SOW Attachment A Steam Traps.pdf
PDF 113 KB Posted
- Solicitation number
- 36C24424R0084
About this file
This document is a Statement of Work (SOW) Attachment A that lists the steam traps that require replacement at the Lebanon VA Medical Center. The SOW provides detailed information on the current steam trap installations, including the building location, equipment tag, elevation, size, type, manufacturer, model, pressure rating, and current condition. The document also specifies the recommended replacement traps, including the size, type, and model number.
The related federal contract opportunity is for a Design-Build project to replace the steam traps at the Lebanon VA Medical Center. The project is set aside 100% for Service-Disabled Veteran-Owned Small Businesses (SDVOSB) and has an estimated construction cost between $250,000 and $500,000. The period of performance is 270 calendar days from the Notice to Proceed. The solicitation is anticipated to be issued on or about October 9, 2024, with a pre-bid conference/site visit scheduled for October 15, 2024.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Recommended Trap Replacement Building Location FL Tag Elev Size Type Mfg Model Psig Equip. Test Comments Qty Size Type Model Repaired or Tested Model Installed
1 Service Room B 117 5 3/4" TD SO 52 25 Drip FC 1 3/4" FTI I-2030-3
1 Service Room B 119 2 1/2" TD SO 52 25 Drip FO 1 1/2" FTI I-2030-2
1 Service Room B 132 4 3/4" TD SO TD52 80 Drip LK 1 3/4" BKT 8000-125
1 541 Mech Rm 5 261 2 3/4" BKT SO B1H 25 Drip LK 1 3/4" FTI I-2030-3
1 A Side Attic 6 248 5 3/4" FT SO FT15 20 HUH FO 1 3/4" FT 2030-3
1 B Side Attic 6 258 6 3/4" FT SO FT30 20 HUH FO 1 3/4" FT 2030-3
2 Basement B 221 5 3/4" UTD SO 52 10 Drip FO 1 3/4" FTI I-2030-3
2 Attic 4 217 4 3/4" BKT AG 811 10 Drip LK 1 3/4" FTI I-2030-3
3 Storage in pit B 352 -2 1/2" TD SO 52 5 Drip FO Condensate pump 1 1/2" FTI I-2030-2
4 Mech Rm B 349 3 1/2" TD SO TD52 80 Drip LK 1 1/2" BKT 8000-125
5 Mech Rm B 347 7 1/2" TD SO 52 5 Drip FC 1 1/2" FTI I-2030-2
6 Mech B 83 7 3/4" FTI SO FT15 5 HUH LK 1 3/4" FTI I-2030-3
7 Storage 2 B 75 6 3/4" FT SO FT15 10 Drip LK 1 3/4" FT 2030-3
7 Pipe storage B 77 5 3/4" FT SO FT15 10 Drip LK 1 3/4" FT 2030-3
7 Pipe storage pit B 78 -2 3/4" TD SO TD52 80 Drip LK 1 3/4" BKT 8000-125
7 SW corner G SW 15 3/4" FT SO FT15 10 HUH FO From landing doc 1 3/4" FT 2030-3
7 By machines G M 8 3/4" FT SO FT15 10 HUH LK 1 3/4" FT 2030-3
10 Basement pump B 146 5 1/2" UTD SO TD52 100 Drip LK 1 1/2" BKT 8000-125
10 Tunnel entrance B 150 1 1/2" UTD SO TD52 100 Drip FO 1 1/2" BKT 8000-125
10 Boiler storage G 143 9 3/4" BKT SO B1H 40 VUH FO 1 3/4" BKT 8000-125
