This is an Amendment to Solicitation/Modification of Contract (Standard Form 30) issued by the Department of Veterans Affairs Network Contracting Office (NCO) in Buffalo, New York. Amendment 0002, effective November 6, 2026, responds to ten vendor questions regarding the Consolidate Primary Care Reception project at the Albany VA Medical Center. The amendment clarifies critical project specifications and requirements for the construction services contract.

Key clarifications include: Automated Logic controls are the only acceptable manufacturer for the existing control system; kitchen work hours end at 3:30 AM with public corridor work permitted after 4:30 PM on weekdays; reception and shared waiting spaces finish installation occurs in Phase 3 with door installation in Phase 4; asbestos removal is limited to 260 linear feet in identified chases; existing electrical panel 1-147 shall be relocated by replacement per sheet E-501 specifications; column fireproofing requires encapsulation with sealant paint followed by a 3-hour fire rating system (spray-applied or intumescent); ceiling replacement depends on damage assessment with full replacement required where repairs cannot achieve uniform appearance; paper towel dispensers must be sensor-activated, hands-free units mounted per A131 specifications; folding partitions are general contractor-furnished phenolic panels (2'W x 4'H) in Pastel Grey 3074 by ASI Global Partitions, capable of supporting 60 pounds; existing fire alarm strobes remain with new devices installed as shown; and Equipment Storage 113/future Exam 3 retains existing cabinets and sink with no additional fixture scope required. Full ICRA protections must remain active adjacent to patient care areas, and the 1C corridor stem and elevator lobby must maintain minimum 6-foot traffic clearance during business hours.

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

5. PROJECT NUMBER (if applicable)

CODE

7. ADMINISTERED BY

2. AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER

3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE OF PAGES

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED

BPA NO.

1. CONTRACT ID CODE

FACILITY CODE

CODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV. 11/2016)

is required to sign this document and return ___________ copies to the issuing office.

is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

Contractor

16C. DATE SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER

16A. NAME AND TITLE OF CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 30

PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer) 11-20-2026 528A8-22-814 36C528 Department of Veterans Affairs Network Contracting Office (NCO) 2 3495 Bailey Avenue Building 3, 2nd floor Buffalo NY 14215 36C528 Department of Veterans Affairs Network Contracting Office (NCO) 2 3495 Bailey Avenue Building 3, 2nd floor Buffalo NY 14215 To all Offerors/Bidders

36C24227B0006 -06-2026

X X X X See attached document.

Michael Spivack

CONTINUATION PAGE

This amendment answers the following vendor questions:

1. The Drawings MH101-1 through MH101-5 list Trane as the Existing Controls Manufacturer. Per Note K.

Is the existing Automated Logic Control System the hospital has standardized on an acceptable controls manufacturer for this project?

Response: Yes, Automated Logic controls will be the only acceptable controls manufacturer for this project.

2. Work hours Section 01 00 00 gives kitchen work hours ending at both 3:00 a.m. and 3:30 a.m. G007-G009 and AD101-AD105 differ on weekend restrictions. Please confirm the kitchen cutoff, whether public corridor work is permitted on weekday nights, and whether heavy construction and deck attachments are restricted to weekends.

Response: Kitchen hours will end at 3:30 AM. Public corridor work will be permitted on weekday nights but construction must be cleared away (daily) for the start of workday access by public and staff. Heavy construction and deck attachments are restricted to weekends. Public corridor work is only permitted after 4:30pm during business days.

3. Finish and doorway phasing A101/A102 defer reception and shared waiting floors and ceilings to Phase 3, while A103/A104 and A107/A108 show work in Phases 2 and 4. Please confirm the finish installation phases and required Phase 2 turnover condition. Please also confirm whether A201’s door installation at the end of Phase 3 refers to D105C, which A401 assigns to Phase 4.

Response:

a. Reception and Shared Waiting spaces are to be constructed in phases as identified in the drawings. The note: “FINISH FLOOR AND CEILING IN NEW SHARED WAITING 105 AND RECEPTION 105B SHALL BE COMPLETED ENTIRELY IN PHASE 3. SEE FINISH PLAN AND PHASE 3 RCP.” refers to overall room finishing where there may need to be some corrections to previous phased work to provide a clean final room appearance. Segments will need to be completed for each phase as required for lighting and MEP installations.

b. A201’S door installation occurs in Phase 4, see A107.

c. Due to active adjacent patient care areas, full ICRA protections must always be in place. Notably the anteroom.

d. The Agent Cashier and Primary Care Reception/Waiting spaces must always remain fully operational and accessible. The 1C corridor stem shall not be blocked during business hours. Patient bed traffic shall not be blocked, and both the 1C corridor stem and Elevator Lobby must maintain a minimum space of 6ft for traffic.

