This document contains an energy audit template and details of a related federal contract opportunity. The template lists estimated energy and cost savings from potential energy conservation measures across various facility systems at a site, including boiler plant improvements, building automation systems, distributed generation, chilled water and steam distribution, and water conservation. The related federal contract opportunity is a pre-solicitation notice for boiler audits at multiple Department of Veterans Affairs medical centers under Veterans Integrated Service Network 4. The audits are to identify energy and cost savings from boiler plant optimization and upgrades. The notice indicates an official solicitation will immediately follow.

View the file

Other files

File Type Posted
Amendment 0002 36C24422Q0152 - VISN 4 Boiler Audit solicitation.docx DOCX document
36C24422Q0152 Amendment 0002.docx DOCX document
Building Inventory.xlsx XLSX spreadsheet
Energry Audit Template.docx DOCX document
Questions and Answers 36C24422Q0152 0001.docx DOCX document
Pittsburgh Wage Determination.pdf PDF
Wilkes Barre Wage Determination.pdf PDF
Wilmington Wage Determination.pdf PDF
Lebanon Wage Determination.pdf PDF
Butler Wage Determination.pdf PDF
Altoona Wage Determination.pdf PDF
Coatesville Wage Determination.pdf PDF
Erie Wage Determination.pdf PDF
Philadelphia Wage Determination.pdf PDF
36C24422Q0152 - VISN 4 Boiler Audit solicitation.docx DOCX document
P01 Energy Boiler Audit QASP.docx DOCX document
36C24422Q0152_1.docx DOCX document
Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Station

Station #:
Station Name:Estimated ValuesRecurring Savings (est annnual)Completion Date
ECM NameProject CategoryECM Description (Quantification)Electric SavingsNatural GasPurchased SteamWater SavingsGHG GasesEnergyWaterO&MInstall CostSimple
PaybackSIR #ScheduledActualFunding SourceComments
ECM #1.0 Boiler Plant Improvements
1.1ECM-1.1 Stack EconomizersBoiler Plant ImprovementsThis ECM involves installing one condensing stack economizer on the main boiler plant exhaust stack, to which each of the steam boilers are tied. The stack economizer will be used to heat domestic hot water (DHW).0kWh9,311.00MMbtuMMbtu0Gal1,639ton$45,461$0$476,63610.5
1.2ECM-1.2 Remove B102 from Steam PlantBoiler Plant ImprovementsProvide about 3,500 MBH of HW capacity for the building and domestic water heating requirements utilizing (3) 50% capacity, dual fuel (gas and No. 2 oil fired) HW condensing boilers.-8,216kWh18,604.00MMbtuMMbtu3,123,000Gal3,271ton$88,457$18,666$1,128,76110.5
Total-8,216kWh27,915.00MMbtu0.00MMbtu3,123,000Gal4,910ton$133,918$18,666$0$1,605,39710.5
3.0 Building Automation Systems
3.1ECM-3.1 BAS improvementsBuilding Automation SystemsExtension of DDC network to selected buildings, to replace thermostats for control of heat pumps and air-conditioning units. Applicability: Buildings 12 and 35268,971kWh6,030.00MMbtuMMbtu754,000Gal1,223ton$46,937$4,507$0$378,6747.4
3.3ECM-3.3 Kitchen Hood ControlsBuilding Automation SystemsThis ECM requires the installation of variable frequency drives (VFDs) to control the kitchen exhaust hood fan motors and the kitchen’s make-up air supply fan motors.372,332572.00MMbtu0324$33,679$0$167,7815.0
Total641,303kWh6,602.00MMbtu0.00MMbtu754,000Gal1,548ton$80,616$4,507$0$546,4556.4
10.0 Distributed Generation
10.1ECM-10.1 Combined Heat and Power (CHP)Distributed GenerationThe proposed solution incorporates two internal combustion engines rated at approximately 1 MW of electric output each to provide a base load of electric power as well as offset a significant portion (5,000 lbs per hour) of the summertime base load steam that is currently used for domestic water heating and HVAC heat and re-heat.16,651,008kWh-86,707.00MMbtuMMbtu0Gal-5,260ton$860,440$10,411,82812.1
Total16,651,008kWh-86,707.00MMbtu0.00MMbtu0Gal-5,260ton$860,440$0$0$10,411,82812.1
7.0 Chilled Water, Hot Water, and Steam Distribution Systems
7.3ECM-7.3 Steam Distribution ImprovementsEnergy/Utility Distribution SystemsThis measure proposes to replace all mechanical steam traps like for like with new traps.0kWh14,449.00MMbtuMMbtu1,577,000Gal2,544ton$70,549$22,463$0$733,8157.9
Total0kWh14,449.00MMbtu0.00MMbtu1,577,000Gal2,544ton$70,549$22,463$0$733,8157.9
13.0 Water and Sewer Conservation Systems
13.1ECM-13.1 Water RetrofitsWater and Sewer Conservation Systemsupgrade the remaining high-flow plumbing fixtures with lower flow fixtures, similar to those currently installed on site in order to reduce water consumption and complete standardization efforts for plumbing fixture equipment.816,389kWhMMbtuMMbtu5,053,000Gal491ton$84,057$71,975$767,5094.9
Total816,389kWh0.00MMbtu0.00MMbtu5,053,000Gal491ton$84,057$71,975$0$767,5094.9
Grand Total18,100,484kWh-37,741MMbtu0MMbtu10,507,000Gal4,232ton1,229,580117,611014,065,00410.4
24,072MMbtu0
Project Savings$1,347,191
Project Costs$14,065,004
Total savings/cost$1,347,191$14,065,004
SIR# - Savings to Investment Ratio
An SIR Value of 1.0 or greater is economically viable.

