Energry Audit Template.docx
DOCX document 88 KB Posted
- Attached to
- F115--VISN 4-Wide Energy Boiler Audits
- Solicitation number
- 36C24422Q0152
About this file
This document contains an energy and water audit report template for a Department of Veterans Affairs medical center campus. The template provides guidelines for conducting an audit of the facility's utility consumption, buildings, energy conservation measures, and recommendations. It outlines the regulatory requirement to perform audits every four years and document the facility description, historical energy and water usage, energy systems and potential improvements. Thirteen categories of energy conservation measures are identified along with an example format for documenting proposed measures. Details include projected installation costs, savings, payback periods and commodity reductions. The report aims to establish an energy baseline and identify opportunities to improve efficiency in compliance with federal law.
A related federal contract opportunity posting seeks pre-solicitation notices for energy audits of Department of Veterans Affairs medical facilities within Veterans Integrated Service Network 4. No further details are provided on requirements, response dates, pricing or other solicitation terms.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment 0002 36C24422Q0152 - VISN 4 Boiler Audit solicitation.docx | DOCX document | |
| 36C24422Q0152 Amendment 0002.docx | DOCX document | |
| Energy Adits ECM List Template.xlsx | XLSX spreadsheet | |
| Building Inventory.xlsx | XLSX spreadsheet | |
| Questions and Answers 36C24422Q0152 0001.docx | DOCX document | |
| Pittsburgh Wage Determination.pdf | ||
| Wilkes Barre Wage Determination.pdf | ||
| Wilmington Wage Determination.pdf | ||
| Lebanon Wage Determination.pdf | ||
| Butler Wage Determination.pdf | ||
| Altoona Wage Determination.pdf | ||
| Coatesville Wage Determination.pdf | ||
| Erie Wage Determination.pdf | ||
| Philadelphia Wage Determination.pdf | ||
| 36C24422Q0152 - VISN 4 Boiler Audit solicitation.docx | DOCX document | |
| P01 Energy Boiler Audit QASP.docx | DOCX document | |
| 36C24422Q0152_1.docx | DOCX document |
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
VISN 08 Network Task 2: Appendix E: Water VAMC Bay Pines Campus
DEPARTMENT OF VETERANS AFFAIRS
Water and Energy Audit Report
Insert station picture
VISN XX
VAMC
Address
TABLE OF CONTENTS
Contents
| 1.0 | Executive Summary | 3 |
| 2.0 | Introduction | 4 |
| 3.0 | Method of Analysis | 5 |
| 3.1 Analysis and General Description | 5 | |
| 3.2 ECM Cost Calculation Description | 6 | |
| 3.3 Energy Modeling Calculation Description | 6 | |
| 4.0 | Historical Utility Consumption/Cost | 6 |
| 4.1 Baseline Utility Usage Evaluation to Reduce Energy and Water Usage | 6 | |
| 4.2 Energy Review | 8 | |
| 4.3 Renewable Energy Review | 8 | |
| 4.4 Water Review | 9 | |
| 4.5 Energy Star Rating | 10 | |
| 5.0 | Facility Description | 11 |
| 5.1 General Facility Description | 11 | |
| 6.0 Sustainable Buildings | 13 | |
| 7.0 ECM Description and TYPE | 13 | |
| Conclusion | 17 |
1.0 Executive Summary
Hospital description / Information
The XX VAMC, station number XX, is located at XX. The XX Healthcare System provides comprehensive medical care including acute/inpatient medical, surgical, and psychiatric care; extended / long-term medical and psychiatric care, rehabilitative inpatient care; and comprehensive outpatient care with multiple specialty services available. In addition, the Medical Center supervises a community nursing home care. The XX VA provides services to more than XX veterans living in XX area of XX. The XX VA Healthcare System is a member of the Veterans Integrated Services Network (VISN 4). The XX VA has XXhospital beds, XX acute beds, XX community living center beds, XX domiciliary beds and XX residential treatment beds. Total Square Footage of the Campus is XXXX gross square feet (GSF).
