VAMC CW Replacement - Bid Set - COVER SHEET.pdf
PDF 2 MB Posted
- Solicitation number
- 36C24522B0009
About this file
This set of construction documents outlines specifications for replacing chilled water piping at a Veterans Affairs medical center. The project will replace piping from Building 500's loading dock to Buildings 502 and 503 to address critical utility needs. The solicitation number is 36C24522B0009 and is issued by the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 5. The bid documents include plans, details, notes, and specifications for mechanical, structural, and electrical work related to demolishing existing piping and installing new chilled water lines in basement and tunnel areas as well as the first and second floors.
View the file
Other files
Show all 21
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
GENERAL
MECHANICAL
TUNNEL AREA
WORK AREA
BUILDING 500
WORK AREA
STRUCTURAL
ELECTRICAL
STATE OFP
R O
FESSIONAL ENG
IN
E E R
L.
PH
ILL
IP GENTRY
14226
W
EST V I RG I N
IA
R
REGISTE ED
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Dwg. ofRevisions: Date
CONSULTANTS:
VAMC - Martinsburg, WV
ARCHITECT/ENGINEERS:
Scale:
AS NOTEDSEAL: 613-16-302
CHILLED WATER LINE
REPLACEMENT BLDG 500 500
Office of
Construction and Facilities Management o n e e ig h th in c h o n e fo o t 1
B
A
C
D
E
F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
VA FORM 08-6231
BID DOCUMENTS SUBMISSION
MEP ENGINEERS
Valley Engineering 4901 Crowe Drive Mount Crawford, VA 22841 of 67
STRUCTURAL ENGINEERS
ADTEK Engineers, Inc.
150 South East Street, Suite 201 Frederick, MD 21701
BID DOCUMENTS G0.01
COVER SHEET
04/22/2022 04/22/2022
BK JCH
CHILLED WATER LINE REPLACEMENT
TO BUILDING 500
FOR
VETERANS ADMINISTRATION
VAMC
MARTINSBURG, WV
STATE MAP VICINITY MAP CAMPUS MAP
SHEET
NUMBER SHEET TITLE 3
S D
T E
A M
S E
T
/0
/2
D E
S
IG
N D
E V
E L
O P
M E
N T
/0
/2
C D
S U
B M
IS
S
IO
N
/1
/2
B
ID
D O
C U
M E
N T
S V
A R
E V
IE
W
/2
/2
B
ID
D O
C U
M E
N T
S S
U B
M
IS
S
IO
N
/2
/2
G0.01 COVER SHEET X X X X X
M0.01 MECHANICAL LEGENDS, ABBREVIATIONS, AND NOTES X X X X X
M1.01e MECHANICAL DEMOLITION PIPING - FIRST FLOOR PLAN-e X X X X X
M2.01 MECHANICAL PIPING - BASEMENT INTERSTITIAL KEY PLAN X X X X X
M2.01a MECHANICAL PIPING - BASEMENT INTERSTITIAL PLAN-a X X X X X
M2.01b MECHANICAL PIPING - BASEMENT INTERSTITIAL PLAN-b X X X X X
M2.01c MECHANICAL PIPING - BASEMENT INTERSTITIAL PLAN-c X X X X X
M2.01d MECHANICAL PIPING - BASEMENT INTERSTITIAL PLAN-d X X X X X
M2.01e MECHANICAL PIPING - BASEMENT INTERSTAITIAL PLAN-e X X X X X
M2.01t MECHANICAL PIPING - BASEMENT PLAN-TUNNEL X X X X X
M2.01ta MECHANICAL PIPING - BASEMENT PLAN-TUNNEL - AREA a X X
M2.01tb MECHANICAL PIPING - BASEMENT PLAN-TUNNEL - AREA b X X
M2.01tc MECHANICAL PIPING - BASEMENT PLAN-TUNNEL - AREA c X X
