36C24518R0046-015.pdf
PDF 5 KB Posted
- Attached to
- VISN 5 CONSTRUCTION MULTIPLE AWARD TASK ORDER CONTRACT $2, 000 - $1, 000, 000 AKA: MATOC TWO
- Solicitation number
- 36C24518R0046
About this file
36C24518R0046 Attach 3A SOW Replace Chiller Bldg. 2.pdf
View the file
Other files
Show 40 more
Latest 50 of 62 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Scope of Work
581-16-108
Replace Chiller Bldg. 2.
This project consists of replacing the existing chiller serving Bldg. 2, with a new air-cooled, variable speed, screw compressor chiller. Work related to the chiller replacement includes replacing piping and insulation, associated pumps and supporting variable speed drives, valves and controls.
Also included is replacing the Bldg. 2 upper loading dock canopy extension and metal walking platform to dumpsters, and improving aesthetics of the loading dock area. Improvement to the
Laundry Plant loading dock includes adding insulated metal wall panel to enclose dock, and adding motorized coiling door on main laundry entrance doors. Additional work includes adding screen wall system around nearby outdoor electrical equipment. Other work includes lead based paint removal, and all other work provided by drawings and specifications.
Bid Item II is the same as Bid Item I, except delete power motor coiling door operator and associated electrical, and install manual operated. Delete new doors at Electrical Room and refinish existing. Omit heavy textured industrial non-slip coating on loading dock concrete surface, and omit commissioning of the mechanical systems and only provide the start-up, functional test and TAB to meet design values.
Bid Item III is the same as Bid Item II, except further delete electrical equipment screen wall system and associated items.
Bid Item IV is the same as Bid Item III, except further delete laundry dock enclosure and all associated items.
Contract duration for all Bid Items is listed at 180 Calendar Days. (The lead time on the chiller delivery and the related work dictates the contract duration; all other work can be done within that time.)