
VAV
8"ø
12"ø
8"ø
12"ø
10"ø
10"ø
10"ø
10"ø
10"ø
10"ø
"ø
10"ø
"ø
10"ø
10"ø
8"ø
10"ø
10"ø
10"ø
10"ø
8"ø
VAV
VAV
VAV
VAV
VAV
21 22 23
VV VV
UU UU
TT TT
SS SS
WW'
XX XX
YY YY
ZZ ZZ
20.5 21.3
22.5
22.5
23.2
23.2
24.2
24.2 24.8
YY.5 YY.5
23.8
SS.5
SS.1
22.8
SS.7
TT'
UU'
VV'
21.4
21.4
XX.3 XX.3
SS.2
XX.6 XX.6
23.9
23.9
TT'.8
WW.8
22.9
22.9
23.7
23.7
WW'.2
VV'.8
UU'.2
12"ø
16"ø
14"ø
57"x26"
54"x30"
10"ø
8"ø
8"ø
6"ø
10"ø
14"ø
8"ø
8"ø
8"ø
8"ø
8"ø
8"ø 8"ø
8"ø
8"ø
8"ø
10"ø
8"ø
8"ø
8"ø
8"ø
8"ø
8"ø
8"ø
12"ø
8"ø
8"ø
8"ø
8"ø
8"ø6"ø
8"ø
10"ø
"ø
14"ø
8"ø
10"ø
8"ø
8"ø
14"ø
8"ø
12"ø
"ø
14"ø
8"ø
8"ø
"ø
1 1
8"ø
16"ø
10"ø
12"ø12"ø
28"ø
36"x22"
42"x22"
46"x22"
12"ø
FD
FD12"ø
10"ø
16"ø
22"x8"
VAV
6"ø
6"ø
30"x10"
22"ø
"ø
VAV
"ø
"ø26"x20"
8"ø
8"ø
1 1
8"ø
8"ø
8"ø
8"ø10"ø
8"ø
1 1
10"ø
10"ø12"ø
12"ø
1 8"ø
14"ø
10"ø
10"ø
12"ø
14"ø
10"ø
8"ø
10"ø
6"ø
10"ø
8"ø
"ø
"ø
"ø
8"ø
10"ø
16"ø
"ø
"ø
"ø
"ø
10"ø
8"ø
"ø
10"ø
6"ø
12"ø
10"ø
"ø
8"ø
30"x20" 14"ø
30"x20"
8"ø
1 11
8"ø
10"ø 6"ø
10"ø
10"ø
6"ø
8"ø
8"ø
16"ø
12"ø
1 1
"ø1
"ø
7 7
16"ø
24"ø
16"ø
8"ø
HVAC NOTES FOR SHEET M201
1. REFER TO FACILITY'S INFECTION CONTROL AND RISK ASSESSMENT (ICRA)
FOR ADDITIONAL REQUIREMENTS.
2. ALL WORK SHALL BE SCHEDULED AND COORDINATED JOINTLY WITH H.H.
MCGUIRE VAMC. A DETAILED JOB TIMELINE SHALL BE ESTABLISHED AND
SUBMITTED FOR REVIEW AND APPROVAL.
3. REFER TO ARCHITECTURAL FOR ADDITIONAL REQUIREMENTS.
4. MAINTAIN 6" MINIMUM CLEARANCE FROM RATED WALLS AND HVAC
EQUIPMENT.
5. DIFFUSERS, REGISTERS AND GRILLES ARE FED DOWN FROM THE
INTERSTITIAL LEVEL TO LEVEL ONE BELOW. REFER TO SHEET M101 FOR
CONTINUATION OF DUCTWORK. DUCTWORK PENETRATING THRU
INTERSTITIAL FLOOR SLAB (WHICH IS 1-HOUR RATED) MUST BE HARD
DUCTED. REFER TO DETAIL ON SHEET M501.
6. ALL DUCTWORK DOWNSTREAM OF VAV TERMINAL BOXES TO BE LOW
PRESSURE (3" PRESSURE CLASS). DUCTWORK UPSTREAM OF VAV
TERMINAL BOXES TO BE MEDIUM PRESSURE (6" PRESSURE CLASS).
