36C24525R0050 0002_1.docx
DOCX document 56 KB Posted
- Solicitation number
- 36C24525R0050
About this file
This document is a modified Statement of Work (SOW) for a Department of Veterans Affairs (VA) construction project to replace the boiler plant water main at Perry Point VA Medical Center in Maryland. The project involves installing approximately 400 linear feet of new 6-inch HDPE water supply piping, 40 linear feet of 6-inch ductile iron piping, and approximately 160 linear feet of 4-inch copper piping, along with associated valves, fittings, and appurtenances. The work includes tapping into an existing water main, installing new piping through excavation, core-drilling building foundations, and connecting to interior water systems for the Boiler and Chiller Plants.
The solicitation is restricted to Service-Disabled Veteran Owned Small Businesses (SDVOSB) under NAICS code 236220, with an estimated construction cost between $250,000 and $500,000. Proposals are due by 11:00 AM EST on May 23, 2025, with a planned Notice to Proceed (NTP) approximately 30 days after award. The contractor will have 90 calendar days to complete the work, including site mobilization within 15 days of NTP and a 10-day commissioning and project close-out period. Key requirements include compliance with VA safety standards, infection control guidelines, waste management protocols, and obtaining necessary environmental permits from Maryland state agencies.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SUBJECT*
Project 512A5-25-002, Replace Boiler Plant Water Main at Perry Point VAMC, MD
GENERAL INFORMATION
| CONTRACTING OFFICE’S ZIP CODE* |
| 25405 |
| SOLICITATION NUMBER* |
| 36C24525R0050 |
BASE NOTICE TYPE
| RESPONSE DATE/TIME/ZONE |
| 05-23-2025 11:00 EASTERN TIME, NEW YORK, USA |
| ARCHIVE |
| 30 DAYS AFTER THE RESPONSE DATE |
| RECOVERY ACT FUNDS |
| N |
| SET-ASIDE |
| SDVOSBC |
| PRODUCT SERVICE CODE* |
| Z2NE |
| NAICS CODE* |
| 236220 |
| CONTRACTING OFFICE ADDRESS |
| Department of Veterans Affairs |
VAMC (613)
VISN 5 Contract Satellite Office 510 Butler Avenue, Building 306A Martinsburg WV 25405
POINT OF CONTACT*
Contracting Officer Liana J Holland Liana.Holland@va.gov No Phone Calls Please - only emails
PLACE OF PERFORMANCE
| ADDRESS |
| Perry Point VAMC |
Department of Veterans Affairs
361 Boiler House Road
Perry Point MD
| POSTAL CODE |
| 21902 |
COUNTRY
ADDITIONAL INFORMATION
AGENCY’S URL
URL DESCRIPTION
AGENCY CONTACT’S EMAIL ADDRESS
EMAIL DESCRIPTION
Modification to a Previous Notice Modification to a Previous Notice
DESCRIPTION
| *= Required Field |
| Modification to a Previous Notice |
Modification to a Previous Notice
5. PROJECT NUMBER (if applicable)
CODE
7. ADMINISTERED BY
2.
AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER
3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE OF PAGES
10A.
MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO.
1. CONTRACT ID CODE
FACILITY CODE
CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office.
is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER
16A. NAME AND TITLE OF CONTRACTING OFFICER
15B.
CONTRACTOR/OFFEROR
STANDARD FORM 30
PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
AMENDMENT OF
SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer) 512A5-25-002 Department of Veterans Affairs
VAMC (613)
VISN 5
Contract Satellite Office 510 Butler Avenue, Building 306A Martinsburg WV 25405 Department of Veterans Affairs
VAMC (613)
VISN 5 Contract Satellite Office 510 Butler Avenue, Building 308B Martinsburg WV 25405 To all Offerors/Bidders
36C24525R0050
X X X
------------------------------Please refer to Page 2 of the SF30 for details--------------------------------------------
Liana J Holland Contracting Officer
VA-VHA-RPOE-2025-0010
Page 1 of Solicitation # 36C24525R0050 Contract Description: Replace Boiler Plant Water Main at Perry Point VAMC, MD Project # 512A5-25-002 Modification: 0002
This modification is to provide RFI responses to the questions submitted in a timely manner. Please note the following important information:
1. The RFI questions and answers raised an awareness that there were some discrepancies in the SOW. Attached to this modification is an updated SOW.
