S02_Atch_2__Bid_Documents_Drawing_Set.pdf
PDF 11 MB Posted
- Attached to
- Upgrade Public Toilets First Floor Federal contract opportunity
- Solicitation number
- 36C24419B0008
About this file
36C24419B0008 S02 Atch 2 Bid Documents Drawing Set.pdf
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 36C24419B0008-0001004.pdf | ||
| 36C24419B0008-0001005.pdf | ||
| 36C24419B0008-0001000.docx | DOCX document | |
| 36C24419B0008-0001001.pdf | ||
| 36C24419B0008-0001002.pdf | ||
| 36C24419B0008-0001003.pdf | ||
| S02_Atch_3_UPTFF_-_Constructiion_Duration_-_Calendar_Days.pdf | ||
| S02_Atch_1__Bid_Documents_Specification_02.pdf | ||
| 36C24419B0008.docx | DOCX document | |
| 36C24419B0008_1.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
LIST OF DRAWINGS
Architectural
Plumbing
GENERAL NOTES CODE ANALYSIS ABBREVIATIONS
Mechanical
Electrical
Fire Protection
Design & Construction Services
12 Elm Street Port Jefferson, NY 11777 631-320-1706
Canteen
Dining Area
A140
Food Court
A142
Waiting
B113
Corridor
C1-9
Food Line
A142C
No.3
A142A
CORRIDOR
C1-10
HAC
B124
MOD E WAITING
B132
1 SOUTH
B113d
CHECK-IN
PHARMACY & NUTRITION
B112A
PHARMACY
B104
TOILET RM
FAMILY
B101
B103
TOILET RM
WOMEN'S
B102
CORRIDOR
C1-11
TOILET RM
MEN'S
B123
K-T954-4STILLNESSFAUCETBRASS
K-T954-4STILLNESSFAUCETBRASS
K-T954-4STILLNESSFAUCETBRASS
STAIR
LACTATION
ROOM
11'
7'-9"
ELECCL.
EXISTING
D.F. NOT IN
CONTRACT
K-T954-4 STILLNESS FAUCET
BRASS
K-T954-4STILLNESSFAUCET
BRASS
K-T954-4STILLNESSFAUCET
BRASS
K-T954-4STILLNESSFAUCETBRASS
B122
5'-0"
TEMPORARY CONSTRUCTION DOOR WITH
LOCK DURING TOILET CONSTRUCTION
5'-0"
CORRIDOR
C1-13
CHASE
FECFEC
MIN.
MIN.
TEMPORARY
PARTITION
TEMPORARY
PARTITION
LOCK-DOWN THIS LEAF (COORDINATE
WITH VA REPRESENTATIVES)
PUT CONSTRUCTION SIGNAGE:
"USE OTHER DOOR (WITH ARROW)"
ANTE
ROOM
2'
TEMPORARY PLASTIC BARRIER
TEMPORARY PLASTIC BARRIER
W/ ACCESS ZIPPER
A T
C O
N T
R A
C T
O R
S
D
I S
C R
E T
I O
N
5'-0" MIN.2'
TEMPORARY
PARTITION
AND DOOR
3'-3"
ANTE
ROOM
TEMPORARY
PARTITION
USE EXISTING
DOOR DURING
CONSTRUCTION
3'-3"
5'-0"
ANTE
ROOM
TEMPORARY CONSTRUCTION
PARTITION AND DOOR WITH
LOCK DURING TOILET
CONSTRUCTION
N e g
P r e s s
M o n i t o r
FAUCETK-T954-4BRASSSTILLNESS
FAUCETBRASSSTILLNESSK-T954-4
K-T954-4FAUCETBRASSSTILLNESS
FAUCETBRASSSTILLNESSK-T954-4FAUCETBRASSK-T954-4STILLNESS FAUCETSTILLNESSBRASSK-T954-4