The purpose of this energy and water audit is to comply with federal law and develop a document to use for further requirements. The once every 4-year requirement is based on the date of the last audit listed in the Department of Energy (DOE)’s Compliance Tracking System (CTS) database. This requirement to complete these audits at least once every four years is mandated in law: 42 U.S.C. 8262 / EISA 2007 section 432. As part of the evaluation the auditor shall identify and assess opportunity for recommissioning measures (or, if the facility has never been commissioned, retro commissioning measures) for each such facility. The goal is to establish baseline energy usage profiles and recommend energy conservation measures (ECMs). This detailed report will be used to further understand the overall potential energy savings and costs associated with energy and cost reduction improvements. The completed report will act as a guide when considering future changes to the building to improve energy efficiency.
Current recommended ECM’s with associated/potential project costs and possible annual energy cost savings:
Insert summary table (from spreadsheet, similar to the one on the next page)
2.0 Introduction
The Department of Veterans Affairs (VA) is required by the Energy and Independence Security Act of 2007 (EISA 2007) section 432 to conduct energy and water audits at each major facility once every 4 years. The energy and water audit are intended to provide a benchmark for the facility to use as a guide to improve energy and water efficiency. The audit should include an a review of all pertinent information from previous audits, retro-commissioning, SCIP submissions, and facility condition reports.
The facility energy and water audit should look at all of the following information:
· Building envelope (roof, windows, etc.)
· Heating, ventilation, and air conditioning equipment (HVAC)
· Building Automation Systems
· Metering – including identifying which buildings have submetering, considering IT integration
· Lighting systems and controls
· Operation and occupancy schedules
· Facility-specific equipment
· Renewable Energy systems, the possibility, true up old assessments
· Alternative energy systems other than renewables
· Water using equipment or processes such has kitchens, rest rooms, hot water, cooling towers, laundry and irrigation
· Water meters
· Maintenance items with an energy component
· Data Center – efficiency, etc. where relevant
· Retro-commissioning or ongoing commissioning
· Energy Star Portfolio Manager (https://portfoliomanager.energystar.gov/)
3.0 Method of Analysis
3.1 Analysis and General Description
A site investigation was conducted to document existing conditions to include campus layout, energy and water/sewer usage and building envelope description. The team reviewed all previous audits, retro-commissioning reports, SCIP submissions, and SCIP request for NRM funding. The following information is provided for each recommended ECM.
1) ECM description; should contain enough information to develop a statement of work (SOW).
2) Evaluation method;
3) Estimated cost to implement;
4) Estimated energy and/or water/sewer consumption savings – include Operations and Maintenance savings where possible;
5) Greenhouse gas (GHG) emissions savings;
6) Simple payback.
3.2 ECM Cost Calculation Description
Cost savings are calculated based on the actual historical energy costs for the facility. Installation costs include labor and equipment costs to estimate the full up-front investment required to implement a change. Costs are derived from RS Means Cost Data, industry publications, and local contractors and equipment suppliers. The evaluations are based on engineering estimations and industry standard calculation methods. Pricing information is based on budgetary equipment pricing and estimated labor costs. More detailed cost analyses require hard equipment specifications, and contractor bid pricing.
3.3 Energy Modeling Calculation Description
The ECM energy calculations and results are provided by excel calculations in the attached spreadsheet. Historical utility data is average for the three previous years (FY2018-2020) and is used to set the baseline utility information.
4.0 Historical Utility Consumption/Cost
4.1 Baseline Utility Usage Evaluation to Reduce Energy and Water Usage
Report documented energy and water usage at the facility.