2. The drawings have also been revised to support the SOW.
3. The recent ACM surveys have been attached for reference (3 files).
4. The recent LBP surveys have been attached for reference (2 files).
5. The electrical site plan has been attached for reference.
No further RFI’s will be accepted. Your proposals are due into the VA by no later than 11:00hrs EST on Friday May 23rd, 2025. Please be sure to complete and return the VAAR 852.219-75 clause. Failure to do this will render your proposal non-compliant and will not be considered.
All other terms and conditions remain the same.
Updated Scope of Work (05/06/2025) Station Level Project No. 512A5-24-002 Replace Boiler Plant Water Main
1. OVERVIEW —
1.1 Government Agency Department and Address:
VA Maryland HealthCare System – VISN5 – Perry Point VAMC – Perry Point, MD
| 1.2 | Project Title, Number and Location: |
| Project Title: | Replace Boiler Plant Water Main |
Project Number: 512A5-25-002
1.3 Scope of Work
In the event that the primary source of domestic water to the Boiler Plant and Chiller Plant is required to be shut-off, a secondary water main is required to maintain a domestic water source. Provide all labor, supervision, travel, equipment, tools, materials, inspection/testing services, and legal disposal of waste materials to install a new water main to the Boiler Plant and Chiller Plant at the Perry Point VA Medical Center. Additionally, cap and abandon in-place the existing water main and backflow preventer within the Chiller Plant.
Project Intent
· Provide locked chain-link fencing as required to prevent unauthorized access to work site hazards. Coordinate material laydown area, equipment storage, and work site layout with COR.
· Survey and mark all existing subsurface utility locations prior to digging.
· Coordinate temporary utility plan and campus utility shutdowns (at least 2 weeks in advance) with the COR and VA Maintenance and Operations staff.
· Tap into adjacent combined system water main running parallel to Avenue D. Water supply to the Perry Point VAMC is provided via an onsite water treatment and pumping facility.
· Excavate access pits as required to expose existing 8-inch water pipe main along Avenue D to install new piping lateral to the Boiler/Chiller Plant.
· Cut-in and install a new 8” x 6” reducing tee into existing water main. Provide bedding and concrete thrust block.
· Install new piping stub, fused MJ Fittings, MJ Adapters w/ DI Back-Up rings & nuts & bolts, and new 6-inch Resilient Seat Gate Valve with 2” operating nut. Valve shall be manufactured in accordance with AWWA Standard C515. Provide bedding for new valve assembly. Connect to new water lateral piping. Install new valve box and cap as required to match finish grade.
· Provide and install approximately 400 linear feet of new AWWA C906 6-inch DIPS, fused, DR 11 (200 psi), HDPE water supply piping and associated fittings, color Black with Blue Stripe, between the existing 8-inch water main and pipe bend location required to transition to the Boiler/Chiller Plant. New HDPE shall be affixed with locating tracer tape. Minimum bury depth shall be no less than 4-feet below finish grade. See drawings for layout plan. Contractor shall verify actual length and exact configuration in field.
· Provide and install approximately 40 linear feet of new 6-inch, ductile iron water supply piping and associated connection fittings (flanged or grooved), between the pipe bend required to transition to the Boiler/Chiller Plant. Connect to new HPDE lateral pipe. Contractor shall verify actual length and exact configuration in field. See drawings for layout plan.
· Core-drill existing concrete foundation for new piping penetration. Install new ductile iron water pipe with rubber link-seals on each side of foundation penetration. Coordinate size of penetration to fit applicable link seal.
· Install ductile iron water supply piping to a point no less than 1 feet within the building interior to which new service is to continue and make connections thereto. Provide 150# ANSI B16.5 flange connection with EPDM gasket and bolt set at end of supply pipe once it enters building for connection to new water supply piping.
