This Quality Assurance Surveillance Plan outlines performance monitoring for an energy audit of boilers, deaerators, and condensate tanks at VA medical centers in Veterans Integrated Service Network 04. Key personnel and their roles are defined, including the Contracting Officer, Contracting Officer's Technical Representative, and Facility Contracting Officer Representatives. Performance standards address the required audit tasks and reports, with methods of surveillance including direct observation and validated user complaints. A rating system is provided to assess performance as exceptional, satisfactory, or unsatisfactory. Procedures for documenting performance issues and corrective action plans are also specified. The contractor must acknowledge and sign the QASP upon award of the related contract for these energy audits across multiple VA medical centers in VISN 04.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment 0002 36C24422Q0152 - VISN 4 Boiler Audit solicitation.docx | DOCX document | |
| 36C24422Q0152 Amendment 0002.docx | DOCX document | |
| Energy Adits ECM List Template.xlsx | XLSX spreadsheet | |
| Building Inventory.xlsx | XLSX spreadsheet | |
| Energry Audit Template.docx | DOCX document | |
| Questions and Answers 36C24422Q0152 0001.docx | DOCX document | |
| Pittsburgh Wage Determination.pdf | ||
| Wilkes Barre Wage Determination.pdf | ||
| Wilmington Wage Determination.pdf | ||
| Lebanon Wage Determination.pdf | ||
| Butler Wage Determination.pdf | ||
| Altoona Wage Determination.pdf | ||
| Coatesville Wage Determination.pdf | ||
| Erie Wage Determination.pdf | ||
| Philadelphia Wage Determination.pdf | ||
| 36C24422Q0152 - VISN 4 Boiler Audit solicitation.docx | DOCX document | |
| 36C24422Q0152_1.docx | DOCX document |
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
QUALITY ASSURANCE SURVEILLANCE PLAN (QASP)
For: Energy Audit and Evaluations of Boiler, Deaerator, and Condensate Tank for Veteran Affairs Medical Centers in Veterans Integrated Service Network (VISN) 04 Contract Number: TBD Contract Description: The VISN 04 VA Medical Centers has a need to obtain technical, analytical, and strategic support to perform an energy audit as well as engineering evaluation of boiler, deaerator, and condensate tank reliability/life expectancy.
Contractor’s name: TBD
1. PURPOSE
This QASP provides a method to evaluate performance and will explain the following:
· What will be monitored?
· How monitoring will take place?
· Who will conduct monitoring?
· How monitoring efforts and results will be documented?
This QASP does not detail how Contractor accomplishes the work. Rather, the QASP is created with premise that the contractor is responsible for management and quality control actions to meet the terms of the contract. It is the Government’s responsibility to be objective, fair, and consistent in evaluating performance.
This QASP is a “living document” and the Government may review and revise it on a regular basis. However, the Government shall coordinate changes with the contractor. Copies of the original QASP and revisions shall be provided to the contractor and Government officials implementing surveillance activities.
2. GOVERNMENT ROLES AND RESPONSIBILITIES
The following personnel shall oversee and coordinate surveillance activities:
Contracting Officer (CO): The CO shall ensure performance of all necessary actions for effective contracting, ensure compliance with the contract terms, and shall safeguard the interests of the United States in the contractual relationship. The CO shall also assure that the contractor receives impartial, fair, and equitable treatment under this contract. The CO is ultimately responsible for the final determination of the adequacy of the contractor’s performance.
VISN 04 Contracting Officer’s Technical Representative (VCOR): The VCOR has authority to provide direction to Contractor if within scope of the contract, does not constitute a change to the contract, and has no funding implications. The VCOR liaisons between the Contracting Officer (CO), the Facility Contracting Officer Representative (FCOR), and the Contractor. The VCOR is not empowered to make any contractual commitments or to authorize any contractual changes on the Government’s behalf.
