EXHIBIT C -Calculation of Self-Performed Work.docx

DOCX document 40 KB Posted

Attached to
P400--Project 529-22-100 Building #3 Demo D/B
Solicitation number
36C24421R0024
Issued by

About this file

This document includes an exhibit calculating self-performed work and details of a federal contract opportunity for demolition and design-build services. The exhibit provides a template for offerors to identify and calculate the cost of work to be self-performed, showing at least 25% of the total work must be self-performed to qualify as a general contractor. The federal contract opportunity is a two-phase design-build solicitation for demolition of Building 3 at the Butler VA Health Care System, with an estimate between $250,000 and $500,000. Only SDVOSB firms will be considered in Phase I. Phase II will be awarded as a firm-fixed-price contract under FAR parts 36.3 and 15, with a 200-day period of performance. The applicable NAICS code is 238910.

View the file

Other files

File Type Posted
36C24421R0024 A0002_1.docx DOCX document
36C24421R0024 A0002.pdf PDF
36C24421R0024 A0001_1.docx DOCX document
36C24421R0024 A0001.pdf PDF
Site Plain 2020 COVID Screen Location.pdf PDF
36C24421R0024_01.pdf PDF
EXHIBIT D -Sample Transmittal Letter for Past Performance Evaluation Questionnaire.docx DOCX document
PDF Specs Combined.pdf PDF
EXHIBIT A - Past Performance Relevancy Questionnaire.docx DOCX document
EXHIBIT E Past Performance Questionnaire.docx DOCX document
SOW DEMO Building 3 Design Build Demo.docx DOCX document
Combined PDF updated 2016 12 23.pdf PDF
EXHIBIT B -Subcontractor Information and Consent Form.docx DOCX document
WD PA20210079.pdf PDF
36C24421R0024_1.docx DOCX document
Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

EXHIBIT C - CALCULATION OF SELF-PERFORMED WORK

EXHIBIT C - CALCULATION OF SELF-PERFORMED WORK

SUBMITTED IN RESPONSE TO Request For Proposal 36C24421R0024

Use a format similar to the following to identify and calculate cost of the work to be self-performed. Refer to the definitions pertaining to “Self-performance of work”, “On the Site” and “Total amount of work to be performed under the contract”.

Explain in detail how you will perform the minimum percentage required (25% GC) with your own resources. Note: An offeror who has the capability to perform both as a General contractor and self-perform a major element of construction, for example, pre-fabricated concrete, may be afforded additional consideration in the evaluation. You should address your general self-performance capability.

(Includes mobilization and utilization of owned or rented plant and equipment to be operated by the prime contractor’s own employees; only those materials which will be both purchased and installed by the prime’s own forces; labor associated with those aforementioned materials or equipment; only those supplies to directly support work performed by the contractor’s own employees; and the contractor’s own job overhead costs.)

Clearly describe the work to be self-performed:

Show Calculation of Self-Performed work:

B.1 Total Offer Price: $

B.2 If applying for consideration as a General Contractor subtract Specialty Trades (Unless being self-performed) $

B.3 Subtract G&A, home office overhead, prime contractor’s markups for profit, bond, state use tax, etc. $

B.4 Remainder is “Total amount of work to be performed under the Contract” =

B.5 “Work to be self-performed”: = $ Amount shown on this line should match the amount shown for “Show Calculation of Self-Performed work”?

(Includes mobilization and utilization of owned or rented plant and equipment to be operated by the prime contractor’s own employees; only those materials which will be both purchased and installed by the prime’s own forces; labor associated with those aforementioned materials or equipment; only those supplies to directly support work performed by the contractor’s own employees; and the contractor’s own job overhead costs.)

B.6 25 % Self-performed Work = Line B.5 / B.4 X 100% = %

File details come from the government source that posted it. Updated .