7. RUNOUT BRANCH DUCTWORK TO SUPPLY DIFFUSERS, RETURN AND
EXHAUST GRILLES TO BE THE SAME SIZE AS THE NECK SIZE ON THE AIR
DEVICE UNLESS NOTED OTHERWISE.
8. USE ALUMINUM DUCT FOR EXHAUST FROM ROOMS WITH SHOWERS. THE
ALUMINUM DUCT SHALL EXTEND A MINIMUM OF 15 FEET FROM THE
INDIVIDUAL EXHAUST GRILLES TOWARDS THE EXHAUST FAN. USE
ALUMINUM SHEET WITH ALL JOINTS AND SEAMS SEALED WITH DUCT
SEALANT OR WELDED FOR WATER TIGHTNESS AND SLOPED DUCT BACK
TOWARDS THE GRILLE.
HVAC KEY NOTES FOR SHEET M201
1 LOCATION OF VERTICAL DUCTWORK DOWN FROM INTERSTITIAL LEVEL TO
LEVEL ONE CEILING SPACE. OPENING TO BE SEALED TO MAINTAIN 1-
HOUR RATING. PROVIDE VOLUME DAMPER IN VERTICAL BEFORE DUCT
PENETRATES INTERSTITIAL FLOOR SLAB IF VOLUME DAMPER IS NOT
SHOWN IN THE HORIZONTAL OF THAT DUCTWORK BRANCH.
4" ROUND DUCT UP TO ROOF LEVEL CLOTHES DRYER DISCHARGE.
34"x 34" EA DUCT TRANSITIONS TO 38" ROUND AND CONNECTS TO EF-1
ON ROOF.
LOCATION OF VERTICAL DUCTWORK DOWN FROM INTERSTITIAL SPACE
TO FIRST FLOOR 1-HR FIRE RATED ROOM. DUCTWORK DOWNSTREAM IS
IN FIRST FLOOR CEILING SPACE. ANY UNUSED PORTION OF OPENING
SHALL BE SEALED TO MAINTAIN 1-HR RATING.
RELOCATE EXISTING DUCTWORK IN AREA INDICATED TO AS TIGHT TO
STRUCTURE AS POSSIBLE TO ALLOW PASSAGE THRU NEW DOORWAY.
COMBINATION SMOKE DETECTOR/SMOKE DAMPER.
INSTALL DUCTWORK AS TIGHT TO STRUCTURE AS POSSIBLE TO
MAXIMIZE HEADROOM ABOVE WALKWAY.
PARTITION TO LIMIT THE TRANSFER OF SMOKE
( NO FIRE RATING )
1-HOUR FIRE RATED PARTITION
FIRE RATED PARTITION LEGEND
2-HOUR FIRE RATED PARTITION
CONSULTANTS:
Drawing Title
Approved: Project Director
Project Title:
Location:
Date: Checked: Drawn:
Drawing Number
Building Number
Project Number
Office of Construction and Facilities Management
VA FORM 08-6231
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
FULLY SPRINKLERED
A
B
C
D
E
F
Revisions: Date0
6 " o n e e ig h th i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e h a lf i n c h o n e f o o t th re e i n c h e s o n e f o o t
6587 Hamilton Avenue Pittsburgh, Pennsylvania 15206 Ph: 412.287.7333 Fax: 412.287.7334 www.ae-works.com
AE Works Project Number:
ARCHITECTS/ENGINEERS:SEAL
H.H. MCGUIRE VAMC -
CONSTRUCT SPINAL CORD
ENHANCEMENT CENTER