K-T954-4STILLNESSFAUCETBRASS
K-2202-8LAVATORYVITREOUS CHINAVITREOUS CHINABROOKLINEBROOKLINEK-2202-8LAVATORY
K-2202-8BROOKLINELAVATORYLAVATORYBROOKLINEK-2202-8VITREOUS CHINAVITREOUS CHINABROOKLINEK-2202-8VITREOUS CHINALAVATORY LAVATORYK-2202-8VITREOUS CHINAVITREOUS CHINALAVATORY BROOKLINELAVATORYVITREOUS CHINA BROOKLINEK-2202-8 K-2202-8BROOKLINE
LAVATORYLAVATORYK-2202-8BROOKLINEK-2202-8BROOKLINE
K-2202-8
LAVATORY
VITREOUS CHINAVITREOUS CHINA
VITREOUS CHINA
LAVATORY
K-2202-8BROOKLINE
BROOKLINEVITREOUS CHINA
BROOKLINELAVATORYK-2202-8BROOKLINEK-2202-8VITREOUS CHINAVITREOUS CHINALAVATORY
PHASING PLAN
PHASING OF NEW WORK
GC101
PHASING PLAN
D.S. E.M./T.V.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
F i l e
P a t h
P
M
BID DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
UPGRADE PUBLIC TOILETS
1ST FLOOR
3900 Woodland Ave., Philadelphia, PA
642-11-151
Project Director
October 30, 2017Revisions: Date:
DCS Infrastructure, LLC Design & Construction Services
12 Elm Street Port Jefferson, NY 11777 631-320-170635% Schematic Submission 04/06/17
12/22/17
FPM Group Engineering and enviromental science 909 Marconi Avenue Ronkonkoma, N.Y. 11779 631-737-6200
POC Chris Schwarz POC Donald Stout Dwg. of
35% Schematic Re-Submission
01/30/1870% Submission 100% Submission 04/13/18 100% Bid Documents 06/11/18
07/18/18100% Bid Documents
FIRST FLOOR KEY PLAN
TRAVEL DISTANCE
NOTES:
LEGEND
Canteen
Dining Area
A140
Food Court
A142
Waiting
B113
Corridor
C1-9
M E
D
G
A S
E S
Food Line
A142C
SCOPE OF WORK
SCOPE OF WORK
SCOPE OF WORK
LIFE SAFETY PLAN
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
A
F i l e
P a t h
P
M
BID DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
UPGRADE PUBLIC TOILETS
1ST FLOOR
3900 Woodland Ave., Philadelphia, PA
642-11-151
Project Director
October 30, 2017Revisions: Date:
Design & Construction Services
12 Elm Street Port Jefferson, NY 11777 631-320-170635% Schematic Submission 04/06/17
12/22/17
909 Marconi Avenue Ronkonkoma, N.Y. 11779 631-737-6200
POC Chris Schwarz POC Donald Stout Dwg. of
35% Schematic Re-Submission
01/30/1870% Submission 100% Submission 04/13/18 100% Bid Documents 06/11/18
07/18/18100% Bid Documents
FIRST FLOOR KEY PLAN
N g
P r e s s
M o n i t o r
FAUCETK-T954-4BRASSSTILLNESS
FAUCETBRASSSTILLNESSK-T954-4
K-T954-4FAUCETBRASSSTILLNESS
FAUCETBRASSSTILLNESSK-T954-4FAUCETBRASSK-T954-4STILLNESS FAUCETSTILLNESSBRASSK-T954-4
