36C24519B0006-003.pdf
PDF 10 MB Posted
- Solicitation number
- 36C24519B0006
About this file
36C24519B0006 2019-04-29 BID DOCUMENTS SUBMISSION.pdf
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C24519B0006-0004001.pdf | ||
| 36C24519B0006-0004000.docx | DOCX document | |
| 36C24519B0006-0003000.docx | DOCX document | |
| 36C24519B0006-0002001.pdf | ||
| 36C24519B0006-0002002.pdf | ||
| 36C24519B0006-0002003.pdf | ||
| 36C24519B0006-0002000.docx | DOCX document | |
| 36C24519B0006-0002004.pdf | ||
| 36C24519B0006-0001000.docx | DOCX document | |
| 36C24519B0006-0001001.pdf | ||
| 36C24519B0006-005.pdf | ||
| 36C24519B0006-004.docx | DOCX document | |
| 36C24519B0006-002.pdf | ||
| 36C24519B0006-001.docx | DOCX document | |
| 36C24519B0006-006.docx | DOCX document | |
| 36C24519B0006-000.docx | DOCX document |
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
GENERAL
MECHANICAL
TUNNEL AREA
WORK AREA
BUILDING 501
WORK AREA
STRUCTURAL
STATE OFP
R O
FESSIONAL ENG
IN
E E R
L.
PH
ILL
IP GENTRY
14226
W
EST V I RG I N
IA
R
REGISTE ED
Department of
Veterans Affairs
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Dwg. ofRevisions: Date
CONSULTANTS:
VAMC - Martinsburg, WV
ARCHITECT/ENGINEERS:
Scale:
AS NOTEDSEAL: 613-15-301REPAIR-UPGRADE STEAM
DISTRIBUTUON
- CENTRAL CAMPUS 500
Office of
Construction and Facilities Management o n e e ig h th in c h o n e fo o t 1
B
A
C
D
E
F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
F
E
D
C
B
A
97 8654321
VA FORM 08-6231
MEP ENGINEERS
Valley Engineering 4901 Crowe Drive Mount Crawford, VA 22841
MEP ENGINEERS
Valley Engineering 4901 Crowe Drive Mount Crawford, VA 22841 of 36
BID DOCUMENTS SUBMISSION
BID DOCUENTS
SUBMISSION
97 8654321
G0.01
COVER SHEET
04/29/2019 04/29/2019
DL / NL JCH
M0.01 MECHANICAL LEGENDS, ABBREVIATIONS, AND NOTES X X X
M2.01 MECHANICAL PIPING - BASEMENT INTERSTITIAL KEY PLAN X X X
M2.01a MECHANICAL PIPING - BASEMENT INTERSTITIAL PLAN-a X X X
M2.01b MECHANICAL PIPING - BASEMENT INTERSTITIAL PLAN-b X X X
M2.01c MECHANICAL PIPING - BASEMENT INTERSTITIAL PLAN-c X X X
M2.01d MECHANICAL PIPING - BASEMENT INTERSTITIAL PLAN-d X X X
M2.01e MECHANICAL PIPING - BASEMENT INTERSTITIAL PLAN-e X X X
M2.01h MECHANICAL PIPING - BASEMENT INTERSTITIAL PLAN-h X X X
M2.01m MECHANICAL PIPING - BASEMENT INTERSTITIAL PLAN-m X X X
M2.01t MECHANICAL PIPING - BASEMENT PLAN-TUNNEL X X X
M2.02 MECHANICAL PIPING - FIRST FLOOR KEY PLAN X X X
M2.02a MECHANICAL PIPING - FIRST FLOOR PLAN-a X X X
M2.02e MECHANICAL PIPING - FIRST FLOOR PLAN-e X X X
M2.03 MECHANICAL PIPING - FIRST FLOOR INTERSTITIAL KEY PLAN X X X
M2.03a MECHANICAL PIPING - FIRST FLOOR INTERSTITIAL PLAN-a X X X
M2.03b MECHANICAL PIPING - FIRST FLOOR INTERSTITIAL PLAN-b X X X
M2.03c MECHANICAL PIPING - FIRST FLOOR INTERSTITIAL PLAN-c X X X
M2.03d MECHANICAL PIPING - FIRST FLOOR INTERSTITIAL PLAN-d X X X
M2.03e MECHANICAL PIPING - FIRST FLOOR INTERSTITIAL PLAN-e X X X
M2.03g MECHANICAL PIPING - FIRST FLOOR INTERSTITIAL PLAN-g X X X
M2.03h MECHANICAL PIPING - FIRST FLOOR INTERSTITIAL PLAN-h X X X
M3.01 MECHANICAL PIPING - BASEMENT INTERSTITIAL DEMOLITION KEY PLAN X X X
M3.01a MECHANICAL PIPING - BASEMENT INTERSTITIAL DEMOLITION PLAN-a X X X
M3.01b MECHANICAL PIPING - BASEMENT INTERSTITIAL DEMOLITION PLAN-b X X X
M3.01c MECHANICAL PIPING - BASEMENT INTERSTITIAL DEMOLITION PLAN-c X X X
M3.01d MECHANICAL PIPING - BASEMENT INTERSTITIAL DEMOLITION PLAN-d X X X
M3.01e MECHANICAL PIPING - BASEMENT INTERSTITIAL DEMOLITION PLAN-e X X X
M3.01t MECHANICAL PIPING - TUNNEL DEMOLITION PLAN X X X
M4.01 PIPE RISERS X X X
M5.01 MECHANICAL DETAILS X X X
M5.02 MECHANICAL DETAILS X X X
REPAIR-UPGRADE STEAM DISTRIBUTION -
CENTRAL CAMPUS
FOR
VETERANS ADMINISTRATION
VAMC
MARTINSBURG, WV
STATE MAP VICINITY MAP CAMPUS MAP
SHEET
NUMBER SHEET TITLE S
D T
E A
M S
E T
-0
/2
D D
/0
/2
D D
T E
A M
S E
T
/0
/2
C O
N S
T R
U C
T
IO
N D
O C
U M
E N
T S
/1
/2
B
ID
D O
C U
M E
N T
S U
B M
IS
S
IO
N
-2
-2
G0.01 COVER SHEET X X X
S101 BASEMENT PLAN - TUNNEL X
S120 FIRST FLOOR INTERSTITAL - LOWER STEEL X
S130 FIRST FLOOR INTERSTITAL - UPPER STEEL X
S200 DETAILS X
G
E
D
C
B
A. B. C. D.
4.
3.
2.
1.
A
F
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
TTTTTTT
10' - 0" 10' - 0" 10' - 0" 10' - 0" 10' - 0" 10' - 0"
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
10' - 0"
10' - 0"
10' - 0"
10' - 0"
10' - 0"
10' - 0"
10' - 0"
10' - 0"
10' - 0"
10' - 0"
10' - 0"
10' - 0"
10' - 0"
10' - 0"
10' - 0"
10' - 0"
Basement
0"
Basement Inter Floor
10'-4"
First Floor
18'-0"
/4
L4x4x3/8
L4x4x3/8
L4x4x3/8
L4x4x3/8
L4x4x3/8
C8X13.75
3/4" ⌀ EPOXY BOLTS
W/ 6" EMBEDMENT @
24" O.C.
3/16
TYP
3/16
TYP
ROLLER SUPPORT
Sheet Notes
1. Verify MEP arrangement prior to shop drawings and fabrication.
2. Verify the location of all supports and obstructions prior to fabrication.
N Indicates typical detail for support of pipe(s), refer to sheet S200
Department of
Veterans Affairs
BID DOCUMENT
SUBMISSION
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Revisions: Date
CONSULTANTS:
VAMC - Martinsburg, WV
ARCHITECT/ENGINEERS:
Scale:
AS NOTEDSEAL: 0419-210REPAIR-UPGRADE STEAM
DISTRIBUTUON
- CENTRAL CAMPUS 500
Office of Construction and Facilities Management o n e e ig h th in c h o n e fo o t 1
B
A
C
D
E
F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
VA FORM 08-6231
MEP ENGINEERS
Valley Engineering 4901 Crowe Drive Mount Crawford, VA 22841
MEP ENGINEERS
Valley Engineering 4901 Crowe Drive Mount Crawford, VA 22841
KEY PLAN
BID DOCUMENTS SUBMISSION
Engineering Solutions & Construction
Managment
Harrisonburg 540-442-8787
Charlottesville 434-202-8527www.engsoln.com
S101
BASEMENT PLAN - TUNNEL
04/26/19 Checker Author
1/16" = 1'-0"S101
1 Basement Plan - Tunnel t
1/2" = 1'-0"S101
T TUNNEL PIPE RACK SECTION - T
29 APRIL 19
Dwg. ofof 362
C O N C . W
A
LK
W A Y
C O
N C
W
A L K
W A
Y
PLAY AREA
A C
C E S S T
O
IN
T E R
S T
IT
IA
L
NORTH
LOCKED
UP
DN UP
UP
DN. UP
DN.
UP
DN.
UP
DN.
UP
DN.
1 2 3 4 5 6 7 8 8.4 9 10 11 12 13 14 15 16 17 18
K
J
H
G7
G
A. B. C. D.
4.
3.
2.
1.
F
C
LOW
C
LOW
EX. W8x10 @6'-2"
EX. EX. W8x10 @6'-2"
EX. W8x10 @6'-2"
EX. W8x10 @6'-2"
EX. W8x10 @6'-2"
EX. W8x10 @6'-2"
EX. W8x10 @6'-2"
EX. W8x10 @6'-2"
EX. W8x10 @6'-2"
EX. W8x10 @6'-2"
C
C L O
W
C L O
W Z
C L O
W Z
C L O
W
C L O
W C
L O
W
C L O
W
C
LOW
Y
Y
Y
Y H
IG
H
HIGH
H
IG
H
HIGH
Y H
IG
H
Y HIGH
Z
W X
W X
D*
D D
D
S200
S200
Sheet Notes
1. Verify MEP arrangement prior to shop drawings and fabrication.
2. Verify the location of all supports and obstructions prior to fabrication.
N Indicates typical detail for support of pipe(s), refer to sheet S200
Department of
Veterans Affairs
BID DOCUMENT
SUBMISSION
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Revisions: Date
CONSULTANTS:
VAMC - Martinsburg, WV
ARCHITECT/ENGINEERS:
Scale:
AS NOTEDSEAL: 0419-210REPAIR-UPGRADE STEAM
DISTRIBUTUON
- CENTRAL CAMPUS 500
Office of Construction and Facilities Management o n e e ig h th in c h o n e fo o t 1
B
A
C
D
E
F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
VA FORM 08-6231
MEP ENGINEERS
Valley Engineering 4901 Crowe Drive Mount Crawford, VA 22841
MEP ENGINEERS
Valley Engineering 4901 Crowe Drive Mount Crawford, VA 22841
KEY PLAN
BID DOCUMENTS SUBMISSION
Engineering Solutions & Construction
Managment
Harrisonburg 540-442-8787
Charlottesville 434-202-8527www.engsoln.com
S120 04/16/19 Checker Author
1/16" = 1'-0"S120
1 FIRST FLOOR INTERSTITIAL FRAMING
29 APRIL 19
FIRST FLOOR INTERSTITAL
- LOWER STEEL
Dwg. ofof 363
C O N C . W
A
LK
W A Y
C O
N C
W
A L K
W A
Y
B E
V E
R A
G E
S
SANDWICHES SALADS
COLD CASE;
MILK, SALAD, WATER, JUICE, SANDWICHES
C O
O
LE
R
ENTREES GRILL
SOUPS
FORKS, SPOONS
& KNIVES
FORKS, SPOONS
& KNIVES
FORKS, SPOONS
& KNIVES
FORKS, SPOONS
& KNIVES
CONDIMENTS TRASH TRASH
C O
F F
E E
C O
F F
E E
S O
D A
C O
F F
E E
C O
N D
IM
E
N T
S
W A
R M
E R
SODA
TRASH
CONDIMENTSTRASH
BEVERAGES
M E
P 's
N O
T Y
E T
U P
D A
T E
D F
O R
T H
IS
P
R O
J E
C T
ARCHITECTURAL IS UPDATED/CURRENT
MEP's NOT YET UPDATED
FOR THIS PROJECT
ARCHITECTURAL IS CURRENT
THIS ROOM (1D-110)
HAS NOT BEEN
UPDATED
142 SQ. FT.
77 SQ. FT. 95 SQ. FT.
93 SQ. FT.78 SQ. FT.
PLAY AREA
A C
C E S S T
O
IN
T E R
S T
IT
IA
L
NORTH
LOCKED
UP
DN UP
UP
DN. UP
DN.
UP
DN.
UP
DN.
UP
DN.
DN.
1 2 3 4 5 6 7 8 8.4 9 10 11 12 13 14 15 16 17 18
K
J
H
G7
G
E
D
C
B
A. B. C. D.
4.
3.
2.
1.
A
F
EX. W24X55 EX. W27X84 EX. W27X84 EX. W27X84 EX. W27X84 EX. W27X84
E X
.W X
E X
. W X
E X
.W X
EX. W24X55
E X
. W X
E X
.W X
E X
. W X
E X
.W X
E X
. W X
E X
.W X
E X
. W X
E X
. W X
E X
.W X
E X
. W X
E X
. W X
E X
.W X
EX. W24X62
E X
. W X
E X
. W X
EX. W24X62
EX. W24X62
E X
. W X
E X
. W X
E X
. W X
E X
. W X
E X
.W X
EX. W24X84
EX. W24X55
EX. W24X55
EX. W24X55
E X
. W X
EX. W24X84
EX. W24X55
EX. W24X55
EX. W24X55
E X
. W X
E X
.W X
EX. W24X76 EX. W27X94
E X
. W X
E X
. W X
EX. W24X84
EX. W21X83
E X
.W X
E X
.W X
E X
.W X
E X
. W X
EX. W24X84 EX. W24X76
E X
. W X
E X
. W X
EX. W21X44
EX. W21X57
E X
. W X
E X
. W X
E X
. W X
W X
W X
EX. W30X99
W X
E X
.W X
E X
. W X
E X
. W X
EX. W21X44
EX. W30X99
E X
.W X
E X
. W X
EX. W21X44
EX. W30X99
E X
.W X
E X
. W X
EX. W21X44
E X
.W X
E X
. W X
EX. W21X44
EX. W30X99 EX. W24X55
EX. W24X55
E X
.W X
Y
A
B
A Y
A A YA
W8X15
W8X15
W8X15
1' - 8"
W8X15
W8X15
W8X15 6' - 4 3/4"
Y
W8X15
W8X15
W8X15
3' - 9 1/2"
E X
E X
E X
E X
. W X
EX. W21X57
E X
. W X
E X
. W X
E X
. W X
X
B B
S200
S200
Sheet Notes
1. Verify MEP arrangement prior to shop drawings and fabrication.
2. Verify the location of all supports and obstructions prior to fabrication.
N Indicates typical detail for support of pipe(s), refer to sheet S200
Department of
Veterans Affairs
BID DOCUMENT
SUBMISSION
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Revisions: Date
CONSULTANTS:
VAMC - Martinsburg, WV
ARCHITECT/ENGINEERS:
Scale:
AS NOTEDSEAL: 0419-210REPAIR-UPGRADE STEAM
DISTRIBUTUON
- CENTRAL CAMPUS 500
Office of Construction and Facilities Management o n e e ig h th in c h o n e fo o t 1
B
A
C
D
E
F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
VA FORM 08-6231
MEP ENGINEERS
Valley Engineering 4901 Crowe Drive Mount Crawford, VA 22841
MEP ENGINEERS
Valley Engineering 4901 Crowe Drive Mount Crawford, VA 22841
KEY PLAN
BID DOCUMENTS SUBMISSION
Engineering Solutions & Construction
Managment
Harrisonburg 540-442-8787
Charlottesville 434-202-8527www.engsoln.com
S130 04/25/19 Checker Author
1/16" = 1'-0"S130
1 SECOND FLOOR FRAMING PLAN
29 APRIL 19
FIRST FLOOR INTERSTITAL
- UPPER STEEL
Dwg. ofof 364
1' - 5"
1' - 1 1/2" 1 3/4" 1' - 5"
EXISTING WF
BEAM CLAMP
1/2" THREADED ROD
P1001 1-5/8" x 3-1/4", 12ga. UNISTRUT, BACK TO BACK, SOLID
12" LONG PIPE SUPPORT FOR
INSULATED PIPES
PIPE ROLLER AND ROLLER
SUPPORT
EXISTING WF
V A
R
IE
S 1/4
METRAFLEX PAI-4 I-BEAM
ANCHOR
METRAFLEX PAI-8
I-BEAM ANCHOR
(4) 3/4" ⌀ BOLTS
METRAFLEX PA
ANCHOR CLAMP
(4) 3/4" ⌀ BOLTS
EXISTING WF
METRAFLEX PTFE SLIDE
GUIDE W/ AXIAL GUIDE BASE
(BOLT DOWN)
(4) 3/4" ⌀ BOLTS
EXISTING WF
METRAFLEX PAI
I-BEAM ANCHOR
1/2" GUSSET PLATE
1/4
L4x4x3/8
KICKER
EX. WF
1/2" GUSSET PLATE
L6x6x1/2 x 15" LONG
(2) 1/2" ⌀ WEDGE ANCHOR
INTO BOTTOM OF TWO
ADJACENT FLUTES
1/4
1,2*,OR 3*
* TO MISS
OBSTRUCTION
1/4
1. All structural steel work shall conform to the following governing standards:
1. AISC "Specification for the Design, Fabrication and Erection of Structural Steel for
Buildings, latest edition.
2. The American Welding Society (AWS D1.1) "Code for Welding in Building
Construction," latest edition.
2. All structural steel shall conform to the following ASTM specifications:
1. Wide flange beams, columns, and structural tees: ASTM A992
2. Hollow structural sections: ASTM A500, Grade B
3. Structural pipe sections: ASTM A53, Grade B
4. Channels, angles, and plates: ASTM A36 unless otherwise noted.
5. Bolted connections of beams/girders are to be designed as follows:
1. Standard beam to beam/girder: A325 or A490 bearing type bolts (3/4" diameter minimum with hardened washers).
6. Anchor bolts: ASTM F1554, Grade 36.
7. Structural steel noted to be stainless steel shall be ASTM A276 stainless steel
Grade 304.
8. All stainless steel bolts shall conform to ASTM F593 Alloy 304.
9. All stainless steel nuts shall conform to ASTM F594 Alloy 304.
3. Minimum weld size is 3/16" fillet unless noted otherwise.
4. Field cutting or burning of steel is prohibited except with the express written approval of the
Structural Engineer of Record.
5. Welding shall be performed by certified licensed, AWS-qualified welders. Electrodes shall be
AWS 5.1, class E70XX (use low hydrogen electrodes for A572, grade 50 steel). Welding electrodes for ASTM A276-97 stainless steel, Grade 304, shall conform to AWS A5.4 for shielded metal arc welding, electrode class E304; or AWS A5.9 for gas metal arc welding, electrode Class ER304, Ft=70 KSI.
6. Items:
1. Shop paint exterior exposed steel members, steel members not encased in concrete or spray fireproofed, and all steel members at the exterior wall with tnemec #10-99.
Field paint all exterior exposed members with tnemec 530 omnithane or approved equal.
2. Hot dip galvanizing shall conform to ASTM A123, repair scratches or abraded galvanized surface with zinc rich paint. All exterior exposed steel and steel supporting exterior shall be hot dipped galvanized.
7. Shop and erection drawings shall be submitted to the structural engineer for review and approval. No fabrication of steel shall commence without approved shop drawings.
8. Provide mechanically galvanized bolts for exterior applications.
Structural Steel
1. All structural work shall be coordinated with architectural and mechanical drawings and shall conform to the project specifications, including the 2015 IBC and 2015 IEBC, as modified by the 2015 West Virginia Uniform Statewide Building Code (USBC).
2. Dimensions and elevations of existing construction given in structural drawings are based on information contained in various original design and construction documents provided by the owner, and limited field observations and measurements. The contractor shall verify all information pertaining to existing conditions by actual measurement and observation at the site.
All discrepancies between actual conditions and those shown in the contract documents shall be reported to the Engineer of Record for evaluation before the affected construction is put in place.
3. Use structural and mechanical drawings in close coordination. Direct any dimensional discrepancy or omission to the EOR for resolution prior to commencement of construction.
4. Coordinate configuration and location of equipment supports and openings with approved mechanical or other approved shop drawings.
5. Where standards are referenced herein, it shall be assumed the edition is the current referenced standard by the governing jurisdiction
GENERAL NOTES
Engineering Solutions was requested to provide structural details of the required attachments for new pipes located at VA Medical Center, in Martinsburg WV. Following the completion of the work described, the structural modifications will be in accordance with the 2015 International Building Code, as modified by the 2015 West Virginia Building Code.
