This document outlines a federal contract opportunity from the Department of Veterans Affairs to replace chilled water piping. The solicitation number is 36C24522B0009 and seeks bids to repair and upgrade critical utilities for chilled water at the Central Campus location in VA. Specifically, the project scope includes replacing chilled water piping from Building 500's loading dock to Buildings 502 and 503. The opportunity is currently in the pre-solicitation phase.

View the file

Other files

Show all 21

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

GENERAL BID NOTE

1. EXISTING DUCTWORK AND PIPING IS BASED ON ORIGINAL CONSTRUCTION DRAWINGS AND MAY NOT REFLECT CURRENT DUCT/PIPING/TERMINAL DEVICE LAYOUT. CONTRACTOR SHALL FIELD VERIFY ACTUAL CONDITIONS PRIOR TO PRICING AND BEFORE PROCEEDING WITH WORK. NOTIFY ENGINEER IN THE EVENT THAT EXISTING MAIN DUCTWORK OR PIPING SHOWN TO REMAIN IS

SIGNIFICANTLY DIFFERENT FROM EXISTING CONDITIONS.

2. CONTRACTORS SHALL BE RESPONSIBLE FOR MATCHING EXISTING BUILDING SYSTEMS WHERE REQUIRED BY DEMOLITION AND NEW WORK.

ITEMS INCLUDING BUT NOT LIMITED TO: WALL TYPES, INSULATION, GLASS, CONCRETE, REBAR, ETC. SHALL MATCH EXISTING DESIGN

CONDITIONS WHEN REPLACED OR REPAIRED.

3. CONTRACTOR SHALL IDENTIFY AND COORDINATE WITH THE OWNER ALL WORK AREAS REQUIRING CONSTRUCTION EFFORTS DURING FACILITY "OFF" HOURS. "OFF" HOUR WORK SHALL BE INCLUDED IN THE CONTRACTOR'S BID/SCOPE OF WORK.

4. CONTRACTOR IS RESPONSIBLE FOR PROVIDING ALL ISOLATION VALVES NECESSARY TO COMPLETE THE DESIGN INDICATED.

5. CONTRACTOR IS RESPONSIBLE FOR RELOCATION OF DOMESTIC WATER PIPING, ELECTRICAL CONDUIT, VAV BOXES, AND OTHER EXISTING COMPONENTS AS REQUIRED TO ACCOMMODATE NEW WORK. CONTRACTOR SHALL FIELD VERIFY THE EXTENT OF RELOCATION WORK

PRIOR TO PRICING. COORDINATE SITE VISITS WITH COR.

MECHANICAL GENERAL DEMOLITION NOTES

1. COORDINATE ALL MECHANICAL UTILITY AND HVAC UNIT SHUT DOWNS WITH OWNER. ANY SHUT DOWNS NECESSARY TO ACHIEVE THE OBJECTIVE OF THIS DESIGN SHALL BE COMPLETED DURING "OFF HOURS" AND SHALL COMPLY WITH OWNER'S UTILITY SHUT DOWN

POLICIES.

2. CONTRACTOR IS RESPONSIBLE FOR ALL CUTTING, PATCHING AND DEMOLITION OF ALL BUILDING SYSTEMS PER THEIR MEANS-AND-

METHODS AS NECESSARY TO PROVIDE THE DESIGN INDICATED.

GENERAL NOTES

1. THE DRAWINGS ILLUSTRATE GENERAL SCOPE AND ARRANGEMENT OF MECHANICAL SYSTEMS. THEY SHALL BE FOLLOWED AS CLOSELY AS ACTUAL CONDITIONS ALLOW. MECHANICAL CONTRACTOR SHALL PROVIDE FITTINGS AND OFFSETS IN DUCTWORK AND PIPING TO AVOID FIELD

INTERFERENCES.

2. ALL WORK SHALL CONFORM TO THE REGULATIONS OF APPLICABLE FEDERAL, STATE, LOCAL LAWS, ORDINANCES AND CODES. MECHANICAL WORK SHALL BE IN ACCORDANCE WITH THE LATEST ADOPTED EDITION OF THE INTERNATIONAL MECHANICAL CODE AND ANY APPROVED

SUPPLEMENTS TO THAT CODE.

3. DRAWINGS, SPECIFICATIONS, AND SCHEDULES TOGETHER FORM THE BASIS OF DESIGN.

4. PROVIDE FIRESTOPPING WHERE NECESSARY. WHERE FIRE STOPPING IS NECESSARY, COMPLETE WORK PER RESPECTIVE UL DETAILS.

PROVIDE UL DETAILS FOR PRODUCTS USED PRIOR TO FINAL INSEPCTION.

5. DIMENSIONS AND DUCT/PIPING/EQUIPMENT SIZES INDICATED ON THE DRAWINGS MAY NOT REFLECT ACTUAL FIELD CONDITIONS IN ALL LOCATIONS. FIELD VERIFY DUCT, PIPING AND EQUIPMENT SIZES AND LOCATIONS PRIOR TO FABRICATION OF DUCTWORK OR PIPING SUCH THAT DUCTWORK, PIPING, AND EQUIPMENT WILL FIT IN APPROXIMATELY THE LOCATION SHOWN ON THE DRAWING.

MECHANICAL ABBREVIATIONS

AMP AMPERE

A/C AIR CONDITIONING

A/E ARCHITECT / ENGINEER

AAHX AIR TO AIR HEAT EXCHANGER

AAV AUTOMATIC AIR VENT

AB AIR BLENDER

ABV ABOVE

ACC AIR COOLED CONDENSER

ACCH AIR COOLED CHILLER

ACCU AIR COOLED CONDENSING UNIT

ACD AUTOMATIC CONTROL DAMPER, MODULATING

ACD-TP AUTOMATIC CONTROL DAMPER, TWO POSITION

ACU AIR CONDITIONING UNIT

AD ACCESS DOOR

AF AIR FILTER

AFC ABOVE FINISHED CEILING

AFCV AIR FLOW CONTROL VALVE

AFF ABOVE FINISHED FLOOR (18" UON)

AFG ABOVE FINISHED GRADE (18" UON)

AFMS AIR FLOW MEASURING STATION

AFW AIR FOIL WHEEL (FAN)

AHU AIR-HANDLING UNIT

ALT ALTERNATE

AMB AMBIENT

AMP AMPERE

ANSI AMERICAN NATIONAL STANDARDS INSTITUTE

AP ACCESS PANEL

APD AIR PRESSURE DROP

APPROX APPROXIMATE

AQST AQUASTAT

ARI AIR CONDITIONING AND REFRIGERATION INSTITUTE

AS AIR SEPARATOR

ASHRAE AMERICAN SOCIETY OF HEATING REFRIGERATION AIR

CONDITIONING ENGINEERS

ASME AMERICAN SOCIETY OF MECHANICAL ENGINEERS

AVG AVERAGE

AW AIR WASHER

AXF AXIAL FLOW

B BOILER

BD BUTTERFLY DAMPER

BDD BACKDRAFT DAMPER

BDR BASE BOARD RADIATOR

BEL BELOW

BFT BOILER PLANT FIRE TUBE

BG BOTTOM GRILL

BHP BRAKE HORSEPOWER

BHW HOT WATER HEATING BOILER

BHX BOILER BLOWDOWN HEAT EXCHANGER

BIW BACKWARD INCLINED WHEEL (FAN)

BLDG BUILDING

BMT BONE MARROW TRANSPLANT

BR BOTTOM REGISTER

BSC BIOLOGICAL SAFETY CABINETS

BT BLOWOFF TANK

BTC BLOWOFF TANK CONTROL VALVE

BTUH BRITISH THERMAL UNIT PER HOUR

BWT BOILER PLANT WATER TUBE

C CENTIGRADE (CELSIUS)

CAV CONSTANT AIR VOLUME

CC COOLING COIL

CCD COOLING COIL CONDENSATE DRAIN

CD CEILING DIFFUSER

CD-1 CONSTRUCTION DOCUMENTS (SUBMISSION1)

CD-2 CONSTRUCTION DOCUMENTS (SUBMISSION2)

CENT CENTRIFUGAL

CFH CUBIC FEET PER HOUR

CFM CUBIC FEET PER MINUTE

CFT CUBIC FEET

CFP CHEMICAL FEED PUMP

CG CEILING GRILL

CH CHILLER

CHP CHILLER WATER PUMP

CHW CHILLER WATER

CHR CHILLER WATER RETURN

CHS CHILLER WATER SUPPLY

CI CAST IRON

CLG CEILING

CM CARBON MONOXIDE

CM CUBIC METER

CM/S CUBIC METER PER SECOND

CO CLEAN OUT

CO2 CARBON DIOXIDE

COMP COMPRESSOR UNIT

COP COEFFICIENT OF PERFORMANCE

COR CONTRACTING OFFICERS REPRESENTATIVE

CP CONDENSATE PUMP

CR CEILING REGISTER

CS CONDENSATE STORAGE TANK

CSG CLEAN STEAM GENERATOR

CT COOLING TOWER

CU CONDENSING UNIT

CUH CABINET UNIT HEATER

CV CONSTANT VOLUME

CW COLD WATER (POTABLE)

CWCC CHILLED WATER COOLING COIL

CWP CONDENSER WATER RETURN

CWR CONDENSER WATER RETURN (TO COOLING TOWER)

CWS CONDENSER WATER SUPPLY (FROM COOLING TOWER)

D DAMPER - AUTOMATIC

Db DRY-BULB TEMPERATURE dB DECIBELS

DCW DOMESTIC COLD WATER

DD-1 DEIGN DEVELOPMENT (SUBMISSION 1)

DD-2 DEIGN DEVELOPMENT (SUBMISSION 2)

DDC DIRECT DIGITAL CONTROLS

DEG DEGREE

DF DIFFUSER

DEMO DEMOLITION

DHW DOMESTIC HOT WATER

DHWR DOMESTIC HOT WATER RETURN

DIA DIAMETER

DIW DEMONIZED WATER

DN DOWN

DP DEW POINT TEMPERATURE

DP DIFFUSER PLATE

DPA DIFFERENTIAL PRESSURE ASSEMBLY

DPS DIFFERENTIAL PRESSURE SENSOR

DWG DRAWING

DX DIRECT EXPANSION

DXCC DIRECT EXPANSION COOLING COIL

ALL ABBREVIATIONS INDICATED MAY NOT APPEAR ON THESE CONTRACT DRAWINGS

R/E RETURN OR EXHAUST

RA RETURN AIR

RAD RETURN AIR DAMPER

RAF RADIO FREQUENCY

RAHX ROTARY AIR HEAT EXCHANGER

RAT RETURN AIR TEMPERATURE

RCCH REMOTE CONDENSER CHILLER

RCU RECIPROCATING CHILLER UNIT

RD ROOF DRAIN

RDS ROOM DATA SHEETS

REA RELIEF AIR

RELAD RELIEF AIR DAMPER

RF RETURN FAN

RG RETURN GRILLE

RH RELATIVE HUMIDITY

RHC REHEAT COIL

RHG REHEAT GRILLE

RL REFRIGERANT HOT GAS

RLA RUN LOAD AMPERE

RO REVERSE OSMSIS

RPM REVOLUTIONS PER MINUTE

RR RETURN REGISTER

RS REFRIGERANT SUCTION

RTU ROOF TOP UNIT

RV RELIEF VALVE

SA SUPPLY AIR

SAD SUPPLY AIR DAMPER

SAT SUPPLY AIR TEMPERATURE

SC SHADING COEFFICIENT

SCFM STANDARD CUBIC FEET PER MINUTE

SCI SPINAL CODE INJURY

SD SMOKE DETECTOR

SD SUPPLY AIR DIFFUSER

SD-1 SCHEMATIC DESIGN (SUBMISSION1)

