This is an Amendment to Solicitation for a federal construction project issued by the Department of Veterans Affairs, Samuel S. Stratton VA Medical Center. Amendment Number 0005, effective April 14, 2026, amends solicitation 36C24226R0032 for Project Number 561A4-18-113 titled "Correct FCA Deficiencies at the Lyons New Jersey VA Medical Center." The amendment provides responses to eleven Requests for Information (RFI) submitted by prospective bidders during the pre-bid phase. The proposal submission deadline remains April 16, 2026 at 12:00 PM EST, with all other terms and conditions of the original solicitation unchanged.
The RFI responses clarify significant project requirements including: asbestos abatement specifications for pipe insulation (30 linear feet of <2 inches diameter, 15 linear feet of 2-6 inches diameter, and 10 linear feet of >6 inches diameter pipe insulation, plus 110 fittings); authorization to use a specific basement-level door for material access; netting installation referencing drawing S1.02 with wire ropes at perimeter and seam locations; mandatory rust removal and painting of all perimeter steel columns; mandatory use of AISC-certified steel fabricator and erector; hot-dipped galvanization of all new structural steel; required lead-based paint testing and removal per specification 028333.13; allowance for Project Superintendent to simultaneously serve as Quality Control Manager subject to VA approval and dual qualification; existing concrete slab specifications of approximately 6.5 inches thick with rebar reinforcement; paint preparation for all basement, ground, and mezzanine walls and hollow metal doors (excluding ground-level roll-up doors); and sanitary piping material restrictions limiting use to cast iron or copper only per specification 221300.
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
5. PROJECT NUMBER (if applicable)
CODE 7. ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER 3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE OF PAGES
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO. 1. CONTRACT ID CODE
FACILITY CODE CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office. is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER 16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30 PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243
(Type or print) (Type or print)
(Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code)
(If other than Item 6)
(Specify type of modification and authority)
(such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer)
1 3
0005 04-14-2026
561A4-18-113
36C242
Department of Veterans Affairs Samuel S . Stratton VA Medical Center 113 Holland Avenue (2-90NCA) Albany NY 12208-3410
36C242
Department of Veterans Affairs Samuel S . Stratton VA Medical Center Network Contracting Activity 113 Holland Avenue (2-90NCA) Albany NY 12208-3410
To all Offerors/Bidders
36C24226R0032
X
X X
N/A
1 1
Amendment to solicitation 36C24226R0032 Project No. 561A4-18-113 Correct FCA Deficiencies at the Lyons New Jersey VA Medical Center.
Amendment is to provide RFI questions and responses.
PROPOSALS REMAIN DUE ON APRIL 16, 2026 AT 12:00PM EST.
All other terms and conditions of the original submission remain unchanged.
Dayna Dickson-Miller Contracting Officer
1) As per the ACM survey report the only work of asbestos abatement is in the main steam pipe insulation in the lower-level vault area which is approx. 15 linear feet. Please confirm. If there is more work then please identify on project drawings.
VA Response: Modify Section 028213.13 Glovebag Asbestos Abatement as follows:
A. Par. 1.1.B.1:
i. Delete the sentence “( ) linear meters (feet) of <50 mm (<2 inches) diameter pipe” in its entirety and replace with, “(30) linear feet of <2 inches diameter pipe insulation.”
ii. Delete the sentence “( ) linear meters (feet) of 50 - 150 mm (2 inches – 6 inches) diameter pipe insulation” in its entirety and replace with, “(15) linear feet of 2 inches to 6 inches diameter pipe insulation.”
iii. Delete the sentence “( ) linear meters (feet) of >150 mm (>6 inches) diameter pipe insulation” in its entirety and replace with, “(10) linear feet of >6 inches diameter pipe insulation.
iv. Delete the sentence “( ) fittings, saddle blocks, valves, T’s, or other mechanical appurtenances 50 - 150 mm (2 inches – 6 inches) in diameter other specify” in its entirety and replace with, “(110 qty.) fittings, saddle blocks, valves, T’s, or other mechanical appurtenances <2 inches to >6 inches in diameter.”
2) During the Prebid we noticed that the only access to basement level (to cart out the construction material) is through the single door which is shown on drawing AD101 between column lines 2 and 3. Please review the attached photo of the door from the street side and confirm that contractor is allowed to use this door as access to the basement level.
VA Response: VA takes no exception to Contractor using this door as access to the basement level.
3) Drawing S1.02 indicates to provide hexagonal netting at the underside of the slab.
Please provide a detailed reflected ceiling drawing showing the sizes of netting panels and layout of the netting. This will help to procure accurate pricing for netting.
VA Response: Refer to drawing 1/S1.02 for the netting location, as indicated by the diamond hatch. Drawings indicate existing columns which are specified as the anchor points. The specification requires wire ropes around the perimeter and at seam locations. In section 055000, add the following:
A. Par. 1.3.B: Netting.
4) At the site visit we observe that most of the perimeter steels columns are rusted but only few are shown on the drawing for rust removal. Please advise if all perimeter steel columns need to remove the rust and paint (photo of the perimeter rusted column attached).
VA Response: Follow bid document requirements to prep and paint all walls, which includes perimeter steel columns (AE401, Room Finish Schedule).
5) Drawings and specs indicate to have an AISC steel fabricator and erector. Please advise if this is a mandatory requirement. Or can be waived off.
VA Response: The requirements for an AISC steel fabricator and erector cannot be waived.
6) Please advise if all the new structural steel must be hot-dipped galvanized?
VA Response: Yes.
7) There is a spec section for Lead-Based Paint Removal and Disposal. Please confirm that abatement of lead paint is not required and only contractor has to follow the lead-safe practice in construction.
VA Response: Lead-based paint removal is required (section 028333.13). Prior to prep and paint, the Contractor must test existing surfaces to be painted for lead-based paint.
8) Spec section 01 45 00 has extensive requirements for quality control manager (QCM).
Please confirm contractor’s site superintendent can simultaneously perform the duties of QCM and contractors does not have to hire a full-time or part-time individual for ACM.
VA Response: Contingent on VA approval through the submittal process, the Project Superintendent and CQC System Manager roles may be served by one person if their qualifications dually meet both roles.
9) Drawing AE101 indicates removal of existing concrete slab. Please specify what is the thickness of existing slab and if there are any existing rebars in the slab.
VA Response: The existing concrete slab is approximately 6.5 inches thick with rebar reinforcement.
10) Please confirm all the walls of basement level, ground level and mezzanine receive new coats of paint. Also clarify if all the doors including the roll-up doors on ground level receive fresh coat of paint?
VA Response: Confirmed, all walls of basement level, ground level, and mezzanine receive prep and paint (AE401, Room Finish Schedule). Prep and paint existing hollow metal doors (099100 par. 1.1.A.13). Do not repaint the existing ground level roll-up doors.
11) Please specify the depth of new 4” sanitary line. Drawings to not indicate any depth.
Also specify if cast iron or PVC material is to be used for the new 4” sanitary line.
VA Response: Final inverts of new sanitary piping shall match existing inverts, as the invert at the sump in basement is not changing. Cast iron or copper sanitary piping are the only materials allowed per specification 221300 par. 2.1.