652 - 314
JKG CJC
1201 Broad Rock Boulevard, Richmond, VA 23249
M201
MECHANICAL - LEVEL ONE INTERSTITIAL -
DUCTWORK
09/11/2017 13030
BID DOCUMENTS 1/8" = 1'-0"
MECHANICAL - LEVEL ONE INTERSTITIAL - DUCTWORK
VAV
VAV
VAV
VAV
13 VAV
11VAV
VAV
VAV
VAV
VAV
VAV
VAV
VAV
VAV
VAV
VAV
REFER TO SHEET
M103 VIEW #2 FOR
CONTINUATION
VAV
VAV
VAV
2 1/2" HWHS
VAV
VAV
2 1/2" HWHS
2" HWHR
2" HWHR
2 1/2" HWHR
2 1/2" HWHR
21 22 23 24
VV VV
UU UU
TT TT
SS SS
WW'
XX
YY YY
ZZ ZZ
20.5 21.3 22.5 23.2 24.2 24.8
YY.5 YY.5
23.8
SS.5 SS.5
22.8
SS.7
TT'
UU'
VV'
21.4
XX.3 XX.3
SS.2
XX.6 XX.6
VAV
VAV
VAV
23.9
TT'.8
WW.8
22.9 23.7
WW'.2
VV'.8
UU'.2
3" LPS
2 1/2" LPCR
1-1/2”“ LPS UP TO AHU-1
PIPE CABINET FOR AHU-1'S
PRE-HEAT COIL
1-1/4” LPS UP TO AHU-1
PIPE CABINET FOR AHU-1'S
HUMIDIFIER
4" CHWS/CHWR UP
TO AHU-1 PIPE
CABINET FOR AHU-1'S
COOLING COIL
4" CHWS
4" CHWR
TO RCP-1
VAV
VAV
VAV
TO RCP-2
TO RCP-3
TO RCP-4
TO RCP-5
TO RCP-6TO RCP-7TO RCP-8TO RCP-9
TO RCP-19
TO RCP-20
TO RCP-21
TO RCP-22
TO RCP-23
TO RCP-24
1 TO RCP-25
TO RCP-26
2" HWHR
2" HWHS
2" HWHS
2 1/2" HWHR
2 1/2" HWHS
VAV
2-1/2" LPCR DOWN FROM
AHU-1 PRE-HEAT COIL
VAV
2" HWHS
1 1/2" HWHR
1 1/2" HWHS
4" CHWS
4" CHWR
HVAC NOTES FOR SHEET M202
1. REFER TO FACILITY'S INFECTION CONTROL AND RISK ASSESSMENT
(ICRA) FOR ADDITIONAL REQUIREMENTS.
2. ALL WORK SHALL BE SCHEDULED AND COORDINATED JOINTLY WITH
H.H. MCGUIRE VAMC. A DETAILED JOB TIMELINE SHALL BE ESTABLISHED
AND SUBMITTED FOR REVIEW AND APPROVAL.
3. REFER TO ARCHITECTURAL FOR ADDITIONAL REQUIREMENTS.
4. MAINTAIN 6" MINIMUM CLEARANCE FROM RATED WALLS AND HVAC
EQUIPMENT.
5. ALL BRANCH PIPING IS 3/4" UNLESS OTHERWISE NOTED.
6. PROVIDE EXPANSION LOOPS, JOINTS, Z BENDS AND PIPING OFFSETS
TO ACCOMMODATE THERMAL AND OTHER PIPING MOVEMENT.
HVAC KEY NOTES FOR SHEET M202
1 3/4" HHWS & HHWR PIPE DOWN TO LEVEL ONE TO SERVE RADIANT
CEILING PANEL. REFER TO M102 FOR CONTINUATION.
HEATING HOT WATER EXPANSION LOOP. REFER TO DETAIL 2 ON
SHEET H503 FOR SIZING REQUIREMENTS.
ISOLATION BALL VALVES PROVIDED ON SUPPLY AND RETURN PIPING.
HEATING HOT WATER DIFFERENTIAL PRESSURE TRANSMITTER
LOCATION.
NOT USED.
INVERTED BUCKET STEAM TRAP ST-5 PIPED BACK TO STEAM
CONDENSATE RECEIVER/PUMP IN MECH SVC BAY 1U-144.