The Environmental Protection Agency’s (EPA) Energy Star Portfolio Manager Program and VISN Service Support Center (VSSC) database record consumption and cost data for energy and water at each facility. Consumption data included energy and water commodity usage at the facility during the most recent three-year period
Example: Table below (data from VSSC)
Commodity Cost per Fiscal Year
| Commodity |
| FY18 |
| FY19 |
| FY20 |
| % Change 18-20 |
| Electricity $ |
| $3,667,788 |
| $3,727,247 |
| $3,891,071 |
| 6.09% |
| Fuel Oil $ |
| $30,073 |
| $191,200 |
| $60,882 |
| 102.45% |
| Natural Gas $ |
| $306,385 |
| $800,716 |
| $652,660 |
| 113.02% |
| Water $ |
| $636,772 |
| $566,009 |
| $734,667 |
| 15.37% |
| Sewer $ |
| $872,910 |
| $818,121 |
| $968,206 |
| 10.92% |
| Total |
| $5,513,928 |
| $6,103,293 |
| $6,307,486 |
| 14.39% |
As shown, electricity costs increased from FY 2018 to FY 2020. The electricity consumption increase was mainly due to the lack of ECM capital improvements to the facility. Fuel oil consumption was the driver for cost increased. Fuel oil increase consumption was due to the ongoing need to operate the generators. Natural gas costs per therm have reduced every fiscal year, while consumption has remained stable. Water costs increased by approximately 15.3% from FY 2018 to FY 2020. Water usage has increased proportionally within this timeframe; in 2020, the increase was largely caused by the opening of a new mental health facility as well as increased legionella water flushes. This correlates to the various construction improvement projects throughout this period. Sewer costs followed the same trend as the water usage.
In accordance with FAR part 41, a review of the utility bills has been conducted to ensure each meter and/or bill is on the appropriate tariff. The following utility rates and tariffs were verified. As a part of your review validate:
Electric Demand Charges on the bills to verify that it matches meter data.
Validate all accounts are on the correct tariff/schedule based on the account type and size.
Taxes and Fees should be reviewed. Most of the time we do not pay taxes and many fees do not apply Find ways to ensure you have the correct type of account for each your accounts.
Each facility should have an account representative at the utility ask for help to review your accounts.
Look for ways to conserve on the expense of utilities.
Do you need to add a water meter to your cooling towers to not pay sewer charges on your water?
Update information below
Recommended Rates for Task 2 Study
| Electricity, $/kWh (Blended*) |
| $0.09 |
| Electricity, $/kWh (Energy**) |
| $0.08 |
| Electricity, $/kWh (Demand) |
| $3.01 |
| Fuel Oil, $/1 Gallons*** |
| $3.03 |
| Natural Gas, $ Therms |
| $0.62 |
| Water, $/1000 Gallons |
| $4.51 |
| Sewer, $/1000 Gallons |
| $5.04 |
4.2 Energy Review
A review of all energy project data and walk through of the facility should give you a holistic approach to what projects still need to be developed. Discuss the impact of completed projects. Discuss the potential impact of projects under development. This is where you will identify measures that will provide cost and savings. Also potential capital improvements that merit further analysis and provide initial judgements about project potential costs and savings.
· Building envelope (roof, windows, etc.)
· Heating, ventilation, and air conditioning equipment (HVAC)
· Building Automation Systems
· Metering – including identifying which buildings have submetering
· Lighting systems and controls
· Operation and occupancy schedules
· Facility-specific equipment
· Commissioning
4.3 Renewable Energy Review
Review feasibility studies for all sites (when available) and update assumptions as appropriate. Alternative renewable energy resources and technologies should include, but are not limited to, the following: geothermal energy (direct geothermal, ground source heat pump); solar energy (photovoltaic, solar thermal, solar concentrating); wind (turbines) include battery storage; also identify if there is a source of bio-fuel which can be used to fuel existing boilers, reciprocating engines, turbines and other applicable equipment; or methane from wastewater treatment plants or nearby landfills; include fuel cell, microturbine technologies and combined heat and power (CHP) system feasibility screening. If none of these are appropriate (cost, technical issues, etc.) it’s fine to write a short paragraph saying so, with some brief explanation.
CHP screening questions:
Answering "yes" to any of the following questions indicates that the facility may be a good candidate for CHP:
· Do you pay more than $0.10 per kWh on average for electricity (including generation, transmission, and distribution)?
· Are you concerned about the impact of current or future energy costs on your business?
· Is your facility located in a deregulated electricity market?
· safety, or health impacts if the electricity supply were interrupted?
· Does your facility operate for more than 5,000 hours per year?
