17306-VAMC Ambulatory-Certificate of Compliance for Lightning Protection Installation and Warranty.pdf
PDF 170 KB Posted
- Solicitation number
- 36C24524B0002
About this file
This document includes a certificate of compliance for lightning protection system installation and a related federal contract opportunity solicitation. The certificate certifies that a lightning protection system was installed at the Louis A. Johnson VA Medical Center Ambulatory Care Addition in compliance with UL96A, LPI-175, and NFPA 780 standards. The master installer completed the work on September 13, 2019 and the certificate and warranty are valid for one year until September 13, 2020.
The related federal contract opportunity is solicitation number 36C24524B0002 to provide labor, materials, and services to repair water damage at the Purple Firm building of the Louis A. Johnson VAMC. The work must be completed within 120 calendar days according to the requirements and specifications. The contractor will be responsible for labor, supervision, materials, equipment, tools, daily cleaning, and safety securing of tools.
View the file
Other files
Show all 21
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
621 Pond Street, Dayton, OH 45402 Phone: 937-228-7250 Fax: 937-228-1508 Email: Maxwell@maxwell-lp.com
Certificate of Compliance for Lightning
Protection Installation and Warranty
This certificate is to certify the lightning protection system installation on the protected building structure listed below. The system has been installed in compliance with current editions from the UL96A, LPI-175, as well as NFPA 780 lightning protection standards including surge protection. If limited scope installation took place this certificate only validates those specified locations.
Completion Date: 09/13/2019
Protected Structure: Louis A. Johnson, VAMC – Ambulatory Care Addition
Maxwell Lightning Protection
Master Installer Designer #1411
The certification of compliance and warranty expires on the date below on (1) year from the completion date. Any modifications to the Structure or installation may compromise the integrity of the lightning protection system or render compliance with Maxwell
Lightning Protection.
Warranty Expiration Date: 09/13/2020
Installation Standards Provided By:
File details come from the government source that posted it. Updated .