Structural Scope of Work
W8x15
6x4x3/8 SHEAR TAB W/
(2) 3/4" ⌀ BOLTS
1/4
L4x4x3/8
L4x4x3/8
ROLLER SUPPORT
3/16
TYP
3/16
TYP
/2
3' - 8"
AT ANCHOR LOCATION
"D*" PROVIDE (2) 1/2 x 6
LONG PLATES WELDED
TO C8
3/16
C8X13.75
6X4X3/8 SHEAR TAB
W/ (2) 3/4" Ø BOLTS
1/4
EX WF
W8
W8x15
EX. CONCRETE SLAB FOR
1ST FL INTERSTITIAL
EX. W8
3/16
1' - 5"
1' - 1 1/2" 1 3/4" 1' - 5"
(2) L6x6x3/8
2x2x1/4 PLATE WASHER AND
NUT TOP AND BOTTOM
1/2" THREADED ROD
P1001 1-5/8" x 3-1/4", 12ga. UNISTRUT, BACK TO BACK, SOLID
12" LONG PIPE SUPPORT FOR
INSULATED PIPES
PIPE ROLLER AND ROLLER
SUPPORT
7x2x3/4 SPACER AT
3 EQUAL SPACES
(2) 3/4" ⌀ BOLTS(2) 3/4" ⌀ BOLTS
V A
R
IE
S
THREAD ROD THROUGH
GAP IN CENTER OF ANGLES
Department of
Veterans Affairs
BID DOCUMENT
SUBMISSION
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Revisions: Date
CONSULTANTS:
VAMC - Martinsburg, WV
ARCHITECT/ENGINEERS:
Scale:
AS NOTEDSEAL: 0419-210REPAIR-UPGRADE STEAM
DISTRIBUTUON
- CENTRAL CAMPUS 500
Office of Construction and Facilities Management o n e e ig h th in c h o n e fo o t 1
B
A
C
D
E
F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
VA FORM 08-6231
MEP ENGINEERS
Valley Engineering 4901 Crowe Drive Mount Crawford, VA 22841
MEP ENGINEERS
Valley Engineering 4901 Crowe Drive Mount Crawford, VA 22841
KEY PLAN
BID DOCUMENTS SUBMISSION
Engineering Solutions & Construction
Managment
Harrisonburg 540-442-8787
Charlottesville 434-202-8527www.engsoln.com
S200
DETAILS
04/29/19 VH VK
1" = 1'-0"S200
A GUIDE ASSEMBLY A
1" = 1'-0"S200
Y ANCHOR ASSEMBLY Y
1" = 1'-0"S200
Z ANCHOR ASSEMBLY Z
1" = 1'-0"S200
C GUIDE ASSEMBLY C
1" = 1'-0"S200
1 TYPICAL KICKERS AT ANCHOR
DESIGN LOADS AND PARAMETER TABLE
GOVERNING CODE: 2015 IBC
RISK CATEGORY: IV
LOADS:
LL 40 PSF INTERSTITIAL FLOOR LOAD
LL 52 PSF - 150
PSF (VARIES)
REDUCED FLOOR LOADS
(PER ORIGINAL DOCUMENTS)
DL 28.6 LB/FT 8" STEEL PIPE, EMPTY
DL 10.8 LB/FT 4" STEEL PIPE, EMPTY
1" = 1'-0"S130 S200
2 NEW W8 TO W8
1/2" = 1'-0"S200
D SUPPORT AT EXTERIOR WALL
1" = 1'-0"S130 S200
4 NEW W8 TO EX. WF
1" = 1'-0"S120 S200
3 W8 ON EX W8 LOW BEAM
1" = 1'-0"S200
5 GUIDE ASSEMBLY B
29 APRIL 19
Dwg. ofof 36
S200
MECHANICAL ABBREVIATIONS
AMP AMPERE
A/C AIR CONDITIONING
A/E ARCHITECT / ENGINEER
AAHX AIR TO AIR HEAT EXCHANGER
AAV AUTOMATIC AIR VENT
AB AIR BLENDER
ABV ABOVE
ACC AIR COOLED CONDENSER
ACCH AIR COOLED CHILLER
ACCU AIR COOLED CONDENSING UNIT
ACD AUTOMATIC CONTROL DAMPER, MODULATING
ACD-TP AUTOMATIC CONTROL DAMPER, TWO POSITION
ACU AIR CONDITIONING UNIT
AD ACCESS DOOR
AF AIR FILTER
AFC ABOVE FINISHED CEILING
AFCV AIR FLOW CONTROL VALVE
AFF ABOVE FINISHED FLOOR (18" UON)
AFG ABOVE FINISHED GRADE (18" UON)
AFMS AIR FLOW MEASURING STATION
AFW AIR FOIL WHEEL (FAN)
AHU AIR-HANDLING UNIT
ALT ALTERNATE
AMB AMBIENT
AMP AMPERE
ANSI AMERICAN NATIONAL STANDARDS INSTITUTE
AP ACCESS PANEL
APD AIR PRESSURE DROP
APPROX APPROXIMATE
AQST AQUASTAT
ARI AIR CONDITIONING AND REFRIGERATION INSTITUTE
AS AIR SEPARATOR
ASHRAE AMERICAN SOCIETY OF HEATING REFRIGERATION AIR
CONDITIONING ENGINEERS
ASME AMERICAN SOCIETY OF MECHANICAL ENGINEERS
AVG AVERAGE
AW AIR WASHER
AXF AXIAL FLOW
B BOILER
BD BUTTERFLY DAMPER
BDD BACKDRAFT DAMPER
BDR BASE BOARD RADIATOR
BEL BELOW
BFT BOILER PLANT FIRE TUBE
BG BOTTOM GRILL
BHP BRAKE HORSEPOWER
BHW HOT WATER HEATING BOILER
BHX BOILER BLOWDOWN HEAT EXCHANGER
BIW BACKWARD INCLINED WHEEL (FAN)
BLDG BUILDING
BMT BONE MARROW TRANSPLANT
BR BOTTOM REGISTER
BSC BIOLOGICAL SAFETY CABINETS
BT BLOWOFF TANK
BTC BLOWOFF TANK CONTROL VALVE
BTUH BRITISH THERMAL UNIT PER HOUR
BWT BOILER PLANT WATER TUBE
C CENTIGRADE (CELSIUS)
CAV CONSTANT AIR VOLUME
CC COOLING COIL
CCD COOLING COIL CONDENSATE DRAIN
CD CEILING DIFFUSER
CD-1 CONSTRUCTION DOCUMENTS (SUBMISSION1)
CD-2 CONSTRUCTION DOCUMENTS (SUBMISSION2)
CENT CENTRIFICAL
CFH CUBIC FEET PER HOUR
CFM CUBIC FEET PER MINUTE
CFT CUBIC FEET
CFP CHEMICAL FEED PUMP
CG CIELING GRILL
CH CHILLER
CHP CHILLER WATER PUMP
CHW CHILLER WATER
CHR CHILLER WATER RETURN
CHS CHILLER WATER SUPPLY
CI CAST IRON
CLG CEILING
CM CARBON MONOXIDE
CM CUBIC METER
CM/S CUBIC METER PER SECOND
CO CLEAN OUT
CO2 CARBON DIOXIDE
COMP COMPRESSOR UNIT
COP COEFFICIENT OF PERFORMANCE
CP CONDENSATE PUMP
CR CEILING REGISTER
CS CONDENSATE STORAGE TANK
CSG CLEAN STEAM GENERATOR
CT COOLING TOWER
CU CONDENSING UNIT
CUH CABINET UNIT HEATER
CV CONSTANT VOLUME
CW COLD WATER (POTABLE)
CWCC CHILLED WATER COOLING COIL
CWP CONDENSER WATER RETURN
CWR CONDENSER WATER RETURN (TO COOLING TOWER)
CWS CONDENSER WATER SUPPLY (FROM COOLING TOWER)
D DAMPER - AUTOMATIC
Db DRY-BULB TEMPERATURE dB DECIBELS
DCW DOMESTIC COLD WATER
DD-1 DEIGN DEVELOPMENT (SUBMISSION 1)
DD-2 DEIGN DEVELOPMENT (SUBMISSION 2)
DDC DIRECT DIGITAL CONTROLS
DEG DEGREE
DF DIFFUSER
DEMO DEMOLITION
DHW DOMESTIC HOT WATER
DHWR DOMESTIC HOT WATER RETURN
DIA DIAMETER
DIW DEIONIZED WATER
DN DOWN
DP DEW POINT TEMPERATURE
DP DIFFUSER PLATE
DPA DIFFERENTIAL PRESSURE ASSEMBLY
DPS DIFFERENTIAL PRESSURE SENSOR
DWG DRAWING
DX DIRECT EXPANSION
DXCC DIRECT EXPANSION COOLING COIL
ALL ABBREVIATIONS INDICATED MAY NOT APPEAR ON THESE CONTRACT DRAWINGS
R/E RETURN OR EXHAUST
RA RETURN AIR
RAD RETURN AIR DAMPER
RAF RADIO FREQUENCY
RAHX ROTARY AIR HEAT EXCHANGER
RAT RETURN AIR TEMPERATURE
RCCH REMOTE CONDENSER CHILLER
RCU RECIPROCATING CHILLER UNIT
RD ROOF DRAIN
RDS ROOM DATA SHEETS
REA RELIEF AIR
RELAD RELIEF AIR DAMPER
RF RETURN FAN
RG RETURN GRILLE
RH RELATIVE HUMIDITY
RHC REHEAT COIL
RHG REHEAT GRILLE
RL REFRIGERANT HOT GAS
RLA RUN LOAD AMPERE
RO REVERSE OSMSIS
RPM REVOLUTIONS PER MINUTE
RR RETURN REGISTER
RS REFRIGERANT SUCTION
RTU ROOF TOP UNIT
RV RELIEF VALVE
SA SUPPLY AIR
SAD SUPPLY AIR DAMPER
SAT SUPPLY AIR TEMPERATURE
SC SHADING COFFICIENT
SCFM STANDARD CUBIC FEET PER MINUTE
SCI SPINAL CODE INJURY
SD SMOKE DETECTOR
SD SUPPLY AIR DIFFUSER
SD-1 SCHEMATIC DESIGN (SUBMISSION1)
SD-2 SCHEMATIC DESIGN (SUBMISSION2)
SDPR SMOKE DAMPER
SDR SMOKE DAMPER (RETURN)
SDS SMOKE DAMPER (SUPPLY)
SEN SENSIBLE HEAT
SF SUPPLY FAN
SF SQUARE FEET
SG SUPPLY AIR GRILLE
SH STEAM HUMIDIFIER
SHC STEAM HEATING COIL
SI SQURE INCHES
SP STATIC PRESSURE
SP GR SPECIFIC GRAVITY
SPD SUPPLY PROCESS AND DISTRIBUTION
SPRV STEAM PRESSURE REDUCING VALVE
SPS STATIC PRESSURE SENSOR
SPEC SPECIFICATION
SQ FT SQUARE FOOT (FEET)
SR SUPPLY AIR REGISTER
SS STAINLESS STEEL
SSHX STEAM TO STEAM HEAT EXCHANGER
SSR SOLID SEPARATOR
ST STEAM TRAP
STD STANDARD
SUH STEAM UNIT HEATER
SV STEAM PRESSURE REDUCING VALVE
SVS STEAM VENT SILENCER
SW SOFTENED WATER
SWHX STEAM TO WATER HEAT EXCHANGER
T&PCV TEMPERATURE AND PRESSURE CONTROL VALVE
TAB TESTING, ADJUSTING, BALANCE,
TD TEMPERATURE DIFFERENCE
TDH TOTAL DYNAMIC HEAD
TDS TOTAL DISSOLVED SOLIDS
TEMP TEMPERATURE
TG TRANSFER GRILLE
TOF TOP OF FOOTER