K-T954-4STILLNESSFAUCETBRASS
K-2202-8LAVATORYVITREOUS CHINAVITREOUS CHINABROOKLINEBROOKLINEK-2202-8LAVATORY
K-2202-8BROOKLINELAVATORYLAVATORYBROOKLINEK-2202-8VITREOUS CHINAVITREOUS CHINABROOKLINEK-2202-8VITREOUS CHINALAVATORY LAVATORYK-2202-8VITREOUS CHINAVITREOUS CHINALAVATORY BROOKLINELAVATORYVITREOUS CHINA BROOKLINEK-2202-8 K-2202-8BROOKLINE
LAVATORYLAVATORYK-2202-8BROOKLINEK-2202-8BROOKLINE
K-2202-8
LAVATORY
VITREOUS CHINAVITREOUS CHINA
VITREOUS CHINA
LAVATORY
K-2202-8BROOKLINE
BROOKLINEVITREOUS CHINA
BROOKLINELAVATORYK-2202-8BROOKLINEK-2202-8VITREOUS CHINAVITREOUS CHINALAVATORY
Canteen
Dining Area
A140
Food Court
A142
Waiting
B113
Corridor
C1-9
M E
D
G
A S
E S
Food Line
A142C
No.3
A142A
CORRIDOR
C1-10
HAC
B124
MOD E WAITING
B132
1 SOUTH
B113d
CHECK-IN
PHARMACY & NUTRITION
B112A
PHARMACY
B104
TOILET RM
FAMILY
B101
B103
TOILET RM
WOMEN'S
B102
CORRIDOR
C1-11
TOILET RM
MEN'S
B123
K-T954-4STILLNESSFAUCETBRASS
K-T954-4STILLNESSFAUCETBRASS
K-T954-4STILLNESSFAUCETBRASS
STAIR
LACTATION
ROOM
ELECCL.
K-T954-4STILLNESSFAUCET
BRASS
K-T954-4STILLNESSFAUCET
BRASS
K-T954-4STILLNESSFAUCET
BRASS
K-T954-4STILLNESSFAUCETBRASS
B122
CORRIDOR
C1-13
CHASE
FECFEC
SCOPE OF WORK
SCOPE OF WORK
ICRA BARRIER LEGEND
ONE-HOUR FIRE-RATED SMOKE TIGHT ICRA TEMP. PARTITION
SCALE: 1 1/2" = 1'-0"
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
F i l e
P a t h
P
M
BID DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
UPGRADE PUBLIC TOILETS
1ST FLOOR
3900 Woodland Ave., Philadelphia, PA
642-11-151
Project Director
October 30, 2017Revisions: Date:
DCS Infrastructure, LLC Design & Construction Services
12 Elm Street Port Jefferson, NY 11777 631-320-170635% Schematic Submission 04/06/17
12/22/17
FPM Group Engineering and enviromental science 909 Marconi Avenue Ronkonkoma, N.Y. 11779 631-737-6200
POC Chris Schwarz POC Donald Stout Dwg. of
35% Schematic Re-Submission
01/30/1870% Submission 100% Submission 04/13/18 100% Bid Documents 06/11/18
07/18/18100% Bid Documents
FIRST FLOOR KEY PLAN
FIRST FLOOR ICRA PLAN
ICRA NOTESGENERAL ICRA NOTES
A140
Food Court
A142
Waiting
B113
Corridor
C1-9
M E
D
G
A S
E S
Food Line
A142C
TOILET HC
MEN'S
B122
CORRIDOR
C1-13
STAIR
FOOD LINE
TOILET HC
WOMEN'S
B123
FEC
CHUTE
LAUNDRY
ADVOCATE
PATIENT
B112
ADVOCATE
PATIENT
B113
ADVOCATE
PATIENT
B102A
AFFAIRS
B101
CORRIDOR
C1-11
ELEC
CL.