SD-2 SCHEMATIC DESIGN (SUBMISSION2)

SDPR SMOKE DAMPER

SDR SMOKE DAMPER (RETURN)

SDS SMOKE DAMPER (SUPPLY)

SEN SENSIBLE HEAT

SF SUPPLY FAN

SF SQUARE FEET

SG SUPPLY AIR GRILLE

SH STEAM HUMIDIFIER

SHC STEAM HEATING COIL

SI SQUARE INCHES

SP STATIC PRESSURE

SP GR SPECIFIC GRAVITY

SPD SUPPLY PROCESS AND DISTRIBUTION

SPRV STEAM PRESSURE REDUCING VALVE

SPS STATIC PRESSURE SENSOR

SPEC SPECIFICATION

SQ FT SQUARE FOOT (FEET)

SR SUPPLY AIR REGISTER

SS STAINLESS STEEL

SSHX STEAM TO STEAM HEAT EXCHANGER

SSR SOLID SEPARATOR

ST STEAM TRAP

STD STANDARD

SUH STEAM UNIT HEATER

SV STEAM PRESSURE REDUCING VALVE

SVS STEAM VENT SILENCER

SW SOFTENED WATER

SWHX STEAM TO WATER HEAT EXCHANGER

T&PCV TEMPERATURE AND PRESSURE CONTROL VALVE

TAB TESTING, ADJUSTING, BALANCE,

TD TEMPERATURE DIFFERENCE

TDH TOTAL DYNAMIC HEAD

TDS TOTAL DISSOLVED SOLIDS

TEMP TEMPERATURE

TG TRANSFER GRILLE

TOF TOP OF FOOTER

TP TRAP

TR TOP REGISTER

TSP TOTAL STATIC PRESSURE

TSTAT THERMOSTAT

TU TERMINAL UNIT

TWU THRU-WALL UNIT

TYP TYPICAL

UC UNDERCOUNTER

UC UNDER CUT

UC UNIT COOLER

UH UNIT HEATER

UL UNDERWRITERS LABORATORY

U.O.N UNLESS OTHERWISE NOTED

URV UPBLAST UNIT VENTILATOR

V VALVE

VAF VANE-AXIAL FAN

VAV VARIABLE AIR VOLUME

VD VOLUME DAMPER (MANUAL OPPOSED BLADE)

VERT VERTICAL

VFD VARIABLE FREQUENCY DRIVE

VHA VETERANS HEALTH ADMINISTRATION

VI VIBRATION ISOLATOR

VP VACUUM PUMP

VPS VARIABLE PRIMARY SYSTEM

VR VACUUM (STEAM CONDENSATE) RETURN

VSD VARIABLE SPEED DRIVE

VUH VERTICAL HEAT UNIT

W WATTS

W/ WITH

W/O WITH OUT

WAG WASTE ANEESIA GAS

Wb WET BULB (TEMPERATURE)

WC WATER COOLED

WCCH WATER COOLED CHILLER

WCCU WATER COOLER CONDENSING UNIT

WCHP WATER COOLED HEAT PUMP

WCPU WATER COOLED PACKAGE UNIT

WEF WALL EXHAUST FAN

WF WATER FILTER

WFCV WATER FLOW CONTROL VALVE

WMF WATER FLOWMETER

WFMD WATER FLOW MEASURING DEVICE

WG WATER GAGE

WPD WATER SIDE PRESSURE DROP

WTR WATER

WWM WELDED WIRE MESH

YR YEAR

I/O INPUT/OUTPUT

IAQ INDOOR AIR QUALITY

IBT INVERTED BUCKET TRAP

ICF IN-LINE CENTRIFUGAL FAN

ICU INTENSIVE CARE UNIT

ID INSIDE DIAMETER

I.E. INVERT ELEVATION

IFB INTEGRAL FACE AND BYPASS

IN INCHES

IN HG INCHES OF MERCURY

IN WC INCH WATER COLUMN

IN WG INCH WATER GAUGE

IN-LB INCH POUND

IPLV INTEGRATED PART LOAD VALUE

IRH INTRARED HEATER

IS INSECT SCREEN

IU INDUCTION UNIT

I.V. INLET VANES

J INTESTINALLY LEFT BANK

KG KILOGRAM

KG/HR KILOGRAM PER HOUR

kPa KILOPASCAL

KW KILOWATTS

KWH KILOWATT HOUR

L LITER

L/h LITER PER HOUR (OR LITER/HOUR) L/m LITER PER MINUTE (OR LITER/MINUTE)

L/S LITER PER SECOND (OR LITER/SECOND)

LAT LEAVING AIR TEMPERATURE

LBS POUNDS

LBS/HR POUNDS PER HOUR

LF LINEAR FOOT (FEET)

LGT LEAVING GLYCOL TEMPERATURE

LH LATENT HEAT

LLHX LIQUID TO LIQUID HEAT EXCHANGER

LPC LOW PRESSURE STEAM CONDENSATE RETURN

LPG LIQUEFIED PETROLEUM GAS

LPR LOW PRESSURE RETURN (STEAM CONDENSATE)

LPRC LOW PRESSURE STEAM RETURN (CLEAN)

LPS LOW PRESSURE STEAM

LPSC LOW PRESSURE STEAM (CLEAN)

LSD LINEAR SLOT DIFFUSER

LTCP LOCAL TEMPERATURE CONTROL PANEL

LVG LEAVING

LVR LOUVER

LWT LEAVING WATER TEMPERATURE

M METER, SI UNIT

M/S METER PER SECOND (OR METER/SECOND)

MA MIXED AIR

MAT MIXED AIR TEMPERATURE

MAU MAKE-UP AIR UNIT

MAV MANUAL AIR VENT

MAX. MAXIMUM

MB MIXING BOX

MBH 1,000 BTUH

MC MECHANICAL CONTRACTOR

MCA MINIMUM BRANCH CIRCUIT AMPACITY

MER MECHANICAL EQUIPMENT ROOM

MFR MANUFACTURER

MH MANHOLE

MHP MOTOR HORSEPOWER

MIN. MINIMUM

MM MILLIMETER

MOD MOTOR OPERATED DAMPER

MOV MOTOR OPERATED VALVE

MPC MEDIUM PRESSURE STEAM CONDENSATE RETURN

MPR MEDIUM PRESSURE RETURN (STEAM CONDENSATE)

MPS MEDIUM PRESSURE STEAM

MRI MAGNETIC RESONANCE IMAGING

MTD MEAN TEMPERATURE DIFFERENCE

MVD MANUAL VOLUME DAMPER

MZ MULTI-ZONE

NA NOT APPLICABLE

NC NOISE CRITERIA

NC NORMALLY CLOSED

NIC NOT IN CONTRACT

NG NATURAL GAS

NGFM NATURAL GAS FLOWMETER

Nm NEWTON METER

NO NORMALLY OPEN

NOAA NATIONAL OCEANIC & ATMOSPHERIC ADMINISTRATION

NOM. NOMINAL

NPLV NON-STANDARD PART LOAD VALUE

NPSH NET POSITIVE SUCTION HEAD

NPSHA NET POSITIVE SUCTION HEAD AVAILABLE

NPSHR NET POSITIVE SUCTION HEAD REQUIRED

NTS NOT TO SCALE

OA OUTSIDE AIR

OAD OUTDOOR AIR DAMPER

OAG OUTSIDE AIR GRILLE

OAI OUTSIDE AIR INTAKE

OD OUTSIDE DIAMETER

OFM OIL FLOWMETER

OR OPERATING ROOM

OA OUTSIDE AIR

OAD OUTDOOR AIR DAMPER

OAG OUTSIDE AIR GRILLE

OAI OUTSIDE AIR INTAKE

OD OUTSIDE DIAMETER

OFM OIL FLOWMETER

OR OPERATING ROOM

P PUMP

Pa PASCAL

PC PUMPED CONDENSATE

PCF POUNDS PER CUBIC FOOT (FEET)

PD PRESSURE DROP

PEF PROPELLER (TYPE) EXHAUST FAN

PF PRE-FILTER

PG PRESSURE GAGE

PGW PROPYENE GLYCOL-WATER (SOLUTION)

PHC PREHEAT COIL

PPM PARTS PER MILLION

PRS PRESSURE REGULATING (VALVE) STATION

PRV PRESSURE REGULATING VALVE

PSI POUND PER SQUARE INCH

PSIA POUND PER SQUARE INCH - ABSOLUTE

PSIG POUND PER SQUARE INCH - GAGE

PSE POUNDS PER SQUARE INCH

PSS PRIMARY SECONDARY SYSTEM

PSV PRESSURE SAFETY VALVE

P/T PRESSURE/TEMERATURE TAP

PTAC PACKAGED TERMINAL AIR CONDITIONER

EA EXHAUST AIR

EAT ENTERING AIR TEMPERATURE

EC ELECTRICAL CONTRACTOR

EC EVAPORATIVE COOLER

ECC ENGINEER CONTROL CENTER

ECU EVAPORATIVE CONDENSER UNIT

EDH ELECTRIC DUCT HEATER

EER ENERGY EFFICIENCY RATIO

EF EXHAUST FAN

EG EXHAUST GRILLE

EGS EMERGENCY GAS SHUTOFF

EGT ENTERING GLYCOL TEMPERATURE

EH EXHAUST HOOD

EJ EXPANSION JOINT

EMD END OF MAIN DRIP (STEAM)

ENT ENTERING

EQUIP EQUIPMENT

ER EXHAUST REGISTER

ER EXISTING RELOCATED

ERC ELECTRIC REHEAT COIL

ERP ELECTRIC RADIANT PANEL

ESP EXTERNAL STATIC PRESSURE

ET EXPANSION TANK

ETO ETHYLENE OXIDE

ETR EXISTING TO REMAIN

EUH ELECTRIC UNIT HEATER

EWC EVAPORATIVE WATER COOLER

EWH ELECTRIC WATER HEATER

EWT ENTERING WATER TEMPERATURE

EX EXISTING

F FAHRENHEIT

F&T FLOAT AND THERMOSTATIC

F/SDPR COMBINATION FIRE SMOKE DAMPER

FA FREE AREA

FBO FURNISHED BY OTHERS

FC FLEXIBLE CONNECTION

FCU FAN COIL UNIT (4 PIPE)