TP TRAP
TR TOP REGISTER
TSP TOTAL STATIC PRESSURE
TSTAT THEROSTAT
TU TERMINAL UNIT
TWU THRU-WALL UNIT
TYP TYPICAL
UC UNDERCOUNTER
UC UNDER CUT
UC UNIT COOLER
UH UNIT HEATER
UL UNDERWRITERS LABORATORY
U.O.N UNLESS OTHERWISE NOTED
URV UPBLAST UNIT VENTILATOR
V VALVE
VAF VANE-AXIAL FAN
VAV VARIBLE AIR VOLUME
VD VOLUME DAMPER (MANUAL OPPOSED BLADE)
VERT VERTICAL
VFD VARIABLE FREQUENCY DRIVE
VHA VETERANS HEALTH ADMINISTRATION
VI VIBRATION ISOLATOR
VP VACUUM PUMP
VPS VARIBLE PRIMARY SYSTEM
VR VACUUM (STEAM CONDENSATE) RETURN
VSD VARIBLE SPEED DRIVE
VUH VERTICAL HEAT UNIT
W WATTS
W/ WITH
W/O WITH OUT
WAG WASTE ANEESIA GAS
Wb WET BULB (TEMPERATURE)
WC WATER COOLED
WCCH WATER COOLED CHILLER
WCCU WATER COOLER CONDENSING UNIT
WCHP WATER COOLED HEAT PUMP
WCPU WATER COOLED PACHAGE UNIT
WEF WALL EXHAUST FAN
WF WATER FILTER
WFCV WATER FLOW CONTROL VALVE
WMF WATER FLOWMETER
WFMD WATER FLOW MEASURING DEVICE
WG WATER GAGE
WPD WATER SIDE PRESSURE DROP
WTR WATER
WWM WELDED WIRE MESH
YR YEAR
I/O INPUT/OUTPUT
IAQ INDOOR AIR QUALITY
IBT INVERTED BUCKET TRAP
ICF IN-LINE CENTRIFUGAL FAN
ICU INTENSIVE CARE UNIT
ID INSIDE DIAMETER
I.E. INVERT ELEVATION
IFB INTEGRAL FACE AND BYPASS
IN INCHES
IN HG INCHES OF MERCURY
IN WC INCH WATER COLUMN
IN WG INCH WATER GAUGE
IN-LB INCH POUND
IPLV INTERGRATED PART LOAD VALUE
IRH INTRARED HEATER
IS INSECT SCREEN
IU INDUCTION UNIT
I.V. INLET VANES
J INTENTIALLY LEFT BANK
KG KILOGRAM
KG/HR KILOGRAM PER HOUR
kPa KILOPASCAL
KW KILOWATTS
KWH KILOWATT HOUR
L LITER
L/h LITER PER HOUR (OR LITER/HOUR) L/m LITER PER MINUTE (OR LITER/MINUTE)
L/S LITER PER SECOND (OR LITER/SECOND)
LAT LEAVING AIR TEMPERATURE
LBS POUNDS
LBS/HR POUNDS PER HOUR
LF LINEAR FOOT (FEET)
LGT LEAVING GLYCOL TEMPERATURE
LH LATENT HEAT
LLHX LIQUID TO LIQUID HEAT EXCHANGER
LPC LOW PRESSURE STEAM CONDENSATE RETURN
LPG LIQUEFIED PETROLEUM GAS
LPR LOW PRESSURE RETURN (STEAM CONDENSATE)
LPRC LOW PRESSURE STEAM RETURN (CLEAN)
LPS LOW PRESSURE STEAM
LPSC LOW PRESSURE STEAM (CLEAN)
LSD LINEAR SLOT DIFFUSER
LTCP LOCAL TEMPERTURE CONTROL PANEL
LVG LEAVING
LVR LOUVER
LWT LEAVING WATER TEMPERATURE
M METER, SI UNIT
M/S METER PER SECOND (OR METER/SECOND)
MA MIXED AIR
MAT MIXED AIR TEMPERATURE
MAU MAKE-UP AIR UNIT
MAV MANUAL AIR VENT
MAX. MAXIMUM
MB MIXING BOX
MBH 1,000 BTUH
MC MECHANICAL CONTRACTOR
MCA MINIMUM BRANCH CIRCUIT AMPACITY
MER MECHANICAL EQUIPMENT ROOM
MFR MANUFACTURER
MH MANHOLE
MHP MOTOR HORSEPOWER
MIN. MINIMUM
MM MILLMETER
MOD MOTOR OPERATED DAMPER
MOV MOTOR OPERATED VALVE
MPC MEDIUM PRESSURE STEAM CONDENSATE RETURN
MPR MEDIUM PRESSURE RETURN (STEAM CONDENSATE)
MPS MEDIUM PRESSURE STEAM
MRI MAGNETIC RESONANCE IMAGING
MTD MEAN TEMPERATURE DIFFERENCE
MVD MANUAL VOLUME DAMPER
MZ MULTI-ZONE
NA NOT APPLICABLE
NC NOISE CRITERIA
NC NORMALLY CLOSED
NIC NOT IN CONTRACT
NG NATURAL GAS
NGFM NATURAL GAS FLOWMWTER
Nm NEWTON METER
NO NORMALLY OPEN
NOAA NATIONAL OCEANIC & ATMOSPHERIC ADMINISTRATION
NOM. NOMINAL
NPLV NON-STANDARD PART LOAD VALUE
NPSH NET POSOTIVE SUCTION HEAD
NPSHA NET POSOTIVE SUCTION HEAD AVAILABLE
NPSHR NET POSOTIVE SUCTION HEAD REQUIRED
NTS NOT TO SCALE
OA OUTSIDE AIR
OAD OUTDOOR AIR DAMPER
OAG OUTSIDE AIR GRILLE
OAI OUTSIDE AIR INTAKE
OD OUTSIDE DIAMETER
OFM OIL FLOWMETER
OR OPERATING ROOM
OA OUTSIDE AIR
OAD OUTDOOR AIR DAMPER
OAG OUTSIDE AIR GRILLE
OAI OUTSIDE AIR INTAKE
OD OUTSIDE DIAMETER
OFM OIL FLOWMETER
OR OPERATING ROOM
P PUMP
Pa PASCAL
PC PUMPED CONDENSATE
PCF POUNDS PER CUBIC FOOT (FEET)
PD PRESSURE DROP
PEF PROPELLER (TYPE) EXHAUST FAN
PF PRE-FILTER
PG PRESSURE GAGE
PGW PROPYENE GLYCOL-WATER (SOLUTION)
PHC PREHEAT COIL
PPM PARTS PER MILLION
PRS PRESSURE REGULATING (VALVE) STATION
PRV PRESSURE REGULATING VALVE
PSI POUND PER SQUARE INCH
PSIA POUND PER SQUARE INCH - ABSOLUTE
PSIG POUND PER SQUARE INCH - GAGE
PSE POUNDS PER SQUARE INCH
PSS PRIMARY SECONDARY SYSTEM
PSV PRESSURE SAFETY VALVE
P/T PRESSURE/TEMERATURE TAP
PTAC PACKAGED TERMINAL AIR CONDITIONER
EA EXHAUST AIR
EAT ENTERING AIR TEMPERATURE
EC ELECTRICAL CONTRACTOR
EC EVAPORATIVE COOLER
ECC ENGINEER CONTROL CENTER
ECU EVAPORATIVE CONDENSER UNIT
EDH ELECTRIC DUCT HEATER
EER ENERGY EFFICIENCY RATIO
EF EXHAUST FAN
EG EXHAUST GRILLE
EGS EMERGENCY GAS SHUTOFF
EGT ENTERING GLYCOL TEMPERTURE
EH EXHAUST HOOD
EJ EXPANSION JOINT
EMD END OF MAIN DRIP (STEAM)
ENT ENTERING
EQUIP EQUIPMENT
ER EXHAUST REGISTER
ER EXISTING RELOCATED
ERC ELECTRIC REHEAT COIL
ERP ELECTRIC RADIANT PANEL
ESP EXTERANL STATIC PRESSURE
ET EXPANSION TANK
ETO ETHYLENE OXIDE
ETR EXISTING TO REMAIN
EUH ELECTRIC UNIT HEATER
EWC EVAPORATIVE WATER COOLER
EWH ELECTRIC WATER HEATER
EWT ENTERING WATER TEMPERATURE
EX EXISTING
F FAHRENHEIT
F&T FLOAT AND THERMOSTATIC
F/SDPR COMBINATION FIRE SMOKE DAMPER
FA FREE AREA
FBO FURNISHED BY OTHERS
FC FLEXIBLE CONNECTION
FCU FAN COIL UNIT (4 PIPE)
FCUC FAN COIL UNIT COOLING ONLY
FCUH FAN COIL UNIT HEATING ONLY
FCW FORWARD CURVED WHEEL (FAN)
FD FLOOR DRAIN
FD FIRE DAMPER
FF FINAL FILTER
FHX FLUE GAS/FEEDWATER HEAT EXCHANGER
FLEX FLEXIBLE
FLR FLOOR
FM FLOW METER
FOB FLAT ON BOTTOM
FOP FUEL OIL PUMP
FOT FUEL OIL TANK
FOT FLAT ON TOP
FOHX FUEL OIL HEAT EXCHANGER
FPM FEET PER MINUTE
FPTU FAN POWERED TERMINAL UNIT
FR FLOOR REGISTER
FRP FIBER REINFORCED POLYESTER
FS FLOW SWITCH
FSTST FREEZESTAT
FT FEET
FT WC FEET OF WATER COLUMN
FT-LB FOOT-POUND
FTR FIN TUBE RADIATION
FV FACE VELOCITY
GA GAUGE
GAL GALLON
GC GENERAL CONTRACTOR
GH GRAFITY HOOD
GPD GALLONS PER DAY
GPH GALLONS PER HOUR
GPM GALLONS PER MINUTE
GPR GAS PRESSURE REGULATOR
GS GALVANIZED STEEL
H HUMIDIFIER
HAC HOUSEKEEPING AID CLOSET
HB HOSE BIBB
HC HEATING COIL
HD HOOD
HGT HEIGHT
HGT HEIGHT
HOA HAND/OFF/AUTOMATIC
HORZ HORIZONTAL
HP HEAT PUMP
HP HORSEPOWER
HPC HIGH PRESSURE STEAM CONDENSATE RETURN
HPDT HIGH PRESSURE DRIP TRAP
HPR HIGH PRESSURE RETURN (STEAM CONDENSATE)
HPS HIGH PRESSURE SUPPLY (STEAM)
HRC HEAT RECOVERY COIL
HRD HEAT RECOVERY DEVICE
HRP HYDRONIC RADIANT (CEILING) PANEL
HRW HEAT RECOVERY WHEEL
HSTAT HUNIDSTAT
HTM HUMIDFIER TERMINAL
HUM HUMIDFIER UNIT MOUNTED
HVU HEATING AND VENTILATING UNIT
HW HOT WATER
HWC HOT WATER COIL
HWHC HOT WATER HEATING COIL
HWP HEATING HOT WATER PUMP
HWR HEATING HOT WATER RETURN
HWS HEATING HOT WATER SUPPLY
HWUH HOT WATER UNIT HEATER
HVAC HEATING, VENTILATION, AND AIR CONDITIONING
HVD HOISTWAY VENT DAMPER
HX HEAT EXCHANGER
HZ HERTZ
GENERAL BID NOTE
1. EXISTING DUCTWORK AND PIPING IS BASED ON ORIGINAL CONSTRUCTION DRAWINGS AND MAY NOT REFLECT CURRENT DUCT/PIPING/TERMINAL DEVICE LAYOUT. CONTRACTOR SHALL FIELD VERIFY ACTUAL CONDITIONS PRIOR TO PRICING AND BEFORE PROCEEDING WITH WORK. NOTIFY ENGINEER IN THE EVENT THAT EXISTING MAIN DUCTWORK OR PIPING SHOWN TO REMAIN IS
SIGNIFICANTLY DIFFERENT FROM EXISTING CONDITIONS.
