S02_Atch_2__Bid_Documents_Drawing_Set.pdf

PDF 11 MB Posted

Attached to
Upgrade Public Toilets First Floor Federal contract opportunity
Solicitation number
36C24419B0008
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 4

About this file

36C24419B0008 S02 Atch 2 Bid Documents Drawing Set.pdf

View the file

Other files for this federal contract opportunity

Other files attached to Upgrade Public Toilets First Floor, newest first.
File Type Posted
36C24419B0008-0001004.pdf PDF
36C24419B0008-0001005.pdf PDF
36C24419B0008-0001000.docx DOCX document
36C24419B0008-0001001.pdf PDF
36C24419B0008-0001002.pdf PDF
36C24419B0008-0001003.pdf PDF
S02_Atch_3_UPTFF_-_Constructiion_Duration_-_Calendar_Days.pdf PDF
S02_Atch_1__Bid_Documents_Specification_02.pdf PDF
36C24419B0008.docx DOCX document
36C24419B0008_1.docx DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

LIST OF DRAWINGS

Architectural

Plumbing

GENERAL NOTES CODE ANALYSIS ABBREVIATIONS

Mechanical

Electrical

Fire Protection

Design & Construction Services

12 Elm Street Port Jefferson, NY 11777 631-320-1706

Canteen

Dining Area

A140

Food Court

A142

Waiting

B113

Corridor

C1-9

Food Line

A142C

No.3

A142A

CORRIDOR

C1-10

HAC

B124

MOD E WAITING

B132

1 SOUTH

B113d

CHECK-IN

PHARMACY & NUTRITION

B112A

PHARMACY

B104

TOILET RM

FAMILY

B101

B103

TOILET RM

WOMEN'S

B102

CORRIDOR

C1-11

TOILET RM

MEN'S

B123

K-T954-4STILLNESSFAUCETBRASS

K-T954-4STILLNESSFAUCETBRASS

K-T954-4STILLNESSFAUCETBRASS

STAIR

LACTATION

ROOM

11'

7'-9"

ELECCL.

EXISTING

D.F. NOT IN

CONTRACT

K-T954-4 STILLNESS FAUCET

BRASS

K-T954-4STILLNESSFAUCET

BRASS

K-T954-4STILLNESSFAUCET

BRASS

K-T954-4STILLNESSFAUCETBRASS

B122

5'-0"

TEMPORARY CONSTRUCTION DOOR WITH

LOCK DURING TOILET CONSTRUCTION

5'-0"

CORRIDOR

C1-13

CHASE

FECFEC

MIN.

MIN.

TEMPORARY

PARTITION

TEMPORARY

PARTITION

LOCK-DOWN THIS LEAF (COORDINATE

WITH VA REPRESENTATIVES)

PUT CONSTRUCTION SIGNAGE:

"USE OTHER DOOR (WITH ARROW)"

ANTE

ROOM

2'

TEMPORARY PLASTIC BARRIER

TEMPORARY PLASTIC BARRIER

W/ ACCESS ZIPPER

A T

C O

N T

R A

C T

O R

S

D

I S

C R

E T

I O

N

5'-0" MIN.2'

TEMPORARY

PARTITION

AND DOOR

3'-3"

ANTE

ROOM

TEMPORARY

PARTITION

USE EXISTING

DOOR DURING

CONSTRUCTION

3'-3"

5'-0"

ANTE

ROOM

TEMPORARY CONSTRUCTION

PARTITION AND DOOR WITH

LOCK DURING TOILET

CONSTRUCTION

N e g

P r e s s

M o n i t o r

FAUCETK-T954-4BRASSSTILLNESS

FAUCETBRASSSTILLNESSK-T954-4

K-T954-4FAUCETBRASSSTILLNESS

FAUCETBRASSSTILLNESSK-T954-4FAUCETBRASSK-T954-4STILLNESS FAUCETSTILLNESSBRASSK-T954-4

K-T954-4STILLNESSFAUCETBRASS

K-2202-8LAVATORYVITREOUS CHINAVITREOUS CHINABROOKLINEBROOKLINEK-2202-8LAVATORY

K-2202-8BROOKLINELAVATORYLAVATORYBROOKLINEK-2202-8VITREOUS CHINAVITREOUS CHINABROOKLINEK-2202-8VITREOUS CHINALAVATORY LAVATORYK-2202-8VITREOUS CHINAVITREOUS CHINALAVATORY BROOKLINELAVATORYVITREOUS CHINA BROOKLINEK-2202-8 K-2202-8BROOKLINE