· Where new 6-inch water main enters building, install approximately 400 linear feet of new 6-inch, stainless steel, ASTM A312, schedule 10, insulated water supply piping and associated appurtenances (valves, fittings, and gauges) as depicted on the design drawings. New water supply piping shall be installed along ceiling of building, utilizing any existing pipe hangers where possible. Contractor shall verify actual length and exact configuration in field.
· At the 4-inch portion of the 6” x 4” tee, install approximately 160 linear feet of new 4-inch, copper, Type K, water supply piping and associated appurtenances (double backflow preventors, valves, fittings, and gauges) as indicated on the design drawings. The basis of design for the double backflow preventers is the Watts 957-RP model or approved equal. Contractor shall verify actual length and exact configuration in field.
· Provide and install two laterals off of the new 4-inch water supply piping as indicated on the design drawing:
· Install approximately 50 linear feet of new 4-inch, copper, Type K, insulated water supply piping and terminate with a flanged gate valve for the VA to connect to the existing chilled water make-up. Contractor shall verify actual length and exact configuration in field.
· Install approximately 50 linear feet of new 4-inch, copper, Type K, water supply piping and terminate with a flanged gate valve for the VA to connect to the existing cooling towers. Contractor shall verify actual length and exact configuration in field.
· Install new gate valve after laterals. Reduce new 4-inch supply line to 1-inch and tie-in new 1-inch, copper, Type K, insulated water supply line (approximately 40 feet) into existing 1-inch water supply line above Chiller Plant’s break room.
· Cut-in and install a new 6-inch tee into existing water main entering the Boiler Plant and finish connecting the new 6-inch water main and associated appurtenances (double backflow preventors, valves, fittings, and gauges) as depicted on the design drawings. The basis of design for the double backflow preventers is the Watts 957-RP model or approved equal.
· Following installation of new water main, remove and properly dispose of existing 4-inch backflow preventer located in the Chiller Plant’s Break Room.
· Cap and abandon in-place existing water main located in the Chiller Plant’s Break Room.
· Coordinate final connection tie-in location with COR and facility M&O.
· Interior piping shall be insulated with 1” wall fiberglass, All Service Jacket.
· Install formed concrete thrust blocks at all piping tees and bends.
· All HPDE pipe butt connections and fittings shall be fused.
· All new piping and valve components shall be certified for use with potable drinking water service.
· All new piping shall be flushed, pressure tested, and disinfected prior to putting new supply into service.
· Backfill and compact soil subgrade, place topsoil, and seed disturbed vegetated areas.
1.4 Work Items Under this Task Order
Offers are to submit proposals based on the project specifications and drawings provided under the project solicitation. The resulting total bid amount shall then be broken down item by item for review of quantities, unit costs and labor costs.
Contractor shall make arrangements to visit the site to survey existing conditions and to determine the methods of the work to be performed prior to submitting proposal.
Work items under this task order include the following but is not limited to:
· Complete all demolition, repair, and replacement work as detailed in the attached construction drawings. All work and materials shall be in accordance with the attached construction specifications. Contractor shall be responsible for adherence to all VA and OSHA construction safety requirements pertaining to the project scope as described in the project drawings and specifications.
· Unless noted otherwise, all new surface repair work shall match the existing adjacent work as much as practical.
· Work Site Protection and Administration shall be included.
· Warranty on new work shall be good for a period of 1 year from date of completion per FAR unless otherwise stated.
· Removal and Disposal and/or recycling of all demolished building materials and construction waste per applicable regulations shall be included. Manifests/disposal/recycle tonnage must be summarized and reported to the COR.
· Hazmat materials shall be removed as shown in work area. Contractor to adhere to OSHA “Lead in Construction” standard (29 CFR 1926.62) for residual lead paint that may remain. All hazardous material manifests and Land Disposal Restrictions MUST be signed by an authorized VA representative before regulated material may be transported off-site. Contractor is responsible for all supplemental testing required (ie. TCLP) to profile and segregate waste streams.
· Contractor shall be responsible for all material deliveries, storage, and the coordination of deliveries. Over-height and over-weight restrictions are in place in one or all of the site access points.