INVERTED BUCKET STEAM TRAP ST-6 PIPED BACK TO STEAM
CONDENSATE RECEIVER/PUMP IN MECH SVC BAY 1U-144.
INVERTED BUCKET STEAM TRAP ST-4 PIPED BACK TO STEAM
CONDENSATE RECEIVER/PUMP IN MECH SVC BAY 1U-144.
COOLING ONLY VAV BOX.
CHILLED WATER VALVE V_CHW1
CHILLED WATER VALVE V_CHW2
PIPING CROSSING BUILDING EXPANSION JOINT. PROVIDE PIPING
ACCESSORIES PER DETAIL 14 ON SHEET M501.
INSTALL PIPING AS TIGHT TO STRUCTURE AS POSSIBLE TO MAXIMIZE
HEADROOM ABOVE WALKWAY.
CAP AND BLIND FLANGE AT THIS LOCATION.
PARTITION TO LIMIT THE TRANSFER OF SMOKE
( NO FIRE RATING )
1-HOUR FIRE RATED PARTITION
FIRE RATED PARTITION LEGEND
2-HOUR FIRE RATED PARTITION
CONSULTANTS:
Drawing Title
Approved: Project Director
Project Title:
Location:
Date: Checked: Drawn:
Drawing Number
Building Number
Project Number
Office of Construction and Facilities Management
VA FORM 08-6231
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
FULLY SPRINKLERED
A
B
C
D
E
F
Revisions: Date0
6 " o n e e ig h th i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e h a lf i n c h o n e f o o t th re e i n c h e s o n e f o o t
6587 Hamilton Avenue Pittsburgh, Pennsylvania 15206 Ph: 412.287.7333 Fax: 412.287.7334 www.ae-works.com
AE Works Project Number:
ARCHITECTS/ENGINEERS:SEAL
H.H. MCGUIRE VAMC -
CONSTRUCT SPINAL CORD
ENHANCEMENT CENTER
652 - 314
JKG CJC
1201 Broad Rock Boulevard, Richmond, VA 23249
M202
MECHANICAL - LEVEL ONE INTERSTITIAL -
PIPING
09/11/2017 13030
BID DOCUMENTS
1/8" = 1'-0"
MECHANICAL - LEVEL ONE INTERSTITIAL - PIPING
HVAC NOTES FOR SHEET M203
1. REFER TO FACILITY'S INFECTION CONTROL AND RISK ASSESSMENT
(ICRA) FOR ADDITIONAL REQUIREMENTS.
2. ALL WORK SHALL BE SCHEDULED AND COORDINATED JOINTLY WITH
H.H. MCGUIRE VAMC. A DETAILED JOB TIMELINE SHALL BE ESTABLISHED
AND SUBMITTED FOR REVIEW AND APPROVAL.
3. REFER TO ARCHITECTURAL FOR ADDITIONAL REQUIREMENTS.
4. ALL STRUCTURAL AND MISCELLANEOUS STEEL REQUIRED TO SUPPORT
AND ANCHOR HVAC EQUIPMENT ON THE ROOF AND STRUCTURAL AND
MISCELLANEOUS STEEL REQUIRED FOR ANY ROOF PENETRATIONS
BEYOND WHAT IS INDICATED ON THE STRUCTURAL DRAWINGS IS THE
RESPONSIBILITY OF THE CONTRACTOR. THIS INCLUDES EQUIPMENT
SHOWN AS BASIS OF DESIGN ON THE CONTRACT DOCUMENTS,
EQUIVALENT EQUIPMENT, OR EQUIPMENT ACCEPTED FROM ALTERNATE
MANUFACTURERS. THE CONTRACTOR SHALL COORDINATE ALL
STRUCTURAL STEEL REQUIREMENTS.
HVAC KEY NOTES FOR SHEET M203
1 MAINTAIN 25'-0" CLEARANCE FOR OUTSIDE AIR INTAKE CLEARANCE. NO
EXHAUST OUTLETS OR PLUMBING VENTS WITHIN 25' OF OUTSIDE AIR
INTAKE.