LAVATORYLAVATORYK-2202-8BROOKLINEK-2202-8BROOKLINE

K-2202-8

LAVATORY

VITREOUS CHINAVITREOUS CHINA

VITREOUS CHINA

LAVATORY

K-2202-8BROOKLINE

BROOKLINEVITREOUS CHINA

BROOKLINELAVATORYK-2202-8BROOKLINEK-2202-8VITREOUS CHINAVITREOUS CHINALAVATORY

PHASING PLAN

PHASING OF NEW WORK

GC101

PHASING PLAN

D.S. E.M./T.V.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

F i l e

P a t h

P

M

BID DOCUMENTS

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

UPGRADE PUBLIC TOILETS

1ST FLOOR

3900 Woodland Ave., Philadelphia, PA

642-11-151

Project Director

October 30, 2017Revisions: Date:

DCS Infrastructure, LLC Design & Construction Services

12 Elm Street Port Jefferson, NY 11777 631-320-170635% Schematic Submission 04/06/17

12/22/17

FPM Group Engineering and enviromental science 909 Marconi Avenue Ronkonkoma, N.Y. 11779 631-737-6200

POC Chris Schwarz POC Donald Stout Dwg. of

35% Schematic Re-Submission

01/30/1870% Submission 100% Submission 04/13/18 100% Bid Documents 06/11/18

07/18/18100% Bid Documents

FIRST FLOOR KEY PLAN

TRAVEL DISTANCE

NOTES:

LEGEND

Canteen

Dining Area

A140

Food Court

A142

Waiting

B113

Corridor

C1-9

M E

D

G

A S

E S

Food Line

A142C

SCOPE OF WORK

SCOPE OF WORK

SCOPE OF WORK

LIFE SAFETY PLAN

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

A

F i l e

P a t h

P

M

BID DOCUMENTS

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

UPGRADE PUBLIC TOILETS

1ST FLOOR

3900 Woodland Ave., Philadelphia, PA

642-11-151

Project Director

October 30, 2017Revisions: Date:

Design & Construction Services

12 Elm Street Port Jefferson, NY 11777 631-320-170635% Schematic Submission 04/06/17

12/22/17

909 Marconi Avenue Ronkonkoma, N.Y. 11779 631-737-6200

POC Chris Schwarz POC Donald Stout Dwg. of

35% Schematic Re-Submission

01/30/1870% Submission 100% Submission 04/13/18 100% Bid Documents 06/11/18

07/18/18100% Bid Documents

FIRST FLOOR KEY PLAN

N g

P r e s s

M o n i t o r

FAUCETK-T954-4BRASSSTILLNESS

FAUCETBRASSSTILLNESSK-T954-4

K-T954-4FAUCETBRASSSTILLNESS

FAUCETBRASSSTILLNESSK-T954-4FAUCETBRASSK-T954-4STILLNESS FAUCETSTILLNESSBRASSK-T954-4

K-T954-4STILLNESSFAUCETBRASS

K-2202-8LAVATORYVITREOUS CHINAVITREOUS CHINABROOKLINEBROOKLINEK-2202-8LAVATORY

K-2202-8BROOKLINELAVATORYLAVATORYBROOKLINEK-2202-8VITREOUS CHINAVITREOUS CHINABROOKLINEK-2202-8VITREOUS CHINALAVATORY LAVATORYK-2202-8VITREOUS CHINAVITREOUS CHINALAVATORY BROOKLINELAVATORYVITREOUS CHINA BROOKLINEK-2202-8 K-2202-8BROOKLINE

