36C24422Q0152 Amendment 0002.docx
DOCX document 92 KB Posted
- Attached to
- F115--VISN 4-Wide Energy Boiler Audits
- Solicitation number
- 36C24422Q0152
About this file
This document is an amendment to a solicitation for boiler audit services across Veterans Integrated Service Network 4 facilities. The amendment updates the solicitation document and replaces the prior version, with small changes throughout but no major material changes. The solicitation is for energy boiler audits to be conducted government-wide at Network 4 locations. Responses are due based on the dates specified in the amended solicitation document. The Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 4 is the issuing agency. The amendment provides an updated solicitation for interested vendors to review requirements and respond accordingly.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment 0002 36C24422Q0152 - VISN 4 Boiler Audit solicitation.docx | DOCX document | |
| Energy Adits ECM List Template.xlsx | XLSX spreadsheet | |
| Building Inventory.xlsx | XLSX spreadsheet | |
| Energry Audit Template.docx | DOCX document | |
| Questions and Answers 36C24422Q0152 0001.docx | DOCX document | |
| Pittsburgh Wage Determination.pdf | ||
| Wilkes Barre Wage Determination.pdf | ||
| Wilmington Wage Determination.pdf | ||
| Lebanon Wage Determination.pdf | ||
| Butler Wage Determination.pdf | ||
| Altoona Wage Determination.pdf | ||
| Coatesville Wage Determination.pdf | ||
| Erie Wage Determination.pdf | ||
| Philadelphia Wage Determination.pdf | ||
| 36C24422Q0152 - VISN 4 Boiler Audit solicitation.docx | DOCX document | |
| P01 Energy Boiler Audit QASP.docx | DOCX document | |
| 36C24422Q0152_1.docx | DOCX document |
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
5. PROJECT NUMBER (if applicable)
CODE
7. ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER
3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE OF PAGES
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO.
1. CONTRACT ID CODE
FACILITY CODE
CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office.
is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER
16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30
PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer) none 00244 Department of Veterans Affairs Network Contracting Office 4
00244 Department of Veterans Affairs Network Contracting Office 4
To all Offerors/Bidders
36C24422Q0152 12-17-2021
X
This amendment to the above solicitation is to update the 1449 solicitation document (36C244Q0152- VISN 4 Boiler and Audit solicitation). The new "Amendment 0002 36C24422Q0152 - VISN 4 Boiler Audit solicitation" updates and replaces the prior one. There are small changes throughout the new document, but no major material changes.
Refer to attachment "Amendment 0002 36C24422Q0152 - VISN 4 Boiler Audit solicitation" .
All other terms and conditions remain the same. ***END OF MODIFICATION***
William Schlobohm Contracting Officer
See attached document: Amendment 0002 36C24422Q0152 - VISN 4 Boiler Audit solicitation.
End of Document Page 1 of
File details come from the government source that posted it. Updated .