36C24618R0135-006.docx

DOCX document 1 MB Posted

Attached to
SCI Expansion, 652-314 (VA-17-900410) Federal contract opportunity
Solicitation number
36C24618R0135
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 6

About this file

36C24618R0135 SCI SPECS VOL 1.docx

View the file

Other files for this federal contract opportunity

Other files attached to SCI Expansion, 652-314 (VA-17-900410), newest first.
File Type Posted
36C24618R0135-00003000.docx DOCX document
36C24618R0135-00002001.pdf PDF
36C24618R0135-00002000.docx DOCX document
36C24618R0135-002.docx DOCX document
36C24618R0135-013.pdf PDF
36C24618R0135-016.pdf PDF
36C24618R0135-009.pdf PDF
36C24618R0135-017.pdf PDF
36C24618R0135-007.docx DOCX document
36C24618R0135-001.docx DOCX document
36C24618R0135-010.pdf PDF
36C24618R0135-012.pdf PDF
36C24618R0135-003.docx DOCX document
36C24618R0135-014.pdf PDF
36C24618R0135-015.pdf PDF
36C24618R0135-011.pdf PDF
36C24618R0135-005.docx DOCX document
36C24618R0135-008.pdf PDF
36C24618R0135-004.docx DOCX document
36C24618R0135-000.docx DOCX document
Show all 20

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Department of Veterans Affairs

H.H. McGuire Medical Center Richmond, Virginia Construct Spinal Cord Enhancement Center VA Project No: 652-314

Project Manual Bid Documents – Vol I

DEPARTMENT OF VETERANS AFFAIRS

VHA MASTER SPECIFICATIONS

SECTION 00 01 10

TABLE OF CONTENTS

DIVISION 00 SPECIAL SECTIONS
DATE

DIVISION 01 GENERAL REQUIREMENTS

01 00 00
General Requirements
08-14
01 00 01
Bid Items
01 32 16.15
Project Schedules (Small Projects – Design/Bid/Build)
04-13
01 33 23
Shop Drawings, Product Data, and Samples
03-12
01 35 26
Safety Requirements
10-14
01 42 19
Reference Standards
09-11
01 45 29
Testing Laboratory Services
07-13
01 57 19
Temporary Environmental Controls
01-11
01 74 19
Construction Waste Management
09-13
01 81 11
Sustainable Design Requirements
02-13
01 91 00
General Commissioning Requirements
06-13

DIVISION 02 – EXISTING CONDITIONS

02 21 00
Site Surveys
05-13
02 41 00
Demolition
04-13
02 82 11
Class II Asbestos Abatement
07-11

DIVISION 03 – CONCRETE

03 30 00
Cast-in-Place Concrete
10-12

DIVISION 04 – MASONRY

04 05 13
Masonry Mortaring
09-11
04 05 16
Masonry Grouting
09-11
04 20 00
Unit Masonry
05-12

DIVISION 05 – METALS

05 12 00
Structural Steel Framing
11-12
05 36 00
Composite Metal Decking
07-11
05 40 00
Cold-Formed Metal Framing
07-11
05 50 00
Metal Fabrications
07-14

DIVISION 06 – WOOD,PLASTICS AND COMPOSITES

06 10 00
Rough Carpentry
09-11
06 20 00
Finish Carpentry
06-13

DIVISION 07 THERMAL AND MOISTURE PROTECTION

07 21 13
Thermal Insulation
06-12
07 22 00
Roof and Deck Insulation
10-10
07 27 27
Fluid-Applied Membrane Air Barrier, Vapor Retarding
08-12
07 53 23
Ethylene-Propylene-Diene-Monomer Roofing
10-11
07 60 00
Flashing and Sheet Metal
07-14
07 72 00
Roof Accessories
10-11
07 81 00
Applied Fireproofing
11-11
07 84 00
Firestopping
10-11
07 92 00
Joint Sealants
12-11
07 95 13
Expansion Joint Cover Assemblies
07-14

DIVISION 08 OPENINGS

08 11 13
Hollow Metal Doors and Frames
01-13
08 14 00
Interior Wood Doors
10-12
08 31 13
Access Doors and Frames
10-11
08 41 13
Aluminum-Framed Entrances and Storefronts
10-11
08 51 13
Aluminum Windows
11-12
08 71 00
Door Hardware
12-13
08 71 13
Automatic Door Operators
06-12
08 80 00
Glazing
05-14

DIVISION 09 – FINISHES

09 05 16
Subsurface Preparation for Floor Finishes
04-14
09 06 00
Schedule for Finishes
10-11
09 22 16
Non-Structural Metal Framing
07-13
09 29 00
Gypsum Board
02-13
09 30 13
Ceramic/Porcelain Tiling
07-14
09 51 00
Acoustical Ceilings
12-13
09 65 13
Resilient Base and Accessories
10-11
09 65 16
Resilient Sheet Flooring
07-13
09 67 23.60
Resinous (Urethane and Epoxy Mortar) Flooring (RES-6)
07-14
09 91 00
Painting
07-13

DIVISION 10 – SPECIALTIES

10 21 23
Cubicle Curtain Tracks
11-11
10 25 13
Patient Bed Service Walls
11-11
10 26 00
Wall and Door Protection
01-11
10 28 00
Toilet, Bath, and Laundry Accessories
11-11
10 44 13
Fire Extinguisher Cabinets
08-14

DIVISION 11 – EQUIPMENT

11 05 12
General Motor Requirements for Equipment
11-11
11 73 00
Ceiling Mounted Patient Lift System
07-13

DIVISION 12 – FURNISHINGS

12 24 00
Window Shades
11-11
12 32 00
Manufactured Wood Casework
11-11
12 36 00
Countertops
06-13
12 56 70.11
Suspended Table
11-11