10 Chiller G 154 9 1" FT SO 30 40 HUH FO 1 1" BKT 8011-200
10 Chiller G 158 15 1" FT SO 30 40 HUH LK 1 1" BKT 8011-200
10 Chiller G 159 15 3/4" FT SO 30 40 HUH FO 1 3/4" BKT 8000-125
17 Service Room B 315 4 1/2" TD SO 52 25 Drip LK 1 1/2" FTI I-2030-2
17 Service Room B 318 3 1/2" TD SO 52 25 Drip FO 1 1/2" FTI I-2030-2
17 Crawl B 332 4 3/4" BKT WM 1031 80 Drip FC 1 3/4" BKT 8000-125
17 Stairs 3 Crawl B 333 4 1/2" TD SO TD52 80 Drip LK 1 1/2" BKT 8000-125
17 Stairs 3 Crawl B 335 5 3/4" FT SO FT15 5 Drip FO 1 3/4" FT 2030-3
17 Stairs 3 Crawl B 341 2 1" FT WM FT30 20 Drip FO Behind 333 1 1" FT 2030-4
17 Attuc 5 282 3 1/2" TD SO 52 20 Drip LK 1 1/2" FTI I-2030-2
17 Attuc 5 289 1 1 1/4" FT MEP 44-530 10 STS FO 3/4" line 1 1 1/4" FT 2030-5
17 Attuc 5 294 5 3/4" FT NN FTN 25 HUH LK 1 3/4" FT 2030-3
17 Attic 5 304 1 1/2" FTI SO FT15 12 Drip FO 1 1/2" FTI I-2030-2
17 Attic 5 309 5 3/4" FT NN FTN 25 HUH LK 1 3/4" FT 2030-3
18 Service Room B 189 5 1/2" UTD SO 52 25 Drip FC 1 1/2" FTI I-2030-2
18 Service Room B 190 6 3/4" FT SO FT15 25 Drip FC 1 3/4" FT 2030-3
18 Service Room B 193 5 3/4" FT SO FT15 5 Drip FO 1 3/4" FT 2030-3
18 Tunnel B 201 2 1" FT SO FT15 5 Drip FO 1 1" FT 2030-4
18 Tunnel B 202 2 1" FT SO FT15 5 Drip LK 1 1" FT 2030-4
18 Tunnel B 203 2 3/4" FT SO FT15 5 Drip FC 1 3/4" FT 2030-3
18 Roof Access 1 1 184 3 1 1/4" FT NN FTN 25 AHU FO 1 1 1/4" FT 2030-5
18 Attic A Side 5 162 4 3/4" BKT NN 805 25 Drip LK 1 3/4" FTI I-2030-3
18 Attic A Side 5 165 3 2" FT NN FTN 25 HEX LK Control valve failed 1 2" FT 2030-8
18 Attic A Side 5 166 4 3/4" BKT NN 805 25 Drip LK 1 3/4" FTI I-2030-3
18 B Side 5 174 1 3/4" FT NN FTN 15 Drip FO 1 3/4" FT 2030-3
19 Basement B 16 3 1/2" TD SO 52 25 Drip FO 1 1/2" FTI I-2030-2
19 Basement B 20 1 1/2" FTI SO 30 25 Drip LK 1 1/2" FTI I-2030-2
19 Crawl B 24 3 3/4" FT SO FT15 5 Drip LK 1 3/4" FT 2030-3
19 Attic Mech A 1 4 3/4" FT SO 30 25 Drip FO 1 3/4" FT 2030-3
22 Basement B 41 3 1/2" TD SO 52 15 Drip FO 1 1/2" FTI I-2030-2
22 Basement B 42 4 1/2" TD SO 52 15 Drip FO Insulation 1 1/2" FTI I-2030-2
22 Basement B 49 9 3/4" FT SO FT15 5 Drip LK 1 3/4" FT 2030-3
23 118 B 58 7 1" FTI AG B4 25 LK 1 1" FTI I-2030-4
23 118 B 62 4 1/2" BKT AG TVS811 80 Drip FO 1 1/2" BKT 8000-125
23 Roof access AHU 1 R 63 3 3/4" FT AG B3 25 Drip NT Check Valve Piped Wrong 1 3/4" FT 2030-3
23 Roof access AHU 1 R 64 3 3/4" FT AG B3 25 AHU NT Check Valve Piped Wrong 1 3/4" FT 2030-3
23 Roof access AHU 2 R 65 3 3/4" FT AG B3 25 AHU FC Check Valve Piped Wrong 1 3/4" FT 2030-3
23 Roof access AHU 3 R 66 3 3/4" FT AG B3 25 AHU NT Check Valve Piped Wrong 1 3/4" FT 2030-3