· Contractor responsible for all temporary site operations facilities, including temporary utility connections, temporary worker restrooms/port-o-johns, field office, storage areas/CONEX boxes, etc. Contractor shall provide total site security measures including locking 8ft-high chain-link fence around entire site complete with privacy screening slats.
· Contractor shall be responsible for providing and maintaining all aspects of construction site safety including but not limited to:
· Fire Extinguishers
· Construction site fencing and access control
· Refer to Specification 01 00 00 General Requirements for all requirements pertaining to the project including the availability and usage of government provided utilities.
· Refer to specification 01 33 23 Shop Drawings, Product Data, and Samples for project submittal requirements.
· Contractor shall apply for and obtain all environmental and other necessary permits that would be required prior to construction commencing – including but not limited to:
· Maryland Dept. of the Environment (MDE)
· Maryland Dept. of Natural Resources (DNR)
· Chesapeake Critical Area Commission (CAC)
1.5 Additional Terms and Conditions
1.5.1 Schedule
Please review specification section 01 32 16.15 for requirements for schedule. Please note that the contractor’s bid proposal provided at the time of bid due date shall require a draft CPM schedule. The intent is to proceed with submittals immediately after contract award, submittals for the long lead items shall be developed, provided, and reviewed.
A project Notice to Proceed (NTP) is planned to be issued roughly 30 days post award. Contractor shall mobilize onsite beginning construction within 15 days of NTP issue. The contractor shall have (90) Ninety calendar days to complete all work including closeout.
See below chart for NTP:
| ID |
| Milestone Task Description |
| Duration |
| Schedule |
Date Actual Date
| 1 |
| Project NTP |
| 1 Day |
| Award + 30 |
| 2 |
| Site Mobilization |
| 15 Days |
| NTP + 15 |
| 3 |
| Complete all work |
| 65 Days |
| NTP + 80 |
| 4 |
| Commissioning and Project Close-out |
| 10 Days |
| NTP + 90 |
1.5.2 Pricing and Payment
1.5.2.1 This project will be deemed complete when all of the required tasks outlined in this SOW are complete and function as intended by design; the work shall be completed within the areas defined in this document. The VA will complete a final walk through and inspection of all work before processing final payment.
1.5.2.2 The contractor may submit progress payment invoices according to the Contracting Officer’s specifications at intervals acceptable to the VA. These progress payments will be substantiated by the COR inspections and the daily logs submitted by the contractor. A schedule of values will need to be submitted and approved.
1.5.2.3 Progress payment invoices shall be sent via email to the COR for approval and payment.
1.5.2.4 Final payment will not be processed until final walk through and approval is complete which includes all punch list items.
1.6 Construction Requirements
| 1.6.1 | The Contractor shall have the skills, availability, capacity and all other required resources required to complete the job on time without delay. |
| 1.6.2 | All site contractors shall have completed the Occupational Safety & Health Administration (OSHA) approved 10-hour construction safety training. |
| 1.6.3 | Mechanical and Plumbing contractors shall have technical training and demonstrable track records of working experience in construction, inspection, and testing of plumbing systems and related components in healthcare, industrial, educational, and commercial facilities. Contractor must hold a current license by the State of Maryland as a licensed Master Plumber/Gas Fitter or approved by COR. |
| 1.6.4 | All work is to shall be in compliance with local, state and federal rules and regulations, and VA technical standards. Compliance is to whichever rule or regulation is the most stringent. VA Master Specifications shall be used as the default when no specifications are issued and when a referenced specification is not found in the projects RFP package, they are at https://www.cfm.va.gov/til/. The intent of the default specifications is to furnish concise industrial and/or commercial standards for construction of Government facilities. If the Statement of Work does not address a specification for an element of the work, the default specification shall apply for the element of work as approved by COR. The omittance of a VA specification, does not relieve the contractor to perform required work under the base task order cost proposal. |
| 1.6.5 | Provide daily on-site project management to coordinate all building trades and provide liaison for construction and VA Project Engineering. General Foreman will be designated and be on-site at all times. |