DRYER EXHAUST VENT. TERMINATE WITH GOOSENECK PER DETAIL 12
ON SHEET M504.
16 17 19 20
21 22 23 24
VV VV
UU UU
TT TT
SS SS
WW'
XX
YY YY
ZZ ZZ
20.5 21.3 22.5 23.2 24.2 24.8
YY.5 YY.5
23.8
SS.5
SS.1
22.8
SS.7
TT'
UU'
VV'
21.4
XX.3 XX.3
SS.2
XX.6 XX.6
23.9
TT'.8
22.9 23.7
WW'.2
VV'.8
UU'.2
AHU
EF
1-1/2”“ LPS TO
AHU-1'S PRE-
HEAT COIL
1-1/4” LPS TO
AHU-1'S
HUMIDIFIER
4" CHWR
FROM AHU-1'S
COOLING COIL
4" CHWS TO
AHU-1'S
COOLING COIL
PIPING VESTIBULE
PARTITION TO LIMIT THE TRANSFER OF SMOKE
( NO FIRE RATING )
1-HOUR FIRE RATED PARTITION
FIRE RATED PARTITION LEGEND
2-HOUR FIRE RATED PARTITION
CONSULTANTS:
Drawing Title
Approved: Project Director
Project Title:
Location:
Date: Checked: Drawn:
Drawing Number
Building Number
Project Number
Office of Construction and Facilities Management
VA FORM 08-6231
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
FULLY SPRINKLERED
A
B
C
D
E
F
Revisions: Date0
6 " o n e e ig h th i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e h a lf i n c h o n e f o o t th re e i n c h e s o n e f o o t
6587 Hamilton Avenue Pittsburgh, Pennsylvania 15206 Ph: 412.287.7333 Fax: 412.287.7334 www.ae-works.com
AE Works Project Number:
ARCHITECTS/ENGINEERS:SEAL
H.H. MCGUIRE VAMC -
CONSTRUCT SPINAL CORD
ENHANCEMENT CENTER
652 - 314
JKG CJC
1201 Broad Rock Boulevard, Richmond, VA 23249
M203
MECHANICAL - ROOF LEVEL - DUCTWORK
AND PIPING
09/11/2017 13030
BID DOCUMENTS
NORTH
PROJECT
1/8" = 1'-0"
MECHANICAL - ROOF LEVEL - DUCTWORK AND PIPING
VALVE V_CHW1VALVE V_CHW2
AHU-1 COOLING
CHWS
FROM CAMPUS
CHILLED WATER
SYSTEM
CHWR
TO CAMPUS
CHILLED WATER
SYSTEM
TWO (2) GATE VALVES WITH
MIDDLE BLEED LINE FOR
DOUBLE BLOCK OF STEAM LINE
FOR STEAM LINE HOT TAP OF
EXISTING SYSTEM
HWR HWR
H W S
H W R
HWR
HWS
HWS
ST-10ST-9
ST-7
ST-8
ST-4
HWP-2
HWP-1
ST-6AHU-1 HUMIDIFIER
ST-5AHU-1 HEATING
ST-3
ST-1ST-2
HX-2 HX-1
ET-1
AS-1
50 PSIG15 PSIG
PRV-2
50 PSIG15 PSIG
PRV-1
CR-1
SFM-1
FROM EXISTING
CAMPUS STEAM
SUPPLY
SYSTEM
TO EXISTING
CAMPUS STEAM
CONDENSATE
SYSTEM
RADIANT
PANELS
(TYP. 17)
VAV
BOXES
(TYP. 29)
L P
C R
LPS
LPCR
CONSULTANTS:
Drawing Title
Approved: Project Director
Project Title:
Location:
Date: Checked: Drawn:
Drawing Number
Building Number
Project Number
Office of Construction and Facilities Management
VA FORM 08-6231
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
FULLY SPRINKLERED
A
B
C
D
E
F
Revisions: Date0
6 " o n e e ig h th i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e h a lf i n c h o n e f o o t th re e i n c h e s o n e f o o t
6587 Hamilton Avenue…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it.