24 Mech B 34 4 1/2" TD SO 52 25 Drip LK 1 1/2" FTI I-2030-2
24 Mech B 37 9 1/2" TD SO 52 25 Drip FC 1 1/2" FTI I-2030-2
24 Gymnasium 1 S 20 1/2" TD SO 52 25 VUH NT 2 traps parallel per VUH 1 1/2" FTI I-2030-2
24 Gymnasium 1 S 20 1/2" TD SO 52 25 VUH NT Remove one w/replacement 0
24 Gymnasium 1 E 20 1/2" TD SO 52 25 VUH NT 2 traps parallel per VUH 1 1/2" FTI I-2030-2
24 Gymnasium 1 E 20 1/2" TD SO 52 25 VUH NT Remove one w/replacement 0
24 Gymnasium 1 NE 20 1/2" TD SO 52 25 VUH NT 2 traps parallel per VUH 1 1/2" FTI I-2030-2
24 Gymnasium 1 NE 20 1/2" TD SO 52 25 VUH NT Remove one w/replacement 0
24 Gymnasium 1 NE 20 1/2" TD SO 52 25 Drip NT under insulation 1 1/2" FTI I-2030-2
24 Gymnasium 1 N 20 1/2" TD SO 52 25 VUH NT 2 traps parallel per VUH 0
24 Gymnasium 1 N 20 1/2" TD SO 52 25 VUH NT Remove one w/replacement 1 1/2" FTI I-2030-2
24 Gymnasium 1 N 20 1/2" TD SO 52 25 Drip NT under insulation 1 1/2" FTI I-2030-2
24 Gymnasium 1 N 20 3/4" FTI SO 30 25 ZRH NT 1 3/4" FTI I-2030-3
24 Gymnasium 1 NW 20 1/2" TD SO 52 25 VUH NT 2 traps parallel per VUH 1 1/2" FTI I-2030-2
24 Gymnasium 1 NW 20 1/2" TD SO 52 25 VUH NT Remove one w/replacement 0
24 Gymnasium 1 W 20 1/2" TD SO 52 25 VUH NT 2 traps parallel per VUH 1 1/2" FTI I-2030-2
24 Gymnasium 1 W 20 1/2" TD SO 52 25 VUH NT Remove one w/replacement 0
24 Gymnasium 1 W 20 1/2" TD SO 52 25 Drip NT under insulation 1 1/2" FTI I-2030-2
24 Gymnasium 1 W 20 1/2" FTI SO 30 25 Drip NT 1 1/2" FTI I-2030-2
24 Gymnasium 1 W 20 3/4" FTI SO 30 25 ZRH NT 1 3/4" FTI I-2030-3
24 Outside access 1 39 2 1" FT SO 30 20 Drip NT 1 1" FT 2030-4
24 Outside access 1 40 6 1" FT SO 30 20 Drip NT 1 1" FT 2030-4
101 14 Mech Rm G 274 4 1 1/4" FT SO FT30 20 HEX FO 1 1 1/4" FT 2030-5
104 Mech Rm B 228 1 1/2" TD SO TD52 80 Drip FO 1 1/2" BKT 8000-125
104 Mechanical Room 3 84 3 3/4" FT SO FT15 80 Drip LK 1 3/4" BKT 8000-125
104 Mechanical Room 3 86 3 1 1/4" FT SO FT15 80 Drip FO On 1" pipe 1 1" BKT 8011-200
104 Mechanical Room 3 87 3 1 1/4" FT SO 30 25 Drip LK 1" pipe 1 1" FT 2030-4
104 Mechanical Room 3 96 1 3/4" BKT AG 811 80 Drip FO 1 3/4" BKT 8000-125
104 Mechanical Room 3 99 2 3/4" BKT AG 811 10 Drip FO 1 3/4" FTI I-2030-3
Current Steam Trap Installed Repair Made
104 Mechanical Room 3 103 5 3/4" FT PEN PT63 10 Drip LK 1 3/4" FT 2030-3
104 Mechanical Room 3 105 3 3/4" BKT AG 811 10 Drip FO 1 3/4" FTI I-2030-3
104 Mechanical Room 3 116 3 1 1/2" FTI AG 125 80 HEX LK 1 1 1/2" FTI I-2125-6
106 Service Room G 54 4 1" TD SO TD52 80 Drip LK 1 1" BKT 8011-200
136 In service room G 69 2 3/4" FT SO 30 25 Drip LK 1 3/4" FT 2030-3
136 In service room G 70 2 3/4" FT NN FTN 25 Drip FO 1 3/4" FT 2030-3
2- Repair List