| 1.6.6 | All employees of contractor shall comply with VA security management program and obtain permission of the VA police, be identified by project and employer, and be restricted from unauthorized access. VA issued ID Badges shall be worn by all workers while within the campus boundaries. Contractor shall make all necessary arrangements to obtain the required badging prior to commencement of work. VA issued ID Badges shall be worn by all workers at all times. |
| 1.6.7 | Follow all Infection Control Risk Assessment (ICRA) guidelines for dust control during all construction and demolition work. A construction dust “Risk Assessment” will be conducted by the Medical Center’s Infection Control Nurse. Temporary “dust” barriers will be installed based on this assessment. Bi-weekly inspections of barriers and work areas will be conducted by Infection Control Nurse, Safety Manager, and COR to enforce implementation of risk assessment. |
| 1.6.8 | Follow Interim Life Safety Measures (ILSM). Any series of Operational Actions taken to temporarily reduce hazards posed by Life Safety deficiencies which have been created by demolition, renovation, or construction works, and which are to remain in place and in effect for duration of Contract work. Provide ILSM where fire protection, fire suppression or smoke/fire partitions will be shut down or rendered ineffective during construction. Coordinate with VA safety office through COR. ILSM must be posted outside work area at all times. |
| 1.6.9 | All equipment and materials shall be approved prior to being brought on job site. |
| 1.6.10 | Normal work hours are 7:00am to 3:30pm, Monday to Friday. Contractor shall make prior arrangements to work earlier or later with COR. Also, contractor shall make arrangements for subcontractors to work in secured areas. VA will not grant access to subcontractors, it is the responsibility of the contractor. |
| 1.6.11 | Daily logs shall be submitted to the COR the Monday following each week worked. |
| 1.6.12 | When using special keys for access to roof, mechanical and electrical areas, doors must be kept closed and locked while in such spaces. |
| 1.6.13 | Contractor must obtain a burn permit from VA Safety Office / Fire Dept prior to any welding, flame cutting, soldering work, and burning. |
| 1.6.14 | The work performed shall be in a professional environment, employees must conduct themselves accordingly. Employees shall not use abusive language, carry firearms, or bring alcoholic beverages on site. Employee's dress code shall consist of normal work uniform. Shirts must be worn at all times. |
| 1.6.15 | Contractor shall provide general clean up to construction area daily to the satisfaction of the COR. |
| 1.6.16 | Remove demolished equipment and restore site. |
| 1.6.17 | Hospital smoking policy (NO SMOKING ON CAMPUS). |
| 1.6.18 | OSHA and VA CONSTRUCTION SAFETY STANDARDS will be enforced. Contractor Supervisor must have 30-hour OSHA Construction Safety course. All contractor employees must have 10-hour OSHA Construction Safety course. |
| 1.6.19 | All fire stop material must be red. |
| 1.6.20 | Any expansion bolts/anchors must be tightened with a torque wrench per OEM. |
| 1.6.21 | For quality control, the individual may not carry dual roles in the construction project. The VA shall require a person with QC/QA background that there only role is to validate that the construction meets or exceeds requirements of the contract. This person will generate a final punch list and provide to the COR. Then the COR will schedule review the completed job with contractor or/and code officials to generate a punch list. The QC inspector shall provide summary to the COR on a weekly basis with inspection sheets and corrections or commented. |
2.0 Safety and Environmental Precautions
| 2.1. | The Contractor shall comply with all applicable Federal, State and local legal requirements regarding workers health and safety. The requirements include but are not limited to, those found in Federal and State Occupational Safety and Health Act (OSHA) statutes and regulations, such as applicable provisions of Title 29, Code of Federal Regulations (CFR) Parts 1910 and 1926. Contractor is solely responsible for determining the legal requirements that apply to activities, and shall ensure safe and healthful working conditions for its employees. |
| 2.2. | Contractor shall assume the responsibility to guard against causing of fires and/or explosions and to protect Government Property. |
| 2.3. | The Contractor shall perform the work in a manner consistent with the area security and fire safety regulations especially with regard to exits and exit way access. Utility shutdowns shall not compromise security, communication or fire safety for occupants. Egress must be maintained for contract workers per OSHA. |
