As-Built for Building 12.pdf
PDF 148 KB Posted
- Solicitation number
- 36C24425R0093
About this file
The document is an architectural, mechanical, and plumbing plan for Building 12, specifically focusing on generator rooms. The plan includes three detailed schematics - an architectural plan, a mechanical plan, and a plumbing plan - with comprehensive symbols and abbreviations for HVAC equipment, plumbing fixtures, and related technical elements. The drawings show three nearly identical generator room layouts, with multiple equipment pads, storage areas, and precise dimensional measurements, indicating a standardized design for power generation infrastructure.
The technical drawings provide extensive legend details, including plumbing symbols (such as sanitary sewer, vent piping, water piping), HVAC duct symbols, and equipment abbreviations like AHU (Air Handling Unit), RTU (Roof Top Unit), and VAV (Variable Air Volume). The plan is part of project ER-12-01A and uses a 1/4" = 1'-0" scale, suggesting these are detailed engineering specifications for a specific building's power and mechanical systems, likely part of a larger infrastructure or facility development project.
View the file
Other files
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1/4" = 1'-0"1 BUILDING 12 - ARCHITECTURAL PLAN
ER-12-01A
BUILDING 12
ARCHITECTURAL, MECHANICAL AND
PLUMBING PLANS
1/4" = 1'-0"2 BUILDING 12 - MECHANICAL PLAN
1/4" = 1'-0"3 BUILDING 12 - PLUMBING PLAN
GENERATOR ROOM
GENERATOR ROOM
25'
24'-8"
'-6
'-2
5'-8"
3'-8" 2'-5" 7"
GE
NE
RA
TO
R-
STOR STOR
EQUIPMENT PAD
EQUIPMENT PADEQUIPMENT PAD
GENERATOR PAD
GENERATOR PAD
GENERATOR ROOM
GENERATOR ROOM
GENERATOR ROOM
GENERATOR ROOM
PLUMBING SYMBOLS
SANITARY SEWER BELOW GRADE
SANITARY SEWER PIPING
SANITARY VENT PIPING
STORM SEWER PIPING
RAIN WATER CONDUCTOR
COLD WATER PIPING
HOT WATER PIPING
HOT WATER RETURN PIPING
BALL VALVE
CHECK VALVE
CAPPED CONNECTION
PIPE DROP
PIPE UP
P-TRAP
FLOOR DRAIN (No. indicates type)
CLEAN OUT
FLOOR
CLEANOUT
CO
CO
FD
OS&Y VALVE
BUTTERFLY VALVE
BACKFLOW PREVENTER
STRAINER
WATER METERM
PRESSURE REGULATING VALVE
VENT THRU ROOF
ELECTRIC WATER HEATEREWH
V.T.R.
HVAC DUCT SYMBOLS
DUCT
SUPPLY DUCT UP/DOWN
RETURN DUCT UP/DOWN
EXHAUST DUCT UP/DOWN
SUPPLY DIFFUSER
RETURN DIFFUSER
EXHAUST DIFFUSER
SQUARE-TO-ROUND DUCT TRANSITION
FIRE, MOTORIZED, SMOKE/FIRE &
MANUAL DAMPER
CAPPED DUCT
LINEAR SLOT DIFFUSER
TURNING VANES
HVAC ABBREVIATIONS
ACCU AIR COOLED CONDENSING UNIT
AHU AIR HANDLING UNIT
AD ACCESS DOOR
A.F.F ABOVE FINISHED FLOOR
AP ACCESS PANEL
AV AIR VENT
CLG,CEL CEILING
CO CLEAN OUT
CU CONDENSING UNIT
CUH CABINET UNIT HEATER
DX DIRECT EXCHANGE
EAL EXHAUST AIR LOUVER
EF EXHAUST FAN
EG EXHAUST GRILLE
ERV ENERGY RECOVERY VENTILATION
ET EXPANSION TANK
EUH ELECTRIC UNIT HEATER
FCU FAN COIL UNIT
FD FIRE DAMPER
FT FINNED TUBE
GCP GROUND CENTRIFUGAL PUMP
GHRP GLYCOL HEAT RECOVERY PUMP
GUH GAS UNIT HEATER
HUH HOT WATER UNIT HEATER
MUA MAKEUP AIR UNIT
MOD MOTOR OPERATED DAMPER
OA OUTSIDE AIR
RA RETURN AIR
RAG RETURN AIR GRILLE
RTU ROOF TOP UNIT
SA SUPPLY AIR
SAD SUPPLY AIR DIFFUSER
SAL SUPPLY AIR LOUVER
SD SMOKE DAMPER
SUH STEAM UNIT HEATER
VAV VARIABLE AIR VOLUME
VD VOLUME DAMPER
VRF VARIABLE REFRIGERANT FLOW
TERMINAL BOX
THERMOSTATT
ROOF MOUNTED EXHAUST FAN
HVAC EQUIPMENT SYMBOLS
FINNED TUBE RADIATOR
CABINET UNIT HEATER
UNIT HEATER
RADIANT CEILING HEATING PANEL
CUH
RCP
AIR HANDLING UNIT
ERV
VRF
VAV
HEATING COIL
CONDENSATE PUMP
AIR SEPERATOR
H HUMIDISTAT
MANUAL DAMPER
PUMP
AutoCAD SHX Text
RWC
AutoCAD SHX Text
ST
AutoCAD SHX Text
SAN
AutoCAD SHX Text
SAN
| Sheets and Views |
| Building 12-ER-12-01A |
File details come from the government source that posted it. Updated .