CHASE
HAC
B124
No.3
FEC
DECEDENT
N e g
P r e s s
M o n i t o r
FAUCETK-T954-4BRASSSTILLNESS
FAUCETBRASSSTILLNESSK-T954-4
K-T954-4FAUCETBRASSSTILLNESS
FAUCETBRASSSTILLNESSK-T954-4FAUCETBRASSK-T954-4STILLNESS FAUCETSTILLNESSBRASSK-T954-4
K-T954-4STILLNESSFAUCETBRASS
K-2202-8LAVATORYVITREOUS CHINAVITREOUS CHINABROOKLINEBROOKLINEK-2202-8LAVATORY
K-2202-8BROOKLINELAVATORYLAVATORYBROOKLINEK-2202-8VITREOUS CHINAVITREOUS CHINABROOKLINEK-2202-8VITREOUS CHINALAVATORY LAVATORYK-2202-8VITREOUS CHINAVITREOUS CHINALAVATORY BROOKLINELAVATORYVITREOUS CHINA BROOKLINEK-2202-8 K-2202-8BROOKLINE
LAVATORYLAVATORYK-2202-8BROOKLINEK-2202-8BROOKLINE
K-2202-8
LAVATORY
VITREOUS CHINAVITREOUS CHINA
VITREOUS CHINA
LAVATORY
K-2202-8BROOKLINE
BROOKLINEVITREOUS CHINA
BROOKLINELAVATORYK-2202-8BROOKLINEK-2202-8VITREOUS CHINAVITREOUS CHINALAVATORY
FIRST FLOOR DEMOLITION PLAN
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
F i l e
P a t h
P
M
BID DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
UPGRADE PUBLIC TOILETS
1ST FLOOR
3900 Woodland Ave., Philadelphia, PA
642-11-151
Project Director
October 30, 2017Revisions: Date:
DCS Infrastructure, LLC Design & Construction Services
12 Elm Street Port Jefferson, NY 11777 631-320-170635% Schematic Submission 04/06/17
12/22/17
FPM Group Engineering and enviromental science 909 Marconi Avenue Ronkonkoma, N.Y. 11779 631-737-6200
POC Chris Schwarz POC Donald Stout Dwg. of
35% Schematic Re-Submission
01/30/1870% Submission 100% Submission 04/13/18 100% Bid Documents 06/11/18
07/18/18100% Bid Documents
FIRST FLOOR KEY PLAN
DEMOLITION KEYED NOTES
CRITICAL BARRIER WALL NOTE
CRITICAL BARRIER WALL NOTE
CRITICAL BARRIER WALLS
EXTENSION DETAIL
CRITICAL BARRIER WALLS
EXTENSION DETAIL
DEMOLITION PLAN GENERAL NOTES
A140
Food Court
A142
Waiting
B113
Corridor
C1-9
M E
D
G
A S
E S
Corridor
C1-11
Food Line
A142C
CLG. HT. 8'-0"
CLG. HT. 8'-0"
CLG. HT. 8'-0"
CLG. HT. 7'-7" CLG. HT. 7'-7" CLG. HT. 7'-7"
CLG. HT. 7'-7"
CLG. HT. 7'-7"
CEILING DEMO. LEGEND
FIRST FLOOR DEMO. REFLECTED CEILING PLAN
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
A
F i t h
P
M
BID DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
UPGRADE PUBLIC TOILETS
1ST FLOOR
3900 Woodland Ave., Philadelphia, PA
642-11-151
Project Director
October 30, 2017Revisions: Date:
Design & Construction Services
12 Elm Street Port Jefferson, NY 11777 631-320-170635% Schematic Submission 04/06/17
12/22/17
909 Marconi Avenue Ronkonkoma, N.Y. 11779 631-737-6200
POC Chris Schwarz POC Donald Stout Dwg. of
35% Schematic Re-Submission
01/30/1870% Submission 100% Submission 04/13/18 100% Bid Documents 06/11/18
07/18/18100% Bid Documents
CEILING DEMOLITION GENERAL NOTES
A140
Food Court
A142
Waiting
B113
Corridor
C1-9
M E
D
G
A S
E S
Food Line