| 2.4. | No flammable liquids shall be stored or used in the medical center. |
| 2.5. | The necessary number and appropriate types of portable fire extinguishers are required per National Fire Protection Agency (NFPA) 10 and NFPA 241. |
| 2.6. | The Contractor shall receive from the station fire department a permit for all cutting, welding, and soldering. All permits shall be prominently displayed during all construction. Permits must be opened at the start of each activity and closed at the end of each workday. |
| 2.7. | All necessary precautions shall be taken by the contractor to prevent accidental operation of any existing smoke detectors or sprinkler heads. |
| 2.8. | Contractor shall be responsible for operational actions taken to temporarily reduce the hazard posed by life safety deficiencies created during and until completion of construction, as well as temporary construction partitions of non-combustible or limited combustible material that will not contribute to the development of spread of fire smoke tight and have smooth clean surface. |
| 2.9. | In order to provide for control of all environmentally hazardous materials arising from demolition and/or construction activities, the Contractor shall comply with all applicable environmentally hazardous material control and all applicable provisions of the Corps of Engineers’ Manual EM 385-1-1, “General Safety Requirements” as well as the specific requirements stated elsewhere in the Contract Documents. |
| 2.10. | All overhead lifts shall comply to VA requirements which may include off shift/days lifts (IE weekends) as scheduled and approved by COR. |
| 2.11. | Site mobilization area: The site mobilization area will be designated prior to the start of work. Area shall be fixed fence and be secured to allow access only to authorized personnel. Fence signs shall be installed to make general public aware. A job board with required permits, bulletins or site documentation shall be installed in area that can be visibly observed by the general public. Temporary walk path (stone or other means) shall be provided if contractor places office trailer in the area. No material tracking onto the sidewalk or roadways is allowed. Area shall be repaired with topsoil and hydroseed when weather conditions allow. No material shall be allowed to be wind blown off the site. Housekeeping of the area shall be performed daily or as required. Contractor is required for any snow removal and protection of assets. All material/equipment shall be covered and protected from weather elements. Sidewalk must always be accessible. Keys must be provided to the VA for any locked fences or other areas as deemed by the COR. |
3.0 Waste Disposal and Management
All waste will be properly handled and disposed of in an environmentally sound manner and will comply with local and federal guidelines. Keeping the premises free from debris is a key component to maintaining a safe work environment. Below are the types of waste and the process for each.
| 3.1 | General Non-Hazardous Waste |
| 3.1.1 | A construction project generates waste either from the parts that are removed or from the packaging of the new products being installed. The contractor shall ensure that all installation debris and product packaging is removed from the work area and placed in trash receptacles that the contractor provides. |
| 3.1.2 | This waste will be transported and disposed of by the contractor’s waste management company. |
| 3.1.3 | Comply with VA Master Specification 017419 Construction Waste Management. This specification identifies materials that MUST be recycled or reused during construction and demolition projects. Additionally, VHA requires that 50% of demolition debris be diverted from the solid waste stream. Contractor shall document all disposal records or recycling records, with quantity and destination of all waste streams. |
| 3.2 | Hazardous Waste (Includes but not limited to Lead and Lead-Based Paint Wastes) |
| 3.2.1 | The contractor must dispose of all universal wastes that does not remain intact as hazardous waste per EPA hazardous waste guidelines (40 CFR 260-299) and COMAR 26 Subtitles 13-18. The contractor must also dispose of all hazardous wastes per EPA hazardous waste guidelines (40 CFR 260-299) and COMAR 26 Subtitles 13-18. |