2. CONTRACTORS SHALL BE RESPONSIBLE FOR MATCHING EXISTING BUILDING SYSTEMS WHERE REQUIRED BY DEMOLITION AND NEW WORK.
ITEMS INCLUDING BUT NOT LIMITED TO: WALL TYPES, INSULATION, GLASS, CONCRETE, REBAR, ETC. SHALL MATCH EXISTING DESIGN
CONDITIONS WHEN REPLACED OR REPAIRED.
3. CONTRACTOR SHALL IDENTIFY AND COORDINATE WITH THE OWNER ALL WORK AREAS REQUIRING CONSTRUCTION EFFORTS DURING FACILITY "OFF" HOURS. "OFF" HOUR WORK SHALL BE INCLUDED IN THE CONTRACTOR'S BID/SCOPE OF WORK.
4. CONTRACTOR IS RESPONSIBLE FOR PROVIDING ALL ISOLATION VALVES NECESSARY TO COMPLETE THE DESIGN INDICATED.
MECHANICAL GENERAL DEMOLITION NOTES
1. COORDINATE ALL MECHANICAL UTILITY AND HVAC UNIT SHUT DOWNS WITH OWNER. ANY SHUT DOWNS NECESSARY TO ACHIEVE THE OBJECTIVE OF THIS DESIGN SHALL BE COMPLETED DURING "OFF HOURS" AND SHALL COMPLY WITH OWNER'S UTILITY SHUT DOWN
POLICIES.
2. CONTRACTOR IS RESPONSIBLE FOR ALL CUTTING, PATCHING AND DEMOLITION OF ALL BUILDING SYSTEMS PER THEIR MEANS-AND-
METHODS AS NECESSARY TO PROVIDE THE DESIGN INDICATED.
GENERAL NOTES
1. THE DRAWINGS ILLUSTRATE GENERAL SCOPE AND ARRANGEMENT OF MECHANICAL SYSTEMS. THEY SHALL BE FOLLOWED AS CLOSELY AS ACTUAL CONDITIONS ALLOW. MECHANICAL CONTRACTOR SHALL PROVIDE FITTINGS AND OFFSETS IN DUCTWORK AND PIPING TO AVOID FIELD
INTERFERENCES.
2. ALL WORK SHALL CONFORM TO THE REGULATIONS OF APPLICABLE FEDERAL, STATE, LOCAL LAWS, ORDINANCES AND CODES. MECHANICAL WORK SHALL BE IN ACCORDANCE WITH THE LATEST ADOPTED EDITION OF THE INTERNATIONAL MECHANICAL CODE AND ANY APPROVED
SUPPLEMENTS TO THAT CODE.
3. DRAWINGS, SPECIFICATIONS, AND SCHEDULES TOGETHER FORM THE BASIS OF DESIGN.
4. PROVIDE FIRESTOPPING WHERE NECESSARY.
5. DIMENSIONS AND DUCT/PIPING/EQUIPMENT SIZES INDICATED ON THE DRAWINGS MAY NOT REFLECT ACTUAL FIELD CONDITIONS IN ALL LOCATIONS. FIELD VERIFY DUCT, PIPING AND EQUIPMENT SIZES AND LOCATIONS PRIOR TO FABRICATION OF DUCTWORK OR PIPING SUCH THAT DUCTWORK, PIPING, AND EQUIPMENT WILL FIT IN APPROXIMATELY THE LOCATION SHOWN ON THE DRAWING.
M
GENERAL
DUCTWORK AND ACCESSORIES
PIPING
PIPE FITTINGS
VALVE SYMBOLS
CONTROLS
MECHANICAL LEGEND
VAV BOX WITH HOT WATER COIL
AIR FLOW STATIONAFS
VOLUME DAMPER W/ REMOTE
DAMPER OPERATORR
REGISTER/GRILLE/DIFFUSER (MARK/CFM)
PRESSURE SWITCH
FLOW SWITCH
UNION
ECCENTRIC PIPE REDUCER/INCREASER
CONCENTRIC PIPE REDUCER/INCREASER
TEE DOWN
"NEW CONSTRUCTION AT
THIS POINT" SYMBOL
"DEMOLITION TO THIS POINT" SYMBOL
ACCESS DOOR, VERTICAL OR HORIZONTAL
SMOKE DETECTOR
STEAM
MEDIUM PRESSURE CONDENSATE
MEDIUM PRESSURE STEAM
HIGH PRESSURE STEAM
HIGH PRESSURE CONDENSATE
SOFT WATER
REFRIGERANT SUCTION
PIPE CAP
TEE UP
TEE AND ELBOW DOWN
TEE AND ELBOW UP
PIPE TURNING DOWN
PIPE TURNING UP
REFRIGERANT LIQUID
FUEL OIL TANK VENT
FUEL OIL RETURN
FUEL OIL SUCTION
NATURAL GAS
SUPPLY DUCT SECTION
(POSITIVE PRESSURE)
EXHAUST DUCT SECTION
(NEGATIVE PRESSURE)
RETURN DUCT SECTION
(NEGATIVE PRESSURE)
SUPPLY DIFFUSER 3-WAY
SUPPLY DIFFUSER 1-WAY
SUPPLY DIFFUSER 2-WAY CORNER
SUPPLY DIFFUSER 2-WAY
FLEXIBLE DUCT
RADIANT CEILING PANEL
EXHAUST GRILLE
RETURN GRILLE
MOTOR OPERATED DAMPER
ROUND DUCT SIZE (INCHES)
3/4" DOOR UNDERCUT
DOOR GRILLE
VOLUME DAMPER
ITEM TO BE PROVIDED
EXISTING
EXISTING TO BE REMOVED
CONDENSER WATER SUPPLY
CHILLED WATER RETURN
CHILLED WATER SUPPLY
PUMPED CONDENSATE
LIQUEFIED PETROLEUM GAS (PROPANE)
LOW PRESSURE CONDENSATE
HEATING WATER SUPPLY
HEATING WATER RETURN
LOW PRESSURE STEAM
SUPPLY GRILLE OR REGISTER
HORIZONTAL FIRE DAMPER
HORIZONTAL FIRE AND SMOKE DAMPER
HORIZONTAL SMOKE DAMPER
VERTICAL FIRE AND SMOKE DAMPER
VERTICAL FIRE DAMPER
VERTICAL SMOKE DAMPER
OUTSIDE AIR DUCT
(NEGATIVE PRESSURE)
NITROGEN DIOXIDE SENSOR
CARBON MONOXIDE SENSOR
PS
FS
75E
SD
AD
HPS
HPC
G
STM
SW
MPC
MPS
RS
RL
FOV
FOR
FOS
R
T
T
DN
UC
DG
HWR
HWS
CWS
CWR
CS
PC
LPG
LPC
LPS
F
F
F/SD
F/SD
SD
SD
CO
NO2
ALL SYMBOLS INDICATED MAY NOT APPEAR ON THESE CONTRACT DRAWINGS
EXISTING REGISTER/GRILLE/DIFFUSER
(CFM SHOWN)
75-
SUPPLY DIFFUSER 4-WAY
22x14
12ø
DUCT SIZE (INCHES), FIRST FIGURE IS
SIDE SHOWN
24x12ø OVAL DUCT SIZE (INCHES), FIRST
FIGURE IS SIDE SHOWN
CHANGE OF ELEVATION-RISE
(UP)-DROP (DN)
ELECTRIC THERMOSTAT
(MOUNT 48" AFF U.O.N)
CONDENSATE DRAIN
CONDENSER WATER RETURN
COMPRESSED AIR
BOILER BLOW DOWN
CR
CD
A
BBD
DOMESTIC COLD WATER
PNEUMATIC THERMOSTAT
(MOUNT 48" AFF U.O.N)
STATIC PRESSURE SENSORSP
GATE VALVE WITH GLOBE-VALVED BYPASS
PLUG VALVE
CONTROL VALVE (CV) - FLOAT-OPERATED
PRESSURE REDUCING VALVE (PRV)
WATER LEVEL CONTROLLER
FLOW METER
LC
M
BALL VALVE
GATE VALVE WITH 3/4" HOSE ADAPTER
CHECK VALVE
ANGLE GLOBE VALVE
BUTTERFLY VALVE
MODULATING CONTROL VALVE
TWO POSITION CONTROL VALVE
THREE-WAY MODULATING CONTROL VALVE
AUTOMATIC BALANCING CONTROL VALVE
PRESSURE SAFETY VALVE
GATE VALVE - THREADED/FLANGED
GLOBE VALVE - THREADED/FLANGED
PRESSURE REGULATING VALVE
THREE-WAY TWO POSITION CONTROL VALVE
WYE STRAINER (WITH BALL VALVE & HOSE
CONNECTION)
FLEXIBLE CONNECTION
WATER BALANCE DEVICE
MODULATING CONTROL BUTTERFLY VALVE
CIRCUIT SETTER VALVE
WYE STRAINER WITH VALVED DRAIN AND
QUICK-COUPLE HOSE CONNECTOR
HIGH PRESSURE STEAM TRAPDISCHARGE
INTO PUMPED CONDENSATE RETURN LINE
STATE OFP
R O
FESSIONAL ENG
IN
E E R
L.