A142C
B123A
B101A
B102A
B103A
B124A
WALL DETAIL
WALL DETAIL
SCALE: 1-1/2" = 1'-0"
FIRST FLOOR CONSTRUCTION PLAN
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
A
F i t h
P
M
BID DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
UPGRADE PUBLIC TOILETS
1ST FLOOR
3900 Woodland Ave., Philadelphia, PA
642-11-151
Project Director
October 30, 2017Revisions: Date:
Design & Construction Services
12 Elm Street Port Jefferson, NY 11777 631-320-170635% Schematic Submission 04/06/17
12/22/17
909 Marconi Avenue Ronkonkoma, N.Y. 11779 631-737-6200
POC Chris Schwarz POC Donald Stout Dwg. of
35% Schematic Re-Submission
01/30/1870% Submission 100% Submission 04/13/18 100% Bid Documents 06/11/18
07/18/18100% Bid Documents
FIRST FLOOR KEY PLAN
FILL-IN OPENING DETAIL
PARTITION LEGEND
CONSTRUCTION PLAN KEYED GENERAL NOTES
CEILING LEGEND
Dining Area
A140
Food Court
A142
Waiting
B113
Corridor
C1-9
Food Line
A142C
CLG. HT. 7'-7"
CLG. HT. 8'-0"
CLG. HT. 8'-0"
CLG. HT. 7'-7"
CLG. HT. 7'-7"
NEW CONSTRUCTION REFLECTED CEILING PLAN
SOFFIT DETAIL AT VANITIES
HUNG CEILING DETAIL
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
A
F i t h
P
M
BID DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
UPGRADE PUBLIC TOILETS
1ST FLOOR
3900 Woodland Ave., Philadelphia, PA
642-11-151
Project Director
October 30, 2017Revisions: Date:
Design & Construction Services
12 Elm Street Port Jefferson, NY 11777 631-320-170635% Schematic Submission 04/06/17
12/22/17
909 Marconi Avenue Ronkonkoma, N.Y. 11779 631-737-6200
POC Chris Schwarz POC Donald Stout Dwg. of
35% Schematic Re-Submission
01/30/1870% Submission 100% Submission 04/13/18 100% Bid Documents 06/11/18
A 1
TOILET PARTITION DETAILS
TILE DETAILS
MEN'S TOILET ROOM
WOMEN'S TOILET, FAMILY RM, LACTATION RM
TYPICAL COUNTER DETAILS
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
A
F i t h
P
M
BID DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
UPGRADE PUBLIC TOILETS
1ST FLOOR
3900 Woodland Ave., Philadelphia, PA
642-11-151
Project Director
October 30, 2017Revisions: Date:
Design & Construction Services
12 Elm Street Port Jefferson, NY 11777 631-320-170635% Schematic Submission 04/06/17
12/22/17
909 Marconi Avenue Ronkonkoma, N.Y. 11779 631-737-6200
POC Chris Schwarz POC Donald Stout Dwg. of
35% Schematic Re-Submission
01/30/1870% Submission 100% Submission 04/13/18 100% Bid Documents 06/11/18
07/18/18100% Bid Documents
HEAD -H 1 JAMB -J 1
HEAD -H 2 JAMB -J 2 DOOR AND FRAME DETAILS
"DUAL" PAINT DETAIL
TYPICAL DOOR FRAME
A140
Food Court
A142
Waiting
B113
Corridor
C1-9
Food Line
A142C
No.3
A142A
CORRIDOR
C1-10
HAC
B124
MOD E WAITING
B132
1 SOUTH
B113d
TOILET RM
FAMILY
B101
B103
TOILET RM
WOMEN'S
B102
CORRIDOR
C1-11
TOILET RM
MEN'S
B123
STAIR
LACTATION
ROOM
ELECCL.