| 3.2.2 | All required paperwork such as hazardous waste profiles, hazardous waste manifests and land disposal restriction (LDR) forms that go with the hazardous waste manifests will be filled out by a MD licensed, hazardous waste subcontractor. The contractor will schedule and coordinate hazardous waste removal with VAMHCS Safety personnel. Hazardous waste manifests will be signed by ONLY a VAMHCS employee with DOT RCRA training certification (please contact VAMHCS GEMS Manager) and a copy provided to the VAMHCS GEMS Manager for the specific VAMHCS facility. Final signed manifests must be received by the VAMHCS from the hazardous waste Treatment, Storage, and Disposal Facility within 45 days of waste shipment per EPA 40 CFR 263.20-.25 as well as Code of Maryland Regulations (COMAR) 26.13.03.06. |
| 3.4.3 | Comply with EPA and MDE requirements for proper handling (such as bagging, sealing and recycling) Mercury-Containing Devices (may include but are not limited to thermometers, manometers, pressure stats, gauges, float or level controls, load meters, supply relays, phase splitters, and sink traps) per 40 CFR 273 and COMAR 26.13.02.08, 26.13.10.06, 26.13.10.09 and 26.13.10.20, 26.13.10.21 and 26.13.10.26 or latest requirements. |
| 3.4.4 | All hazardous waste expected as a result of renovation, demolition or construction activities (including but not limited to mercury-containing dental amalgam wastes, fluorescent bulbs, electrical devices that contain PCBs) must be properly managed and disposed in accordance with EPA and MDE requirements per EPA 40 CFR 260-299 as well as COMAR 26.13.02.01, 26.13.02.08, 26.13.10.20, 26.13.10.21 and 26.13.10.26 or latest requirements. |
| 3.4.5 | Records of hazardous waste disposal (such as manifests, hazardous waste profiles, LDRs) must be provided by approved waste transporter and signed by an approved VAMHCS Manifest signer from the VAMHCS Safety Department. All records provided to COR and VAMHCS GEMS Coordinator at VAMHCSGEMSProgram@va.gov |
| 3.4.6 | All hazardous chemicals that need to remain at the job site must be stored and handled in accordance with EPA; MDE; OSHA and NFPA requirements |
| 3.4.7 | Contractor must adhere to the lead in construction standard (29 CFR 1926.62(a) where lead is encountered in the course of work. If any lead is present, these regulations apply. The employer (contractor) must determine if employees will be exposed above the Permissible Exposure Limit for lead. |
E N D S C O P E O F W O R K
RFI Responses:
1. Is there any Lead Paint or Asbestos remediation required? Please provide hazardous materials report.
VA Response: Lead Paint or Asbestos remediation is required in any area where disturbance of those materials is required to execute scope of work. The following Hazardous Material (Lead and Asbestos) Reports for the Boiler Plant (Building 315) and Chiller Plant (Building 321) have been provided:
· Boiler Plant ACM Inspection Summary Report Revised 6.23.2016
· Boiler and Chiller Plant ACM Inspection Summary Report 6.28.2016
· Boiler Plant ACM Survey Results 11.28.2023
· Boiler and Chiller Plant Lead Survey Summary Report Excerpt 11.13.2013
· Boiler Plant Lead Screening 2.11.2019
2. The drawings do not indicate any electrical duct banks in the location of the new waterline. However, there are conduits that come up out of the ground in the exterior of the building we will be penetrating with the new waterline. Please provide additional drawings/information for existing underground utilities in this area.
VA Response: A drawing identifying additional information for existing underground utilities in the area of the Chiller Plant and Boiler Plant is provided. Note that this drawing and all other drawings provided are for informational purpose only. As noted in Section 1.3 of the SOW, the contractor is responsible for surveying and marking all existing subsurface utility locations prior to digging.
3. The plan notes, pipeline markers and notes, on the on drawings W-1 and W-2 are very light blue font which are not legible. Can we receive the same drawings with a more legible color font (black) on both the pipelines and drawing notes?
VA Response: Revised drawings with a more legible color font (black) on both the pipelines and drawing notes will be provided.
4. In order to connect the new water main to the existing water main located in the boiler plant, should the installing contractor plan to wet tap that connection to prevent having to shut down and drain the existing service? , Or will the VA shut down and drain the existing water main serving the boiler plant, including any temporary water feeds which need to be established and maintained during the outage period?
VA Response: Installation of the new water main to the existing water main should not be done via wet tap. The VA will perform the shutdown and provide temporary water feeds to allow for the tie-in to the existing water main. As noted in Section 1.3 of the SOW, the contractor shall coordinate temporary utility plan and campus utility shutdowns (at least 2 weeks in advance) with the COR and VA Maintenance and Operations staff.