M2.02 MECHANICAL PIPING - FIRST FLOOR KEY PLAN X X X X X
M2.02a MECHANICAL PIPING - FIRST FLOOR PLAN-a X X X X X
M2.02d MECHANICAL PIPING PHASE-2 FIRST FLOOR PLAN-d X X X X
M2.03 MECHANICAL PIPING - FIRST FLOOR INTERSTITIAL KEY PLAN X X X X X
M2.03a MECHANICAL PIPING - FIRST FLOOR INTERSTITIAL PLAN-a X X X X X
M2.03b MECHANICAL PIPING - FIRST FLOOR INTERSTITIAL PLAN-b X X X X X
M2.03c MECHANICAL PIPING - FIRST FLOOR INTERSTITIAL PLAN-c X X X X X
M2.03d MECHANICAL PIPING - FIRST FLOOR INTERSTITIAL PLAN-d X X X X X
M2.03g MECHANICAL PIPING - FIRST FLOOR INTERSTITIAL PLAN-g X X X X X
M2.03h MECHANICAL PIPING - FIRST FLOOR INTERSTITIAL PLAN-h X X X X X
M3.01 MECHANICAL PIPING - BASEMENT INTERSTITIAL DEMOLITION KEY PLAN X X X X X
M3.01a MECHANICAL PIPING - BASEMENT INTERSTITIAL DEMOLITION PLAN-a X X X X X
M3.01b MECHANICAL PIPING - BASEMENT INTERSTITIAL DEMOLITION PLAN-b X X X X X
M3.01t MECHANICAL PIPING - TUNNEL DEMOLITION PLAN X X X X X
M4.01 PIPE RISERS X X X X X
M4.02 PIPE SECTIONS AT TUNNEL X X X X
M4.03 PIPE SECTIONS AT TUNNEL X X
M5.01 MECHANICAL DETAILS X X X X X
M5.02 SEISMIC DETAILS X X
M6.01 TUNNEL PHOTOS X X
M6.02 TUNNEL PHOTOS X X
M6.03 TUNNEL PHOTOS X X
M6.04 TUNNEL PHOTOS X X
S0.01 STRUCTURAL NOTES X X
S2.01t BASEMENT INTERSTITIAL FRAMING PLAN-TUNNEL X X
S2.01ta BASEMENT INTERSTITIAL FRAMING PLAN-TUNNEL-AREA a X X
S2.01tb BASEMENT INTERSTITIAL FRAMING PLAN-TUNNEL-AREA b X X
S2.01tc BASEMENT INTERSTITIAL FRAMING PLAN-TUNNEL-AREA c X X
S2.02 FIRST FLOOR FRAMING PLAN (OVERALL) X X
S2.02a FIRST FLOOR FRAMING PLAN-a X X
S2.02b FIRST FLOOR FRAMING PLAN-b X X
S2.02d FIRST FLOOR FRAMING PLAN-d X X
S2.02e FIRST FLOOR FRAMING PLAN-e X X
S2.03 FIRST FLOOR INTERSTITIAL FRAMING PLAN (OVERALL) X X
S2.03a FIRST FLOOR INERSTITIAL FRAMING PLAN-a X X
S2.03d FIRST FLOOR INERSTITIAL FRAMING PLAN-d X X
S2.04 SECOND FLOOR FRAMING PLAN (OVERALL) X X
S2.04a SECOND FLOOR FRAMING PLAN-a X X
S2.04b SECOND FLOOR FRAMING PLAN-b X X
S2.04c SECOND FLOOR FRAMING PLAN-c X X
S2.04d SECOND FLOOR FRAMING PLAN-d X X
S2.04g SECOND FLOOR FRAMING PLAN-g X X
S2.04h SECOND FLOOR FRAMING PLAN-h X X
S4.01 PIPE SUPPORT DETAILS X X
S4.02 PIPE SUPPORT DETAILS X X
E0.01 ELECTRICAL LEGENDS, ABBREVIATIONS, AND NOTES X X
E1.01 ELECTRICAL POWER - BASEMENT INTERSTITIAL KEY PLAN X X
E1.01a ELECTRICAL POWER - BASEMENT INTERSTITIAL PLAN-a X X
E1.01d ELECTRICAL POWER - BASEMENT INTERSTITIAL PLAN-d X X
E1.01e ELECTRICAL POWER - BASEMENT INTERSTITIAL PLAN-e X X
E1.01ta ELECTRICAL POWER - BASEMENT PLAN - TUNNEL - AREA a X X
E1.03 ELECTRICAL POWER - FIRST FLOOR INTERSTITIAL KEY PLAN X X
E1.03a ELECTRICAL POWER - FIRST FLOOR INTERSTITIAL PLAN-a X X
E1.03d ELECTRICAL POWER - FIRST FLOOR INTERSTITIAL PLAN-d X X
| Sheets |
| G0.01 - COVER SHEET |
File details come from the government source that posted it. Updated .