B122
CORRIDOR
C1-13
CHASE
FECFEC
m i n m a x
This Drawing Produced by the U.S. Access Board m a x m a x
>20-25 max20 max
This Drawing Produced by the U.S. Access Board
10 max m a x m i n
This Drawing Produced by the U.S. Access Board
10 max m a x m a x m a x m a x
> 10-24 max
This Drawing Produced by the U.S. Access Board
Figure 308.3.2
Obstructed High Side Reach
Figure 308.3.1
Unobstructed Side Reach
Figure 308.2.2
Obstructed High Forward Reach
Figure 308.2.1
Unobstructed Forward Reach
FINISH & SIGNAGE PLAN
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
F i l e
P a t h
P
M
BID DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
UPGRADE PUBLIC TOILETS
1ST FLOOR
3900 Woodland Ave., Philadelphia, PA
642-11-151
Project Director
October 30, 2017Revisions: Date:
DCS Infrastructure, LLC Design & Construction Services
12 Elm Street Port Jefferson, NY 11777 631-320-170635% Schematic Submission 04/06/17
12/22/17
FPM Group Engineering and enviromental science 909 Marconi Avenue Ronkonkoma, N.Y. 11779 631-737-6200
POC Chris Schwarz POC Donald Stout Dwg. of
35% Schematic Re-Submission
01/30/1870% Submission 100% Submission 04/13/18 100% Bid Documents 06/11/18
07/18/18100% Bid Documents
FINISH SCHEDULE
FINISH ABBREVIATIONS
GENERAL FINISH NOTES
GENERAL SIGNAGE NOTESDIRECTIONAL SIGNAGE LEGEND
ADA COMPLIANT MOUNTING HEIGHTS
ADA REACH REQUIREMENTS
TURNING SPACE
ADA WATER CLOSET AND SINK DETAILS
WHEEL CHAIR
STANDARD WATER CLOSET DETAILS
GRAB BAR DETAIL
UNDER CONSTRUCTION
STAIR #3
Storage
Corridor
CA-9
CORRIDOR
CA-13
Corridor
CA-10
JAN. CL.
B-6
SOILED
LINEN
B-5
LOCKER
ROOM
B-4
CARPENTER SHOP
FOREMAN
B034
SYSTEMS
ENGINEER
B033
M/R CHEF
B032
ELECTRIC
SHOP
B026
CARPENTER
SHOP
B035
STORAGE
B035a
A/C CONSOLE ROOM
B-2
Biomed
A15
BASEMENT FLOOR CONSTRUCTION PLAN
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
A
F i t h
P
M
BID DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
UPGRADE PUBLIC TOILETS
1ST FLOOR
3900 Woodland Ave., Philadelphia, PA
642-11-151
Project Director
October 30, 2017Revisions: Date:
Design & Construction Services
12 Elm Street Port Jefferson, NY 11777 631-320-170635% Schematic Submission 04/06/17
12/22/17
909 Marconi Avenue Ronkonkoma, N.Y. 11779 631-737-6200
POC Chris Schwarz POC Donald Stout Dwg. of
35% Schematic Re-Submission
01/30/1870% Submission 100% Submission 04/13/18 100% Bid Documents 06/11/18
GENERAL ARCHITECTURAL NOTES
INTERIOR ELEVATIONS
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
A
F i t h
P
M
BID DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
UPGRADE PUBLIC TOILETS
1ST FLOOR
3900 Woodland Ave., Philadelphia, PA
642-11-151
Project Director
October 30, 2017Revisions: Date:
Design & Construction Services
12 Elm Street Port Jefferson, NY 11777 631-320-170635% Schematic Submission 04/06/17
12/22/17
909 Marconi Avenue Ronkonkoma, N.Y. 11779 631-737-6200
POC Chris Schwarz POC Donald Stout Dwg. of
35% Schematic Re-Submission
01/30/1870% Submission 100% Submission 04/13/18 100% Bid Documents 06/11/18