PH
ILL
IP GENTRY
14226
W
EST V I RG I N
IA
R
REGISTE ED
Department of
Veterans Affairs
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Dwg. ofRevisions: Date
CONSULTANTS:
VAMC - Martinsburg, WV
ARCHITECT/ENGINEERS:
Scale:
AS NOTEDSEAL: 613-15-301REPAIR-UPGRADE STEAM
DISTRIBUTUON
- CENTRAL CAMPUS 500
Office of
Construction and Facilities Management o n e e ig h th in c h o n e fo o t 1
B
A
C
D
E
F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
F
E
D
C
B
A
97 8654321
VA FORM 08-6231
MEP ENGINEERS
Valley Engineering 4901 Crowe Drive Mount Crawford, VA 22841
MEP ENGINEERS
Valley Engineering 4901 Crowe Drive Mount Crawford, VA 22841 of 36
BID DOCUMENTS SUBMISSION
BID DOCUENTS
SUBMISSION
97 8654321
M0.01
MECHANICAL LEGENDS,
ABBREVIATIONS, AND NOTES
04/29/2019 04/29/2019
DL / NL JCH
CH
M
M
PO
D
M
LPR
LP
R
LP
R
LPR
LP
R
LP
R
LPR
LP
R
LP
R
LPR
LP
R
LP
R
DDD
D
500-C2B
TO INTERSTITIAL
BOX AT COL.
11.8, A
RLRS RS RS RSRL RL RL
V
V
VV
V
V
V
V
V
V V
V V
V V
V V
V
V
V
V
V
V V
V
V
SR SR
SRSR
SR
SR
SR
SR
SR
HS
HS
HS
HS
CH
CHR
3" CH
3" CHR
3" CH
AP VD
8" CH
8" CHR
C
PD
H W H R
H W H
C H R
C H
M
PS
C
PD
M
PS
H W H R
H W H C H
C H R
4" CHR
4" CH
8" C
H
CHR
CH
500-CC-3
6" 6"
1/2"1 1/4"
3" CH 3" CHR
2½" CHR
2½" CH
2½" CHR
2½" CH
2½" CHR
2½" CH
3" CH
3" CHR
C H R
C H S
M
M
STM
VD
VD
8"∅
8"∅
E1
DP
DP
VAV-21
VAV-17
VAV-16
VAV-18
VAV-4 VAV-5
EF
C
C
AP
VD
M
AP
VD
VDAP
VD
AP
VD
AP
D
VD
VDVD
AP AP
AP AP
VD
R
12X12
AP
8X4
12X6
VD
VD
APVD
VD
AP
VD
AP
VD
20X10
VDAP
18X10
VD
AP
AD
AD
POD
AP
POD
POD
POD
POD
POD
AP
VD
VD
VD
VD
VD
VD
VDVD
VD
VD
VD
VDVD
VD
M
M
M
M
S F
S F
D
M
M
M
MM
M
MM
M
M M
M
D
M
M
D
M
T
T
T
T
T
T
T T
T
T
T
TT
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
TTT
T
T
T
T
T
T
TT
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
TTTT
T
T
T
TT
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
TT
T T
T T
T
T
T
T
TT
T
T
T
T T
T
T
T
T
T
T
T
TT
T
T
T
T
T
T
T
TT
F.E.C.
75" H. WALL
ABOVE
SHAFT
ELEVATOR
ABOVE
SHAFT
SERVICE AREA
SERVICE AREA
R A M P
FD
FD
D.F.
GD-100J
GD-100K
GC-101A
GC-101B
GC-100
GC-101
GC-112
GC-104C
GC-104A
GC-103A
GC-100A
GC-112A
GC-100B
GC-C6
GA-127F
GC-102K
GB-100R
GE-100
GE-104A
GE-105A
GB-100N
GA-127C
GE-100B
GE-104
GE-105
GE-105
GD-121B
GE-102
GD-C7
GE-100A
GA-137H
GA-137
GA-C14
GA-118C
GA-C7AGA-118B
GA-C7
GA-118A
GA-137G
GA-C15
GA-139
GA-141GA-140
GA-138A
GA-127D
G A
-1
GA-127
GD-121
GD-121A
GD-C8
GD-121C
GC-102I
GA-C6
G-S5
GC-102L
GA-112 GA-114
GA-117GA-115
GA-119
GB-100B
GA-119B
732 SQ. FT.
GA-106
290 SQ. FT.
GA-106A
GA-108
309 SQ. FT.
GA-C5
GA-113A
GA-110
GA-111
GA-109
GA-105
GB-100D
GA-107
GA-120
GB-C2
S-4
GE-101A
GE-101
GB-100A
GA-127A
GA-C3
GA-127E
GA-C8
GA-127B
G A
-C
GA-129
GA-136
GA-130
GA-139B
GA-139A
GD-123A
S-9
GD-C1
GA-126
GD-123
GD-127
GD-120GD-126
GA-120D
GD-125
GD-C4
GA-120E
GD-C9
GA-C9
GD-124
GD-122
GA-122
GD-100F
GB-C9
GD-100
GA-C2
GD-100E
G-S7
GD-118
GA-104
GD-117
GD-100D
GD-C5
S-6
GD-100H
GC-C1
GB-118
GB-108
T -1
GB-109
GB-111
GB-110
GB-112
GB-113A
GB-113GB-113BGB-115B
GB-120F
42 SQ. FT.
GB-120H
GD-111
G B
-1
B
GB-100F
GB-123
S-8
7173 SQ. FT.
GB-100
S-1
GB-C1
GB-C3
GD-101
GB-100C
GD-102
GB-100E
GB-100S
GD-102A
GB-100G
GB-121
GB-100HGB-100JGB-100K
GA-120K
GA-100
GB-C4
S-5
GA-C1
GA-113
GA-128
GA-138
GA-C11
GB-107
GA-120H
GA-120F
GA-C10
GA-120C
GA-121
GA-103
GA-102
GA-101
GB-103A
S-7
GB-C10
GC-106
GA-120A
GD-C2
GA-123
GA-124
GB-C8
GD-102B
GA-125
GD-128
GA-120G
GA-120J
GB-122A
GB-122
GA-120B
GB-100M
796 SQ. FT.
GC-C4
GB-100P
G B
-C
GB-102
GB-119
GD-104
G B
-C
GD-105
T -1
GD-108
GB-C6
G-S3
GD-109
GD-110
GB-104
GB-106
GB-103
GD-113
GB-105 GB-101
GB-105A
GB-114
GB-100L
GB-115
GB-100T
GB-115A
GB-116
G B
-1
DGB-117
GB-120C
T -1
GB-120G
GD-103
GD-103A
G B
-1
J
GB-108A
GC-102A
GD-112
GC-102F
GC-102E
GC-102D
GD-111A
GC-105
GD-114A
GC-105
GD-115
GB-120K
GC-105C
GD-116
GC-105D
GC
GA-137C
GC-105B
GC-105A
GA-137F
GC-C5
G-S4
GC-107B
GC-C3
GC-107A
GC-107
GC-109A
GC-109B
GC-C2
GC-107C
GC-109
GD-C3
GC-110A
GD-100A
GD-100B
GC-102B
GA-C12
GA-137D
GA-137E
GA-137A
GA-137B
GA-118
GA-133
GA-132A
GA-132B
GA-134
GD-111B
GD-114
GD-119
GA-132
GB-120A
GC-102C
GB-120I
GB-120E
STORAGE
CLEAN
ROOM
BREAKOUT
H.A.C.
MANUAL CART WASH
(CLEAN AREA)
PACK & PREP STERILIZATION ROOM
(DIRTY AREA)
DECONTAMINATION ROOM
STORAGE
STERILE OR
TOILET
MALE
TOILET
FEMALE
STORAGE
AUTOCLAVE
STORAGE
STORAGE
CORRIDOR
SHOP
OFFICE
OFFICE
MEZZANINE
COMPACTOR
DOCK AREA
TUNNEL
EXHAUST
HALLWAY
OFFICE
OFFICE
BIO. HAZARD
SLURRY
GENERATOR
EMERGENCY
MECHANICAL
ROOM
TRANSFORMER
TELE. ROOM
ROOM
SWITCHGEAR
CORRIDOR
WASTE STORAGE
BIO HAZARD
SHOP / ELEC.
EMS STORAGE
CORRIDOR
OFFICE
CORRIDORTOILET
CORRIDOR
MECH. ROOM
SHOP / ELEC.
CORRIDOR
SERVICE
MECHANICAL
MED. GASFLAM. STOR.
SHOP
LOUNGE
S
TO
R A
G E
ENGINEER SHOP
BIO. MED.
MECHANICAL ROOM
ELEC. ROOM
CORRIDOR
MECHANICAL ROOM
OFFICE
CORRIDOR
STAIR # 5
TRAINING ROOM
VOLUNTEER
OFFICE OFFICE
OFFICEH.A.C.
OFFICE
H.A.C.
OFFICE
MAIL ROOM
OFFICE
OFFICE
CORRIDOR
OFFICE
OFFICE
OFFICE
MALE TOILET
ELEV. MACH. RM.
FEMALE TOILET
FEMALE TOILET
PHARMACY
CORRIDOR
ELEV.
STORAGE
BATTERY
STORAGE
OXYGEN
MALE TOILET
BIO MED SHOP
CORRIDOR
BIO. MED.
CORRIDOR
BIO. MED.
C O
R R
ID
O
R
OFFICE
ROOM
TELE. EQUIP.
OFFICE
TELE. ROOM
ELEC. ROOM
ROOM
CONFERENCE
ELEV.
CORRIDOR
MACHINE RM.
ROOM
CONFERENCE
KITCHENETTE
ELEC. ROOM
TOILET
FEMALE
OFFICE
TOILET
MALE
CORRIDOR
OFFICE
CORRIDOR
CORRIDOR
H.A.C.
LOADING DOCK
MECHANICAL ROOM
ROOM
MECHANICAL
CORRIDOR
WAREHOUSE
CORRIDOR
OFFICE
STAIR # 7
OFFICE
PANEL ROOM
FIRE ALARM
OFFICE
MALE TOILET
CORRIDOR
ELEV.
STORAGE
CORRIDOR
TOILET
FEMALE
UTILITY ROOM
MECH. ROOM
TOILET
FEMALE
SOILED TERM.