DIVISION 13 - SPECIAL CONSTRUCTION

13 05 41
Seismic Restraint Requirements for Non-Structural Components
01-14

DIVISION 14– CONVEYING EQUIPEMENT

(not used)

DIVISION 21- FIRE SUPPRESSION

21 05 11
Common Work Results for Fire Suppression
11-09
21 08 00
Commissioning of Fire Suppression System
06-13
21 10 00
Water-Based Fire-Suppression Systems
09-11

DIVISION 22 – PLUMBING

22 05 11
Common Work Results for Plumbing
07-14
22 05 19
Meters and Gages for Plumbing Piping
07-14
22 05 23
General-Duty Valves for Plumbing Piping
07-14
22 07 11
Plumbing Insulation
05-11
22 08 00
Commissioning of Plumbing Systems
06-13
22 13 00
Facility Sanitary and Vent Piping
07-14
22 14 00
Facility Storm Drainage
12-09
22 40 00
Plumbing Fixtures
01-14
22 62 00
Vacuum Systems for Laboratory and Healthcare Facilities
08-12
22 63 00
Gas Systems for Laboratory and Healthcare Facilities
12-10

DIVISION 23 – HEATING, VENTILATING, AND AIR

CONDITIONING (HVAC)

23 05 11
Common Work Results for HVAC
11-10
23 05 12
General Motor Requirements for HVAC Equipment
11-10
23 05 41
Noise and Vibration Control for HVAC Piping and Equipment
11-10
23 05 93
Testing, Adjusting, and Balancing for HVAC
05-11
23 07 11
HVAC Insulation
05-11
23 08 00
Commissioning of HVAC Systems
06-13
23 09 23
Direct-Digital Control System for HVAC
09-11
23 21 13
Hydronic Piping
09-12
23 21 23
Hydronic Pumps
02-10
23 21 30
Packaged Chiller System
23 22 13
Steam and Condensate Heating Piping
03-10
23 22 23
Steam Condensate Pumps
02-10
23 25 00
HVAC Water Treatment
02-10
23 31 00
HVAC Ducts and Casings
03-13
23 34 00
HVAC Fans
11-09
23 36 00
Air Terminal Units
03-10
23 37 00
Air Outlets and Inlets
11-09
23 40 00
HVAC Air Cleaning Devices
02-12
23 64 00
Packaged Water Chillers
04-11
23 74 13
Packaged, Outdoor, Central-Station Air-Handling Units
04-11
23 82 00
Convection Heating and Cooling Units
04-11
23 82 16
Air Coils
04-11

DIVISION 25 – INTEGRATED AUTOMATION

(not used)

DIVISION 26 – ELECTRICAL

26 01 00
Basic Electrical Requirements
26 02 00
Quality Requirements
26 05 00
Common Work Results for Electrical
26 05 11
Requirements for Electrical Installations
12-12
26 05 19
Low-Voltage Electrical Power Conductors and Cables
07-13
26 05 26
Grounding and Bonding for Electrical Systems
12-12
26 05 33
Raceway and Boxes for Electrical Systems
05-14
26 05 41
Underground Electrical Construction
12-12
26 05 73
Overcurrent Protective Device Coordination Study
12-12
26 08 00
Commissioning of Electrical Systems
06-13
26 09 23
Lighting Controls
05-14
26 22 00
Low-Voltage Transformers
08-14
26 24 13
Distribution Switchboards
08-14
26 24 16
Panelboards
05-14
26 27 26
Wiring Devices
08-14
26 29 21
Enclosed Switches and Circuit Breakers
12-12
26 32 13
Engine Generators
12-12
26 36 23
Automatic Transfer Switches
12-12
26 41 00
Facility Lightning Protection
12-12
26 43 13
Surge Protective Device
12-12
26 51 00
Interior Lighting
08-14
26 56 00
Exterior Lighting
05-14

DIVISION 27 – COMMUNICATIONS

27 05 11
Requirements for Communications Installations
11-09
27 05 26
Grounding and Bonding for Communications Systems
10-06
27 05 33
Raceways and Boxes for Communications Systems
12-05
27 11 00
Communications Equipment Room Fittings
06-13
27 15 00
Communications Horizontal Cabling
06-13
27 41 31
Master Antenna Television Equipment and Systems
06-13
27 51 16
Public Address and Mass Notification Systems
06-13
27 52 23
Nurse Call and Code Blue Systems
06-13

DIVISION 28 – ELECTRONIC SAFETY AND SECURITY

28 05 00
Common Work Results for Electronic Safety and Security
09-11
28 05 13
Conductors and Cables for Electronic Safety and Security
09-11
28 05 26
Grounding and Bonding for Electronic Safety and Security
09-11
28 13 00
Physical Access Control System
10-11
28 23 00
Video Surveillance
09-11
28 31 00
Fire Detection and Alarm
10-11

DIVISION 31 – EARTHWORK

31 20 00
Earth Moving
10-12
31 23 19
Dewatering
10-12
31 23 23.33
Flowable Fill
10-12

DIVISION 32 – EXTERIOR IMPROVEMENTS

32 05 23
Cement and Concrete for Exterior Improvements
05-13
32 12 16
Asphalt Paving
10-09
32 17 23
Pavement Markings
04-10
32 90 00
Planting
10-11

DIVISION 33 – UTILITIES

33 10 00
Water Utilities
01-14
33 30 00
Sanitary Sewer Utilities
06-13
33 40 00
Storm Sewer Utilities
10-11

SECTION 01 00 00

GENERAL REQUIREMENTS

1.1 safety requirements Refer to section 01 35 26, SAFETY REQUIREMENTS for safety and infection control requirements.

1.2 GENERAL INTENTION

A.Contractor shall completely prepare site for building operations, including demolition and removal of existing structures, and furnish labor and materials and perform work for the Spinal Cord Enhancement Center building addition to the H.H. McGuire VA Medical Center as required by drawings and specifications.
B.Offices of AE Works Ltd., 6587 Hamilton Avenue, Pittsburgh PA 15206, as ArchitectEngineers, will render certain technical services during construction. Such services shall be considered as advisory to the Government and shall not be construed as expressing or implying a contractual act of the Government without affirmations by Contracting Officer or his duly authorized representative.
C.All employees of general contractor and subcontractors shall comply with VA security management program and obtain permission of the VA police, be identified by project and employer, and restricted from unauthorized access.

D. Prior to commencing work, General Contractor shall provide proof that a OSHA certified "competent person" (CP) (29 CFR 1926.20(b)(2) will maintain a presence at the work site whenever the General or Subcontractors are present.

E. Training:

1. All employees of general contractor and subcontractors shall have the 10-hour OSHA certified Construction Safety course, Asbestos awareness safety courses, OSHA SDS training, and /or other relevant competency training, as determined by VA COR or Safety Office with input from the ICRA team.

2. Supervisors of general contractor and subcontractors shall have the 30-hour OSHA certified Construction Safety course and other relevant competency training, as determined by VA CP with input from the ICRA team.

3. Submit training records of all such employees for approval before the start of work.

1.3 SHUTDOWNS

Contractor shall maintain all services to occupied portions of building, except as scheduled and approved by COR. To insure such executions, Contractor shall furnish the COR with a schedule of shutdown dates on which the Contractor intends to accomplish work on adjacent floors and areas. In addition, Contractor shall notify the COR two weeks in advance of the proposed date of starting work in each specific area or riser which will affect adjacent occupied areas.

1.4 SPECIFICATIONS AND DRAWINGS FOR CONTRACTOR

A. AFTER AWARD OF CONTRACT, the Contractor can download PDF files of the contract drawings and specifications for his use and distribution to Subcontractors.

1.5 CONSTRUCTION SECURITY REQUIREMENTS

A.Security Plan:
1.Prior to start of work, prepare a plan detailing project specific security measures. The security plan defines both physical and administrative security procedures that will remain effective for the entire duration of the project.
2.The General Contractor is responsible for assuring that all sub-contractors working on the project and their employees also comply with these regulations.
B.Security Procedures:
1.General Contractor’s employees shall not enter the project site without appropriate badge. They may also be subject to inspection of their personal effects when entering or leaving the project site or Richmond VAMC campus.
2.For working outside the “regular hours” as defined in the contract, The General Contractor shall give 3 business days notice to the Contracting Officer so that security arrangements can be provided for the employees. This notice is separate from any notices required for utility shutdown described later in this section.
3.No photography of VA premises is allowed without written permission of the Contracting Officer.
4.VA reserves the right to close down or shut down the project site and order General Contractor’s employees off the premises in the event of a national emergency. The General Contractor may return to the site only with the written approval of the Contracting Officer.

5. Contractor shall be responsible for access control to the construction site. Contractor shall secure the site during and after the work day to prevent all unauthorized individuals from entering the construction site.

D.Key Control:
1.The General Contractor shall provide duplicate keys and lock combinations to the Contracting officers representative (COR for the purpose of security inspections of every area of project including tool boxes and parked machines and take any emergency action.
2.The General Contractor shall turn over all permanent lock cylinders to the VA locksmith for permanent installation. See Section 08 71 00, DOOR HARDWARE and coordinate.

3. Richmond VAMC will issue keys as needed through the Engineering Locksmith. Contractor should request a key through the COR. Contractor will need photo ID and is required to sign-out keys.

1. One key per contract can be issued. Additional keys can be requested and are subject to approval by the Chief of Engineering.

1. Lost keys must be reported immediately to VA Police and to the COR. Contractor can be billed the cost to re-core and re-key all affected areas.

1. Keys must be returned at the completion of the project, or prior to vacating the project site, whichever comes first.

E.Document Control:
1.Before starting any work, the General Contractor/Sub Contractors shall submit an electronic security memorandum describing the approach to following goals and maintaining confidentiality of “sensitive information”.
2.The General Contractor is responsible for safekeeping of all drawings, project manual and other project information. This information shall be shared only with those with a specific need to accomplish the project.
3.Certain documents, sketches, videos or photographs and drawings may be marked “Law Enforcement Sensitive” or “Sensitive Unclassified”. Secure such information in separate containers and limit the access to only those who will need it for the project. Return the information to the Contracting Officer upon request.
4.These security documents shall not be removed or transmitted from the project site without the written approval of Contracting Officer.
5.All paper waste or electronic media such as CD’s and diskettes shall be shredded and destroyed in a manner acceptable to the VA.
6.Notify Contracting Officer and Site Security Officer immediately when there is a loss or compromise of “sensitive information”.
7.All electronic information shall be stored in specified location following VA standards and procedures using an Engineering Document Management Software (EDMS).
a.Security, access and maintenance of all project drawings, both scanned and electronic shall be performed and tracked through the EDMS system.
b.“Sensitive information” including drawings and other documents may be attached to e-mail provided all VA encryption procedures are followed.
F.Motor Vehicle Restrictions
1.Vehicle authorization request shall be required for any vehicle entering the site and such request shall be submitted 24 hours before the date and time of access. Access shall be restricted to picking up and dropping off materials and supplies.
2.A limited number of (1) permit shall be issued for General Contractor and its employees for parking in designated areas only.

1.6 FIRE SAFETY

A. Applicable Publications: Publications listed below form part of this Article to extent referenced. Publications are referenced in text by basic designations only.