LAVATORYLAVATORYK-2202-8BROOKLINEK-2202-8BROOKLINE

K-2202-8

LAVATORY

VITREOUS CHINAVITREOUS CHINA

VITREOUS CHINA

LAVATORY

K-2202-8BROOKLINE

BROOKLINEVITREOUS CHINA

BROOKLINELAVATORYK-2202-8BROOKLINEK-2202-8VITREOUS CHINAVITREOUS CHINALAVATORY

Canteen

Dining Area

A140

Food Court

A142

Waiting

B113

Corridor

C1-9

M E

D

G

A S

E S

Food Line

A142C

No.3

A142A

CORRIDOR

C1-10

HAC

B124

MOD E WAITING

B132

1 SOUTH

B113d

CHECK-IN

PHARMACY & NUTRITION

B112A

PHARMACY

B104

TOILET RM

FAMILY

B101

B103

TOILET RM

WOMEN'S

B102

CORRIDOR

C1-11

TOILET RM

MEN'S

B123

K-T954-4STILLNESSFAUCETBRASS

K-T954-4STILLNESSFAUCETBRASS

K-T954-4STILLNESSFAUCETBRASS

STAIR

LACTATION

ROOM

ELECCL.

K-T954-4STILLNESSFAUCET

BRASS

K-T954-4STILLNESSFAUCET

BRASS

K-T954-4STILLNESSFAUCET

BRASS

K-T954-4STILLNESSFAUCETBRASS

B122

CORRIDOR

C1-13

CHASE

FECFEC

SCOPE OF WORK

SCOPE OF WORK

ICRA BARRIER LEGEND

ONE-HOUR FIRE-RATED SMOKE TIGHT ICRA TEMP. PARTITION

SCALE: 1 1/2" = 1'-0"

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

F i l e

P a t h

P

M

BID DOCUMENTS

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

UPGRADE PUBLIC TOILETS

1ST FLOOR

3900 Woodland Ave., Philadelphia, PA

642-11-151

Project Director

October 30, 2017Revisions: Date:

DCS Infrastructure, LLC Design & Construction Services

12 Elm Street Port Jefferson, NY 11777 631-320-170635% Schematic Submission 04/06/17

12/22/17

FPM Group Engineering and enviromental science 909 Marconi Avenue Ronkonkoma, N.Y. 11779 631-737-6200

POC Chris Schwarz POC Donald Stout Dwg. of

35% Schematic Re-Submission

01/30/1870% Submission 100% Submission 04/13/18 100% Bid Documents 06/11/18

07/18/18100% Bid Documents

FIRST FLOOR KEY PLAN

FIRST FLOOR ICRA PLAN

ICRA NOTESGENERAL ICRA NOTES

A140

Food Court

A142

Waiting

B113

Corridor

C1-9

M E

D

G

A S

E S

Food Line

A142C

TOILET HC

MEN'S

B122

CORRIDOR

C1-13

STAIR

FOOD LINE

TOILET HC

WOMEN'S

B123

FEC

CHUTE

LAUNDRY

ADVOCATE

PATIENT

B112

ADVOCATE

PATIENT

B113

ADVOCATE

PATIENT

B102A

AFFAIRS

B101

CORRIDOR

C1-11

ELEC

CL.

CHASE

HAC

B124

No.3

FEC

DECEDENT

N e g

P r e s s

M o n i t o r

FAUCETK-T954-4BRASSSTILLNESS

FAUCETBRASSSTILLNESSK-T954-4

K-T954-4FAUCETBRASSSTILLNESS

FAUCETBRASSSTILLNESSK-T954-4FAUCETBRASSK-T954-4STILLNESS FAUCETSTILLNESSBRASSK-T954-4

K-T954-4STILLNESSFAUCETBRASS

K-2202-8LAVATORYVITREOUS CHINAVITREOUS CHINABROOKLINEBROOKLINEK-2202-8LAVATORY

K-2202-8BROOKLINELAVATORYLAVATORYBROOKLINEK-2202-8VITREOUS CHINAVITREOUS CHINABROOKLINEK-2202-8VITREOUS CHINALAVATORY LAVATORYK-2202-8VITREOUS CHINAVITREOUS CHINALAVATORY BROOKLINELAVATORYVITREOUS CHINA BROOKLINEK-2202-8 K-2202-8BROOKLINE