4. Asbestos quantity and survey HA101 Table 1 lists 400 LF of presumed concealed pipe/fitting insulation, while Section 02 82 11 lists 260 LF. Please confirm the quantity and removal limits to include in the base bid.

Response: 260 linear feet is the estimated quantity. Removal is limited to chases identified on HA101-HA103.

5. Panel 1-147 EP-101-4 directs relocation of existing panel 1-147, while Detail 4/E-502 calls for a new panel. Please confirm reuse or replacement and provide the required panel specifications if replacement is intended.

Response: Panel is to be relocated by replacement. Panel is to match existing characteristics that can be found on the panel schedule shown on sheet E-501. Specification Section 26 24 16 is included in the Bid Documents.

6. Column fireproofing Demolition keynote 9 calls for spray-applied fireproofing, while architectural new-work keynote 1 calls for three-hour intumescent protection under UL Design Y633. Please confirm the required system and provide a coordinated detail addressing full-height coverage and compatibility with the specified lead-paint encapsulation.

Response: Primary issue is that the existing lead painted columns are to be encapsulated with sealant paint and that the columns are then covered with a 3-hour fire proofing system. The application of fire proofing can be achieved with spray applied or intumescent as long as the system meets the 3-hour fire rating requirement and the column is fully covered. As the GC will be submitting products for approvals, they must make sure encapsulation paint selected and fire protection product selected are compactable. Project dimension must also be maintained with using this method.

7. Ceiling replacement limits G007-G009 require full ceiling replacement following removal of barriers in public areas, while AD101 permits reinstallation where new ceilings are not scheduled. Please identify the limits of full replacement and confirm whether both grid and tile are required. Please clarify whether the basement ceilings on P-100-3/P-100-4 are to be reused or replaced at final turnover.

Response: The issue will become one of the extent of damage where barriers are to be installed floor to slab above. Where ceilings are damaged and cannot easily be repaired to present a uniform clean appearance, they shall be completely replaced.

8. Equipment and specialty assignments A701 lists the furnishing/installation assignment for paper towel dispensers A5082 as “<varies>” and shows a phenolic folding partition without a schedule entry. Please identify furnishing and installation responsibility by location and provide the folding partition specification, dimensions and mounting requirements.

Responses:

a. A5082 to read: DISPENSER, PAPER TOWEL, SENSOR, HANDS FREE, C/C. A SURFACE-MOUNTED, SENSOR-ACTIVATED ROLL TOWEL DISPENSER THAT ONLY DISPENSES WHEN HANDS ARE PLACED UNDER IT. SHEET LENGTH, TIME DELAY AND SENSOR RANGE MAY BE ADJUSTABLE. IT RUNS ON BATTERIES, WITH AN OPTIONAL AC ADAPTER. SEE A131, TOILET ACCESSORY MOUNTING HEIGHTS.

b. The phenolic folding partition is to be furnished and installed by the GC. Panels are to be 2’W x 4’H x ½” TH. The two panels are to be connected with a continuous hinge and secured to the wall with a continuous hinge as shown on the plans and interior elevations. Basis Of Design for the phenolic panels to be: ASI Global Partitions; color: Pastel Grey 3074. Ensure phenolic folding partition system and panels can sustain a weight of 60 pounds or more hanging from its handle.

9. Existing fire alarm strobes FAD-101-1 excludes existing strobes from removal, while FA-101-1 through FA-101-5 call for new notification devices. Please identify which strobes remain, are relocated, or are replaced, and show the required final locations.

Responses: Existing strobes within the project spaces shall remain and new devices shall be installed where shown.

10. Equipment Storage 113 conversion to Exam 3 A103 shows Equipment Storage 113 without a sink; A105 shows Exam 3 PC110 with a sink, but P-101-3 does not identify a new fixture or connections in this room. Please confirm the scope and phase of the conversion, including sink, casework, finishes and MEP work, and provide the missing plumbing details.

Responses: The cabinets and sink are already installed in the Equipment Storage 113/future Exam 3 A105 and are to remain.

All other terms and conditions remain the same.