GENERAL NOTES
ABBREVIATIONS
PROJECT NOTES
LEGEND
BASIS OF DESIGN LIGHTING FIXTURE SCHEDULE
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Fi le
P at h 6/
/2
:3
9:
P M
BID DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
UPGRADE PUBLIC TOILETS
1ST FLOOR
3900 Woodland Ave., Philadelphia, PA
642-11-151
Project Director
October 30, 2017Revisions: Date:
DCS Infrastructure, LLC Design & Construction Services
12 Elm Street Port Jefferson, NY 11777 631-320-170635% Schematic Submission 04/06/17
12/22/17
FPM Group Engineering and enviromental science 909 Marconi Avenue Ronkonkoma, N.Y. 11779 631-737-6200
POC Chris Schwarz POC Donald Stout Dwg. of
35% Schematic Re-Submission
01/30/1870% Submission 100% Submission 04/13/18
A140
Food Court
A142
Waiting
B113
Corridor
C1-9
M E
D
G
A S
E S
Waiting
Corridor
C1-11
Food Line
A142C
KEYED NOTES
ELEC. DEMO. LEGEND
SHEET NOTES
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
A
F i t h
P
M
BID DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
UPGRADE PUBLIC TOILETS
1ST FLOOR
3900 Woodland Ave., Philadelphia, PA
642-11-151
Project Director
October 30, 2017Revisions: Date:
Design & Construction Services
12 Elm Street Port Jefferson, NY 11777 631-320-170635% Schematic Submission 04/06/17
12/22/17
909 Marconi Avenue Ronkonkoma, N.Y. 11779 631-737-6200
POC Chris Schwarz POC Donald Stout Dwg. of
35% Schematic Re-Submission
01/30/1870% Submission 100% Submission 04/13/18 100% Bid Documents 06/11/18
ELECTRICAL DEMOLITION FLOOR PLAN
A140
Food Court
A142
Waiting
B113
Corridor
C1-9
M E
D
G
A S
E S
Food Line
A142C
ELEC. LEGEND
ELECTRICAL CONSTRUCTION FLOOR PLAN
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
A
F i t h
P
M
BID DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
UPGRADE PUBLIC TOILETS
1ST FLOOR
3900 Woodland Ave., Philadelphia, PA
642-11-151
Project Director
October 30, 2017Revisions: Date:
Design & Construction Services
12 Elm Street Port Jefferson, NY 11777 631-320-170635% Schematic Submission 04/06/17
12/22/17
909 Marconi Avenue Ronkonkoma, N.Y. 11779 631-737-6200
POC Chris Schwarz POC Donald Stout Dwg. of
35% Schematic Re-Submission
01/30/1870% Submission 100% Submission 04/13/18
CLG. HT. 8'-0"
CLG. HT. 8'-0"
CLG. HT. 7'-7"
Canteen
Dining Area
A140
Food Court
A142
Waiting
B113
Corridor
C1-9
M E
D
G
A S
E S
Waiting
Corridor
C1-11
Food Line
A142C
CLG. HT. 8'-0"
CLG. HT. 7'-7" CLG. HT. 7'-7"
CLG. HT. 7'-7"
CLG. HT. 7'-7"
SHEET NOTES
ELEC. DEMO. LEGEND
FIRST FLOOR ELEC. DEMOLITION REFLECTED CEILING PLAN
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
A
F i t h
P
M
BID DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
UPGRADE PUBLIC TOILETS
1ST FLOOR
3900 Woodland Ave., Philadelphia, PA
642-11-151
Project Director
October 30, 2017Revisions: Date:
Design & Construction Services
12 Elm Street Port Jefferson, NY 11777 631-320-170635% Schematic Submission 04/06/17
12/22/17
909 Marconi Avenue Ronkonkoma, N.Y. 11779 631-737-6200