FCUC FAN COIL UNIT COOLING ONLY

FCUH FAN COIL UNIT HEATING ONLY

FCW FORWARD CURVED WHEEL (FAN)

FD FLOOR DRAIN

FD FIRE DAMPER

FF FINAL FILTER

FHX FLUE GAS/FEEDWATER HEAT EXCHANGER

FLEX FLEXIBLE

FLR FLOOR

FM FLOW METER

FOB FLAT ON BOTTOM

FOP FUEL OIL PUMP

FOT FUEL OIL TANK

FOT FLAT ON TOP

FOHX FUEL OIL HEAT EXCHANGER

FPM FEET PER MINUTE

FPTU FAN POWERED TERMINAL UNIT

FR FLOOR REGISTER

FRP FIBER REINFORCED POLYESTER

FS FLOW SWITCH

FSTST FREEZESTAT

FT FEET

FT WC FEET OF WATER COLUMN

FT-LB FOOT-POUND

FTR FIN TUBE RADIATION

FV FACE VELOCITY

GA GAUGE

GAL GALLON

GC GENERAL CONTRACTOR

GH GRAVITY HOOD

GPD GALLONS PER DAY

GPH GALLONS PER HOUR

GPM GALLONS PER MINUTE

GPR GAS PRESSURE REGULATOR

GS GALVANIZED STEEL

H HUMIDIFIER

HAC HOUSEKEEPING AID CLOSET

HB HOSE BIBB

HC HEATING COIL

HD HOOD

HGT HEIGHT

HGT HEIGHT

HOA HAND/OFF/AUTOMATIC

HORZ HORIZONTAL

HP HEAT PUMP

HP HORSEPOWER

HPC HIGH PRESSURE STEAM CONDENSATE RETURN

HPDT HIGH PRESSURE DRIP TRAP

HPR HIGH PRESSURE RETURN (STEAM CONDENSATE)

HPS HIGH PRESSURE SUPPLY (STEAM)

HRC HEAT RECOVERY COIL

HRD HEAT RECOVERY DEVICE

HRP HYDRONIC RADIANT (CEILING) PANEL

HRW HEAT RECOVERY WHEEL

HSTAT HUMIDISTAT

HTM HUMIDIFIER TERMINAL

HUM HUMIDIFIER UNIT MOUNTED

HVU HEATING AND VENTILATING UNIT

HW HOT WATER

HWC HOT WATER COIL

HWHC HOT WATER HEATING COIL

HWP HEATING HOT WATER PUMP

HWR HEATING HOT WATER RETURN

HWS HEATING HOT WATER SUPPLY

HWUH HOT WATER UNIT HEATER

HVAC HEATING, VENTILATION, AND AIR CONDITIONING

HVD HOISTWAY VENT DAMPER

HX HEAT EXCHANGER

HZ HERTZ

M

GENERAL

DUCTWORK AND ACCESSORIES

PIPING

PIPE FITTINGS

VALVE SYMBOLS

CONTROLS

MECHANICAL LEGEND

VAV BOX WITH HOT WATER COIL

AIR FLOW STATIONAFS

VOLUME DAMPER W/ REMOTE

DAMPER OPERATORR

REGISTER/GRILLE/DIFFUSER (MARK/CFM)

PRESSURE SWITCH

FLOW SWITCH

UNION

ECCENTRIC PIPE REDUCER/INCREASER

CONCENTRIC PIPE REDUCER/INCREASER

TEE DOWN

"NEW CONSTRUCTION AT

THIS POINT" SYMBOL

"DEMOLITION TO THIS POINT" SYMBOL

ACCESS DOOR, VERTICAL OR HORIZONTAL

SMOKE DETECTOR

STEAM

MEDIUM PRESSURE CONDENSATE

MEDIUM PRESSURE STEAM

HIGH PRESSURE STEAM

HIGH PRESSURE CONDENSATE

SOFT WATER

REFRIGERANT SUCTION

PIPE CAP

TEE UP

TEE AND ELBOW DOWN

TEE AND ELBOW UP

PIPE TURNING DOWN

PIPE TURNING UP

REFRIGERANT LIQUID

FUEL OIL TANK VENT

FUEL OIL RETURN

FUEL OIL SUCTION

NATURAL GAS

SUPPLY DUCT SECTION

(POSITIVE PRESSURE)

EXHAUST DUCT SECTION

(NEGATIVE PRESSURE)

RETURN DUCT SECTION

(NEGATIVE PRESSURE)

SUPPLY DIFFUSER 3-WAY

SUPPLY DIFFUSER 1-WAY

SUPPLY DIFFUSER 2-WAY CORNER

SUPPLY DIFFUSER 2-WAY

FLEXIBLE DUCT

RADIANT CEILING PANEL

EXHAUST GRILLE

RETURN GRILLE

MOTOR OPERATED DAMPER

ROUND DUCT SIZE (INCHES)

3/4" DOOR UNDERCUT

DOOR GRILLE

VOLUME DAMPER

ITEM TO BE PROVIDED

EXISTING

EXISTING TO BE REMOVED

CONDENSER WATER SUPPLY

CHILLED WATER RETURN

CHILLED WATER SUPPLY

PUMPED CONDENSATE

LIQUEFIED PETROLEUM GAS (PROPANE)

LOW PRESSURE CONDENSATE

HEATING WATER SUPPLY

HEATING WATER RETURN

LOW PRESSURE STEAM

SUPPLY GRILLE OR REGISTER

HORIZONTAL FIRE DAMPER

HORIZONTAL FIRE AND SMOKE DAMPER

HORIZONTAL SMOKE DAMPER

VERTICAL FIRE AND SMOKE DAMPER

VERTICAL FIRE DAMPER

VERTICAL SMOKE DAMPER

OUTSIDE AIR DUCT

(NEGATIVE PRESSURE)

NITROGEN DIOXIDE SENSOR

CARBON MONOXIDE SENSOR

PS

FS

75E

SD

AD

HPS

HPC

G

STM

SW

MPC

MPS

RS

RL

FOV

FOR

FOS

R

T

T

DN

UC

DG

HWR

HWS

CWS

CWR

CS

PC

LPG

LPC

LPS

F

F

F/SD

F/SD

SD

SD

CO

NO2

ALL SYMBOLS INDICATED MAY NOT APPEAR ON THESE CONTRACT DRAWINGS

EXISTING REGISTER/GRILLE/DIFFUSER

(CFM SHOWN)

75-

SUPPLY DIFFUSER 4-WAY

22x14

12ø

DUCT SIZE (INCHES), FIRST FIGURE IS

SIDE SHOWN

24x12ø OVAL DUCT SIZE (INCHES), FIRST

FIGURE IS SIDE SHOWN

CHANGE OF ELEVATION-RISE

(UP)-DROP (DN)

ELECTRIC THERMOSTAT

(MOUNT 48" AFF U.O.N)

CONDENSATE DRAIN

CONDENSER WATER RETURN

COMPRESSED AIR

BOILER BLOW DOWN

CR

CD

A

BBD

DOMESTIC COLD WATER

PNEUMATIC THERMOSTAT

(MOUNT 48" AFF U.O.N)

STATIC PRESSURE SENSORSP

DP

L H

DIFFERENTIAL PRESSURE TRANSDUCER

PIPE FIXED ANCHOR POINT

PIPE GUIDE LOCATION

GATE VALVE WITH GLOBE-VALVED BYPASS

PLUG VALVE

CONTROL VALVE (CV) - FLOAT-OPERATED

PRESSURE REDUCING VALVE (PRV)

WATER LEVEL CONTROLLER

FLOW METER

LC

M

BALL VALVE

GATE VALVE WITH 3/4" HOSE ADAPTER

CHECK VALVE

ANGLE GLOBE VALVE

BUTTERFLY VALVE

MODULATING CONTROL VALVE

TWO POSITION CONTROL VALVE

THREE-WAY MODULATING CONTROL VALVE

AUTOMATIC BALANCING CONTROL VALVE

PRESSURE SAFETY VALVE

GATE VALVE - THREADED/FLANGED

GLOBE VALVE - THREADED/FLANGED

PRESSURE REGULATING VALVE

THREE-WAY TWO POSITION CONTROL VALVE

WYE STRAINER (WITH BALL VALVE & HOSE

CONNECTION)

FLEXIBLE CONNECTION

WATER BALANCE DEVICE

MODULATING CONTROL BUTTERFLY VALVE

CIRCUIT SETTER VALVE

WYE STRAINER WITH VALVED DRAIN AND

QUICK-COUPLE HOSE CONNECTOR

LIFE SAFETY CODE: NFPA 101 LIFE SAFETY CODE: 2015

ENERGY CODE: ASHRAE/IESNA 90.1-2010 ENERGY STANDARD FOR

BUILDINGS EXCEPT LOW-RISE RESIDENTIAL BUILDINGS

INTERNATIONAL ENERGY CONSERVATION CODE: 2009

FM INSURED: N/A

BUILDING CODE: INTERNATIONAL BUILDING CODE: 2015

INTERNATIONAL EXISTING BUILDING CODE: 2015

MECHANICAL CODE: INTERNATIONAL MECHANICAL CODE: 2015

PLUMBING CODE: INTERNATIONAL PLUMBING CODE: 2015

ELECTRICAL CODE: NFPA 70 NATIONAL ELECTRICAL CODE: 2014

PROPOSED USE: INSTITUTIONAL I-2

OWNER: MARTINSBURG VA MEDICAL CENTER

OWNER CONTACT: SAMUEL GUDEX

VE PROJ NO.: 11764-6

APPLICABLE CODES

MEDICAL GAS & VACUUM SYSTEMS: NFPA 99 STANDARD FOR HEALTH CARE FACILITIES:

MPE DESIGN SUMMARY

PROJECT INFORMATION

PROJECT NAME: CHILLED WATER LINE REPLACEMENT BLDG 500

ADDRESS: 510 BUTLER AVE., MARTINSBURG WV, 25405

PROJECT TEAM

PROJECT MANAGER: PHIL GENTRY

PROJECT TEAM:

HVAC ENGINEER BRENT KUHN

PLUMBING ENGINEER

ELECTRICAL ENGINEER SCOTT BENNETT

REVIT/CAD PROJECT LEAD JEFF HALBEISEN

PIPE CHANGEOVER NOTES

1. WORK IS OCCURRING IN AN ACTIVE HOSPITAL. CONTRACTOR SHALL COORDINATE ALL WORK, INCLUDING NEW PIPE INSTALLATION, CLEANING, FILLING, AND WATER TREATMENT, TO MINIMIZE

CHILLER PLANT SHUTDOWNS.

2. CONTRACTOR SHALL PROVIDE 1-1/2" VALVED HOSE CONNECTIONS AND ISOLATION VALVES LOCATED

AS NEEDED TO PERFORM THE NECESSARY PROCEDURES AND COMPLETE THE DESIGN INDICATED.