LAVATORYLAVATORYK-2202-8BROOKLINEK-2202-8BROOKLINE

K-2202-8

LAVATORY

VITREOUS CHINAVITREOUS CHINA

VITREOUS CHINA

LAVATORY

K-2202-8BROOKLINE

BROOKLINEVITREOUS CHINA

BROOKLINELAVATORYK-2202-8BROOKLINEK-2202-8VITREOUS CHINAVITREOUS CHINALAVATORY

FIRST FLOOR DEMOLITION PLAN

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

F i l e

P a t h

P

M

BID DOCUMENTS

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

UPGRADE PUBLIC TOILETS

1ST FLOOR

3900 Woodland Ave., Philadelphia, PA

642-11-151

Project Director

October 30, 2017Revisions: Date:

DCS Infrastructure, LLC Design & Construction Services

12 Elm Street Port Jefferson, NY 11777 631-320-170635% Schematic Submission 04/06/17

12/22/17

FPM Group Engineering and enviromental science 909 Marconi Avenue Ronkonkoma, N.Y. 11779 631-737-6200

POC Chris Schwarz POC Donald Stout Dwg. of

35% Schematic Re-Submission

01/30/1870% Submission 100% Submission 04/13/18 100% Bid Documents 06/11/18

07/18/18100% Bid Documents

FIRST FLOOR KEY PLAN

DEMOLITION KEYED NOTES

CRITICAL BARRIER WALL NOTE

CRITICAL BARRIER WALL NOTE

CRITICAL BARRIER WALLS

EXTENSION DETAIL

CRITICAL BARRIER WALLS

EXTENSION DETAIL

DEMOLITION PLAN GENERAL NOTES

A140

Food Court

A142

Waiting

B113

Corridor

C1-9

M E

D

G

A S

E S

Corridor

C1-11

Food Line

A142C

CLG. HT. 8'-0"

CLG. HT. 8'-0"

CLG. HT. 8'-0"

CLG. HT. 7'-7" CLG. HT. 7'-7" CLG. HT. 7'-7"

CLG. HT. 7'-7"

CLG. HT. 7'-7"

CEILING DEMO. LEGEND

FIRST FLOOR DEMO. REFLECTED CEILING PLAN

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

A

F i t h

P

M

BID DOCUMENTS

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

UPGRADE PUBLIC TOILETS

1ST FLOOR

3900 Woodland Ave., Philadelphia, PA

642-11-151

Project Director

October 30, 2017Revisions: Date:

Design & Construction Services

12 Elm Street Port Jefferson, NY 11777 631-320-170635% Schematic Submission 04/06/17

12/22/17

909 Marconi Avenue Ronkonkoma, N.Y. 11779 631-737-6200

POC Chris Schwarz POC Donald Stout Dwg. of

35% Schematic Re-Submission

01/30/1870% Submission 100% Submission 04/13/18 100% Bid Documents 06/11/18

07/18/18100% Bid Documents

CEILING DEMOLITION GENERAL NOTES

A140

Food Court

A142

Waiting

B113

Corridor

C1-9

M E

D

G

A S

E S

Food Line

A142C

B123A

B101A

B102A

B103A

B124A

WALL DETAIL

WALL DETAIL

SCALE: 1-1/2" = 1'-0"

FIRST FLOOR CONSTRUCTION PLAN

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

A

F i t h

P

M

BID DOCUMENTS

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

UPGRADE PUBLIC TOILETS

1ST FLOOR

3900 Woodland Ave., Philadelphia, PA

642-11-151

Project Director

October 30, 2017Revisions: Date:

Design & Construction Services

12 Elm Street Port Jefferson, NY 11777 631-320-170635% Schematic Submission 04/06/17

12/22/17

909 Marconi Avenue Ronkonkoma, N.Y. 11779 631-737-6200

POC Chris Schwarz POC Donald Stout Dwg. of

35% Schematic Re-Submission

01/30/1870% Submission 100% Submission 04/13/18 100% Bid Documents 06/11/18

07/18/18100% Bid Documents

FIRST FLOOR KEY PLAN

FILL-IN OPENING DETAIL

PARTITION LEGEND

CONSTRUCTION PLAN KEYED GENERAL NOTES

CEILING LEGEND

Dining Area

A140

Food Court

A142

Waiting

B113

Corridor

C1-9

Food Line

A142C

CLG. HT. 7'-7"

CLG. HT. 8'-0"

CLG. HT. 8'-0"

CLG. HT. 7'-7"

CLG. HT. 7'-7"

NEW CONSTRUCTION REFLECTED CEILING PLAN

SOFFIT DETAIL AT VANITIES

HUNG CEILING DETAIL

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

A

F i t h

P

M

BID DOCUMENTS

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

UPGRADE PUBLIC TOILETS

1ST FLOOR

3900 Woodland Ave., Philadelphia, PA

642-11-151

Project Director

October 30, 2017Revisions: Date:

Design & Construction Services

12 Elm Street Port Jefferson, NY 11777 631-320-170635% Schematic Submission 04/06/17

12/22/17

909 Marconi Avenue Ronkonkoma, N.Y. 11779 631-737-6200

POC Chris Schwarz POC Donald Stout Dwg. of

35% Schematic Re-Submission

01/30/1870% Submission 100% Submission 04/13/18 100% Bid Documents 06/11/18

A 1

TOILET PARTITION DETAILS

TILE DETAILS

MEN'S TOILET ROOM

WOMEN'S TOILET, FAMILY RM, LACTATION RM

TYPICAL COUNTER DETAILS

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

A

F i t h

P

M

BID DOCUMENTS

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

UPGRADE PUBLIC TOILETS

1ST FLOOR

3900 Woodland Ave., Philadelphia, PA

642-11-151

Project Director

October 30, 2017Revisions: Date:

Design & Construction Services

12 Elm Street Port Jefferson, NY 11777 631-320-170635% Schematic Submission 04/06/17

12/22/17

909 Marconi Avenue Ronkonkoma, N.Y. 11779 631-737-6200

POC Chris Schwarz POC Donald Stout Dwg. of

35% Schematic Re-Submission

01/30/1870% Submission 100% Submission 04/13/18 100% Bid Documents 06/11/18

07/18/18100% Bid Documents

HEAD -H 1 JAMB -J 1

HEAD -H 2 JAMB -J 2 DOOR AND FRAME DETAILS

"DUAL" PAINT DETAIL

TYPICAL DOOR FRAME

A140

Food Court

A142

Waiting

B113

Corridor

C1-9

Food Line

A142C

No.3

A142A

CORRIDOR

C1-10

HAC

B124

MOD E WAITING

B132

1 SOUTH

B113d

TOILET RM

FAMILY

B101

B103

TOILET RM

WOMEN'S

B102

CORRIDOR

C1-11

TOILET RM

MEN'S

B123

STAIR

LACTATION

ROOM

ELECCL.

B122

CORRIDOR

C1-13

CHASE

FECFEC

m i n m a x

This Drawing Produced by the U.S. Access Board m a x m a x

>20-25 max20 max

This Drawing Produced by the U.S. Access Board

10 max m a x m i n

This Drawing Produced by the U.S. Access Board

10 max m a x m a x m a x m a x

> 10-24 max

This Drawing Produced by the U.S. Access Board

Figure 308.3.2

Obstructed High Side Reach

Figure 308.3.1

Unobstructed Side Reach

Figure 308.2.2

Obstructed High Forward Reach

Figure 308.2.1

Unobstructed Forward Reach

FINISH & SIGNAGE PLAN

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

F i l e

P a t h

P

M

BID DOCUMENTS

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

UPGRADE PUBLIC TOILETS

1ST FLOOR

3900 Woodland Ave., Philadelphia, PA

642-11-151

Project Director

October 30, 2017Revisions: Date:

DCS Infrastructure, LLC Design & Construction Services

12 Elm Street Port Jefferson, NY 11777 631-320-170635% Schematic Submission 04/06/17

12/22/17

FPM Group Engineering and enviromental science 909 Marconi Avenue Ronkonkoma, N.Y. 11779 631-737-6200

POC Chris Schwarz POC Donald Stout Dwg. of

35% Schematic Re-Submission

01/30/1870% Submission 100% Submission 04/13/18 100% Bid Documents 06/11/18

07/18/18100% Bid Documents

FINISH SCHEDULE

FINISH ABBREVIATIONS

GENERAL FINISH NOTES

GENERAL SIGNAGE NOTESDIRECTIONAL SIGNAGE LEGEND

ADA COMPLIANT MOUNTING HEIGHTS

ADA REACH REQUIREMENTS

TURNING SPACE

ADA WATER CLOSET AND SINK DETAILS

WHEEL CHAIR

STANDARD WATER CLOSET DETAILS

GRAB BAR DETAIL

UNDER CONSTRUCTION

STAIR #3

Storage

Corridor

CA-9

CORRIDOR

CA-13

Corridor

CA-10

JAN. CL.

B-6

SOILED

LINEN

B-5

LOCKER

ROOM

B-4

CARPENTER SHOP

FOREMAN

B034

SYSTEMS

ENGINEER

B033

M/R CHEF

B032

ELECTRIC

SHOP

B026

CARPENTER

SHOP

B035

STORAGE

B035a

A/C CONSOLE ROOM

B-2

Biomed

A15

BASEMENT FLOOR CONSTRUCTION PLAN

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

A

F i t h

P

M

BID DOCUMENTS

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

UPGRADE PUBLIC TOILETS

1ST FLOOR

3900 Woodland Ave., Philadelphia, PA

642-11-151

Project Director

October 30, 2017Revisions: Date:

Design & Construction Services

12 Elm Street Port Jefferson, NY 11777 631-320-170635% Schematic Submission 04/06/17

12/22/17

909 Marconi Avenue Ronkonkoma, N.Y. 11779 631-737-6200

POC Chris Schwarz POC Donald Stout Dwg. of

35% Schematic Re-Submission

01/30/1870% Submission 100% Submission 04/13/18 100% Bid Documents 06/11/18

GENERAL ARCHITECTURAL NOTES

INTERIOR ELEVATIONS

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

A

F i t h

P

M

BID DOCUMENTS

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

UPGRADE PUBLIC TOILETS

1ST FLOOR

3900 Woodland Ave., Philadelphia, PA

642-11-151

Project Director

October 30, 2017Revisions: Date:

Design & Construction Services

12 Elm Street Port Jefferson, NY 11777 631-320-170635% Schematic Submission 04/06/17

12/22/17

909 Marconi Avenue Ronkonkoma, N.Y. 11779 631-737-6200

POC Chris Schwarz POC Donald Stout Dwg. of

35% Schematic Re-Submission

01/30/1870% Submission 100% Submission 04/13/18 100% Bid Documents 06/11/18

GENERAL NOTES

ABBREVIATIONS

PROJECT NOTES

LEGEND

BASIS OF DESIGN LIGHTING FIXTURE SCHEDULE

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Fi le

P at h 6/

/2

:3

9:

P M

BID DOCUMENTS

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

UPGRADE PUBLIC TOILETS

1ST FLOOR

3900 Woodland Ave., Philadelphia, PA

642-11-151

Project Director

October 30, 2017Revisions: Date:

DCS Infrastructure, LLC Design & Construction Services

12 Elm Street Port Jefferson, NY 11777 631-320-170635% Schematic Submission 04/06/17

12/22/17

FPM Group Engineering and enviromental science 909 Marconi Avenue Ronkonkoma, N.Y. 11779 631-737-6200

POC Chris Schwarz POC Donald Stout Dwg. of

35% Schematic Re-Submission

01/30/1870% Submission 100% Submission 04/13/18

A140

Food Court

A142

Waiting

B113

Corridor

C1-9

M E

D

G

A S

E S

Waiting

Corridor

C1-11

Food Line

A142C

KEYED NOTES

ELEC. DEMO. LEGEND

SHEET NOTES

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

A

F i t h

P

M

BID DOCUMENTS

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

UPGRADE PUBLIC TOILETS

1ST FLOOR

3900 Woodland Ave., Philadelphia, PA

642-11-151

Project Director

October 30, 2017Revisions: Date:

Design & Construction Services

12 Elm Street Port Jefferson, NY 11777 631-320-170635% Schematic Submission 04/06/17

12/22/17

909 Marconi Avenue Ronkonkoma, N.Y. 11779 631-737-6200

POC Chris Schwarz POC Donald Stout Dwg. of

35% Schematic Re-Submission

01/30/1870% Submission 100% Submission 04/13/18 100% Bid Documents 06/11/18

ELECTRICAL DEMOLITION FLOOR PLAN

A140

Food Court

A142

Waiting

B113

Corridor

C1-9

M E

D

G

A S

E S

Food Line

A142C

ELEC. LEGEND

ELECTRICAL CONSTRUCTION FLOOR PLAN

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

A

F i t h

P

M

BID DOCUMENTS

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

UPGRADE PUBLIC TOILETS

1ST FLOOR

3900 Woodland Ave., Philadelphia, PA

642-11-151

Project Director

October 30, 2017Revisions: Date:

Design & Construction Services

12 Elm Street Port Jefferson, NY 11777 631-320-170635% Schematic Submission 04/06/17

12/22/17

909 Marconi Avenue Ronkonkoma, N.Y. 11779 631-737-6200

POC Chris Schwarz POC Donald Stout Dwg. of

35% Schematic Re-Submission

01/30/1870% Submission 100% Submission 04/13/18

CLG. HT. 8'-0"

CLG. HT. 8'-0"

CLG. HT. 7'-7"

Canteen

Dining Area

A140

Food Court

A142

Waiting

B113

Corridor

C1-9

M E

D

G

A S

E S

Waiting

Corridor

C1-11

Food Line

A142C

CLG. HT. 8'-0"

CLG. HT. 7'-7" CLG. HT. 7'-7"

CLG. HT. 7'-7"

CLG. HT. 7'-7"

SHEET NOTES

ELEC. DEMO. LEGEND

FIRST FLOOR ELEC. DEMOLITION REFLECTED CEILING PLAN

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

A

F i t h

P

M

BID DOCUMENTS

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

UPGRADE PUBLIC TOILETS

1ST FLOOR

3900 Woodland Ave., Philadelphia, PA

642-11-151

Project Director

October 30, 2017Revisions: Date:

Design & Construction Services

12 Elm Street Port Jefferson, NY 11777 631-320-170635% Schematic Submission 04/06/17

12/22/17

909 Marconi Avenue Ronkonkoma, N.Y. 11779 631-737-6200

POC Chris Schwarz POC Donald Stout Dwg. of

35% Schematic Re-Submission

01/30/1870% Submission 100% Submission 04/13/18

A140

Food Court

A142

Waiting

B113

Corridor

C1-9

M E

D

G

A S

E S

Food Line

A142C

A

D

S

S

S

S

S

S

S

ECP1-1

BP68-1

a b c a

C

BP67-1

b a b c

C b

BP67-1

ECP1-1

A a

BP67-1

A a

C

BP67-1

b

C

BP67-1

b

BP67-1

A a

BP67-1

A a

ECP1-1

A a

C

BP68-2

b

C

BP68-2

b

C

BP68-2

b

C

BP68-2

b

C

BP68-2

b

ECP1-1

A a

BP68-1

B a

B a

BP68-1

B a

D

B P c

F F a a

B P

B P

S a b

B a

BP68-1

B a

D

BP68-1

a

F F a a

BP68-1BP68-1

BP68-1

BP68-1

ECP1-1

A a

A a

A a a

F b

BP68-6

S b

F c

F F

F c c c

BP68-6

BP68-6BP68-6

BP68-6

a

S a

CLG. HT. 7'-7"