1. American Society for Testing and Materials (ASTM):

a. E84-2008 Surface Burning Characteristics of Building Materials

2. National Fire Protection Association (NFPA):

a. 10-2006Standard for Portable Fire Extinguishers
b. 30-2007Flammable and Combustible Liquids Code
c. 51B-2003Standard for Fire Prevention During Welding, Cutting and Other Hot Work
d. 70-2007National Electrical Code
e. 241-2004Standard for Safeguarding Construction, Alteration, and Demolition Operations

3. Occupational Safety and Health Administration (OSHA):

a. 29 CFR 1926 Safety and Health Regulations for Construction B. Fire Safety Plan: Establish and maintain a fire protection program in Contract accordance with 29 CFR 1926. Prior to start of work, prepare a plan detailing project-specific fire safety measures, including periodic status reports, and submit to Resident Engineer and Facility Safety Manager for review for compliance with contract requirements in accordance with Section 01 33 23, SHOP DRAWINGS, PRODUCT DATA AND SAMPLES. Prior to any worker for the Contractor or Subcontractors beginning work, they shall undergo a safety briefing provided by the General Contractor’s competent person per OSHA requirements. This briefing shall include information on the construction limits, VAMC safety guidelines, means of egress, break areas, work hours, locations of restrooms, use of VAMC equipment, etc. Documentation shall be provided to the Resident Engineer that individuals have undergone Contractor’s safety briefing.

C. Site and Building Access: Maintain free and unobstructed access to facility emergency services and for fire, police and other emergency response forces in accordance with NFPA 241.

D. Separate temporary facilities, such as trailers, storage sheds, and dumpsters, from existing buildings and new construction by distances in accordance with NFPA. For small facilities with less than 6 m (20 feet) exposing overall length, separate by 3m (10 feet).

E. Temporary Construction Partitions:

1. Install and maintain temporary construction partitions to provide smoke-tight separations between construction areas, the areas that are described in phasing requirements, and adjoining areas. Construct partitions of gypsum board or treated plywood (flame spread rating of 25 or less in accordance with ASTM E84) on both sides of fire retardant treated wood or metal steel studs. Extend the partitions through suspended ceilings to floor slab deck or roof. Seal joints and penetrations. At door openings, install Class C, 3/4 hour fire/smoke rated doors with self-closing devices.

2. Install fire-rated temporary construction partitions as shown on drawings to maintain integrity of existing exit stair enclosures, exit passageways, fire-rated enclosures of hazardous areas, horizontal exits, smoke barriers, vertical shafts and openings enclosures.

3. Close openings in smoke barriers and fire-rated construction to maintain fire-ratings. Seal penetrations with listed through-penetration firestop materials in accordance with Section 07 84 00, FIRESTOPPING.

F. Temporary Heating and Electrical: Install, use and maintain installations in accordance with 29 CFR 1926, NFPA 241 and NFPA 70.

G. Means of Egress: Do not block exiting for occupied buildings, including paths from exits to roads. Minimize disruptions and coordinate with Resident Engineer.

H. Egress Routes for Construction Workers: Maintain free and unobstructed egress. Inspect daily. Report findings and corrective actions weekly to Resident Engineer and Facility Safety Manager.

I. Fire Extinguishers: Provide and maintain extinguishers in construction areas and temporary storage areas in accordance with 29 CFR 1926, NFPA 241 and NFPA 10.

J. Flammable and Combustible Liquids: Store, dispense and use liquids in accordance 29 CFR 1926, NFPA 241 and NFPA 30.

K. Sprinklers: Install, test and activate new automatic sprinklers prior to removing existing sprinklers.

L. Existing Fire Protection: Do not impair automatic sprinklers, smoke and heat detection, and fire alarm systems, except for portions immediately under construction, and temporarily for connections. Provide fire watch for impairments more than 4 hours in a 24-hour period. Request interruptions in accordance with Article, OPERATIONS AND STORAGE AREAS, and coordinate with Resident Engineer and Facility Safety Manager. All existing or temporary fire protection systems (fire alarms, sprinklers) located in construction areas shall be tested as coordinated with the medical center. Parameters for the testing and results of any tests performed shall be recorded by the medical center and copies provided to the Resident Engineer.

M. Smoke Detectors: Prevent accidental operation. Remove temporary covers at end of work operations each day. Coordinate with Resident Engineer and Facility Safety Manager.

N. Hot Work: Perform and safeguard hot work operations in accordance with NFPA 241 and NFPA 51B. Coordinate with COR; obtain permits from facility Safety Manager at least 72 hours in advance. Designate Contractor's responsible project-site fire prevention program manager to permit hot work.

O. Fire Hazard Prevention and Safety Inspections: Inspect entire construction areas weekly. Coordinate with, and report findings and corrective actions weekly to COR and Facility Safety Manager.

Smoking: Smoking is prohibited in and adjacent to construction areas inside existing buildings and additions under construction. In separate and detached buildings under construction, smoking is prohibited except in designated smoking rest areas.

P. Dispose of waste and debris in accordance with NFPA 241. Remove from buildings daily.

Q. Perform other construction, alteration and demolition operations in accordance with 29 CFR 1926.

R. If required, submit documentation to the Resident Engineer that personnel have been trained in the fire safety aspects of working in areas with impaired structural or compartmentalization features.