TOILET
MALE
OFFICE
OFFICEOFFICE
TOILET
MALE
DECONTAMINATION
H.A.C.
VAULT
M E
C H
. R O
O M
MECH.
EQUIP. ROOM
CONDENSING
FUTURE ELEV.
KITCHEN
ELEV.
CORRIDOR
CORRIDOR
OFFICE
SUPPLIES
SANITARY
MECHANICAL SERVICE
ELECTRICAL
REFRIGERATOR
ELEC. ROOM
OFFICE
TRAINING ROOM
OFFICEOFFICEOFFICE
PHARMACY
MECH RM
CORRIDOR
ELEV.
LOBBY
SERVICE ELEVATOR
HOSPITAL PATIENT &
OFFICE
OFFICE
CARPENTERS
CORRIDOR
REFRIGERATOR
OFFICE
OFFICE
CORRIDOR
OFFICE
PHARMACY ROOM
MECHANICAL ROOM
MECHANICAL ROOM
TELEPHONE RM.
FREEZER
ELEV.
CORRIDOR
GENERATOR ROOM
O.R. EMERGENCY
HSKP
CORRIDOR
FEMALE TOILET
MALE TOILET
CORRIDOR
TELE. ROOM
H.A.C.
UPS
MALE TOILET
FEMALE TLT.
OFFICE
OFFICE
MED STORAGE
OFFICE
CORRIDOR
OFFICE
C O
R R
ID
O
R
KITCHEN STORAGE
TOILET
MALE
OFFICE
C O
R R
ID
O
R
OFFICE
OFFICE
CORRIDOR
STAIR # 3
STORAGE
ELECTRICAL
STORAGE
H.A.C.
CLEAN FACILITY
REFRIG
CLOSET
REFRIG FREEZER
FREEZER
H.A.C.
FOOD STORAGE
LOUNGE
OFFICE
TOILET
FEMALE
LOUNGE
H .A
.C
MECHANICAL RM.
STORAGE
NON-STERILE
STERILE &
(DIRTY AREA)
STERILIZATION RM.
STORAGE
ROOM
IRM COMPUTER
C A
R T
W A
S H
M A
N U
A L
MECH. RM.
OFFICE
TOILET
OFFICE
OFFICE
OFFICE
VESTIBULE
SERVICES
MECHANICAL
COPY
SERVICES
MECHANICAL
M. LCKR RM
WORK AREA
TELE. ROOM
OFFICE
ROOM
ELECTRICAL
AREAWAY
OUTSIDE
STORAGE
TELE. ROOM
ROOM
ELECTRICAL
OFFICE
CORRIDOR
STAIR # 4
& SHOWER
MALE TOILET
CORRIDOR
LAVATORY
MALE
LOUNGE
& SHOWER
FEMALE TOILET
FEMALE TOILET
CORRIDOR
ROOM
MALE LOCKER
ROOM
FEMALE LOCKER
CORRIDOR
STORAGE
TELEPHONE ROOM
OFFICE
OFFICE
CORRIDOR
OFFICE/TRAINING
OFFICE
ELECTRIC SHOP
STORAGE
STORAGE
CLOTHING STORAGE
CLOTHING STORAGE
CHANGE
DIRTY UNIFORMS
EVIDENCE
W. LCKR RM
HOLDING RM.
OFFICE
(CLEAN AREA)
STERILIZATION RM.
OFFICE
MECH. RM.
STORAGE
NON-STERILE
STERILE &
P A
N D
E M
IC
PROSTHETICS
ROOM
STATIONBREAK AREA
AREA
DISCREPENCY
PACKAGING
FORKLIFT CHARGEINCOMING
PHARMACY
NX AREA
DUMBWAITER-13
MEZZANINE
UP
UP
UP
DN.
UP
UP
UP
DN.
UP
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
16 17 18
A
B
C
D
E
F
G
H
J
K
G.7
SHEET M201t
SHEET M201e
8" HPS UP
4" PC UP
3" PC
8" HPS
8" HPS
4" PC BELOW
4" HPS
2" PC
4" HPS
2" PC
20ø TRASH DUCT
20ø LAUNDRY DUCT
SHEET M201m
SHEET M201h
SHEET M201a SHEET M201b SHEET M201c SHEET M201d
8.4
PROPOSED
WALL OPENING
AREA OF PROPOSED EXCAVATION
FOR BASEMENT INTERSTITIAL
SPACE DEMOLITION
STATE OFP
R O
FESSIONAL ENG
IN
E E R
L.
PH
ILL
IP GENTRY
14226
W
EST V I RG I N
IA
R
REGISTE ED
Department of
Veterans Affairs
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Dwg. ofRevisions: Date
CONSULTANTS:
VAMC - Martinsburg, WV
ARCHITECT/ENGINEERS:
Scale:
AS NOTEDSEAL: 613-15-301REPAIR-UPGRADE STEAM
DISTRIBUTUON
- CENTRAL CAMPUS 500
Office of
Construction and Facilities Management o n e e ig h th in c h o n e fo o t 1
B
A
C
D
E
F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
F
E
D
C
B
A
97 8654321
VA FORM 08-6231
MEP ENGINEERS
Valley Engineering 4901 Crowe Drive Mount Crawford, VA 22841
MEP ENGINEERS
Valley Engineering 4901 Crowe Drive Mount Crawford, VA 22841 of
NORTHKEY PLAN
j a b c d e hgf t
BID DOCUMENTS SUBMISSION
BID DOCUENTS
SUBMISSION
97 8654321
M2.01
MECHANICAL PIPING - BASEMENT
INTERSTITIAL KEY PLAN
04/29/2019 04/29/2019
DL / NL JCH
SCALE: 1/16" = 1'-0"
MECHANICAL PIPING - BASEMENT INTERSTITIAL KEY PLAN
GENERAL NOTES
1. COLUMN LINES ARE MARKED ON BEAMS AT EACH COLUMN, i.e., F7.
2. SEE LABELED SHEETS FOR ENLARGED PLANS.
3. HATCHED AREAS ARE SEMI-CLEAR WALKWAYS THAT SHOULD BE KEPT CLEAR,
AS MUCH AS POSSIBLE. NEW OBSTRUCTIONS NOT ABLE TO BE EASILY
CROSSED, SHALL BE PROVIDED WITH A GALV. BRIDGE WITH STEPS; GRATE
MATERIAL. ALL NEW WORK IN THESE AREAS ARE TO APPROVED BY OWNER’S
REP. BEFORE PROCEEDING.
4. ROOMS NOTED ARE THE LEVEL BELOW THE INTERSTITIAL SPACE.
5. WORK IS OCCURING IN AN ACTIVE HOPITAL. ALL SYSTEMS EXISTING IN
BUILDING MUST REMAIN ACTIVE UNLESS PLANS ARE MADE FOR A SHUTDOWN.
ALL SHUTDOWN OCCURENCES MUST BE KEPT TO A MINIMUM AND DURATION
OF SHUTDOWNS KEPT AS SHORT AS POSSIBLE.
6. DRYWALL WORK IS PART OF PROJECT.
7. ANYTIME ANY BARRIER IS PENETRATED, IT MUST BE REPAIRED W/ LIKE
CONSTRUCTION OR BETTER. EVEN IF IT HASN'T BEEN NEARBY.
8. NO NEW CONSTRUCTION CAN TOUCH SPRINKLER LINES.
9. INFORM BOILER PLANT OF ALL TESTING WHICH WILL INCREASE LOAD SO PLANT
CAN MAKE BOILER ADJUSTMENTS AS NECCESSARY.
� CONSTRUCTION NOTES
D
VD
VDVD
AP AP
M
M
M
M
M
D
T
T
T
T
T
T
T
T
GC-102K
GB-100R
GC-102I
GC-102L GB-120F
GB-123
GB-C10
GB-122GB-100P
GB-120C
GC-102A
GC-105
GB-120K
GC-105C
GC-105D
GC-102B
GC-102C
OFFICE
OFFICE
OFFICE TRAINING ROOM
VOLUNTEER DECONTAMINATION
EQUIP. ROOM
CONDENSING
CORRIDOR
STORAGE
NON-STERILE
STERILE &
OFFICE
SERVICES
MECHANICAL
WORK AREA
TELE. ROOM
ROOM
ELECTRICAL
OFFICE
OFFICE
STORAGE
NON-STERILE
1 2 3 4 5
C
D
E
F
H P
S
P C
M4.01
5" HPS 2" PC BELOW
5" HPS
2" PC
6" HPS
2 1/2" PC
8" HPS
1 1/2" PC
5" HPS
/2
P C
H P
S
1 1/2" PC
5" HPS
5" HPS UP
1 1/2" PC UP
TO 1ST FLOOR
SHEET M2.02a
8" HPS UP
4" PC UP
SEE SHEET M202a5
STATE OFP
R O
FESSIONAL ENG
IN
E E R
L.
PH
ILL
IP GENTRY
14226
W
EST V I RG I N
IA
R
REGISTE ED
Department of
Veterans Affairs
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Dwg. ofRevisions: Date
CONSULTANTS:
VAMC - Martinsburg, WV
ARCHITECT/ENGINEERS:
Scale:
AS NOTEDSEAL: 613-15-301REPAIR-UPGRADE STEAM
DISTRIBUTUON
- CENTRAL CAMPUS 500
Office of
Construction and Facilities Management o n e e ig h th in c h o n e fo o t 1
B
A
C
D
E
F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
F
E
D
C
B
A
97 8654321
VA FORM 08-6231
MEP ENGINEERS
Valley Engineering 4901 Crowe Drive Mount Crawford, VA 22841
MEP ENGINEERS
Valley Engineering 4901 Crowe Drive Mount Crawford, VA 22841 of
NORTHKEY PLAN
a
BID DOCUMENTS SUBMISSION
BID DOCUENTS
SUBMISSION
97 8654321
M2.01a
MECHANICAL PIPING - BASEMENT
INTERSTITIAL PLAN-a
04/29/2019 04/29/2019
DL / NL JCH
GENERAL NOTES
1. REMOVE PIPE HANGERS ASSOCIATED WITH PIPING SHOWN TO BE REMOVED.
HANGERS SHALL NOT BE ABANDONED IN PLACE.
2. COORDINATE ALL MECHANICAL UTILITY AND HVAC UNIT SHUT DOWNS WITH
OWNER. ANY SHUT DOWNS NECESSARY TO ACHIEVE THE OBJECTIVE OF THIS
DESIGN SHALL BE COMPLETED DURING "OFF HOURS" AND SHALL COMPLY WITH
OWNER'S UTILITY SHUT DOWN POLICIES.
3. CONTRACTOR IS RESPONSIBLE FOR ALL CUTTING, PATCHING AND DEMOLITION
OF ALL BUILDING SYSTEMS PER THEIR MEANS-AND-METHODS AS NECESSARY TO
PROVIDE THE DESIGN INDICATED.
