015 1 15 Second Floor Addition Dimentions-Areas Marked_Amendment2.pdf

PDF 595 KB Posted

Attached to
Z1DA--Replace Dialysis Sanitary Lines Federal contract opportunity
Solicitation number
36C24525B0002
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 5

About this file

This is an architectural floor plan drawing showing the second floor addition dimensions and marked areas for a construction project at what appears to be a VA medical facility. The drawing includes detailed dimensions, room layouts, and a fire/sound rated graphic symbol legend at the top. The plan shows both existing space and new construction areas, with a specific section highlighted in red that appears to define the active work area. Green lines within the red boundary appear to indicate internal divisions or phases of work. The drawing includes standard architectural notations, measurements, and technical details typical of construction documents. The drawing is labeled as sheet 1-15 and was prepared by TAG-VVKR Architects for what appears to be a medical addition and alterations project in West Virginia.

View the file

Other files for this federal contract opportunity

Other files attached to Z1DA--Replace Dialysis Sanitary Lines, newest first.
File Type Posted
36C24525B0002 0003.docx DOCX document
RFIs Round 2.docx DOCX document
36C24525B0002 0002.docx DOCX document
017 1 17 Third Floor Addition Dimentions- Area Labeled_Amendment 2.pdf PDF
230593_Specs.pdf PDF
054 1 54 First Floor Addition Reflected Ceiling Plan.pdf PDF
S05_ Pre-Bid RFIs Revised 12.30.2024.pdf PDF
Site Visit 12_18_2024.pdf PDF
073 1 H65 Enlarged Second Floor Addition Plans and Sections.pdf PDF
058 1 58 Third Floor Addition Reflected Ceiling Plan.pdf PDF
057 1H49 Second Floor Addition Ductwork Plan.pdf PDF
052 1 52 Basement Addition Reflected Ceiling Plan.pdf PDF
015 1 15 Second Floor Addition Dimentions.pdf PDF
011 1 11 Basement Addition Dimentions.pdf PDF
Lab tray Line.pdf PDF
36C24525B0002 0001.docx DOCX document
017 1 17 Third Floor Addition Dimentions.pdf PDF
Drawing Set 3.pdf PDF
Drawing Set 2.pdf PDF
Drawing Set 1.pdf PDF
Life Safety Drawings Building 1 and CA.pdf PDF
059 1 H51 Third Floor Addition Ductwork Plan.pdf PDF
057 1H49 Second Floor Addition Ductwork Plan 02.pdf PDF
056 1 56 Second Floor Addition Reflected Ceiling Plan.pdf PDF
013 1 13 First Floor Addition Dimentions.pdf PDF
S02_LIMITATIONS ON SUBCONTRACTING-CERTIFICATE OF COMPLIANCE.pdf PDF
S02_WageRates_Harrison_WV.pdf PDF
S02 - Attachment A_Contractor Cert._Immigration_Nationality Act of 1952.pdf PDF
S02 - 540-24-111 Specs Combined.pdf PDF
S02_Replace Dialysis Sanitary Lines SOW-Revised.pdf PDF
36C24525B0002_1.docx DOCX document
S02 - 540-24-111 Replace Dialysis Sanitary Lines- ICRA-1-2-IC Signed.pdf PDF
Show all 32

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

VHACLARaberW Polygonal Line

VHACLARaberW Polygonal Line

VHACLARaberW Polygonal Line

VHACLARaberW Callout Red area outlines the space to be balanced. Green area represents the active work area.

File details come from the government source that posted it. Updated .