36C24419B0008-0001000.docx
DOCX document 274 KB Posted
- Attached to
- Upgrade Public Toilets First Floor Federal contract opportunity
- Solicitation number
- 36C24419B0008
About this file
36C24419B0008 0001 36C24419B0008 0001.docx
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 36C24419B0008-0001004.pdf | ||
| 36C24419B0008-0001005.pdf | ||
| 36C24419B0008-0001001.pdf | ||
| 36C24419B0008-0001002.pdf | ||
| 36C24419B0008-0001003.pdf | ||
| S02_Atch_2__Bid_Documents_Drawing_Set.pdf | ||
| S02_Atch_3_UPTFF_-_Constructiion_Duration_-_Calendar_Days.pdf | ||
| S02_Atch_1__Bid_Documents_Specification_02.pdf | ||
| 36C24419B0008.docx | DOCX document | |
| 36C24419B0008_1.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
5. PROJECT NUMBER (if applicable)
CODE
7. ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER
3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE OF PAGES
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO.
1. CONTRACT ID CODE
FACILITY CODE
CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office.
is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER
16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30
PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer) 02-04-2019 642-11-151 00244 Department of Veterans Affairs Network Contracting Office 4 20 Montchanin Rd Greenville
DE
19807 00244 Department of Veterans Affairs Network Contracting Office 4 20 Montchanin Rd Greenville
DE
19807 To all Offerors/Bidders
36C24419B0008
X X X
X
Project: Upgrade Public Toilets First Floor, Philadelphia VA Medical Center
The purpose of this amendment is to:
1. Provide pre-bid/site visit meeting minutes
2. Attendance Sheet
3. Provide questions and answers
4. Attachments (7)
5. Provide Bid Deduct Schedule
6. Clarify Construction Duration Days are 300 Days Charles H. Peck, Jr.
Contracting Officer
PRE-BID CONFERENCE & SITE VISIT
MEETING MINUTES
UPGRADE PUBLIC TOILETS (FIRST FLOOR)
CONSTRUCTION PROJECT #642-11-151
SOLICITATION #36C24419B0008
JANUARY 24, 2019, 10:00 AM
BUILDING 5, CONFERENCE ROOM
1. Introduction: Contracting Officer (CO): Charles “Chuck” Peck, Contracting Specialist(CS): Cheryl A. Roberts, Contracting Officer Representative (COR): Frederick Schultz. *Everett Shaver, Contracting Officer.
2. Solicitation Highlights: The solicitation was posted to FEDBIZOPPS on January 11, 2019 as a SDVOSB set aside to include three attachments. The NAICS Code for this project is 236220. The wage rate requirements (Construction) Building dated 1/4/19. All contractors should have reviewed the entire solicitation before this meeting.
3. Brief overview of project Scope of Work: This project will require bids for the Base Bid and three (3) Bid Deducts to complete renovation of the following spaces (Decedent Affairs B101, Patient Advocate B102A, Patient Advocate B112, Patient Advocate B113 Men’s Toilet B122, Women’s Toilet B123 and HAC B124 to create the following new spaces: Family Toilet Room B101, Women’s Toilet Room B102, Lactation Room B103, Men’s Toilet Room B123 and HAC B124). The project is scheduled to take 254 calendar days to complete. The Construction Magnitude is $500,000.00-1,000,000.00.
COR Comments:
0. The location of this project is in an area of HEAVY PUBLIC TRAFFIC and contactors must consider this at all times.
0. Please note the requirements of CRITICAL WALL BARRIERS, as per Drawing AD101.
0. Please note that this is a Phased project.
0. Installation of Critical Barrier and ICRA Barrier walls must be installed after normal business hours of the VA [4:30PM – 11 PM].
0. Please note that the Fire Suppression System must remain in function throughout demolition and new work installation.
0. The Contractor must provide 14 Calendar days’ notice prior to any system shut- downs to support their work.
4. Additional Information: This is a construction project that will be awarded as a SDVOSB set aside. The only award factor for this project will be price along with conformance to the solicitation. The Contractor is required to be registered in SAM, VetBizOps and VETS 4212.
5. The Bid opening will be Tuesday, February 12, 2019, 3:00 p.m. (EST). All bids can be sent by e-mail, hand carried or mailed to the Wilmington VA Medical Center, Contracting Office, Room 113 (Attn: Cheryl A. Roberts), 20 Montchanin Road, (Montchanin Corporate Center), Greenville, DE 19807.
6. Send all questions pertaining to this solicitation to Cheryl A. Roberts (CS), and Frederick Schultz (COR) by e-mail no later than Tuesday, January 29, 2019.
7. Please follow up all questions asked during the site visit with an email to Cheryl A. Roberts (CS) and Frederick Schultz (COR). All questions and answers from the Pre-bid Meeting/Site Visit will be documented and posted to FEDBIZOPPS. Cheryl Roberts’ contact information is cheryl.roberts2@va.gov or (302) 994-2511 x7525, and Frederick Schultz’s contact information is frederick.schultz@va.gov or (215) 823-5800 x5771.
8. Mr. Schultz will take you on the site visit. Please follow up all questions asked during the site visit with an email to Cheryl A. Roberts (CS) and Frederick Schultz (COR). All questions and answers from the Pre-bid Meeting/Site Visit will be documented and posted to FEDBIZOPPS. Cheryl Roberts’ contact information is cheryl.roberts2@va.gov or (302) 994-2511 x7525, and Frederick Schultz’s contact information is frederick.schultz@va.gov or (215) 823-5800 x5771.