3. WHEN SHUTDOWNS ARE UNAVOIDABLE, WORK SHALL BE SCHEDULED FOR TIMES WHEN THE AMBIENT TEMPERATURE IS BELOW 50°F FOR THE DURATION OF THE SHUTDOWN. NOTIFY THE COR TWO WEEKS

IN ADVANCE OF PLANNED SHUTDOWNS.

4. CONTRACTOR SHALL ATTAIN THE SERVICES OF THE VA HOSPITAL'S CONTRACTED CHEMICAL

TREATMENT VENDOR, WTS FIRST DEFENSE, FOR THE PURCHASE OF PIPE CLEANING AND WATER

TREATMENT CHEMICALS.

WTS FIRST DEFENSE CONTACT INFORMATION: BILL CAMPBELL, 800.817.5116 X708

5. PERFORM PIPE FLUSHING, CLEANING, AND WATER TREATMENT PROCEDURES AFTER EACH PHASE

OF PIPE INSTALLATION IN THE TUNNEL AREAS.

STATE OFP

R O

FESSIONAL ENG

IN

E E R

L.

PH

ILL

IP GENTRY

14226

W

EST V I RGI N

IA

R

REGISTE ED

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Dwg. ofRevisions: Date

CONSULTANTS:

VAMC - Martinsburg, WV

ARCHITECT/ENGINEERS:

Scale:

AS NOTEDSEAL: 613-16-302

CHILLED WATER LINE

REPLACEMENT BLDG 500 500

Office of

Construction and Facilities Management o n e e ig h th in c h o n e fo o t 1

B

A

C

D

E

F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

VA FORM 08-6231

BID DOCUMENTS SUBMISSION

MEP ENGINEERS

Valley Engineering 4901 Crowe Drive Mount Crawford, VA 22841 of 67

STRUCTURAL ENGINEERS

ADTEK Engineers, Inc.

150 South East Street, Suite 201 Frederick, MD 21701

BID DOCUMENTS M0.01

MECHANICAL LEGENDS,

ABBREVIATIONS, AND NOTES

04/22/2022 04/22/2022

BK JCH

POD

POD

POD

POD

POD

M

MM

M

MM

M

T

R A M P

GE-100

GE-104A

GE-105A

GE-100B

GE-100E

GE-100C

GE-104

GE-105

GE-105GE-102

GE-100A

GE-101A

GE-101

DOCK AREA

TUNNEL

EXHAUST

HALLWAY

BIO. HAZARD

TRASH

GENERATOR

EMERGENCY

MECHANICAL

ROOM

TRANSFORMER

ROOM

SWITCHGEAR

WASTE STORAGE

BIO HAZARD

CORRIDOR

STORAGE

BATTERY

STORAGE

OXYGEN

UP

UP

UP

DN.

15 16 17 18

B

C

D

E

3/4" HPS

3/4" HPC

1" HPS

8" HPS

3" PC

H P

S

3" PC

8" HPS

3" PC

8" HPS

H P

S

P C

8" HPS

4" PC

EXISTING INSULATED PIPE

ENCLOSURE. FIELD VERIFY

DIMENSIONS AND EXTENT OF

INSTALLATION.

16" CWS

16" CWR

16" CWS

16" CWR

16" CWS

STATE OFP

R O

FESSIONAL ENG

IN

E E R

L.

PH

ILL

IP GENTRY

14226

W

EST V I RGI N

IA

R

REGISTE ED

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Dwg. ofRevisions: Date

CONSULTANTS:

VAMC - Martinsburg, WV

ARCHITECT/ENGINEERS:

Scale:

AS NOTEDSEAL: 613-16-302

CHILLED WATER LINE

REPLACEMENT BLDG 500 500

Office of

Construction and Facilities Management o n e e ig h th in c h o n e fo o t 1

B

A

C

D

E

F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

VA FORM 08-6231

BID DOCUMENTS SUBMISSION

MEP ENGINEERS

Valley Engineering 4901 Crowe Drive Mount Crawford, VA 22841 of

NORTHKEY PLAN

e

STRUCTURAL ENGINEERS

ADTEK Engineers, Inc.

150 South East Street, Suite 201 Frederick, MD 21701

BID DOCUMENTS M1.01e

MECHANICAL DEMOLITION PIPING -

FIRST FLOOR PLAN-e

04/22/2022 04/22/2022

BK JCH

SCALE: 1/4" = 1'-0"

MECHANICAL DEMOLITION PIPING - FIRST FLOOR PLAN-e

GENERAL NOTES

1. REMOVE PIPE HANGERS ASSOCIATED WITH PIPING SHOWN TO BE REMOVED. HANGERS SHALL NOT

BE ABANDONED IN PLACE.

2. COORDINATE ALL MECHANICAL UTILITY AND HVAC UNIT SHUT DOWNS WITH OWNER. ANY SHUT DOWNS NECESSARY TO ACHIEVE THE OBJECTIVE OF THIS DESIGN SHALL BE COMPLETED DURING

"OFF HOURS" AND SHALL COMPLY WITH OWNER'S UTILITY SHUT DOWN POLICIES.

3. CONTRACTOR IS RESPONSIBLE FOR ALL CUTTING, PATCHING AND DEMOLITION OF ALL BUILDING SYSTEMS PER THEIR MEANS-AND-METHODS AS NECESSARY TO PROVIDE THE DESIGN INDICATED.

4. LISTED ROOMS ARE IN THE FLOOR BELOW THE INTERSTITIAL SPACE.

5. RELOCATE DOMESTIC WATER PIPING, ELECTRICAL CONDUIT, AND ANCILLARY COMPONENTS AS

REQUIRED DUE TO NEW WORK.

6. WORK IS OCCURING IN AN ACTIVE HOPITAL. ALL SYSTEMS EXISTING IN BUILDING MUST REMAIN ACTIVE UNLESS PLANS ARE MADE FOR A SHUTDOWN. ALL SHUTDOWN OCCURENCES MUST BE KEPT

TO A MINIMUM AND DURATION OF SHUTDOWNS KEPT AS SHORT AS POSSIBLE.

7. DRYWALL WORK IS PART OF PROJECT.

8. REPAIR ANY BARRIER THAT IS PENETRATED OR DAMAGED DURING THIS WORK EVEN IF EXISTING

OPENINGS HAVE NOT BEEN REPAIRED NEARBY. REPAIR WITH LIKE CONSTRUCTION OR BETTER.

9. NO NEW CONSTRUCTION CAN TOUCH EXISTING OR NEW SPRINKLER LINES.

10. INFORM CHILLED WATER PLANT OF ALL TESTING WHICH WILL INCREASE LOAD SO PLANT CAN MAKE

CHILLER ADJUSTMENTS AS NECCESSARY.

11 CONTRACTOR SHALL BE RESPONSIBLE FOR BLEADING AIR INTRODUCED IN THE NEW PIPING AND EXISTING PIPING. BLEAD AND PURGING OF AIR, WHEN THE SYSTEM IS FILLED, IS NOT LIMITED TO NEW WORK. IT IS INCLUSIVE OF ALL CHILLED WATER SUPPLY AND RETURN PIPING ON THE CAMPUS.

12 CONTRACTOR SHALL PROVIDE 1.5" VALVED DRAINS WITH HOSE CONNECTIONS LOCATED AS NEEDED

TO FILL PIPING AND PERFORM FLUSHING AND CLEANING PROCEDURES.

◇ DEMOLITION NOTES

1. REMOVE ALL ABANDONED LAUNDRY AND TRASH DUCTWORK FROM THE BASEMENT INTERSTITIAL SPACE AT COLUMN-LINE 14 TO THE GE105 HALLWAY. CAP THE REMAINING DUCT OPENING AT THE POINT OF DEMOLITION. PATCH ALL WALL PENETRATIONS. CONSTRUCTION MUST MATCH UL RATINGS

OF EXISTING WALL.

2. REMOVE INSULATED PIPE ENCLOSURE FROM THE ENCLOSURE'S BEGINNING AT COLUMN LINE 15 TO THE POINT INDICATED. PROVIDE TEMPORARY COVER DURING DEMOLITION AND CONSTRUCTION TO PROTECT ENCLOSED PIPES FROM FREEZING TEMPERATURES. SEE NEW WORK PLANS FOR DIRECTION

ON SEALING THE OPENING.

3. REMOVE 12"x12" METAL CEILING TILES AS NEEDED TO PERFORM WORK. STORE REMOVED TILES IN A SAFE LOCATION AND REPLACE EXISTING TILES AFTER NEW WORK IS COMPLETE. REPAIR OR REPLACE

ANY CEILING TILES AND CEILING TILE SUPPORT SYSTEMS THAT ARE DAMAGED DURING WORK.

M

M

PO

D

M

LPR

LP

R

LP

R

LPR

LP

R

LP

R

LPR

LP

R

LP

R

LPR

LP

R

LP

R

AIR-COOLED

CHILLER

20 13

13 13 13

13 14

20 14

20 14

20x40 RA AND 20x40 OA

DN TO AC-3 TRANSITION

DOWN IN VERTICAL TO AC-3

INLET. PROVIDE FC AT AC-3.

EXHAUST

SHAFT

M

D

M

M

M

D

M

M

M

M

S F

DD

M

M

U

U

U

SPS

SPS

SD

SD

SDSD

M

M

M

M

D

D

D

D D

H

M

M

D

M

D

M

M

M

M

M

D

D

M

D

M

M

D

D

MM

MM

M

M

D

D

M

M

M

D

M

H

D

D

500-C2B

HS

HS

HS

HS

VD

VD

8"∅

8"∅

E1

DP

DP

VAV-21

VAV-17

VAV-16

VAV-18

VAV-4 VAV-5

EF

C

C

AP

VD

M

AP

VD

VDAP

VD

AP

VD

AP

D

VD

VDVD

AP AP

AP AP

VD

R

12X12

AP

8X4

12X6

VD

VD

APVD

VD

AP

VD

AP

VD

20X10

VDAP

18X10

VD

AP

AD

AD

POD

AP

POD

POD

POD

POD

POD

AP

VD

VD

VD

VD

VD

VD

VDVD

VD

VD

VD

VDVD

VD

M

M

M

M

S F

S F

D

M

M

M

MM

M

MM

M

M M

M

D

M

M

D

M

T

T

T

T

F.E.C.

75" H. WALL

R A M P

FD

FD

D.F.