POC Chris Schwarz POC Donald Stout Dwg. of
35% Schematic Re-Submission
01/30/1870% Submission 100% Submission 04/13/18
A140
Food Court
A142
Waiting
B113
Corridor
C1-9
M E
D
G
A S
E S
Food Line
A142C
A
D
S
S
S
S
S
S
S
ECP1-1
BP68-1
a b c a
C
BP67-1
b a b c
C b
BP67-1
ECP1-1
A a
BP67-1
A a
C
BP67-1
b
C
BP67-1
b
BP67-1
A a
BP67-1
A a
ECP1-1
A a
C
BP68-2
b
C
BP68-2
b
C
BP68-2
b
C
BP68-2
b
C
BP68-2
b
ECP1-1
A a
BP68-1
B a
B a
BP68-1
B a
D
B P c
F F a a
B P
B P
S a b
B a
BP68-1
B a
D
BP68-1
a
F F a a
BP68-1BP68-1
BP68-1
BP68-1
ECP1-1
A a
A a
A a a
F b
BP68-6
S b
F c
F F
F c c c
BP68-6
BP68-6BP68-6
BP68-6
a
S a
CLG. HT. 7'-7"
CLG. HT. 7'-7"
CLG. HT. 7'-7"
CLG. HT. 8'-0"
CLG. HT. 8'-0"
ECP1-1
c
S
ECP1-1
A
D
S
S
S
S
S
S
S
ECP1-1
BP68-1
a b c a
C
BP67-1
b a b c
C b
BP67-1
ECP1-1
A a
BP67-1
A a
C
BP67-1
b
C
BP67-1
b
BP67-1
A a
BP67-1
A a
ECP1-1
A a
C
BP68-2
b
C
BP68-2
b
C
BP68-2
b
C
BP68-2
b
C
BP68-2
b
ECP1-1
A a
BP68-1
B a
B a
BP68-1
B a
D
B P c
F F a a
B P
B P
S a b
B a
BP68-1
B a
D
BP68-1
a
F F a a
BP68-1BP68-1
BP68-1
BP68-1
ECP1-1
A a
A a
A a a
F b
BP68-6
S b
F c
F F
F c c c
BP68-6
BP68-6BP68-6
BP68-6
a
S a
CLG. HT. 7'-7"
CLG. HT. 7'-7"
CLG. HT. 7'-7"
CLG. HT. 8'-0"
CLG. HT. 8'-0"
ECP1-1
c
S
ECP1-1
LIGHTING FIXTURE SCHEDULE
SYSTEM SYMBOLS
a,b,c, S
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
A
F i t h
P
M
BID DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
UPGRADE PUBLIC TOILETS
1ST FLOOR
3900 Woodland Ave., Philadelphia, PA
642-11-151
Project Director
October 30, 2017Revisions: Date:
Design & Construction Services
12 Elm Street Port Jefferson, NY 11777 631-320-170635% Schematic Submission 04/06/17
12/22/17
909 Marconi Avenue Ronkonkoma, N.Y. 11779 631-737-6200
POC Chris Schwarz POC Donald Stout Dwg. of
35% Schematic Re-Submission
01/30/1870% Submission 100% Submission 04/13/18 100% Bid Documents 06/11/18
07/18/18100% Bid Documents
ELECTRICAL - LIGHTING PLAN
ELECTRICAL NOTES
| GI101 Title Sheet-COVER |
| GC101 1st floor Phasing Plan-GC101 |
| GC102 1st floor Life Safety Plan-GC102 |
| GC103 1st floor Infection Control-GC103 |
| AD101 1st Floor Demo Plan-AD101 |
| AD102 1st Floor Reflected Ceiling Demo Plan-AD102 |
| AE101 1st Floor Construction Plan-AE101 |
| AE102 1st Floor Reflected Ceiling Plan New Construction-AE102 |
| AE103 Toilet Enlarged Details-TOILET PLANS |
| AE104 Finish Schedule and Signage-FINISH SCHEDULE & SIGNAGE |
| AE105 Basement Construction Plan-BASEMENT CONSTRUCTION PLAN |
| AI101 Interior Elevations-INTERIOR ELEVATIONS |
| Signed&Sealed PDF |
| HPSC0487 |
| HPSC0489 |
| HPSC0491 |
| HPSC0492 |
| HPSC0494 |
| HPSC0496 |
| HPSC0497 |
| HPSC0498 |
| EG101 Electrical Notes, Symbols, Abbreviations, & Schedules-EG101 |
| ED101 1st Floor Electrical Demo Plan-ED101 |
| EP101 1st Floor Electrical Construction Plan-EP101 |
| ED102 Electrical 1st Floor Reflected Ceiling Demo Plan-ED102 |
| EL101 1st Floor Electrical Construction Reflected Clg Plan-EL101 |
File details come from the government source that posted it.