This is a Request for Information (RFI) Questions and Answers document for Solicitation 36C24227R0009 regarding the replacement of a chilled water pump at James J. Peter Veterans Affairs Medical Center in Bronx, New York. The document, updated November 12, 2026, provides clarifications on equipment specifications, site conditions, and project requirements in response to ten inquiries from potential contractors.

Key project details include: the pump being replaced is designated CHWP-1 and operates on a variable frequency drive (VFD); the existing motor nameplate data and pump schedule are provided in a referenced table; no standby or parallel pump is available during the outage, though system redundancy is provided by remaining chillers; contractors must replace flexible connectors, gauges, and clean the strainer, with isolation valve condition assessment required; and ICRA controls are not required for the boiler plant work area. Additional requirements specify that contractors must dispose of the removed pump and motor, electrical drawings are unavailable and sizing should follow manufacturer recommendations and new nameplate specifications, and no additional site visits are scheduled. The document confirms that isolation valves, base, flexible connectors, and gauges require evaluation, with flexible connectors and gauges to be replaced as part of the work.

View the file

Other files

Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Solicitation 36C24227R0009 – Replace Chilled Water Pump at the Boiler Plant

James J. Peter VAMC

130 West Kingsbridge Road

Bronx, NY 10468

RFI Questions and Answers (Updated 11-12-26)

1. Nameplate data for the existing pump and motor (manufacturer, model, flow, head, horsepower, voltage, phase, RPM, impeller size).

Please see the schedule below.

2. Any available mechanical or electrical drawings or an equipment schedule for the boiler plant chilled water system.

Please refer to the response and attachment provided in question 1 and below. We do not have electrical drawings available. Everything should be sized as per the manufacture recommendation and new name plate.

3. Whether the existing motor is on a variable frequency drive or an across-the-line starter.

The existing motor is on a variable frequency drive (VFD).

4. Please provide the specs of existing pump and motor nameplate data (manufacturer, model, size, horsepower, voltage, RPM), the design flow and head, and whether the pump runs on a starter or a VFD.

Please see the responses provided in questions 1 and 3.

5. Is there a standby or parallel pump that will carry the load during the outage, and what outage duration and season will VA permit?

No, each pump is dedicated to individual chiller; the remaining chillers provide system redundancy during an outage.

6. Please confirm the condition of the existing isolation valves, and whether the base, flexible connectors and gauges are to be replaced or reused.

The contractor must replace the flexible connectors, gauges, and clean the strainer.

7. Is the boiler plant considered an ICRA-controlled area for this work? Are 1-hour barrier walls and negative pressure required, or only dust control and tacky mats?

No, ICRA controls are not required for this area.

8. Is there VA guidance on disposition of the removed pump and motor (salvage to VA or disposal by the contractor)?

The removed pump and motor are to be disposed by the contractor.

9. Please confirm if the pump being replaced is CWP-1 or CHWP-1.

CHWP-1

10. Is there any additional site visit scheduled?

No.