GHG Conversion

Electric RegionEnergy ConversionGHG Conversion [Option 1]GHG Conversion [Option 2]
AKGD0.003413MMBTU / kWh0.16412MTCO2e/MMBtu0.000560MTCO2e / kWh
AKMS0.003413MMBTU / kWh0.06652MTCO2e/MMBtu0.000227MTCO2e / kWh
AZNM0.003413MMBTU / kWh0.17503MTCO2e/MMBtu0.000597MTCO2e / kWh
CAMX0.003413MMBTU / kWh0.09665MTCO2e/MMBtu0.000330MTCO2e / kWh
ERCT0.003413MMBTU / kWh0.17668MTCO2e/MMBtu0.000603MTCO2e / kWh
FRCC0.003413MMBTU / kWh0.17607MTCO2e/MMBtu0.000601MTCO2e / kWh
HIMS0.003413MMBTU / kWh0.20414MTCO2e/MMBtu0.000697MTCO2e / kWh
HIOA0.003413MMBTU / kWh0.24209MTCO2e/MMBtu0.000826MTCO2e / kWh
MROE0.003413MMBTU / kWh0.24516MTCO2e/MMBtu0.000837MTCO2e / kWh
MROW0.003413MMBTU / kWh0.24347MTCO2e/MMBtu0.000831MTCO2e / kWh
NEWE0.003413MMBTU / kWh0.12423MTCO2e/MMBtu0.000424MTCO2e / kWh
NWPP0.003413MMBTU / kWh0.12058MTCO2e/MMBtu0.000412MTCO2e / kWh
NYCW0.003413MMBTU / kWh0.10870MTCO2e/MMBtu0.000371MTCO2e / kWh
NYLI0.003413MMBTU / kWh0.20531MTCO2e/MMBtu0.000701MTCO2e / kWh
NYUP0.003413MMBTU / kWh0.09633MTCO2e/MMBtu0.000329MTCO2e / kWh
RFCE0.003413MMBTU / kWh0.15224MTCO2e/MMBtu0.000520MTCO2e / kWh
RFCM0.003413MMBTU / kWh0.20897MTCO2e/MMBtu0.000713MTCO2e / kWh
RFCW0.003413MMBTU / kWh0.20549MTCO2e/MMBtu0.000701MTCO2e / kWh
RMPA0.003413MMBTU / kWh0.25151MTCO2e/MMBtu0.000858MTCO2e / kWh
SPNO0.003413MMBTU / kWh0.26200MTCO2e/MMBtu0.000894MTCO2e / kWh
SPSO0.003413MMBTU / kWh0.22137MTCO2e/MMBtu0.000756MTCO2e / kWh
SRMV0.003413MMBTU / kWh0.13607MTCO2e/MMBtu0.000464MTCO2e / kWh
SRMW0.003413MMBTU / kWh0.24459MTCO2e/MMBtu0.000835MTCO2e / kWh
SRSO0.003413MMBTU / kWh0.19908MTCO2e/MMBtu0.000679MTCO2e / kWh
SRTV0.003413MMBTU / kWh0.20185MTCO2e/MMBtu0.000689MTCO2e / kWh
SRVC0.003413MMBTU / kWh0.15171MTCO2e/MMBtu0.000518MTCO2e / kWh
Territory0.003413MMBTU / kWh0.25231MTCO2e/MMBtu0.000861MTCO2e / kWh
US0.003413MMBTU / kWh0.17760MTCO2e/MMBtu0.000606MTCO2e / kWh