1.7 HAZARDOUS MATERIALS MANAGEMENT

A.Hazard Communication Program: Establish and maintain a Hazard Communication Program in accordance to the Occupational Safety and Health Administration (OSHA) regulations. Ensure staff have been properly trained on the hazardous materials that they will be brought on site as well as the location where the material safety data sheets (MSDSs) will be kept onsite. Ensure all MSDSs are provided and stored on site near the actual work area(s). MSDSs cannot only be available in an onsite trailer or office remote from the actual work site. All containers of hazardous materials and wastes must be properly labeled and stored at all times.
B.Control of Hazardous Dusts, Vapors, Mists, and Runoff: Every reasonable effort is to be made in the use of hazardous materials to prevent or at last minimize exposure to construction staff and others in adjacent areas, as well as to prevent entrainment in the central HVAC system, This applies to work performed both indoors as well as outdoors. Should a problem arise, work will have to be modified or suspended to eliminate or reduce the impact to workers and/or building occupants.

C. Disposal of Hazardous Wastes: All hazardous wastes generated are to be properly stored and removed as soon as practical from the job site. Transportation and disposal of such wastes is to be in accordance with Environmental Protection Agency (EPA), Department of Transportation (DOT), and State and local regulations.

D. Asbestos: The facility has asbestos containing materials (ACM). In the process of construction the contractor may come in contact with suspected ACM that has not yet been identified. If suspected ACM is noted, stop work immediately and notify the COR. Under no circumstances is work to continue. Failure to halt will result in work stoppage and possible citation from the EPA and/or OSHA.

1.8 OPERATIONS AND STORAGE AREAS

A.The Contractor shall confine all operations (including storage of materials) on Government premises to areas authorized or approved by the Contracting Officer. The Contractor shall hold and save the Government, its officers and agents, free and harmless from liability of any nature occasioned by the Contractor's performance.
B.Temporary buildings (e.g., storage sheds, shops, offices) and utilities may be erected by the Contractor only with the approval of the Contracting Officer and shall be built with labor and materials furnished by the Contractor without expense to the Government. The temporary buildings and utilities shall remain the property of the Contractor and shall be removed by the Contractor at its expense upon completion of the work. With the written consent of the Contracting Officer, the buildings and utilities may be abandoned and need not be removed.
C.The Contractor shall, under regulations prescribed by the Contracting Officer, use only established roadways, or use temporary roadways constructed by the Contractor when and as authorized by the Contracting Officer. When materials are transported in prosecuting the work, vehicles shall not be loaded beyond the loading capacity recommended by the manufacturer of the vehicle or prescribed by any Federal, State, or local law or regulation. When it is necessary to cross curbs or sidewalks, the Contractor shall protect them from damage. The Contractor shall repair or pay for the repair of any damaged curbs, sidewalks, or roads.

(FAR 52.236-10)

D.Working space and space available for storing materials shall be as determined by the COR.
E.Workmen are subject to rules of Medical Center applicable to their conduct.
F.Execute work so as to interfere as little as possible with normal functioning of Medical Center as a whole, including operations of utility services, fire protection systems and any existing equipment, and with work being done by others. Use of equipment and tools that transmit vibrations and noises through the building structure, are not permitted in buildings that are occupied, during construction, jointly by patients or medical personnel, and Contractor's personnel, except as permitted by COR where required by limited working space. If proposed work shall adversely affect or hinder the normal operations in adjacent areas of work or the Medical Center, the contractor shall coordinate and schedule such work for times when the affected areas or spaces are minimally utilized. This may require that the specified work be performed over weekends, holidays and/or nights, with accelerated work schedules to minimize impact of interruption and restore use of the affected areas for the next scheduled day of operation. The adjoining building functions will remain in operation during the construction period. The contractor shall schedule work and/or provide such modification and temporary services to reasonably reduce or eliminate interruption of services. Approval of any electrical, water, heating or ventilation shutdown or interruption of service normally requires 21 days for signatory approval.
1.Do not store materials and equipment in other than assigned areas.
2.Schedule delivery of materials and equipment to immediate construction working areas within buildings in use by Department of Veterans Affairs in quantities sufficient for not more than two work days. Provide unobstructed access to Medical Center areas required to remain in operation.
G.Phasing:
The Medical Center must maintain its operation 24 hours a day 7 days a week. Therefore, any interruption in service must be scheduled and coordinated with the COR to ensure that no lapses in operation occur. It is the CONTRACTOR'S responsibility to develop a work plan and schedule detailing, at a minimum, the procedures to be employed, the equipment and materials to be used, the interim life safety measure to be used during the work, and a schedule defining the duration of the work with milestone subtasks. The work to be outlined shall include, but not be limited to:
To insure such executions, Contractor shall furnish the COR with a schedule of approximate dates on which the Contractor intends to accomplish work in each specific area of site, building or portion thereof. In addition, Contractor shall notify the COR two weeks in advance of the proposed date of starting work in each specific area of site, building or portion thereof. Arrange such dates to insure accomplishment of this work in successive phases mutually agreeable to COR and Contractor, as follows:

1. Contractor shall take all measures and provide all material necessary for protecting existing equipment and property in affected areas of construction against dust and debris, so that equipment and affected areas to be used in the Medical Centers operations will not be hindered. Contractor shall permit access to Department of Veterans Affairs personnel and patients through other construction areas which serve as routes of access to such affected areas and equipment. Coordinate alteration work in areas occupied by Department of Veterans Affairs so that Medical Center operations will continue during the construction period.

H.The Medical Center will be occupied during performance of work; but immediate areas of alterations will be temporarily vacated.
I.Construction Fence: Before construction operations begin, Contractor shall provide a chain link construction fence, 2.1m (seven feet) minimum height, around the construction area indicated on the drawings. Provide gates as required for access with necessary hardware, including hasps and padlocks. Fasten fence fabric to terminal posts with tension bands and to line posts and top and bottom rails with tie wires spaced at maximum 375mm (15 inches). Bottom of fences shall extend to 25mm (one inch) above grade. Remove the fence when directed by COR.
1.Include vinyl privacy screen; 100 percent visibility blockage, total opacity and privacy, UV inhibitor, edges taped and grommets minimum 24 inches o.c., center line grommets.