· Do you have thermal loads throughout the year (such as steam, hot water, chilled water, or hot air)?
· Do you expect to replace, upgrade, or retrofit central plant equipment (such as generators, boilers, and chillers) within the next 3 to 5 years?
· Do you anticipate a facility expansion or new construction project within the next 3 to 5 years?
· Have you already implemented energy efficiency measures and still have high energy costs?
· Are you interested in reducing your facility's impact on the environment?
If you answer yes to any of the questions and have not had a feasibility study conducted, then use the CHP Screening tool on the EPA – CHP page. The excel tool is on the following link.
https://www.epa.gov/chp/my-facility-good-candidate-chp
4.4 Water Review
When conducting the walk-through water survey verify at a minimum:
In the dining hall and kitchettes verify water using equipment such as dishwashers are energy star certified. The pre-rinse spray heads should be upgraded to allow for air assist. Ice machines use a lot of water, if air cooled then chances are it is energy star certified. If the ice machine’s serial number begins with an A then it is often energy star compliant. If not, then recommend upgrade or develop this into an ECM for future funding.
Cooling towers use an abundance of water so ensure there is a utility compliant water meter. This ensures that you are not being charged for sewer use.
Review your water meters are they in the correct place?
Are the meters reporting?
Hot water in rest rooms need to be compliant with the legionella directive and kept at the correct temperature.
Have the toilets, urinals, faucets and plumbing fixtures been upgraded to water sense certified products?
If your facility has a laundry, consider what you can do to improve water consumption - are the washers, dryers, and other relevant equipment energy star certified? Is appropriate metering in place?
Landscape irrigation should be monitored and measured. Irrigation systems that are controlled automatically based on weather and soil condition that precisely schedules the irrigation based on the actual needs of the plants are ideal. Consider what type of water is being used - Potable water, which is drinking water, Non-potable water that is not safe to drink, or alternative sources such as rainwater/gray/reuse water. Each state has its own rules.
Additional resources are located on the Federal Energy Management Program Website https://www.energy.gov/sites/prod/files/2018/11/f57/handbook-walk-through-water-survey.pdf
4.5 Energy Star Rating
EPA, in an effort to promote energy management, created a system for benchmarking energy use among various end users, named Portfolio Manager. The Portfolio Manager tool allows tracking and assessment of energy consumption via the template forms located on the ENERGY STAR website (www.energystar.gov). Portfolio Manager will calculate a score for the facility on a scale of 1 to 100 based on user inputs. These ratings, on a scale of 1 to 100, provide a means for benchmarking the energy efficiency of specific facilities against the energy performance of similar facilities. The ratings are used by building and energy managers to evaluate the energy performance of existing buildings. Facilities that score a 75 or greater may qualify for an ENERGY STAR rating. Utility data can be entered into Portfolio Manager to calculate the Energy Use Index (EUI) kBtu/Sq.Ft/yr. EUI is a good measure of a building’s energy use per square foot and is utilized regularly for comparison of energy performance for similar building types. The EUI is a good indicator of the relative potential for energy savings also. A low EUI indicates less potential for energy savings, while a high EUI indicates poor building performance therefore a high potential for energy savings.
Verify Energy Star Portfolio Manager data is correct and complete for your facility and ensure an Energy Performance rating or EUI score is showing up.
According to the Energy Star Portfolio Manager, the facility scored an Energy Performance Rating of XX out of a possible 100.
5.0 Facility Description
5.1 General Facility Description
The below information must be updated for facility.
The campus is comprised of a number of buildings, totaling approximately XX square feet, with over XX square feet of interstitial space. These buildings were constructed between XX and XX. The main hospital building was built in XX. The XX VA Healthcare System provides comprehensive medical care including acute/in-patient medical, surgical, and psychiatric care; extended / long-term medical and psychiatric care, rehabilitative inpatient care; and comprehensive outpatient care with multiple specialty services available. In addition, the Medical Center supervises a community nursing home care program which is one of the largest in the VA system. The XX VA provides services to more than XX veterans living in a ten-county area in west central Florida.