GD-100J

GD-100K

GC-101A

GC-101B

GC-100

GC-101

GC-112

GC-104C

GC-104A

GC-103A

GC-100A

GC-112A

GC-100B

GC-C6

GA-127F

GC-102K

GB-100R

GE-100

GE-104A

GE-105A

GA-C4

GB-100N

GA-127C

GE-100B

GE-100E

GE-100C

GE-104

GE-100D

GE-105

GE-105

GD-121B

GE-102

GD-C7

GE-100A

GA-137H

GA-137

GA-C14

GA-118C

GA-C7AGA-118B

GA-C7

GA-118A

GA-137G

GA-C15

GA-139

GA-141GA-140

GA-138A

GA-127D

G A

-1

GA-127

GD-121

GD-121A

GD-C8

GD-121C

GC-102I

GA-C6

G-S5

GC-102L

GA-112 GA-114

GA-117GA-115

GA-119

GB-100B

GA-119B

732 SQ. FT.

GA-106

290 SQ. FT.

GA-106A

GA-108

309 SQ. FT.

GA-C5

GA-113A

GA-110

GA-111

GA-109

GA-105

GB-100D

GA-107

GA-120

GB-C2

S-4

GE-101A

GE-101

GB-100A

GA-127A

GA-C3

GA-127E

GA-C8

GA-127B

G A

-C

GA-129

GA-136

GA-130

GA-139B

GA-139A

GD-123A

S-9

GD-C1

GA-126

GD-123

GD-127

GD-120GD-126

GA-120D

GD-125

GD-C4

GA-120E

GD-C9

GA-C9

GD-124

GD-122

GA-122

GD-100F

GB-C9

GD-100

GA-C2

GD-100E

G-S7

GD-118

GA-104

GD-117

GD-100D

GD-C5

S-6

GD-100H

GC-C1

GB-118

GB-108

T -1

GB-109

GB-111

GB-110

GB-112

GB-113A

GB-113GB-113BGB-115B

GB-120F

42 SQ. FT.

GB-120H

GD-111

G B

-1

B

GB-100F

GB-123

S-8

7173 SQ. FT.

GB-100

S-1

GB-C1

GB-C3

GD-101

GB-100C

GD-102

GB-100E

GB-100S

GD-102A

GB-100G

GB-121

GB-100HGB-100JGB-100K

GA-120K

GA-100

GB-C4

S-5

GA-C1

GA-113

GA-128

GA-138

GA-C11

GB-107

GA-120H

GA-120F

GA-C10

GA-120C

GA-121

GA-103

GA-102

GA-101

GB-103A

S-7

GB-C10

GC-106

GA-120A

GD-C2

GA-123

GA-124

GB-C8

GD-102B

GA-125

GD-128

GA-120G

GA-120J

GB-122A

GB-122

GA-120B

GB-100M

796 SQ. FT.

GC-C4

GB-100P

G B

-C

GB-102

GB-119

GD-104

G B

-C

GD-105

T -1

GD-108

GB-C6

G-S3

GD-109

GD-110

GB-104

GB-106

GB-103

GD-113

GB-105 GB-101

GB-105A

GB-114

GB-100L

GB-115

GB-100T

GB-115A

GB-116

G B

-1

DGB-117

GB-120C

T -1

GB-120G

GD-103

GD-103A

G B

-1

J

GB-108A

GC-102A

GD-112

GC-102F

GC-102E

GC-102D

GD-111A

GC-105

GD-114A

GC-105

GD-115

GB-120K

GC-105C

GD-116

GC-105D

GC

GA-137C

GC-105B

GC-105A

GA-137F

GC-C5

G-S4

GC-107B

GC-C3

GC-107A

GC-107

GC-109A

GC-109B

GC-C2

GC-107C

GC-109

GD-C3

GC-110A

GD-100A

GD-100B

GC-102B

GA-C12

GA-137D

GA-137E

GA-137A

GA-137B

GA-118

GA-133

GA-132A

GA-132B

GA-134

GD-111B

GD-114

GD-119

GA-132

GB-120A

GC-102C

GB-120I

GB-120E

STORAGE

CLEAN

ROOM

BREAKOUT

H.A.C.

MANUAL CART WASH

(CLEAN AREA)

PACK & PREP STERILIZATION ROOM

(DIRTY AREA)

DECONTAMINATION ROOM

STORAGE

STERILE OR

TOILET

MALE

TOILET

FEMALE

STORAGE

AUTOCLAVE

STORAGE

STORAGE

CORRIDOR

SHOP

OFFICE

OFFICE

MEZZANINE

COMPACTOR

DOCK AREA

TUNNEL

EXHAUST

HALLWAY

CORRIDOR

OFFICE

OFFICE

BIO. HAZARD

TRASH

CORRIDOR

GENERATOR

EMERGENCY

CORRIDOR

MECHANICAL

ROOM

TRANSFORMER

TELE. ROOM

ROOM

SWITCHGEAR

CORRIDOR

WASTE STORAGE

BIO HAZARD

SHOP / ELEC.

EMS STORAGE

CORRIDOR

OFFICE

CORRIDORTOILET

CORRIDOR

MECH. ROOM

SHOP / ELEC.

CORRIDOR

SERVICE

MECHANICAL

MED. GASFLAM. STOR.

SHOP

LOUNGE

S

TO

R A

G E

ENGINEER SHOP

BIO. MED.

MECHANICAL ROOM

ELEC. ROOM

CORRIDOR

MECHANICAL ROOM

OFFICE

CORRIDOR

STAIR # 5

TRAINING ROOM

VOLUNTEER

OFFICE OFFICE

OFFICEH.A.C.

OFFICE

H.A.C.

OFFICE

MAIL ROOM

OFFICE

OFFICE

CORRIDOR

OFFICE

OFFICE

OFFICE

MALE TOILET

ELEV. MACH. RM.

FEMALE TOILET

FEMALE TOILET

PHARMACY

CORRIDOR

ELEV.

STORAGE

BATTERY

STORAGE

OXYGEN

MALE TOILET

BIO MED SHOP

CORRIDOR

BIO. MED.

CORRIDOR

BIO. MED.

C O

R R

ID

O

R

OFFICE

ROOM

TELE. EQUIP.

OFFICE

TELE. ROOM

ELEC. ROOM

ROOM

CONFERENCE

ELEV.

CORRIDOR

MACHINE RM.

ROOM

CONFERENCE

KITCHENETTE

ELEC. ROOM

TOILET

FEMALE

OFFICE

TOILET

MALE

CORRIDOR

OFFICE

CORRIDOR

CORRIDOR

H.A.C.

LOADING DOCK

MECHANICAL ROOM

ROOM

MECHANICAL

CORRIDOR

WAREHOUSE

CORRIDOR

OFFICE

STAIR # 7

OFFICE

PANEL ROOM

FIRE ALARM

OFFICE

MALE TOILET

CORRIDOR

ELEV.

STORAGE

CORRIDOR

TOILET

FEMALE

UTILITY ROOM

MECH. ROOM

TOILET

FEMALE

SOILED TERM.

TOILET

MALE

OFFICE

OFFICEOFFICE

TOILET

MALE

DECONTAMINATION

H.A.C.

VAULT

M E

C H

. R O

O M

MECH.

EQUIP. ROOM

CONDENSING

FUTURE ELEV.

KITCHEN

ELEV.

CORRIDOR

CORRIDOR

OFFICE

SUPPLIES

SANITARY

MECHANICAL SERVICE

ELECTRICAL

REFRIGERATOR

ELEC. ROOM

OFFICE

TRAINING ROOM

OFFICEOFFICEOFFICE

PHARMACY

MECH RM

CORRIDOR

ELEV.

LOBBY

SERVICE ELEVATOR

HOSPITAL PATIENT &

OFFICE

OFFICE

CARPENTERS

CORRIDOR

REFRIGERATOR

OFFICE

OFFICE

CORRIDOR

OFFICE

PHARMACY ROOM

MECHANICAL ROOM

MECHANICAL ROOM

TELEPHONE RM.

FREEZER

ELEV.

CORRIDOR

GENERATOR ROOM

O.R. EMERGENCY

HSKP

CORRIDOR

FEMALE TOILET

MALE TOILET

CORRIDOR

TELE. ROOM

H.A.C.

UPS

MALE TOILET

FEMALE TLT.

OFFICE

OFFICE

MED STORAGE

OFFICE

CORRIDOR

OFFICE

C O

R R

ID

O

R

KITCHEN STORAGE

TOILET

MALE

OFFICE

C O

R R

ID

O

R

OFFICE

OFFICE

CORRIDOR

STAIR # 3

STORAGE

ELECTRICAL

STORAGE

H.A.C.

CLEAN FACILITY

REFRIG

CLOSET

REFRIG FREEZER

FREEZER

H.A.C.

FOOD STORAGE

LOUNGE

OFFICE

TOILET

FEMALE

LOUNGE

H .A

.C

MECHANICAL RM.

STORAGE

NON-STERILE

STERILE &

(DIRTY AREA)

STERILIZATION RM.

STORAGE

ROOM

IRM COMPUTER

C A

R T

W A

S H

M A

N U

A L

MECH. RM.

OFFICE

TOILET

OFFICE

OFFICE

OFFICE

VESTIBULE

SERVICES

MECHANICAL

COPY

SERVICES

MECHANICAL

M. LCKR RM

WORK AREA

TELE. ROOM

OFFICE

ROOM

ELECTRICAL

AREAWAY

OUTSIDE

STORAGE

TELE. ROOM

ROOM

ELECTRICAL

OFFICE

CORRIDOR

STAIR # 4

& SHOWER

MALE TOILET

CORRIDOR

LAVATORY

MALE

LOUNGE

& SHOWER

FEMALE TOILET

FEMALE TOILET

CORRIDOR

ROOM

MALE LOCKER

ROOM

FEMALE LOCKER

CORRIDOR

STORAGE

TELEPHONE ROOM

OFFICE

OFFICE

CORRIDOR

OFFICE/TRAINING

OFFICE

ELECTRIC SHOP

STORAGE

STORAGE

CLOTHING STORAGE

CLOTHING STORAGE

CHANGE

DIRTY UNIFORMS

EVIDENCE

W. LCKR RM

HOLDING RM.

OFFICE

(CLEAN AREA)

STERILIZATION RM.

OFFICE

MECH. RM.

STORAGE

NON-STERILE

STERILE &

P A

N D

E M

IC

PROSTHETICS

ROOM

STATIONBREAK AREA

AREA

DISCREPENCY

PACKAGING

FORKLIFT CHARGEINCOMING

PHARMACY

NX AREA

DUMBWAITER-13

UP

UP

UP

UP

DN.

UP

UP

UP

DN.

UP

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

16 17 18

A

B

C

D

E

F

G

H

J

K

SHEET M2.01t

SHEET M2.01e

SHEET M2.01a SHEET M2.01b SHEET M2.01c SHEET M2.01d

8.4

STATE OFP

R O

FESSIONAL ENG

IN

E E R

L.

PH

ILL

IP GENTRY

14226

W

EST V I RGI N

IA

R

REGISTE ED

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Dwg. ofRevisions: Date

CONSULTANTS:

VAMC - Martinsburg, WV

ARCHITECT/ENGINEERS:

Scale:

AS NOTEDSEAL: 613-16-302

CHILLED WATER LINE

REPLACEMENT BLDG 500 500

Office of

Construction and Facilities Management o n e e ig h th in c h o n e fo o t 1

B

A

C

D

E

F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

VA FORM 08-6231

BID DOCUMENTS SUBMISSION

MEP ENGINEERS

Valley Engineering 4901 Crowe Drive Mount Crawford, VA 22841 of

NORTHKEY PLAN

a b c d et

STRUCTURAL ENGINEERS

ADTEK Engineers, Inc.