5. Please confirm Schedule 10-316 stainless steel, welded pipe and fittings are required as specified in Specification Section 22 11 00, for piping 6” diameter and larger.
VA Response: Schedule 10-316 stainless steel, welded pipe and fittings are required as specified in Specification Section 22 11 00, for piping 6” diameter and larger.
6. Please clarify what type of pipe material is to be used for the interior 6” pipe:
Note 6 on W-2 states 300LF of 6” stainless steel ASTM A312, Schedule 40 The project SOW states 400LF of 6” stainless steel ASTM A312 Schedule 10 VA Response: Note 6 on the SOW has been updated to state that 400LF of 6” stainless steel ASTM A312, Schedule 10 is required.
7. Please clarify what type of pipe material is to be used for the interior 4” pipe:
Note 7 on W-2 states 160LF of 4” stainless steel ASTM A312, Schedule 40 VA Response: The interior 4” pipe shall be copper, Type K. Note 7 on the SOW has been revised to state 160LF of 4” copper, Type K.
8. In lieu of excavating the 400 lf of 6” HDPE piping would it be allowed to directional born this line from the point of connection to the existing 8” water main to the building.
VA Response: Installation of the 400 linear feet of 6” HDPE piping shall be done via excavation.
9. The drawings call out schedule 40 SS pipe while the scope calls for Schedule 10. Please confirm which is correct.
VA Response: Stainless steel pipe shall be schedule 10. The drawings have been updated accordingly.
10. The drawings call for the 4” leg to be stainless steel while the scope calls for K copper piping. Please confirm which is correct.
VA Response: The 4” leg shall be copper, type K as indicated in the SOW. The drawings have been revised to indicate that the 4” piping shall be copper, type K.
11. Please provide a spec for the back flow preventers to be installed.
VA Response: The basis of design for the backflow preventers is the Watts 957-RP model or approved equal. The SOW has been updated accordingly.
12. Is there a spot on site to put the spoils?
VA Response: There is no location for spoils onsite. Spoils should be properly handled and disposed of in an environmentally sound manner and will comply with local and federal guidelines.
13. Is there an S&E permit covering the site and are there drawings?
VA Response: There is no existing S&E permit covering the site. The SOW has been updated to include the following:
Contractor shall apply for and obtain all environmental and other necessary permits that would be required prior to construction commencing – including but not limited to:
· Maryland Dept. of the Environment (MDE)
· Maryland Dept. of Natural Resources (DNR)
· Chesapeake Critical Area Commission (CAC)
14. Is temporary construction fence needed around the excavation site?
VA Response: Per Section 1.4 - Work Items Under this Task Order, “Contractor shall provide total site security measures including locking 8ft-high chain-link fence around entire site complete with privacy screening slats.”
See attached document: Drawing 1 - New Work Plan - Exterior_Rev 2.
See attached document: Drawing 2 - New Work Plan - Interior_Rev 2.
See attached document: Boiler and Chiller Plant ACM Inspection Summary Report 6.28.2016.
See attached document: Boiler and Chiller Plant Lead Survey Summary Report_Excerpt 11.13.2013.
See attached document: Boiler Plant ACM Inspection Summary Report Revised 6.23.2016.
See attached document: Boiler Plant ACM Survey Results 11.28.2023.
See attached document: Boiler Plant Lead Screening 2.11.2019.
See attached document: Elect site planE100B.
See attached document: VAAR 852.219-75 - Construction.
See attached document: Drawing 1 - New Work Plan - Exterior_Rev 2.
See attached document: Drawing 2 - New Work Plan - Interior_Rev 2.
See attached document: Boiler Plant ACM Inspection Summary Report Revised 6.23.2016.
See attached document: Boiler and Chiller Plant ACM Inspection Summary Report 6.28.2016.
See attached document: Boiler Plant ACM Survey Results 11.28.2023.
See attached document: Boiler and Chiller Plant Lead Survey Summary Report_Excerpt 11.13.2013.
See attached document: Boiler Plant Lead Screening 2.11.2019.
See attached document: Elect site planE100B.
See attached document: VAAR 852.219-75 - Construction.