Buildings 1, 71, 100, 101, 102 and Fisher House are used in continuous 24 hours per day, 7 days per week (24/7). Other areas, such as the administrative, service and some patient common areas, are nominally one shift per day Monday-Friday, 9 hours per day, and 5 days per week (9/5). A campus map is shown below.
Building 100 contains the main chiller and boiler plants. The main chiller plant supplies chilled water to buildings 1, 20, 22, 23, 71, 100, 101 and 102 with hot water reheat for humidity control. The remaining buildings are served by a variety of DX units. Steam is supplied by three (3) natural gas boilers which supply 100 psi steam for the laundry, sterilization, kitchen, heating and hot water reheat for the air conditioning systems. Also, steam from the central system is converted to hot water for heat in buildings 1, 20, 22, 71, 100, 101, and 102. Each building has its own hot water converter. There are also two 150 gallon gas water heaters in the boiler plant and two in Building 1. Building 2 is equipped with older style radiators for heating.
Campus Map
Insert campus map
6.0 Sustainable Buildings
7.0 ECM Description and TYPE
All ECM’s must follow the category list attached to this document. ECM Description must include ECM Number, ECM Technology category, and ECM Type; to include a description that can be used as a basic statement of work, as well as ECM Project Cost, ECM Project Savings, and ECM Commodity Savings .
EXAMPLE
ECM Number 5.0: Lighting ECM Technology Category: Interior / Exterior lighting retrofits and replacements.
About 20 percent of the electricity in hospitals is used for lighting, Lighting is used primarily for Illumination.
How much light is needed ?
How is the light controlled?
How can lighting be provided more efficiently?
ECM Project Installation Cost: $29,755 ECM Project Annual Savings: 4,288 ECM Simple Annual Pay Back: 6.9 years ECM Commodity Savings: 54,112 kWh
· ECM Number 1.1: Boiler Plant Improvements – Boiler Stack Economizers
· ECM Technology Category: Boiler control, including new controls, retrofits to existing controls, burner replacement, heat recovery
· ECM Description: This ECM involves installing one condensing stack economizer on the main boiler plant exhaust stack, to which each of the steam boilers are tied. The stack economizer will be used to heat domestic hot water (DHW).
· ECM Project Cost: $474,698
· ECM Annual Project Savings: $45,461
· ECM Simple Payback: 10.4 years
· ECM Commodity Savings: 9,311 MMBtu
· ECM Number 1.2: Boiler Plant Improvements – Remove B102 from Steam Plant
· ECM Technology Category: Replacement of existing boilers with high efficiency boilers
· ECM Description: Provide about 3,500 MBH of HW capacity for the building and domestic water heating requirements utilizing (3) 50% capacity, dual fuel (gas and No. 2 oil fired) HW condensing boilers.
· ECM Project Cost: $1,124,172
· ECM Annual Project Savings: $107,123
· ECM Simple Payback: 10.5 years
· ECM Commodity Savings: -48,216 kWh; 18,604.00 MMBtu; 3,123,000 Gal
· ECM Number 3.1 Building Automation Systems – BAS Improvements
· ECM Technology Category: Heating, Ventilating, and Air Conditioning (HVAC) upgrade from pneumatics to Direct Digital Control
· ECM Description: Extension of DDC network to selected buildings, to replace thermostats for control of heat pumps and air-conditioning units. Applicability: Buildings 12 and 35
· ECM Project Cost: $377,135
· ECM Annual Project Savings: $51,444
· ECM Simple Payback: 7.3 years
· ECM Commodity Savings: 268,971 kWh; 6,030 MMBtu; 754,000 Gal
· ECM Number 3.3 Building Automation Systems – Kitchen Hood Controls
· ECM Technology Category: Other including diagnostic software. Also, reduce outside air when unoccupied.
· ECM Description: This ECM requires the installation of variable frequency drives (VFDs) to control the kitchen exhaust hood fan motors and the kitchen’s make-up air supply fan motors.