150 South East Street, Suite 201 Frederick, MD 21701

BID DOCUMENTS M2.01

MECHANICAL PIPING - BASEMENT

INTERSTITIAL KEY PLAN

04/22/2022 04/22/2022

BK JCH

SCALE: 1/16" = 1'-0"

MECHANICAL PIPING - BASEMENT INTERSTITIAL KEY PLAN

GENERAL NOTES

1. COLUMN LINES ARE MARKED ON BEAMS AT EACH COLUMN, i.e., F7.

2. SEE LABELED SHEETS FOR ENLARGED PLANS.

3. HATCHED AREAS ARE SEMI-CLEAR WALKWAYS THAT SHOULD BE KEPT CLEAR,

AS MUCH AS POSSIBLE. NEW OBSTRUCTIONS NOT ABLE TO BE EASILY

CROSSED, SHALL BE PROVIDED WITH A GALV. BRIDGE WITH STEPS; GRATE

MATERIAL. ALL NEW WORK IN THESE AREAS ARE TO APPROVED BY OWNER’S

REP. BEFORE PROCEEDING.

4. ROOMS NOTED ARE THE LEVEL BELOW THE INTERSTITIAL SPACE.

5. WORK IS OCCURING IN AN ACTIVE HOPITAL. ALL SYSTEMS EXISTING IN

BUILDING MUST REMAIN ACTIVE UNLESS PLANS ARE MADE FOR A SHUTDOWN.

ALL SHUTDOWN OCCURENCES MUST BE KEPT TO A MINIMUM AND DURATION

OF SHUTDOWNS KEPT AS SHORT AS POSSIBLE.

6. DRYWALL WORK IS PART OF PROJECT.

7. REPAIR ANY BARRIER THAT IS PENETRATED OR DAMAGED DURING THIS WORK

EVEN IF EXISTING OPENINGS HAVE NOT BEEN REPAIRED NEARBY. REPAIR

WITH LIKE CONSTRUCTION OR BETTER.

8. NO NEW CONSTRUCTION CAN TOUCH EXISTING OR NEW SPRINKLER LINES.

9. INFORM CHILLED WATER PLANT OF ALL TESTING WHICH WILL INCREASE LOAD

SO PLANT CAN MAKE CHILLER ADJUSTMENTS AS NECCESSARY.

M

D

D

D

VD

VDVD

AP AP

M

M

M

M

M

D

T

GC-102K

GB-100R

GC-102I

GC-102L

GB-120F

GB-123

GB-107

GB-C10

GB-122GB-100P

GB-120C

GC-102A

GC-105

GB-120K

GC-105C

GC-105D

GC-102B

GC-102C

OFFICE

OFFICE

OFFICE

TRAINING ROOM

VOLUNTEER

DECONTAMINATION

EQUIP. ROOM

CONDENSING

REFRIGERATOR

OFFICEOFFICE

STORAGE

NON-STERILE

STERILE &

OFFICE

SERVICES

MECHANICAL

WORK AREA

TELE. ROOM

ROOM

ELECTRICAL

OFFICE

OFFICE

STORAGE

NON-STERILE

1 2 3 4 5

C

D

E

F

16" CWR UP

16" CWS UP

8" HPS

4" PC

8" CWR

8" CWS

12" CWR

12" CWS

12" CWR

12" CWS

8" CWR

8" CWS

TO 1ST FLOOR

SHEET M2.02a

SEE SHEET M2.02a

C W

S

C W

R

A F

F

8" CWR UP

8" CWS UP

M4.013

16" CWR

16" CWS

STATE OFP

R O

FESSIONAL ENG

IN

E E R

L.

PH

ILL

IP GENTRY

14226

W

EST V I RGI N

IA

R

REGISTE ED

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Dwg. ofRevisions: Date

CONSULTANTS:

VAMC - Martinsburg, WV

ARCHITECT/ENGINEERS:

Scale:

AS NOTEDSEAL: 613-16-302

CHILLED WATER LINE

REPLACEMENT BLDG 500 500

Office of

Construction and Facilities Management o n e e ig h th in c h o n e fo o t 1

B

A

C

D

E

F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

VA FORM 08-6231

BID DOCUMENTS SUBMISSION

MEP ENGINEERS

Valley Engineering 4901 Crowe Drive Mount Crawford, VA 22841 of

NORTHKEY PLAN

a

STRUCTURAL ENGINEERS

ADTEK Engineers, Inc.

150 South East Street, Suite 201 Frederick, MD 21701

BID DOCUMENTS M2.01a

MECHANICAL PIPING - BASEMENT

INTERSTITIAL PLAN-a

04/22/2022 04/22/2022

BK JCH

SCALE: 1/4" = 1'-0"

MECHANICAL PIPING - BASEMENT INTERSTITIAL PLAN-a

� CONSTRUCTION NOTES

1. RELOCATE CONDUIT, REFRIGERANT PIPING, AND ANCILLARY COMPONENTS AS NEEDED TO

ACCOMPLISH THE DESIGN INDICATED. COORDINATE FINAL LOCATION OF RELOCATED DEVICES WITH

THE COR.

2. ROUTE NEW PIPING THROUGH TUNNEL WALL INTO UPPER LEVEL CONDENSER BUILDING AND UP

THROUGH ROOF.

3. COORDINATE VALVE LOCATIONS WITH EXISTING LIGHT FIXTURES AND CONDUITS.

4. ROUTE NEW 8" CHILLED WATER PIPES TO EXISTING 8" PIPES AND TEMPORARILY TERMINATE WITH A BUTTERFLY VALVE AND BLIND FLANGE FOR FUTURE INTERFACE WITH EXISTING PIPE. ONCE THE NEW CHILLED WATER MAINS ARE ACTIVE, SCHEDULE SHUTDOWN OF IMPACTED EQUIPMENT WITH OWNER

AND MAKE FINAL CONNECTIONS AS SHOWN.

5. TIE NEW CHILLED WATER PIPES INTO EXISTING. PROVIDE BUTTERFLY VALVES FOR ISOLATION.

GENERAL NOTES

1. REMOVE PIPE HANGERS ASSOCIATED WITH PIPING SHOWN TO BE REMOVED. HANGERS SHALL NOT

BE ABANDONED IN PLACE.

2. COORDINATE ALL MECHANICAL UTILITY AND HVAC UNIT SHUT DOWNS WITH OWNER. ANY SHUT DOWNS NECESSARY TO ACHIEVE THE OBJECTIVE OF THIS DESIGN SHALL BE COMPLETED DURING

"OFF HOURS" AND SHALL COMPLY WITH OWNER'S UTILITY SHUT DOWN POLICIES.

3. CONTRACTOR IS RESPONSIBLE FOR ALL CUTTING, PATCHING AND DEMOLITION OF ALL BUILDING SYSTEMS PER THEIR MEANS-AND-METHODS AS NECESSARY TO PROVIDE THE DESIGN INDICATED.

4. LISTED ROOMS ARE IN THE FLOOR BELOW THE INTERSTITIAL SPACE.

5. RELOCATE DOMESTIC WATER PIPING, ELECTRICAL CONDUIT, AND ANCILLARY COMPONENTS AS

REQUIRED DUE TO NEW WORK.

6. WORK IS OCCURING IN AN ACTIVE HOPITAL. ALL SYSTEMS EXISTING IN BUILDING MUST REMAIN ACTIVE UNLESS PLANS ARE MADE FOR A SHUTDOWN. ALL SHUTDOWN OCCURENCES MUST BE KEPT

TO A MINIMUM AND DURATION OF SHUTDOWNS KEPT AS SHORT AS POSSIBLE.

7. DRYWALL WORK IS PART OF PROJECT.

8. REPAIR ANY BARRIER THAT IS PENETRATED OR DAMAGED DURING THIS WORK EVEN IF EXISTING

OPENINGS HAVE NOT BEEN REPAIRED NEARBY. REPAIR WITH LIKE CONSTRUCTION OR BETTER.

9. NO NEW CONSTRUCTION CAN TOUCH EXISTING OR NEW SPRINKLER LINES.

10. INFORM CHILLED WATER PLANT OF ALL TESTING WHICH WILL INCREASE LOAD SO PLANT CAN MAKE

CHILLER ADJUSTMENTS AS NECCESSARY.

11 CONTRACTOR SHALL BE RESPONSIBLE FOR BLEADING AIR INTRODUCED IN THE NEW PIPING AND EXISTING PIPING. BLEAD AND PURGING OF AIR, WHEN THE SYSTEM IS FILLED, IS NOT LIMITED TO NEW WORK. IT IS INCLUSIVE OF ALL CHILLED WATER SUPPLY AND RETURN PIPING ON THE CAMPUS.

12 CONTRACTOR SHALL PROVIDE 1.5" VALVED DRAINS WITH HOSE CONNECTIONS LOCATED AS NEEDED

TO FILL PIPING AND PERFORM FLUSHING AND CLEANING PROCEDURES.

75" H. WALL

FD

FD

S-4

GA-104

S-6

GB-118

GB-108

T -1

GB-109

GB-111

GB-110

GB-112

GB-120F

42 SQ. FT.

GB-120H

G B

-1

B S-8

GB-C1

GB-C3

GA-100S-5

GA-101

S-7

GB-C8

GB-119

T -1

GB-120G

G B

-1

J

GB-108A

GB-120A

GB-120I

ELEV.

CORRIDOR

PANEL ROOM

FIRE ALARM

ELEV.

TOILET

FEMALE

UTILITY ROOM

MECH. ROOM

TOILET

FEMALE

SOILED TERM.

TOILET

MALE

DECONTAMINATION

H.A.C.

M E

C H

. R O

O M

FUTURE ELEV.

CORRIDOR

CORRIDOR

MECH RMELEV.

TELEPHONE RM.

ELEV.

CORRIDOR

TOILET

MALE

(DIRTY AREA)

STERILIZATION RM.

C A

R T

W A

S H

M A

N U

A L

MECH. RM.

(CLEAN AREA)

STERILIZATION RM.

MECH. RM.

5 6 7 8

C

D

E

F

12" CWR

12" CWS

8.4

C W

S

12" CWR

12" CWS

STATE OFP

R O

FESSIONAL ENG

IN

E E R

L.

PH

ILL

IP GENTRY

14226

W

EST V I RGI N

IA

R

REGISTE ED

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Dwg. ofRevisions: Date

CONSULTANTS:

VAMC - Martinsburg, WV

ARCHITECT/ENGINEERS:

Scale:

AS NOTEDSEAL: 613-16-302

CHILLED WATER LINE

REPLACEMENT BLDG 500 500

Office of

Construction and Facilities Management o n e e ig h th in c h o n e fo o t 1

B

A

C

D

E

F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

VA FORM 08-6231

BID DOCUMENTS SUBMISSION

MEP ENGINEERS

Valley Engineering 4901 Crowe Drive Mount Crawford, VA 22841 of

NORTHKEY PLAN

b

STRUCTURAL ENGINEERS

ADTEK Engineers, Inc.