2. Project Standard: Vinyl Brick w/ Hedge Fence Screen (www.fencescreen.com) or equal.

J.When a building and/or construction site is turned over to Contractor, Contractor shall accept entire responsibility including upkeep and maintenance therefore:
1.Contractor shall maintain a minimum temperature of 4 degrees C (40 degrees F) at all times, except as otherwise specified.
2.Contractor shall maintain in operating condition existing fire protection and alarm equipment. In connection with fire alarm equipment, Contractor shall make arrangements for preinspection of site with Fire Department or Company (Department of Veterans Affairs or municipal) whichever will be required to respond to an alarm from Contractor's employee or watchman.
K.Utilities Services: Maintain existing utility services for Medical Center at all times. Provide temporary facilities, labor, materials, equipment, connections, and utilities to assure uninterrupted services. Where necessary to cut existing water, steam, gases, sewer or air pipes, or conduits, wires, cables, etc. of utility services or of fire protection systems and communications systems (including telephone), they shall be cut and capped at suitable places where shown; or, in absence of such indication, where directed by COR.
1.No utility service such as water, gas, steam, sewers or electricity, or fire protection systems and communications systems may be interrupted without prior approval of COR. Electrical work shall be accomplished with all affected circuits or equipment de-energized. When an electrical outage cannot be accomplished, work on any energized circuits or equipment shall not commence without a detailed work plan, the Medical Center Director’s prior knowledge and written approval. Refer to specification Sections 26 05 11, REQUIREMENTS FOR ELECTRICAL INSTALLATIONS and 27 05 11 REQUIREMENTS FOR COMMUNICATIONS INSTALLATIONS for additional requirements.
2.Contractor shall submit a request to interrupt any such services to COR, in writing, 14 days in advance of proposed interruption. Request shall state reason, date, exact time of, and approximate duration of such interruption.
3.Contractor will be advised (in writing) of approval of request, or of which other date and/or time such interruption will cause least inconvenience to operations of Medical Center. Interruption time approved by Medical Center may occur at other than Contractor's normal working hours.
4.Major interruptions of any system must be requested, in writing, at least 15 calendar days prior to the desired time and shall be performed as directed by the COR.
5.In case of a contract construction emergency, service will be interrupted on approval of COR. Such approval will be confirmed in writing as soon as practical.
L.Abandoned Lines: All service lines such as wires, cables, conduits, ducts, pipes and the like, and their hangers or supports, which are to be abandoned but are not required to be entirely removed, shall be sealed, capped or plugged at the main, branch or panel they originate from. The lines shall not be capped in finished areas, but shall be removed and sealed, capped or plugged in ceilings, within furred spaces, in unfinished areas, or within walls or partitions; so that they are completely behind the finished surfaces.
M.To minimize interference of construction activities with flow of Medical Center traffic, comply with the following:
1.Keep roads, walks and entrances to grounds, to parking and to occupied areas of buildings clear of construction materials, debris and standing construction equipment and vehicles. Wherever excavation for new utility lines cross existing roads, at least one lane must be open to traffic at all times with approval.
2.Method and scheduling of required cutting, altering and removal of existing roads, walks and entrances must be approved by the COR.
N.Coordinate the work for this contract with other construction operations as directed by COR. This includes the scheduling of traffic and the use of roadways, as specified in Article, USE OF ROADWAYS.

1.9 ALTERATIONS

A.Survey: Before any work is started, the Contractor shall make a thorough survey with the COR and a representative of VA Supply Service, of areas of buildings in which alterations occur and areas which are anticipated routes of access, and furnish a report, signed by both, to the Contracting Officer. This report shall list by rooms and spaces:
1.Existing condition and types of resilient flooring, doors, windows, walls and other surfaces not required to be altered throughout affected areas of building.
2.Shall note any discrepancies between drawings and existing conditions at site.
3.Shall designate areas for working space, materials storage and routes of access to areas within buildings where alterations occur and which have been agreed upon by Contractor and COR.
B.Protection: Provide the following protective measures:
1.Wherever existing roof surfaces are disturbed they shall be protected against water infiltration. In case of leaks, they shall be repaired immediately upon discovery.
2.Temporary protection against damage for portions of existing structures and grounds where work is to be done, materials handled and equipment moved and/or relocated.
3.Protection of interior of existing structures at all times, from damage, dust and weather inclemency. Wherever work is performed, floor surfaces that are to remain in place shall be adequately protected prior to starting work, and this protection shall be maintained intact until all work in the area is completed.

4. Dampen debris to keep down dust and provide temporary construction partitions in existing structures where directed by Facility Engineer. Blank off ducts and diffusers to prevent circulation of dust into occupied areas during construction.

1.10 INFECTION PREVENTION MEASURES

A. Implement the requirements of the VAMC’s Infection Control Risk Assessment (ICRA) team. ICRA Group may monitor dust in the vicinity of the construction work and require the Contractor to take corrective action immediately if the safe levels are exceeded. Inspections may take place at any time. Infection Control applies to all contracts where there are patients or staff offices in adjacent rooms, or vicinity of, and dust would have detrimental effects on veterans and staff in the opinion of the ICRA Group.

B. Establish and maintain a dust control program as part of the Contractor’s infection preventive measures in accordance with the guidelines provided by ICRA Group. Prior to start of work, prepare a plan detailing project-specific dust protection measures, including periodic status reports, and submit to Resident Engineer for review for compliance with Contract requirements in accordance with Section 01 33 23, SHOP DRAWINGS, PRODUCT DATA AND SAMPLES.

1. All personnel involved in the construction or renovation activity shall be educated and trained in infection prevention measures established by the medical center.