· ECM Project Cost: $167,072
· ECM Annual Project Savings: $33,679
· ECM Simple Payback: 5.0 years
· ECM Commodity Savings: 372,332 kWh; 572 MMBtu
· ECM Number 7.3 Chilled Water, Hot Water, and Steam Distribution Systems – Steam Distribution Improvements
· ECM Technology Category: Steam trap repair and replacement
· ECM Description: This measure proposes to replace all mechanical steam traps like for like with new traps.
· ECM Project Cost: $730,831
· ECM Annual Project Savings: $93,012
· ECM Simple Payback: 7.9 years
· ECM Commodity Savings: 14,449 MMBtu; 1,577,000 Gal
· ECM Number 10.1 Distributed Generation – Combined Heat and Power (CHP)
· ECM Technology Category: Cogeneration systems installation
· ECM Description: The proposed solution incorporates two internal combustion engines rated at approximately 1 MW of electric output each to provide a base load of electric power as well as offset a significant portion (5,000 lbs. per hour) of the summertime base load steam that is currently used for domestic water heating and HVAC heat and re-heat.
· ECM Project Cost: $10,411,828
· ECM Annual Project Savings: $860,440
· ECM Simple Payback: 12.1 years
· ECM Commodity Savings: 16,651,008 kWh; -86,707 MMBtu
· ECM Number 13.1 Water and Sewer Conservation Systems – Water Retrofits
· ECM Technology Category: Low-flow faucets and showerheads
· ECM Description: upgrade the remaining high-flow plumbing fixtures with lower flow fixtures, similar to those currently installed on site in order to reduce water consumption and complete standardization efforts for plumbing fixture equipment.
· ECM Project Cost: $764,389
· ECM Annual Project Savings: $156,032
· ECM Simple Payback: 4.9 years
· ECM Commodity Savings: 816,389 kWh; 5,053,000 Gal
Conclusion
The purpose of this energy and water d audit is to comply with federal law as described above and develop a document to use for further requirements. The once every 4-year requirement is based on the date of the last audit listed in the DOE CTS database. An excel spreadsheet should be completed to accompany this document, and the results uploaded to the DOE CTS database prior to the expiration of the last audit date. OCAMES and OAEM should be notified when data has been uploaded to CTS.
APPENDIX:
| # |
| ECM Technology Category |
| ECM Number |
| ECM Type |
| 1 |
| Boiler Plant Improvements |
| 1.1 |
| Boiler control, including new controls, retrofits to existing controls, burner replacement, heat recovery. |
| 1.2 |
| Replacement of existing boilers with high efficiency boilers |
| 1.3 |
| Boiler decentralization |
| 1.4 |
| Other |
| 2 |
| Chiller Plant Improvements |
| 2.1 |
| Chiller retrofits or replacements |
| 2.2 |
| Chiller plant pumping, piping, and controls retrofits and replacements |
| 2.3 |
| Other |
| 3 |
| Building Automation Systems/Energy Management Control Systems (EMCS) |
| 3.1 |
| Heating, Ventilating, and Air Conditioning (HVAC) upgrade from pneumatics to Direct Digital Control |
| 3.2 |
| Upgrade or replacement of existing EMCS systems |
| 3.3 |
| Other including diagnostic software. Also, reduce outside air when unoccupied. |
| 4 |
| Heating, Ventilating, and Air Conditioning |
| 4.1 |
| Packaged air conditioning unit replacements |
| 4.2 |
| HVAC damper and controller repair or replacement |
| 4.3 |
| Window air conditioning replacement with high efficiency units |
| 4.4 |
| Cooling tower retrofits or replacements |
| 4.5 |
| Economizer installation |
| 4.6 |
| Fans and pump replacement or impeller trimming |
| 4.7 |
| Thermal energy storage |
| 4.8 |
| Variable air volume retrofit and fan wall option. |
| 4.9 |
| Other including heat recovery options. |
| 5 |
| Lighting Improvements |
| 5.1 |