150 South East Street, Suite 201 Frederick, MD 21701

BID DOCUMENTS M2.01b

MECHANICAL PIPING - BASEMENT

INTERSTITIAL PLAN-b

04/22/2022 04/22/2022

BK JCH

SCALE: 1/4" = 1'-0"

MECHANICAL PIPING - BASEMENT INTERSTITIAL PLAN-b

� CONSTRUCTION NOTES

1. PROVIDE NEW 12" BUTTERFLY VALVES FOR FUTURE DEMOLITION OF DOWNSTREAM PIPING.

GENERAL NOTES

1. REMOVE PIPE HANGERS ASSOCIATED WITH PIPING SHOWN TO BE REMOVED. HANGERS SHALL NOT

BE ABANDONED IN PLACE.

2. COORDINATE ALL MECHANICAL UTILITY AND HVAC UNIT SHUT DOWNS WITH OWNER. ANY SHUT DOWNS NECESSARY TO ACHIEVE THE OBJECTIVE OF THIS DESIGN SHALL BE COMPLETED DURING

"OFF HOURS" AND SHALL COMPLY WITH OWNER'S UTILITY SHUT DOWN POLICIES.

3. CONTRACTOR IS RESPONSIBLE FOR ALL CUTTING, PATCHING AND DEMOLITION OF ALL BUILDING SYSTEMS PER THEIR MEANS-AND-METHODS AS NECESSARY TO PROVIDE THE DESIGN INDICATED.

4. LISTED ROOMS ARE IN THE FLOOR BELOW THE INTERSTITIAL SPACE.

5. RELOCATE DOMESTIC WATER PIPING, ELECTRICAL CONDUIT, AND ANCILLARY COMPONENTS AS

REQUIRED DUE TO NEW WORK.

6. WORK IS OCCURING IN AN ACTIVE HOPITAL. ALL SYSTEMS EXISTING IN BUILDING MUST REMAIN ACTIVE UNLESS PLANS ARE MADE FOR A SHUTDOWN. ALL SHUTDOWN OCCURENCES MUST BE KEPT

TO A MINIMUM AND DURATION OF SHUTDOWNS KEPT AS SHORT AS POSSIBLE.

7. DRYWALL WORK IS PART OF PROJECT.

8. REPAIR ANY BARRIER THAT IS PENETRATED OR DAMAGED DURING THIS WORK EVEN IF EXISTING

OPENINGS HAVE NOT BEEN REPAIRED NEARBY. REPAIR WITH LIKE CONSTRUCTION OR BETTER.

9. NO NEW CONSTRUCTION CAN TOUCH EXISTING OR NEW SPRINKLER LINES.

10. INFORM CHILLED WATER PLANT OF ALL TESTING WHICH WILL INCREASE LOAD SO PLANT CAN MAKE

CHILLER ADJUSTMENTS AS NECCESSARY.

11 CONTRACTOR SHALL BE RESPONSIBLE FOR BLEADING AIR INTRODUCED IN THE NEW PIPING AND EXISTING PIPING. BLEAD AND PURGING OF AIR, WHEN THE SYSTEM IS FILLED, IS NOT LIMITED TO NEW WORK. IT IS INCLUSIVE OF ALL CHILLED WATER SUPPLY AND RETURN PIPING ON THE CAMPUS.

D

E1

D.F.

GA-C4

GA-119B

GA-105

GA-120

GB-100A

GA-C8

GA-129

GA-130

GA-120D

GA-C9

G-S7

S-8

GA-120K

GA-100

GA-128

GA-C11

GA-C10

GA-120C

GA-120A

GA-123

GA-124

GA-125

GA-120B

GA-133

GA-132B

GA-132

CORRIDOR

ELEV. MACH. RM.

PHARMACY

MALE TOILET

CORRIDOR

CORRIDOR

OFFICE

OFFICE

OFFICE

OFFICE

CORRIDOR

STAIR # 7

FUTURE ELEV.

PHARMACY

MECH RM

OFFICE

CORRIDOR

CORRIDOR

OFFICE

HSKP

FEMALE TOILET

MALE TOILET

H.A.C.

MED STORAGE

CLOTHING STORAGE

CHANGE

OFFICE

DUMBWAITER-13

UP

9 10 11 12

C

D

E

F

12" CWR

8.4

C W

S

C W

R

C W

S

STATE OFP

R O

FESSIONAL ENG

IN

E E R

L.

PH

ILL

IP GENTRY

14226

W

EST V I RGI N

IA

R

REGISTE ED

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Dwg. ofRevisions: Date

CONSULTANTS:

VAMC - Martinsburg, WV

ARCHITECT/ENGINEERS:

Scale:

AS NOTEDSEAL: 613-16-302

CHILLED WATER LINE

REPLACEMENT BLDG 500 500

Office of

Construction and Facilities Management o n e e ig h th in c h o n e fo o t 1

B

A

C

D

E

F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

VA FORM 08-6231

BID DOCUMENTS SUBMISSION

MEP ENGINEERS

Valley Engineering 4901 Crowe Drive Mount Crawford, VA 22841 of

NORTHKEY PLAN

c

STRUCTURAL ENGINEERS

ADTEK Engineers, Inc.

150 South East Street, Suite 201 Frederick, MD 21701

BID DOCUMENTS M2.01c

MECHANICAL PIPING - BASEMENT

INTERSTITIAL PLAN-c

04/22/2022 04/22/2022

BK JCH

SCALE: 1/4" = 1'-0"

MECHANICAL PIPING - BASEMENT INTERSTITIAL PLAN-c

GENERAL NOTES

1. REMOVE PIPE HANGERS ASSOCIATED WITH PIPING SHOWN TO BE REMOVED. HANGERS SHALL NOT

BE ABANDONED IN PLACE.

2. COORDINATE ALL MECHANICAL UTILITY AND HVAC UNIT SHUT DOWNS WITH OWNER. ANY SHUT DOWNS NECESSARY TO ACHIEVE THE OBJECTIVE OF THIS DESIGN SHALL BE COMPLETED DURING

"OFF HOURS" AND SHALL COMPLY WITH OWNER'S UTILITY SHUT DOWN POLICIES.

3. CONTRACTOR IS RESPONSIBLE FOR ALL CUTTING, PATCHING AND DEMOLITION OF ALL BUILDING SYSTEMS PER THEIR MEANS-AND-METHODS AS NECESSARY TO PROVIDE THE DESIGN INDICATED.

4. LISTED ROOMS ARE IN THE FLOOR BELOW THE INTERSTITIAL SPACE.

5. RELOCATE DOMESTIC WATER PIPING, ELECTRICAL CONDUIT, AND ANCILLARY COMPONENTS AS

REQUIRED DUE TO NEW WORK.

6. WORK IS OCCURING IN AN ACTIVE HOPITAL. ALL SYSTEMS EXISTING IN BUILDING MUST REMAIN ACTIVE UNLESS PLANS ARE MADE FOR A SHUTDOWN. ALL SHUTDOWN OCCURENCES MUST BE KEPT

TO A MINIMUM AND DURATION OF SHUTDOWNS KEPT AS SHORT AS POSSIBLE.

7. DRYWALL WORK IS PART OF PROJECT.

8. REPAIR ANY BARRIER THAT IS PENETRATED OR DAMAGED DURING THIS WORK EVEN IF EXISTING

OPENINGS HAVE NOT BEEN REPAIRED NEARBY. REPAIR WITH LIKE CONSTRUCTION OR BETTER.

9. NO NEW CONSTRUCTION CAN TOUCH EXISTING OR NEW SPRINKLER LINES.

10. INFORM CHILLED WATER PLANT OF ALL TESTING WHICH WILL INCREASE LOAD SO PLANT CAN MAKE

CHILLER ADJUSTMENTS AS NECCESSARY.

11 CONTRACTOR SHALL BE RESPONSIBLE FOR BLEADING AIR INTRODUCED IN THE NEW PIPING AND EXISTING PIPING. BLEAD AND PURGING OF AIR, WHEN THE SYSTEM IS FILLED, IS NOT LIMITED TO NEW WORK. IT IS INCLUSIVE OF ALL CHILLED WATER SUPPLY AND RETURN PIPING ON THE CAMPUS.

12 CONTRACTOR SHALL PROVIDE 1.5" VALVED DRAINS WITH HOSE CONNECTIONS LOCATED AS NEEDED

TO FILL PIPING AND PERFORM FLUSHING AND CLEANING PROCEDURES.

INFORMATION ONLY - NO WORK ON THIS SHEET

8" CWS & CWR

DN TO CENTRAL

MECH ROOM

PO

D

M

LP

R

H

D

M

D

M

M

M

D

VD

AP

AD

AD

POD

APM

M M

M

D.F.

GA-127F

GA-C4

GA-118A

GA-139

GA-141GA-140

GA-138A

GE-101A

GE-101

GA-127E

GA-127B

G A

-C

GA-129

GA-136

GA-130

GA-139B

GA-139A

GA-128

GA-138

GA-133

GA-132A

GA-132B

GA-134

GA-132

SHOP

CORRIDOR

MECH. ROOM

CORRIDOR

SERVICE

MECHANICAL

MED. GASFLAM. STOR.

SHOP

ENGINEER SHOP

STORAGE

BATTERY

STORAGE

OXYGEN

BIO. MED.

BIO. MED.

C O

R R

ID

O

R

OFFICE

ROOM

TELE. EQUIP.

OFFICE

TELE. ROOM

ELEC. ROOM

OFFICE

CARPENTERS

CLOTHING STORAGE

CLOTHING STORAGE

CHANGE

DIRTY UNIFORMS

OFFICE

12 13 14 15

C

D

E

F

16" CWR

16" CWS

EXISTING CHILLER WATER

PIPING TO REMAIN

6" CWR

6" CWS

5" HPS

1 1/2" PC

M2.02d

16" CWS UP

16" CWR UP

M2.02d

16" CWR

16" CWS

1 2 3

HEAT TRACE ANTICIPATED

FROM THIS POINT

STATE OFP

R O

FESSIONAL ENG

IN

E E R

L.

PH

ILL

IP GENTRY

14226

W

EST V I RGI N

IA

R

REGISTE ED

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Dwg. ofRevisions: Date

CONSULTANTS:

VAMC - Martinsburg, WV

ARCHITECT/ENGINEERS:

Scale:

AS NOTEDSEAL: 613-16-302

CHILLED WATER LINE

REPLACEMENT BLDG 500 500

Office of

Construction and Facilities Management o n e e ig h th in c h o n e fo o t 1

B

A

C

D

E

F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

VA FORM 08-6231

BID DOCUMENTS SUBMISSION

MEP ENGINEERS

Valley Engineering 4901 Crowe Drive Mount Crawford, VA 22841 of

NORTHKEY PLAN

d

STRUCTURAL ENGINEERS

ADTEK Engineers, Inc.