C. Medical center Infection Control personnel shall monitor for airborne disease (e.g. aspergillosis) as appropriate during construction. A baseline of conditions may be established by the medical center prior to the start of work and periodically during the construction stage to determine impact of construction activities on indoor air quality. In addition:

1. The COTR and VAMC Infection Control personnel shall review pressure differential monitoring documentation to verify that pressure differentials in the construction zone and in the patient-care rooms are appropriate for their settings. Maintain negative air pressure in the construction zone during demolition or any dust producing activities. Upon notification, the Contractor shall implement corrective measures to restore proper pressure differentials as needed.

2. In case of any problem, the medical center, along with assistance from the Contractor, shall conduct an environmental assessment to find and eliminate the source.

D. In general, following preventive measures shall be adopted during construction to keep down dust and prevent mold.

1. Dampen debris to keep down dust and provide temporary construction partitions in existing structures where directed by Resident Engineer. Blank off ducts and diffusers to prevent circulation of dust into occupied areas during construction.

2. Do not perform dust producing tasks within occupied areas without the approval of the Resident Engineer. For construction in any areas that will remain jointly occupied by the medical Center and Contractor’s workers, the Contractor shall:

a. Provide dust proof fire-rated temporary drywall construction barriers to completely separate construction from the operational areas of the hospital in order to contain dirt debris and dust. Barriers shall be sealed and made presentable on hospital occupied side. Install a self-closing rated door in a metal frame, commensurate with the partition, to allow worker access. Maintain negative air at all times. A fire retardant polystyrene, 6-mil thick or greater plastic barrier meeting local fire codes may be used where dust control is the only hazard, and an agreement is reached with the Resident Engineer and Medical Center.

b. Provide temporary filtration of supply air into rooms and areas affected by demolition and installation of new HVAC work.

c. HEPA filtration is required where the exhaust dust may reenter the breathing zone. Contractor shall verify that construction exhaust to exterior is not reintroduced to the medical center through intake vents, or building openings. Install HEPA (High Efficiency Particulate Accumulator) filter vacuum system rated at 95% capture of 0.3 microns including pollen, mold spores and dust particles. Insure continuous negative air pressures occurring within the work area. HEPA filters should have ASHRAE 85 or other prefilter to extend the useful life of the HEPA. Provide both primary and secondary filtrations units. Exhaust hoses shall be heavy duty, flexible steel reinforced and exhausted so that dust is not reintroduced to the medical center.

d. Adhesive Walk-off/Carpet Walk-off Mats, minimum 600mm x 900mm(24" x 36"), shall be used at all interior transitions from the construction area to occupied medical center area. These mats shall be changed as often as required to maintain clean work areas directly outside construction area at all times.

e. Vacuum and wet mop all transition areas from construction to the occupied medical center at the end of each workday. Vacuum shall utilize HEPA filtration. Maintain surrounding area frequently. Remove debris as they are created. Transport these outside the construction area in containers with tightly fitting lids.

f. The Contractor shall not haul debris through patient-care areas without prior approval of the Resident Engineer and the Medical Center. When approved, debris shall be hauled in enclosed dust proof containers or wrapped in plastic and sealed with duct tape. No sharp objects should be allowed to cut through the plastic. Wipe down the exterior of the containers with a damp rag to remove dust. All equipment, tools, material, etc. transported through occupied areas shall be made free from dust and moisture by vacuuming and wipe down.

g. Using a HEPA vacuum, clean inside the barrier and vacuum ceiling tile prior to replacement. Any ceiling access panels opened for investigation beyond sealed areas shall be sealed immediately when unattended.

h. There shall be no standing water during construction. This includes water in equipment drip pans and open containers within the construction areas. All accidental spills must be cleaned up and dried within 12 hours. Remove and dispose of porous materials that remain damp for more than 72 hours.

i. At completion, remove construction barriers and ceiling protection carefully, outside of normal work hours. Vacuum and clean all surfaces free of dust after the removal.

E. Final Cleanup:

1. Upon completion of project, or as work progresses, remove all construction debris from above ceiling, vertical shafts and utility chases that have been part of the construction.

2. Perform HEPA vacuum cleaning of all surfaces in the construction area. This includes walls, ceilings, cabinets, furniture (built-in or free standing), partitions, flooring, etc.

3. All new air ducts shall be cleaned prior to final inspection.

1.11 DISPOSAL AND RETENTION

A.Materials and equipment accruing from work removed and from demolition of buildings or structures, or parts thereof, shall be disposed of as follows:
1.Reserved items which are to remain property of the Government are identified by attached tags as items to be stored. Items that remain property of the Government shall be removed or dislodged from present locations in such a manner as to prevent damage which would be detrimental to reinstallation and reuse. Store such items where directed by COR.
2.Items not reserved shall become property of the Contractor and be removed by Contractor from Medical Center.
3.Items of portable equipment and furnishings located in rooms and spaces in which work is to be done under this contract shall remain the property of the Government. When rooms and spaces are vacated by the Department of Veterans Affairs during the alteration period, such items which are NOT required by drawings and specifications to be either relocated or reused will be removed by the Government in advance of work to avoid interfering with Contractor's operation.

1.12 PROTECTION OF EXISTING VEGETATION, STRUCTURES, EQUIPMENT, UTILITIES, AND IMPROVEMENTS

A.The Contractor shall preserve and protect all structures, equipment, and vegetation (such as trees, shrubs, and grass) on or adjacent to the work site, which are not to be removed and which do not unreasonably interfere with the work required under this contract. The Contractor shall only remove trees when specifically authorized to do so, and shall avoid damaging vegetation that will remain in place. If any limbs or branches of trees are broken during contract performance, or by the careless operation of equipment, or by workmen, the Contractor shall trim those limbs or branches with a clean cut and paint the cut with a tree-pruning compound as directed by the Contracting Officer.
B.The Contractor shall protect from damage all existing improvements and utilities at or near the work site and on adjacent property of a third party, the locations of which are made known to or should be known by the Contractor. The Contractor shall repair any damage to those facilities, including those that are the property of a third party, resulting from failure to comply with the requirements of this contract or failure to exercise reasonable care in performing the work. If the Contractor fails or refuses to repair the damage promptly, the Contracting Officer may have the necessary work performed and charge the cost to the Contractor.