CLG. HT. 7'-7"

CLG. HT. 7'-7"

CLG. HT. 8'-0"

CLG. HT. 8'-0"

ECP1-1

c

S

ECP1-1

A

D

S

S

S

S

S

S

S

ECP1-1

BP68-1

a b c a

C

BP67-1

b a b c

C b

BP67-1

ECP1-1

A a

BP67-1

A a

C

BP67-1

b

C

BP67-1

b

BP67-1

A a

BP67-1

A a

ECP1-1

A a

C

BP68-2

b

C

BP68-2

b

C

BP68-2

b

C

BP68-2

b

C

BP68-2

b

ECP1-1

A a

BP68-1

B a

B a

BP68-1

B a

D

B P c

F F a a

B P

B P

S a b

B a

BP68-1

B a

D

BP68-1

a

F F a a

BP68-1BP68-1

BP68-1

BP68-1

ECP1-1

A a

A a

A a a

F b

BP68-6

S b

F c

F F

F c c c

BP68-6

BP68-6BP68-6

BP68-6

a

S a

CLG. HT. 7'-7"

CLG. HT. 7'-7"

CLG. HT. 7'-7"

CLG. HT. 8'-0"

CLG. HT. 8'-0"

ECP1-1

c

S

ECP1-1

LIGHTING FIXTURE SCHEDULE

SYSTEM SYMBOLS

a,b,c, S

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

A

F i t h

P

M

BID DOCUMENTS

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

UPGRADE PUBLIC TOILETS

1ST FLOOR

3900 Woodland Ave., Philadelphia, PA

642-11-151

Project Director

October 30, 2017Revisions: Date:

Design & Construction Services

12 Elm Street Port Jefferson, NY 11777 631-320-170635% Schematic Submission 04/06/17

12/22/17

909 Marconi Avenue Ronkonkoma, N.Y. 11779 631-737-6200

POC Chris Schwarz POC Donald Stout Dwg. of

35% Schematic Re-Submission

01/30/1870% Submission 100% Submission 04/13/18 100% Bid Documents 06/11/18

07/18/18100% Bid Documents

ELECTRICAL - LIGHTING PLAN

ELECTRICAL NOTES

GI101 Title Sheet-COVER
GC101 1st floor Phasing Plan-GC101
GC102 1st floor Life Safety Plan-GC102
GC103 1st floor Infection Control-GC103
AD101 1st Floor Demo Plan-AD101
AD102 1st Floor Reflected Ceiling Demo Plan-AD102
AE101 1st Floor Construction Plan-AE101
AE102 1st Floor Reflected Ceiling Plan New Construction-AE102
AE103 Toilet Enlarged Details-TOILET PLANS
AE104 Finish Schedule and Signage-FINISH SCHEDULE & SIGNAGE
AE105 Basement Construction Plan-BASEMENT CONSTRUCTION PLAN
AI101 Interior Elevations-INTERIOR ELEVATIONS
Signed&Sealed PDF
HPSC0487
HPSC0489
HPSC0491
HPSC0492
HPSC0494
HPSC0496
HPSC0497
HPSC0498
EG101 Electrical Notes, Symbols, Abbreviations, & Schedules-EG101
ED101 1st Floor Electrical Demo Plan-ED101
EP101 1st Floor Electrical Construction Plan-EP101
ED102 Electrical 1st Floor Reflected Ceiling Demo Plan-ED102
EL101 1st Floor Electrical Construction Reflected Clg Plan-EL101

File details come from the government source that posted it.