9. Questions, Comments or Notes?
Question 1: It is stated that: "All work within the BASE BID shall be performed between 7:00 a.m. through 4:00 p.m." What are the working hours for work that is required to take place in the corridors? For instance, the Nurse Call home run cabling to POE switch. Is it permitted to work after hours between 4:30 p.m. through 11 :00 p.m. to accomplish work required in the corridors?
VA Answer 1: All work in the Corridors shall be performed during the hours of 4:30PM to 11PM.
Question 2: The electrical power plan (EP101) indicates junction boxes, with 120-volt circuit, for the auto-flushers and auto-faucets. Where are the J boxes located? Typically, there would be transformer involved (auto-faucets below counter top and auto-flush above ceiling???). Who is responsible for the low voltage wiring?
VA Answer 2: See the attached cut sheets for Auto-Flush and Auto-Faucet [this is for “Basis-of-Design”, Approved Equal may be submitted.
| These are both 120V, included are installation details showing mounting of J-Boxes [no | Transformers are required]. |
| If a 240V is selected by the Contractor, the Transformer is supplied, as part of the unit, | and shall be mounted, as per the manufacturer's recommendation. |
Question 3: The electrical lighting plan (EL101) indicates 1/2 shaded (emergency driver) 2'x2' and 2'x4' light fixtures circuited back to emergency panel ECP1. The same fixtures have a small letter switch designation which indicates that they will be controlled with the same switch that controls the "normal" powered fixtures in that area (panel BPG_). Are the 1/2 shaded fixtures constantly ON "night" lights, and do they require emergency drivers? The emergency drivers should be connected to, and ahead of, the local lighting circuit serving that area.
VA Answer 3: Yes, make the fixtures “nightlights” (on 24/7) [therefore, no switching]. Yes, provide Emergency Drivers.
Question 4: There are (2) fixture schedules located in the electrical plans. One on drawing EG101 and one on drawing EL101. Which one is the correct one?
VA Answer 4: Drawing EG101 is correct. Drawing EL101 shall be revised, as per the attached 'Partial Photocopy of Drawing EL101', dated 31JAN19.
| Question 5: Please provide the vendor name and contact information for the existing |
| Fire Alarm System. |
VA Answer 5: The Contractors can use any vendor that is Certified in the installation of Fire Alarm Systems.
Question 6: Please provide the vendor name and contact information for the existing Nurse Call System.
VA Answer 6: The Contractors can use any Vendor that is Certified in the installation of Nurse Call Systems.
Question 7: Will work be required in the IT closets?
VA Answer 7: There is no work in the IT Closets.
Question 8: The solicitation stated 254 days to complete the project and the Phasing schedule stated 294/300 days to complete the project which one is correct?
VA Answer 8: Please use the following for the Construction Duration Days: 300 Days [See the attached modified document for this issue.]
| Atch 1 Bid Schedule |
| Atch 2 Sign in Sheet |
| Atch 3 Auto-Faucet cut Sheet |
| Atch 4 Auto-Faucet installation instructions |
| Atch 5 Auto-Flush cut sheets |
| Atch 6 Auto-Flush installation instructions |
| Atch 7 Partial Photocopy of Drawing EL101 dated 31 Jan 19 |
BID SCHEDULE
BID ITEMS
SCHEDULE BIDS
THE GOVERNMENT INTENDS TO AWARD A CONTRACT TO THE RESPONSIVE /RESPONSIBLE OFFER FOR LINE ITEMS 0001, 0002, 0003 or 0004 TO ACHIEVE THE BEST VALUE FOR THE GOVERNMENT.
| ITEM NO. | SUPPLIES/SERVICE | QTY UNIT | UNIT PRICE AMOUNT |
| (includes Construction) |
0001 Base Price Construction 1 Job $__________________
BASE BID, GENERAL CONSTRUCTION: The project consists of Construction and Alterations necessary for the complete renovation of the following existing spaces: Decedent Affairs B101, Patient Advocate B102A, Patient Advocate B112, Patient Advocate B113 Men’s Toilet B122, Women’s Toilet B123 and HAC B124 to create the following new spaces: Family Toilet Room B101, Women’s Toilet Room B102, Lactation Room B103, Men’s Toilet Room B123 and HAC B124 on the first floor of the Corporal Michael J. Crescenz VA Medical Center. The contractor will be required to provide all necessary tools, labor, equipment, materials, and supervision necessary to complete the project. All work within the BASE BID shall be performed between 7:00 a.m. through 4:00 p.m. and corridor work between 4:30-11:00 p.m.
0002 Bid Deduct #1 Same as Base Price except delete 1 Job $__________________ Omit all plumbing/finishes in family toilet Total value of job minus this line item
0003 Bid Deduct #2 Same as Base Price except delete 1 Job $__________________ Omit all finishes in Lactation Room
0004 Bid Deduct #3 Same as Base Price except delete 1 Job $__________________ Omit all work in HAC Room
Firm Fixed Price (FFP)
This project is located within the Corporal Michael J. Crescenz VA Medical Center. Contractor shall completely prepare site required to construct General Construction and Alterations necessary to complete renovation for “UPGRADE PUBLIC TOILETS FIRST FLOOR 642-11-151” as required by drawings and specifications.
Atch 1
Atch 2 See attached document: Atch 3 Auto-Faucet cut sheet.
See attached document: Atch 4 Auto-Faucet installation instructions.
See attached document: Atch 5 Auto-Flush cut sheets.
See attached document: Atch 6 Auto-Flush installation instructions.
See attached document: Atch 7 Partial Photocopy of Drawing EL101, dated 31JAN19.
End of Document image1.png
File details come from the government source that posted it.