Facility COR (FCOR): The FCOR which are the VISN 04 VA Medical Centers Energy Managers and Facility Chiefs are responsible for technical administration of the contract and shall assure proper Government surveillance of the contractor’s performance. The FCOR shall keep a quality assurance file. The FCOR is not empowered to make any contractual commitments or to authorize any contractual changes on the Government’s behalf.
| Name |
| Role |
| Telephone |
| William Schlobohm |
| Contracting Officer |
| william.schlobohm@va.gov |
| 878-271-6639 |
| Dominique Lee |
| VISN 04 Contracting Officer Representative |
| dominique.lee@va.gov |
| 717-272-6621 X3062 |
| Corbin McNeill |
| VISN 04 Energy Manager |
| corbin.mcneill@va.gov |
| 610-384-7711 X4434 |
| Doug Pollock |
| Altoona (503), Butler (529), Erie (562), and Pittsburgh (646) Energy Manager |
| douglas.pollock2@va.gov |
| 814-860-2937 |
| Jerry Wilson |
| Altoona (503) Facility Chief |
| jerry.wilson5@va.gov |
| 814-943-8164 X8347 |
| Daniel Michalek |
| Butler (529) Facility Chief |
| richard.crumley@va.gov |
| 724-285-267 |
| Richard Crumley |
| Coatesville (542) Facility Chief |
| richard.crumley@va.gov |
| 610-384-7711 X4225 |
| Jessica Lemmon |
| Erie (562) Facility Chief |
| jessica.lemmon@va.gov |
| 814-860-2090 |
| Ronald Heberle |
| Lebanon (595) and Wilkes-Barre (693) Energy Manager |
| ronald.heberle@va.gov |
| 717-272-6621 |
| Thaddeus Kocuba |
| Lebanon (595) Facility Chief |
| thaddeus.kocuba2@va.gov |
| 717-272-6621 X4740 |
| Susan McCaffrey |
| Philadelphia (642) Facility Chief |
| susan.mccaffrey@va.gov |
| 215-823-5800 X4251 |
| Todd Guarnieri |
| Pittsburgh (646) Facility Chief |
| todd.guarnieri@va.gov |
| 412-360-6831 |
| Orlando Mirarchi |
| Wilkes-Barre (693) Facility Chief |
| orlando.mirachijr@va.gov |
| 570-824-3521 X24169 |
| Edward Gannon |
| Wilmington (460) Energy Manager |
| edward.gannonIII@va.gov |
| 302-994-2511 X4554 |
| Jermaine Best |
| Wilmington (460) Facility Chief |
| jermaine.best@va.gov |
| 302-994-2511 X4098 |
3. CONTRACTOR REPRESENTATIVES
Contractor must provide contact information for the Contractor’s Project Manager to all Facility Chief/Energy Managers and alternates to the Contracting Officer (CO) and applicable FCOR as presented in this QASP.
4. PERFORMANCE STANDARDS
Performance standards define desired services. The Government performs surveillance to determine if the Contractor exceeds, meets, or does not meet these standards. The Government will use these standards to determine Contractor performance and will compare Contractor performance to the acceptable quality level (AQL).
5. INCENTIVES
The Government will report performance through Contractor Performance Assessment Reporting System (CPARS). The report will be based on the Contractor meeting or not meeting performance standards.
6. METHODS OF QA SURVEILLANCE
Various methods exist to monitor performance. The VCOR shall use the surveillance methods listed below in the administration of the QASP.
Direct Observation: Can be performed periodically or through 100% surveillance
Validated User/Customer Complaints: Feedback and complaints submitted to Energy Managers and Facility Chiefs will be investigated to determine if valid or invalid.
