Site Visit Sign In Sheet.pdf
PDF 18 KB Posted
- Solicitation number
- 36C24425R0006
About this file
This document is a Request for Proposal (RFP) for the Design-Build Replacement of Multi-Stack Heat Pumps in Building 37 at the Lebanon VA Medical Center. The project requires the contractor to provide design and construction services to replace the failing multi-stack heat pumps in Building 37, including replacing deteriorated piping, valves, insulation, wiring, and converting the HVAC controls to a new Distech Tridium system. The contractor must follow VA guidelines, specifications, and design standards, with a 280-day construction schedule. Key submission requirements include 35% Design Development, 100% Design Development, and final Construction Documents. The contractor is expected to provide construction period services such as shop drawing reviews, site visits, and as-built drawings. Specific project details, technical specifications, and submission requirements are provided in the attachments.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C24425R0006 0002.docx | DOCX document | |
| EXHIBIT E Past Performance Questionnaire.docx | DOCX document | |
| P07 SCA2015-4231 7.22.24 reupload.pdf | ||
| 36C24425R0006 0001.docx | DOCX document | |
| P07 SCA2015-4231 7.22.24.pdf | ||
| 013526 Lebanon Safety Requirements Spec 20240516.docx | DOCX document | |
| 010000 Lebanon General Requirements Spec.docx | DOCX document | |
| P07 PA20240093 7.19.24.pdf | ||
| SOW - 595-25-102 Replace Multi-Stack Building 37 - DB.docx | DOCX document | |
| Liquidated Damages signed.pdf | ||
| HVAC Controls - J and A Distech Controls signed redacted.pdf | ||
| 230923 HVAC Controls Specification.docx | DOCX document | |
| 36C24425R0006_1.docx | DOCX document |
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .