This document is an Amendment to a Previous Combined Solicitation for FY26 Services related to Lockout/Tagout (LOTO) and Electrical Control Procedures (ECP) at the Western New York (WNY) Veterans Affairs Medical Centers.
The Department of Veterans Affairs, RPO East Contracting Office in Bath, New York (Contracting Officer: Nathan Northrup, nathan.northrup@va.gov) is seeking services under solicitation number 36C24226Q0539 for a base year plus four option years. The response deadline has been extended to Tuesday, June 30, 2026, at 12:00 PM Eastern Time. The set-aside is Service-Disabled Veteran-Owned Small Business (SDVOSBC), with Product Service Code R425 and NAICS Code 541330. Work will be performed at Buffalo VA Medical Center (3795 Bailey Avenue, Buffalo, NY 14215) and Batavia VA Medical Center (222 Richmond Avenue, Batavia, NY 14020). The amendment addresses six vendor questions and provides clarifications on key contractual requirements: (1) the contractor will utilize available VA-provided equipment data but must conduct field surveys for complete inventory; (2) the contractor establishes and maintains the Brady Link360 account with VA having administrative access during option years; (3) live electrical work is restricted to extreme situations with Engineering Leadership approval and requires NFPA 70E-qualified personnel, with VA staff performing all equipment shutdowns and disconnects; (4) lead contractor staff will receive PIV cards for facility access with limited VA escort availability (maximum two at Buffalo, one at Batavia); (5) the COR review process begins with example procedures for each utility source, followed by shop reviews and corrections before loading into Brady Link360; and (6) all procedures must be laminated with 10 mil anti-UV lamination, with energy magnitude required only on LOTO procedures, not on all lockout-point labels. The revised Statement of Work (SOW Revision 1) is attached to this amendment, and all other terms and conditions remain in effect.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Final SOW - Rev 1.pdf | ||
| Final SOW.pdf | ||
| 36C24226Q0539.pdf | ||
| WD 2015-4147 - Erie County.pdf | ||
| 2020-01-13_MCP 138-15_Electrical Safety Program.pdf | ||
| WD 2015-4181 - Genesee County.pdf | ||
| Limitations on Subcontracting.pdf | ||
| 1811_D_2023-04-10.pdf | ||
| 2024-09-10_MCP 00-190_Control of Hazardous Enegry Program.pdf | ||
| 36C24226Q0539 Pricing Worksheet.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Amendment to a Previous Combined Solicitation
*= Required Field Amendment to a Previous Combined Solicitation
SUBJECT* FY26 Services (Base plus 4) - WNY ECP/LOTO Procedures - 528/528A4
GENERAL INFORMATION
CONTRACTING OFFICE’S ZIP CODE* 14810
SOLICITATION NUMBER* 36C24226Q0539
RESPONSE DATE/TIME/ZONE 06-30-2026 12:00 EASTERN TIME, NEW YORK, USA
ARCHIVE 15 DAYS AFTER THE RESPONSE DATE
RECOVERY ACT FUNDS N
SET-ASIDE SDVOSBC
PRODUCT SERVICE CODE* R425
NAICS CODE* 541330
CONTRACTING OFFICE ADDRESS Department of Veterans Affairs
RPO East, NCO 2 Contracting Office 76 Veterans Avenue Bath NY 14810
POINT OF CONTACT*
Contract Specialist Nathan Northrup nathan.northrup@va.gov
PLACE OF PERFORMANCE
ADDRESS Buffalo and Batavia VA Medical Centers 3795 Bailey Avenue Buffalo, NY 14215, and 222 Richmond Avenue Batavia NY
POSTAL CODE 14020
COUNTRY USA
ADDITIONAL INFORMATION
AGENCY’S URL https://www.va.gov URL DESCRIPTION Department of Veterans Affairs Website AGENCY CONTACT’S EMAIL ADDRESS nathan.northrup@va.gov EMAIL DESCRIPTION Contract Specialist Email
DESCRIPTION
The purpose of this amendment is to answer vendor questions/requests for information pertaining to solicitation 36C24226Q0539 and revise SOW where necessary (revisions in yellow). The secondary purpose is to extend by two (2) business days for review of this amendment. Quote submissions shall now be submitted on or before Tuesday, June 30th, 2026, 12:00pm EST. See vendor questions below with Government answers in red. See attached SOW revision one (1).
1. Government-furnished equipment data: Will VA provide equipment inventories, EE numbers, CMMS exports, existing LOTO procedures, as-built drawings, one-lines, utility drawings, or location lists, or should offerors assume the full covered-equipment inventory must be generated through contractor field survey?
a. The Batavia & Buffalo facilities are willing to share any data we have available to assist in the creation of the LOTO program. We may not have everything that is sought, but the Contractor is welcome to utilize what we have.
2. Brady Link360 account, QR links, and data ownership: Please confirm whether the contractor should establish a new Brady Link360 account or configure an existing VA account. Please also confirm who will own and administer the account, procedures, QR links, photos, and exports after base-year completion and during option-year performance.
a. The Contractor will be responsible for creation and renewal of the required Brady Link360 account subscriptions. In the ensuing option years, per section B.3.6.K.1-2, the Contractor shall be responsible for reviewing and updating all procedures, links, photos, and exports in the Brady Link360 account. The facilities will require individual(s), TBD, to also have administrative access to the account to make any required changes.
3. Electrical/live-work boundary: The SOW states that electrical shutdowns may not be feasible and work may have to be conducted live. Please confirm whether the contractor is expected to perform any energized electrical work or operate/expose electrical equipment, or whether VA qualified personnel will operate/expose equipment while the contractor observes, documents, photographs, and develops ECPs.
a. Live work would only be conducted in an extreme situation. Before this activity could take place, Engineering Leadership must approve the work. The Contractor employee involved is required to be fully qualified per NFPA 70E standards.
Contractor staff will not be allowed to operate or expose electrical equipment, shutdowns, and operation of disconnects can only be performed by VA Electrical Staff, or other 70E qualified VA staff members.
4. Site access, escorts, and concurrent work: Please confirm expected VA escort availability, whether multiple contractor teams may work concurrently across buildings or campuses, and whether escorts will be available during approved evening, weekend, or shutdown windows.
a. The plan is to have lead Contractor staff issued PIV cards so they will have access to the areas of concern. For certain areas we will provide an escort but the number of escorts we can provide will be limited in number. Up to a max of 2 for the Buffalo location and 1 for Batavia.
5. COR review and approval workflow: Please define the expected review/approval process for draft procedures, including preferred batch size, expected Government review time, number of review cycles, and when a procedure is considered approved for printing and installation.
a. To start, the facilities shall be provided an example of each type of LOTO procedure for each source of utility (Water, Steam, Electrical, HVAC, Industrial Machinery, etc.…) Once the format and information are acceptable the contractor shall produce the draft procedures for each device. The respective shops will then review for accuracy and completeness. This process my take some time to accomplish as reviewing the procedures will be secondary to ensuring the medical facilities remain operational and all required maintenance is being performed. After review and any corrections are made the procedures shall be loaded into Brady Link360.
6. Material/specification conflicts: Please confirm the required lamination thickness/specification. The SOW references anti-UV 5mm lamination, the deliverables section references 10 mil lamination, and the sample image references 5 mil anti-UV lamination. Please also confirm whether energy magnitude is required on all lockout-point labels.
a. The procedures shall be laminated with 10 mil anti-UV lamination. The energy magnitude does not need to be included on all lockout-point labels only on the LOTO procedures. SOW will be revised and attached to amendment.
All other terms and conditions remain in full force and effect.
See attached document: Final SOW - Rev 1.
B.3 SCOPE OF WORK (SOW)
B.3.1 Summary
A. This firm fixed-price requirement is for Energy Control Procedures (ECP)/lockout tagout (LOTO) procedures, including installation, incorporation, program integration, training, and testing of a new Brady Link360 application at the Buffalo VA Medical Center located at 3495 Bailey Avenue, Buffalo, NY 14215, and the Batavia VA Medical Center, 222 Richmond Avenue, Batavia, NY 14020 from one base year from date of award plus the provision of four (4) option years. Contractor shall provide all personnel, materials, tools, labor, and travel necessary to complete the work and training to implement LOTO program to meet or exceed compliance with OSHA 1910.147, and ANSI/ASSE 244.1 guidance.
B.3.2 General
A. Contractor shall identify equipment and/or energy sources that require LOTO procedures, approximated at 650 ECPs for both campus’, all categorized using the following options:
1.Multi-Energy Source (Electric, Steam, Water, Gas, etc.)
2.Single Energy Source located within employee control and supervision 3.Single Energy source located outside employee control and supervision
B. Contractor shall provide software, development, and implementation of all ECPs identified.
1.All ECPs shall be inputted and configured into the Brady Link360 platform. Contractor shall give COR access to the Brady Link360 account prior to printing to review/verify the accuracy of each procedure.
2.Contractor shall submit draft lockout procedures digitally for approval before publishing to software or printing.
C. All procedures shall include at minimum:
1. Name of equipment and EE number if applicable.
2. Location of equipment.
3. Primary and secondary types of hazardous energy (electrical, steam, water, thermal, stored pressure, etc.)
4. Magnitude of energy source (volts, psi, etc.)
5. Specific location of each disconnects (north side, front side, etc.)
6. Method of LOTO isolation techniques.
7. Type of LOTO device required (padlock, clamshell, circuit breaker, lockout device, etc.)
8. Verification step to ensure the LOTO was performed correctly.
9. Photos of the isolation points for clear identification.
10. Graphic illustrations of an overhead layout of the equipment, identifying the location of all primary and secondary energy source.
i. Graphic illustrations shall be printed on an aluminum sign base with a 6-ring binder attached to it housing the procedures. (See section B.3.6 below).