| Task |
| Standard |
| PWS Reference |
| Acceptable Quality Level (AQL) |
| Method of Surveillance |
| Remedy |
| Incentive |
| Boiler, Deaerator, and Condensate Inspection/Testing |
| Visually inspect and document the locations with sketch/picture, signs of warping, misalignment, overheating, evidence of corrosion, cracking, shifting, sagging, scale buildup, and other defects |
| Inspection Requirements of Boilers Section |
Boiler, Deaerator, and Condensate Tank Testing Section
| 100% |
| Direct Observation |
| Contractor must remedy within the allotted time frame |
| Document performance in CPARS |
| Energy Audit |
| All buildings will be evaluated on each VAMC, estimate energy and water/sewer consumption savings |
| Task Section |
| 100% |
| Direct Observation |
| Contractor must remedy within the allotted time frame |
| Document performance in CPARS |
| Submission of required documents |
| Required documents must be received timely |
| Energy Audit Draft and Final Written Report Section |
Boilers, Deaerators, and Condensate Tank Report Requirements Section
| 100% |
| Receipt of documents |
| Contractor must remedy within the allotted time frame |
| Document performance in CPARS |
| Services performed safely |
| Services are performed safely and meet safety requirements |
| Qualification Requirements for Consultant and Inspection Personnel Section |
Other Personnel Considerations Section
| 100% |
| Direct Observation |
| Contractor must remedy immediately |
| Document performance in CPARS |
7. RATINGS
Metrics and methods are designed to determine if performance exceeds, meets, or does not meet a given standard and acceptable quality level. A rating scale shall be used to determine a positive, neutral, or negative outcome. The following ratings shall be used:
Exceptional = Exceeds standards Satisfactory = Meets standards Unsatisfactory = Fails to meet standards
| Surveillance Method |
| Rating |
| Direct Observation |
| Exceptional |
| Performance significantly exceeds contract requirements to the Government’s benefit. |
| Satisfactory |
| Performance meets contractual requirements |
| Unsatisfactory |
| Performance does not meet contractual requirements |
| VA Medical Centers staff/customer feedback and complaints |
| Satisfactory |
| Reported complaint/feedback was not validated – performance did meet contractual requirements |
| Unsatisfactory |
| Reported complaint/feedback was validated – performance did not meet contractual requirements |
Satisfactory Performances: The Government shall document positive performance. Any report may become a part of the supporting documentation for any contractual action.
Unsatisfactory Performances: When unsatisfactory performance occurs, the FCOR will inform the Contractor as well as documenting the issue on the report, giving the Contractor an opportunity to address the concerns and to fix any issues. This report will be shared with the Contractor.
When the FCOR determines formal written communication is required, the FCOR shall prepare a Contract Performance Report (CPR) and present it to the contractor's program manager with a copy to the Contracting Officer.
The contractor shall acknowledge receipt of the CPR in writing. The CPR will specify if the contractor is required to prepare a corrective action plan (CAP) to document how the contractor shall correct the unacceptable performance and avoid a recurrence.
The CPR will also state how long after receipt the contractor must present this CAP to the FCOR. The Government shall review the contractor's corrective action plan to determine acceptability.
The Facility Chief/Energy Manager must acknowledge receipt of the CPR in writing by signing a copy of the CPR.
Any CPRs may become a part of the supporting documentation for any contractual action deemed necessary by the CO.
The CO will assure the Contractor receives impartial, fair, and equitable treatment. The CO is ultimately responsible for the final determination of the adequacy of the contractor’s performance.
8. DOCUMENTING PERFORMANCE
Contract Performance Report (CPR): Unsatisfactory performance notification may be verbal or written depending on the severity. The FCOR determines the method of notification. Written notification will be accomplished by completing the CPR. The CPR must be presented to the Contractor’s Project Manager or alternate and to the VCOR and CO.
Corrective Action Plan (CAP): The FCOR may determine a CAP is required to resolve unsatisfactory performance. The Contractor must complete and return the CAP within time constraints the FCOR determines. CPRs requiring work stoppage resulting from unsafe conditions require a written CAP. The CAP remedy must be approved by the FCOR prior to work recommencement.
9. FREQUENCY OF MEASUREMENT
During contract performance, the FCOR (VISN 04 VA Medical Centers Energy Managers and Facility Chiefs) will periodically analyze whether the negotiated frequency of surveillance is appropriate for the work being performed.
The VCOR shall meet with the contractor weekly to assess performance and shall provide a written assessment.
10. QASP ACKNOWLEDGEMENT
Signed:
Signature – Contractor Name/Title Date
Signature – VISN 04 FCOR/Title Date
Signature – Altoona FCOR/Title Date
Signature – Butler FCOR/Title Date
Signature – Coatesville FCOR/Title Date
Signature – Erie FCOR/Title Date
Signature – Lebanon FCOR/Title Date
Signature – Philadelphia FCOR/Title Date
Signature – Pittsburgh FCOR/Title Date
Signature – Wilkes-Barre FCOR/Title Date
Signature – Wilmington FCOR/Title Date