(FAR 52.236-9)

C.Refer to Section 01 57 19, TEMPORARY ENVIRONMENTAL CONTROLS, for additional requirements on protecting vegetation, soils and the environment. Refer to Articles, "Alterations", "Restoration", and "Operations and Storage Areas" for additional instructions concerning repair of damage to structures and site improvements.
D.Refer to FAR clause 52.236-7, "Permits and Responsibilities," which is included in General Conditions. A National Pollutant Discharge Elimination System (NPDES) permit is required for this project. The Contractor is considered an "operator" under the permit and has extensive responsibility for compliance with permit requirements. VA will make the permit application available at the (appropriate medical center) office. The apparent low bidder, contractor and affected subcontractors shall furnish all information and certifications that are required to comply with the permit process and permit requirements. Many of the permit requirements will be satisfied by completing construction as shown and specified. Some requirements involve the Contractor's method of operations and operations planning and the Contractor is responsible for employing best management practices. The affected activities often include, but are not limited to the following:
-Designating areas for equipment maintenance and repair;
-Providing waste receptacles at convenient locations and provide regular collection of wastes;
-Locating equipment wash down areas on site, and provide appropriate control of wash-waters;
-Providing protected storage areas for chemicals, paints, solvents, fertilizers, and other potentially toxic materials; and
-Providing adequately maintained sanitary facilities.

1.13 RESTORATION

A.Remove, cut, alter, replace, patch and repair existing work as necessary to install new work. Except as otherwise shown or specified, do not cut, alter or remove any structural work, and do not disturb any ducts, plumbing, steam, gas, or electric work without approval of the COR. Existing work to be altered or extended and that is found to be defective in any way, shall be reported to the COR before it is disturbed. Materials and workmanship used in restoring work, shall conform in type and quality to that of original existing construction, except as otherwise shown or specified.
B.Upon completion of contract, deliver work complete and undamaged. Existing work (walls, ceilings, partitions, floors, mechanical and electrical work, lawns, paving, roads, walks, etc.) disturbed or removed as a result of performing required new work, shall be patched, repaired, reinstalled, or replaced with new work, and refinished and left in as good condition as existed before commencing work.
C.At Contractor's own expense, Contractor shall immediately restore to service and repair any damage caused by Contractor's workmen to existing piping and conduits, wires, cables, etc., of utility services or of fire protection systems and communications systems (including telephone) which are not scheduled for discontinuance or abandonment.
D.Expense of repairs to such utilities and systems not shown on drawings or locations of which are unknown will be covered by adjustment to contract time and price in accordance with clause entitled "CHANGES" (FAR 52.243-4 and VAAR 852.236-88) and "DIFFERING SITE CONDITIONS" (FAR 52.236-2).

1.14 PHYSICAL DATA

A.Data and information furnished or referred to below is for the Contractor's information. The Government shall not be responsible for any interpretation of or conclusion drawn from the data or information by the Contractor.
1.The indications of physical conditions on the drawings and in the specifications are the result of site investigations by Draper Aden Associates.

(FAR 52.2364)

B.Subsurface conditions have been developed by core borings and test pits. Logs of subsurface exploration are shown diagrammatically on drawings.
C.Government does not guarantee that other materials will not be encountered nor that proportions, conditions or character of several materials will not vary from those indicated by explorations. Bidders are expected to examine site of work and logs of borings; and, after investigation, decide for themselves character of materials and make their bids accordingly. Upon proper application to Department of Veterans Affairs, bidders will be permitted to make subsurface explorations of their own at site.

1.15 PROFESSIONAL SURVEYING SERVICES

A registered professional land surveyor or registered civil engineer whose services are retained and paid for by the Contractor shall perform services specified herein and in other specification sections. The Contractor shall certify that the land surveyor or civil engineer is not one who is a regular employee of the Contractor, and that the land surveyor or civil engineer has no financial interest in this contract.

1.16 LAYOUT OF WORK

A. The Contractor shall lay out the work from Government established base lines and bench marks, indicated on the drawings, and shall be responsible for all measurements in connection with the layout. The Contractor shall furnish, at Contractor's own expense, all stakes, templates, platforms, equipment, tools, materials, and labor required to lay out any part of the work. The Contractor shall be responsible for executing the work to the lines and grades that may be established or indicated by the Contracting Officer. The Contractor shall also be responsible for maintaining and preserving all stakes and other marks established by the Contracting Officer until authorized to remove them. If such marks are destroyed by the Contractor or through Contractor's negligence before their removal is authorized, the Contracting Officer may replace them and deduct the expense of the replacement from any amounts due or to become due to the Contractor.

(FAR 52.236-17)

B.Establish and plainly mark corner of column lines and/or addition to each existing building, and such other lines and grades that are reasonably necessary to properly assure that location, orientation, and elevations established for addition and parking lots, are in accordance with lines and elevations shown on contract drawings.
C.Following completion of general mass excavation and before any other permanent work is performed, establish and plainly mark (through use of appropriate batter boards or other means) sufficient additional survey control points or system of points as may be necessary to assure proper alignment, orientation, and grade of all major features of work. Survey shall include, but not be limited to, location of lines and grades of footings, exterior walls, center lines of columns in both directions, major utilities and elevations of floor slabs:

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it.