| Interior and exterior lighting retrofits and replacements |
| 5.2 |
| Intelligent lighting controls |
| 5.3 |
| Occupancy sensors |
| 5.4 |
| Light Emitting Diode technologies |
| 5.5 |
| Daylighting |
| 5.6 |
| Spectrally enhanced lighting |
| 5.7 |
| Fiber optic lighting technologies |
| 5.8 |
| Other |
| 6 |
| Building Envelope Modifications |
| 6.1 |
| Insulation installation |
| 6.2 |
| Weatherization |
| 6.3 |
| Window replacement |
| 6.4 |
| Reflective solar window tinting |
| 6.5 |
| Other |
| 7 |
| Chilled Water, Hot Water, and Steam Distribution Systems |
| 7.1 |
| Piping insulation installation |
| 7.2 |
| Hot water heater repair and replacement |
| 7.3 |
| Steam trap repair and replacement |
| 7.4 |
| Repair or replacement of existing condensate return systems and installation of new condensate return |
systems
| 7.5 |
| Other including replacement of steam heat systems with hot water or other heating methods. Also, consider ways to utilize or minimize flash steam. |
| 8 |
| Electric Motors and Drives |
| 8.1 |
| Motor replacement with high efficiency motors |
| 8.2 |
| Variable speed motors or drives |
| 8.3 |
| Other |
| 9 |
| Refrigeration |
| 9.1 |
| Replacement of ice/refrigeration equipment with high efficiency units |
| 9.2 |
| Other |
| 10 |
| Distributed Generation |
| 10.1 |
| Cogeneration systems installation |
| 10.2 |
| Microturbines installation |
| 10.3 |
| Fuel cells installation |
| 10.4 |
| Other |
| 11 |
| Renewable Energy Systems |
| 11.1 |
| Photovoltaic system installation |
| 11.2 |
| Solar hot water system installation |
| 11.3 |
| Solar ventilation preheating system installation |
| 11.4 |
| Wind energy system installation |
| 11.5 |
| Passive solar heating installation |
| 11.6 |
| Landfill gas, wastewater treatment plant digester gas, and coalbed methane power plant installation |
| 11.7 |
| Wood waste, other organic waste stream heating or power plant installation |
| 11.8 |
| Replacement of AC and heating units with ground coupled heat pump systems |
| 11.9 |
| Other |
| 12 |
| Energy/Utility Distribution Systems |
| 12.1 |
| Transformers installation |
| 12.2 |
| Power quality upgrades |
| 12.3 |
| Power factor correction |
| 12.4 |
| Gas distribution systems installation |
| 12.5 |
| Other |
| 13 |
| Water and Sewer Conservation Systems |
| 13.1 |
| Low-flow faucets and showerheads |
| 13.2 |
| Low-flow plumbing equipment |
| 13.3 |
| Water efficient irrigation |
| 13.4 |
| On-site sewer treatment systems |
| 13.5 |
| Other |
| 14 |
| Electrical Peak Shaving/Load Shifting |
| 14.1 |
| Thermal energy storage |
| 14.2 |
| Gas cooling |
| 14.3 |
| Other |
| 15 |
| Energy Cost Reduction Through Rate Adjustments |
| 15.1 |
| Change to more favorable rate schedule |
| 15.2 |
| Lower energy cost supplier(s) (where applicable) |
| 15.3 |
| Energy service billing and meter auditing recommendations |
| 15.4 |
| Other |
| 16 |
| Energy Related Process Improvements |
| 16.1 |
| Production and/or manufacturing improvements |
| 16.2 |
| Recycling and other waste stream reductions |
| 16.3 |
| Industrial process improvement |
| 16.4 |
| Other |
| 17 |
| Commissioning Measures |
| 17.1 |
| Commissioning Measures |
| 17.2 |
| Other |
| 18 |
| Advanced Metering Systems |
| 18.1 |
| Advanced Metering Systems |
| 19 |
| Appliance/Plug-load reductions |
| 19.1 |
| Replace air-cooled ice/refrigeration equipment |
| 19.2 |
| Replace refrigerators, note personal items that are not energy star rated. |
| 19.3 |
| De-lamp vending machines |
| 19.4 |
| Plug timers |
| 19.5 |
| Energy Star® products, Computer Power Down |
| 19.6 |
| Other |
| 20 |
| Other |
| 20.1 |
| Other |
October 2012 14 image1.emf image2.jpg image3.jpeg