4. LISTED ROOMS ARE IN THE FLOOR BELOW THE INTERSTITIAL SPACE.
5. DEMO ABANDONED TRASH AND LAUNDRY DUCT IF NEEDED TO INSTALL NEW
STEAM AND PUMPED CONDENSATE PIPING. SEE DEMO SHEET 301 a-e FOR DUCT
LICATIONS AND DEMO INSTRUCTIONS. KEEP COST SEPARATE TO HELP WITH
COST COMPARISON.
6. WORK IS OCCURING IN AN ACTIVE HOPITAL. ALL SYSTEMS EXISTING IN BUILDING
MUST REMAIN ACTIVE UNLESS PLANS ARE MADE FOR A SHUTDOWN. ALL
SHUTDOWN OCCURENCES MUST BE KEPT TO A MINIMUM AND DURATION OF
SHUTDOWNS KEPT AS SHORT AS POSSIBLE.
7. DRYWALL WORK IS PART OF PROJECT.
8. ANYTIME ANY BARRIER IS PENETRATED, IT MUST BE REPAIRED W/ LIKE
CONSTRUCTION OR BETTER. EVEN IF IT HASN'T BEEN NEARBY.
9. NO NEW CONSTRUCTION CAN TOUCH SPRINKLER LINES.
10. INFORM BOILER PLANT OF ALL TESTING WHICH WILL INCREASE LOAD SO PLANT
CAN MAKE BOILER ADJUSTMENTS AS NECCESSARY.
SCALE: 1/4" = 1'-0"
MECHANICAL PIPING - BASEMENT INTERSTITIAL PLAN-a
� CONSTRUCTION NOTES
1. RELOCATE CONDUIT, CONDENSING UNITS, REFRIGERANT PIPING, AND
ANCILLARY COMPONENTS, AS NEEDED, TO ACCOMPLISH THE DESIGN
INDICATED.
2. ROUTE NEW 2 1/2" PUMPED-CONDENSATE PIPE DOWN TO EXISTING 1 1/2" PIPE,
THROUGH NEW CORE-DRILLED HOLE ABOVE, AND TEMPORARILY TERMINATE
WITH A GATE VALVE AND BLIND FLANGE FOR YOUR FUTURE INTERFACE WITH
EXISTING PIPE BELOW; TO BE SCHEDULED LATER WITH THE OWNER.
3. ROUTE NEW 5" STEAM PIPE TO EXISTING 5" PIPE, THROUGH NEW CORE-DRILLED
HOLE ABOVE, AND TEMPORARILY TERMINATE WITH A GATE VALVE AND BLIND
FLANGE FOR YOUR FUTURE INTERFACE WITH EXISTING PIPE BELOW; TO BE
SCHEDULED LATER WITH THE OWNER.
4. INSTALL GATE VALVES AND HIGH PRESSURE STEAM TRAP DISCHARGE INTO
PUMPED CONDENSATE RETURN LINE.
5. ROUTE NEW PIPING THROUGH TUNNEL WALL IN TO UPPER LEVEL CONDENSER
BUILDING AND UP THROUGH ROOF.
VV
V
V
V
V V
V
SRSR
SR
3" CHR
T
T
T
T
T
75" H. WALL
FD
FD
S-4
GA-104
S-6
GB-118
GB-108
T -1
GB-109
GB-111
GB-110
GB-112
GB-120F
42 SQ. FT.
GB-120H
G B
-1
B S-8
GB-C1
GB-C3
GA-100S-5
GA-C1
GA-101
S-7
GB-C8
GB-119
T -1
GB-120G
G B
-1
J
GB-108A
GB-120A
GB-120I
ELEV.
CORRIDOR
PANEL ROOM
FIRE ALARM
ELEV.
TOILET
FEMALE
UTILITY ROOM
MECH. ROOM
TOILET
FEMALE
SOILED TERM.
TOILET
MALE
DECONTAMINATION
H.A.C.
M E
C H
. R O
O M
FUTURE ELEV.
CORRIDOR
CORRIDOR
MECH RMELEV.
LOBBY
SERVICE ELEVATOR
HOSPITAL PATIENT &
TELEPHONE RM.
ELEV.
CORRIDOR
TOILET
MALE
(DIRTY AREA)
STERILIZATION RM.
C A
R T
W A
S H
M A
N U
A L
MECH. RM.
(CLEAN AREA)
STERILIZATION RM.
MECH. RM.
5 6 7 8
C
D
E
F
6" HPS
2 1/2" PC
H P
S
/2
P C
/2
P C
H P
S
H P
S
P C
8.4
EXISTING STEAM AND
PUMPED CONDENSATE
TO CENTRAL AND NORTH
MECHANICAL ROOM
P C
H P
S
EXISTING TO REMAIN
UP TO PENTHOUSE
STATE OFP
R O
FESSIONAL ENG
IN
E E R
L.
PH
ILL
IP GENTRY
14226
W
EST V I RG I N
IA
R
REGISTE ED
Department of
Veterans Affairs
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Dwg. ofRevisions: Date
CONSULTANTS:
VAMC - Martinsburg, WV
ARCHITECT/ENGINEERS:
Scale:
AS NOTEDSEAL: 613-15-301REPAIR-UPGRADE STEAM
DISTRIBUTUON
- CENTRAL CAMPUS 500
Office of
Construction and Facilities Management o n e e ig h th in c h o n e fo o t 1
B
A
C
D
E
F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
F
E
D
C
B
A
97 8654321
VA FORM 08-6231
MEP ENGINEERS
Valley Engineering 4901 Crowe Drive Mount Crawford, VA 22841
MEP ENGINEERS
Valley Engineering 4901 Crowe Drive Mount Crawford, VA 22841 of
NORTHKEY PLAN
b
BID DOCUMENTS SUBMISSION
BID DOCUENTS
SUBMISSION
97 8654321
M2.01b
MECHANICAL PIPING - BASEMENT
INTERSTITIAL PLAN-b
04/29/2019 04/29/2019
DL / NL JCH
GENERAL NOTES
1. REMOVE PIPE HANGERS ASSOCIATED WITH PIPING SHOWN TO BE REMOVED.
HANGERS SHALL NOT BE ABANDONED IN PLACE.
2. COORDINATE ALL MECHANICAL UTILITY AND HVAC UNIT SHUT DOWNS WITH
OWNER. ANY SHUT DOWNS NECESSARY TO ACHIEVE THE OBJECTIVE OF THIS
DESIGN SHALL BE COMPLETED DURING "OFF HOURS" AND SHALL COMPLY WITH
OWNER'S UTILITY SHUT DOWN POLICIES.
3. CONTRACTOR IS RESPONSIBLE FOR ALL CUTTING, PATCHING AND DEMOLITION
OF ALL BUILDING SYSTEMS PER THEIR MEANS-AND-METHODS AS NECESSARY TO
PROVIDE THE DESIGN INDICATED.
4. LISTED ROOMS ARE IN THE FLOOR BELOW THE INTERSTITIAL SPACE.
5. DEMO ABANDONED TRASH AND LAUNDRY DUCT IF NEEDED TO INSTALL NEW
STEAM AND PUMPED CONDENSATE PIPING. SEE DEMO SHEET 301 a-e FOR DUCT
LICATIONS AND DEMO INSTRUCTIONS. KEEP COST SEPARATE TO HELP WITH
COST COMPARISON.
6. WORK IS OCCURING IN AN ACTIVE HOPITAL. ALL SYSTEMS EXISTING IN BUILDING
MUST REMAIN ACTIVE UNLESS PLANS ARE MADE FOR A SHUTDOWN. ALL
SHUTDOWN OCCURENCES MUST BE KEPT TO A MINIMUM AND DURATION OF
SHUTDOWNS KEPT AS SHORT AS POSSIBLE.
7. DRYWALL WORK IS PART OF PROJECT.
8. ANYTIME ANY BARRIER IS PENETRATED, IT MUST BE REPAIRED W/ LIKE
CONSTRUCTION OR BETTER. EVEN IF IT HASN'T BEEN NEARBY.
9. NO NEW CONSTRUCTION CAN TOUCH SPRINKLER LINES.
10. INFORM BOILER PLANT OF ALL TESTING WHICH WILL INCREASE LOAD SO PLANT
CAN MAKE BOILER ADJUSTMENTS AS NECCESSARY.
SCALE: 1/4" = 1'-0"
MECHANICAL PIPING - BASEMENT INTERSTITIAL PLAN-b
� CONSTRUCTION NOTES
1. INSTALL GATE VALVES AND HIGH PRESSURE STEAM TRAP DISCHARGE INTO
PUMPED CONDENSATE RETURN LINE.
V
V
V V
V
SR
SR
3" CHR
3" CH
AP VD
8" CH
8" CHR
E1
T
T T
T
T
T
T
T
T
T
T
T
T
T
T
T
D.F.
GA-119B
GA-105
GA-120
GB-100A
GA-C8
GA-129
GA-130
GA-120D
GA-C9
G-S7
S-8
GA-120K
GA-100
GA-128
GA-C11
GA-C10
GA-120C
GA-120A
GA-123
GA-124
GA-125
GA-120B
GA-133
GA-132B
GA-132
ELEV. MACH. RM.
PHARMACY
MALE TOILET
CORRIDOR
CORRIDOR
OFFICE
OFFICE
OFFICE
OFFICE
CORRIDOR
STAIR # 7
FUTURE ELEV.
PHARMACY
MECH RM
OFFICE
CORRIDOR
CORRIDOR
OFFICE
HSKP
FEMALE TOILET
MALE TOILET
H.A.C.
MED STORAGE
CLOTHING STORAGE
CHANGE
OFFICE
DUMBWAITER-13
UP
9 10 11
C
D
E
F
/2
P C
H P
S
20ø LAUNDRY DUCT
20ø TRASH DUCT
12" CWS
12" CWR
8.4
EXISTING STEAM AND
PUMPED CONDENSATE
TO CENTRAL AND NORTH
MECHANICAL ROOM
P C
H P
S
STATE OFP
R O
FESSIONAL ENG
IN
E E R
L.
PH
ILL
IP GENTRY
14226
W
EST V I RG I N
IA
R
REGISTE ED
Department of
Veterans Affairs
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Dwg. ofRevisions: Date
CONSULTANTS:
VAMC - Martinsburg, WV
ARCHITECT/ENGINEERS:
Scale:
AS NOTEDSEAL: 613-15-301REPAIR-UPGRADE STEAM
DISTRIBUTUON
- CENTRAL CAMPUS 500
Office of
Construction and Facilities Management o n e e ig h th in c h o n e fo o t 1
B
A
C
D
E
F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it.