150 South East Street, Suite 201 Frederick, MD 21701

BID DOCUMENTS M2.01d

MECHANICAL PIPING - BASEMENT

INTERSTITIAL PLAN-d

04/22/2022 04/22/2022

BK JCH

SCALE: 1/4" = 1'-0"

MECHANICAL PIPING - BASEMENT INTERSTITIAL PLAN-d

� CONSTRUCTION NOTES

1. ROUTE NEW 16" CHILLED WATER PIPES UP THROUGH 1A-187 STORAGE ROOM ABOVE. SEE M2.02d FOR

CONTINUATION.

2. RELOCATE CONDUIT, ABANDONED DUCTWORK, AND ANCILLARY COMPONENTS AS NEEDED TO

ACCOMPLISH THE DESIGN INDICATED.

3. PROVIDE FIRE STOPPING ON PIPE PENETRATION THROUGH FLOOR. COORDINATE SPECIFIC LOCATION AND SPACING OF PIPE RISERS WITH THE UL LISTED PENETRATIONS USED, AND REQUIRED PIPE

SUPPORTS.

4. REMOVE AND REPLACE INSULATION ON CHW PIPING LEFT EXPOSED DUE TO THE REMOVAL OF THE

INSULATED ENCLOSURE.

5. PROVIDE HEAT TRACE ON ALL CHW PIPING EXPOSED TO AMBIENT TEMPERATURES OR INSTALLED IN UNTEMPERED SPACES, SUCH AS ABOVE THE LOADING DOCK CEILING. 11.8 W/FT HEAT OUTPUT, 277V.

6.

GENERAL NOTES

1. REMOVE PIPE HANGERS ASSOCIATED WITH PIPING SHOWN TO BE REMOVED. HANGERS SHALL NOT

BE ABANDONED IN PLACE.

2. COORDINATE ALL MECHANICAL UTILITY AND HVAC UNIT SHUT DOWNS WITH OWNER. ANY SHUT DOWNS NECESSARY TO ACHIEVE THE OBJECTIVE OF THIS DESIGN SHALL BE COMPLETED DURING

"OFF HOURS" AND SHALL COMPLY WITH OWNER'S UTILITY SHUT DOWN POLICIES.

3. CONTRACTOR IS RESPONSIBLE FOR ALL CUTTING, PATCHING AND DEMOLITION OF ALL BUILDING SYSTEMS PER THEIR MEANS-AND-METHODS AS NECESSARY TO PROVIDE THE DESIGN INDICATED.

4. LISTED ROOMS ARE IN THE FLOOR BELOW THE INTERSTITIAL SPACE.

5. RELOCATE DOMESTIC WATER PIPING, ELECTRICAL CONDUIT, AND ANCILLARY COMPONENTS AS

REQUIRED DUE TO NEW WORK.

6. WORK IS OCCURING IN AN ACTIVE HOPITAL. ALL SYSTEMS EXISTING IN BUILDING MUST REMAIN ACTIVE UNLESS PLANS ARE MADE FOR A SHUTDOWN. ALL SHUTDOWN OCCURENCES MUST BE KEPT

TO A MINIMUM AND DURATION OF SHUTDOWNS KEPT AS SHORT AS POSSIBLE.

7. DRYWALL WORK IS PART OF PROJECT.

8. REPAIR ANY BARRIER THAT IS PENETRATED OR DAMAGED DURING THIS WORK EVEN IF EXISTING

OPENINGS HAVE NOT BEEN REPAIRED NEARBY. REPAIR WITH LIKE CONSTRUCTION OR BETTER.

9. NO NEW CONSTRUCTION CAN TOUCH EXISTING OR NEW SPRINKLER LINES.

10. INFORM CHILLED WATER PLANT OF ALL TESTING WHICH WILL INCREASE LOAD SO PLANT CAN MAKE

CHILLER ADJUSTMENTS AS NECCESSARY.

11 CONTRACTOR SHALL BE RESPONSIBLE FOR BLEADING AIR INTRODUCED IN THE NEW PIPING AND EXISTING PIPING. BLEAD AND PURGING OF AIR, WHEN THE SYSTEM IS FILLED, IS NOT LIMITED TO NEW WORK. IT IS INCLUSIVE OF ALL CHILLED WATER SUPPLY AND RETURN PIPING ON THE CAMPUS.

POD

POD

POD

POD

M

MM

M

MM

M

T

R A M P

GE-100

GE-104A

GE-105A

GE-100B

GE-100E

GE-100C

GE-104

GE-105

GE-105GE-102

GE-100A

GE-101A

GE-101

DOCK AREA

TUNNEL

EXHAUST

HALLWAY

BIO. HAZARD

TRASH

GENERATOR

EMERGENCY

MECHANICAL

ROOM

TRANSFORMER

ROOM

SWITCHGEAR

WASTE STORAGE

BIO HAZARD

CORRIDOR

STORAGE

BATTERY

STORAGE

OXYGEN

UP

UP

UP

DN.

15 16 17 18

B

C

D

E

16" CWR

16" CWS

16" CWR

16" CWS

16" CWR

16" CWS

16" CWR

16" CWS

16" CWR

16" CWS

18" CWR

18" CWS

55 55 6

1" HPS

8 9

EX STEAM TRAP

METAL MESH OVER

END FRAME

BLANKET INSULATION

OVER END FRAME

EX METAL MESH OVER

END FRAME

EX BLANKET INSULATION

OVER END FRAME

NEW PIPE INSULATION

EX 1" HPS PIPE

EX 16" CW PIPES

PIPE ENCLOSURE REPAIR DETAIL

16 GA GALVANIZED

STEEL PIPE SLEEVE

METAL MESH

BLOCKING

BLANKET INSULATION

WITH VAPOR BARRIER

EX PIPE INSUL

SEAL WITH VAPOR BARRIER

TAPE AROUND PERIMETER

TAPE JOINT AND SEAL WITH VAPOR

BARRIER MASTIC AND SEALANT

EX CLOSURE FRAME

SEAL SLEEVE ENDS

PIPE INSULATION

EX BLANKET INSULATION

EX METAL MESH

SEAL JOINT BETWEEN NEW

AND EXISTING INSULATION

PER SPECIFICATIONS

BACKER ROD

STATE OFP

R O

FESSIONAL ENG

IN

E E R

L.

PH

ILL

IP GENTRY

14226

W

EST V I RGI N

IA

R

REGISTE ED

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Dwg. ofRevisions: Date

CONSULTANTS:

VAMC - Martinsburg, WV

ARCHITECT/ENGINEERS:

Scale:

AS NOTEDSEAL: 613-16-302

CHILLED WATER LINE

REPLACEMENT BLDG 500 500

Office of

Construction and Facilities Management o n e e ig h th in c h o n e fo o t 1

B

A

C

D

E

F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

VA FORM 08-6231

BID DOCUMENTS SUBMISSION

MEP ENGINEERS

Valley Engineering 4901 Crowe Drive Mount Crawford, VA 22841 of

NORTHKEY PLAN

e

STRUCTURAL ENGINEERS

ADTEK Engineers, Inc.

150 South East Street, Suite 201 Frederick, MD 21701

BID DOCUMENTS M2.01e

MECHANICAL PIPING - BASEMENT

INTERSTAITIAL PLAN-e

04/22/2022 04/22/2022

BK JCH

MECHANICAL PIPING - BASEMENT INTERSTAITIAL PLAN-e

SCALE: 1/4" = 1'-0"

� CONSTRUCTION NOTES

1. NEW BUTTERFLY VALVES WITH BLIND FLANGE FOR FUTURE 18" CHILLED WATER MAIN REPLACEMENT.

2. PATH FOR FUTURE 18" CHW MAINS. MAINS NOT INSTALLED UNDER THIS CONTRACT.

3. NEW BUTTERFLY VALVES FOR ISOLATION SERVICE DURING FUTURE 18" CHILLED WATER MAIN

REPLACEMENT.

4. INSTALL NEW SECTION OF PIPE INTO EXISTING CHILLED WATER MAINS FOR BRANCH PIPE

INSTALLATION.

5. INSTALL ELBOWS TO ADJUST PIPE ELEVATION AS NEEDED TO INSTALL BRANCH CONNECTIONS AND

VALVES.

6. COVER OPENING OF PIPE ENCLOSURE WITH METAL MESH AND INSULATION. MESH AND INSULATING MATERIALS TO MATCH EXISTING. PROVIDE VAPOR BARRIER, AND SEAL VAPOR BARRIER BETWEEN

NEW AND EXISTING INSULATION. SEE DETAILS ON THIS SHEET.

7. PROVIDE NEW, CONTINUOUS INSULATION ON 1" HPS FROM THE CHILLED WATER PIPE ENCLOSURE TO

EXISTING STEAM TRAP.

8. REMOVE AND REPLACE INSULATION ON CHW PIPING LEFT EXPOSED DUE TO THE REMOVAL OF THE

INSULATED ENCLOSURE.

9. PROVIDE HEAT TRACE ON ALL CHW PIPING EXPOSED TO AMBIENT TEMPERATURES OR INSTALLED IN UNTEMPERED SPACES, SUCH AS ABOVE THE LOADING DOCK CEILING. 11.8 W/FT HEAT OUTPUT, 277V.

10. EXTEND HEAT TRACE 3" INTO PIPE ENCLOSURE.

GENERAL NOTES

1. REMOVE PIPE HANGERS ASSOCIATED WITH PIPING SHOWN TO BE REMOVED. HANGERS SHALL NOT

BE ABANDONED IN PLACE.

2. COORDINATE ALL MECHANICAL UTILITY AND HVAC UNIT SHUT DOWNS WITH OWNER. ANY SHUT DOWNS NECESSARY TO ACHIEVE THE OBJECTIVE OF THIS DESIGN SHALL BE COMPLETED DURING

"OFF HOURS" AND SHALL COMPLY WITH OWNER'S UTILITY SHUT DOWN POLICIES.

3. CONTRACTOR IS RESPONSIBLE FOR ALL CUTTING, PATCHING AND DEMOLITION OF ALL BUILDING SYSTEMS PER THEIR MEANS-AND-METHODS AS NECESSARY TO PROVIDE THE DESIGN INDICATED.

4. LISTED ROOMS ARE IN THE FLOOR BELOW THE INTERSTITIAL SPACE.

5. RELOCATE DOMESTIC WATER PIPING, ELECTRICAL CONDUIT, AND ANCILLARY COMPONENTS AS

REQUIRED DUE TO NEW WORK.

6. WORK IS OCCURING IN AN ACTIVE HOPITAL. ALL SYSTEMS EXISTING IN BUILDING MUST REMAIN ACTIVE UNLESS PLANS ARE MADE FOR A SHUTDOWN. ALL SHUTDOWN OCCURENCES MUST BE KEPT

TO A MINIMUM AND DURATION OF SHUTDOWNS KEPT AS SHORT AS POSSIBLE.

7. DRYWALL WORK IS PART OF PROJECT.

8. REPAIR ANY BARRIER THAT IS PENETRATED OR DAMAGED DURING THIS WORK EVEN IF EXISTING

OPENINGS HAVE NOT BEEN REPAIRED NEARBY. REPAIR WITH LIKE CONSTRUCTION OR BETTER.

9. NO NEW CONSTRUCTION CAN TOUCH EXISTING OR NEW…