11. Authorized department to perform LOTO procedures.
12. Description of steps to restore equipment to service.
13. The specific department required to be notified before shutdown and startup.
14. Personal Protective Equipment (PPE) to be donned.
15. Hazardous warnings such as confined space areas or ladders.
16. Specific location of each disconnect.
17. QR code linked to Brady Link360 for digital procedure retrieval using mobile device.
D. Contractor shall correct/re-perform any discrepancies found or integration errors found by COR before final acceptance of work.
E. Approved LOTO procedures shall be printed in full color and laminated using anti-UV 10mm lamination.
F. Final procedures shall be installed on or near equipment. In addition, a binder containing LOTO procedures shall be provided for each campus and tabulated by location and equipment type.
1.Equipment-specific aluminum energy source identification labels shall be placed that identify the lockout point and contain the following: equipment name, energy type, energy icon, energy magnitude, and VA logo. Labels shall be installed using aircraft stainless steel safety wire when attached to pipes and 3M double-sided tape on flat surfaces.
2.See section B.3.6 below for sample.
G. Contractor shall provide initial training on software, program, system, etc., for up to 15 personnel, delegated by COR, prior to final acceptance of work.
1.Training shall include ability to created new procedures for future equipment and updating existing procedures due to equipment modifications.
2.Training shall cover identifying energy sources and the data needed to write a lockout procedure.
3.Training shall include instructions on using the software program.
H. Certification and Accreditation requirements do not apply. A security accreditation package is not required.
B.3.3 Schedule
A. Contractor shall provide a proposed performance schedule/checklist with their quote proposal. The schedule/checklist shall be in the form of a progress chart of suitable scale to indicate the work scheduled for completion by any given date during the work period.
The proposed schedule/checklist shall be reviewed by the COR. Any requirements for adjusting the schedule (e.g., to minimize disruption to the VA) shall be incorporated by the Contractor. No work shall be performed without 72 hours’ notice to the COR.
1. The following are Federal Holidays observed by the facility and the Contractor shall not expect access to the VA Facility of VA employees on these dates unless notified otherwise by the COR.
a) https://www.opm.gov/policy-data-oversight/pay-leave/federal-holidays/
B. Contractor shall report to COR (or designee) before and after performance of service and provide debrief of service performed.
C. The facility is a health care facility providing critical care 24 hours a day, and as such, disruptions in operations are not feasible and will need to be coordinated closely with the COR. Electrical work requiring shutdown may not be feasible and work may have to be conducted live.
1. If it becomes difficult for the Contractor to complete the required services due to patient care related activities or security issues, the Contractor shall not be obligated to complete the work in the area of concern at the time of their scheduled visit. The Contractor shall be obligated to complete any incomplete portion of their work at the time of the next scheduled visit to the facility. The final authority relative to this decision will be the COR. Unless fully absolved by the VA, the Contractor shall be responsible for completing all work.
D. All electrical work not requiring an electrical shutdown or work outside of normal business hours shall be performed between 7:00am to 4:30pm, Monday through Friday.
E. Tasks requiring utility shutdowns may need to be conducted on weekends and/or outside of normal business hours. Utility shutdowns will be minimized to as short of duration as possible. All shutdown requests will require detailed work plans and scheduling prior to approval. Requests to conduct work on weekends and outside of normal duty hours must be submitted in writing at least fourteen (14) working days in advance of the anticipated work to the COR. If this new schedule is agreed upon, work can begin. The original written request will remain with all test documents along with any written agreements relative to the original requests.
B.3.4 Contractor Qualifications
A. All work shall comply with OSHA Control of Hazardous Energy (Lockout/ Tagout) Standard, 29 Code of Federal Regulations (CFR) 1910.147.
B. Contractor employees shall perform work with a VA staff escort, photo ID will be required to sign-in as a visitor and then a temporary contractor badge will be provided.
C. All Contractor employees working on-site shall always wear their issued Contractor badge above the waist while on the VAMC campus’.
D. All Contractor employees working on-site shall have minimum two (2) years’ experience working on Energy Control Procedures, and OSHA approved 10-hour construction safety course, documentation requestable by the COR at any time.
https://www.opm.gov/policy-data-oversight/pay-leave/federal-holidays/
E. Contractor shall have a supervisor always working on-site who is trained in NFPA 70E, deemed a “Qualified Person” as per Article 100, documentation requestable by the COR at any time.
B.3.5 Safety
A. The COR shall notify the Contractor of any safety issues and corrective actions to be taken.
B. At no time shall the fire alarm, nurse call, or other vital system be out of service. The contractor shall ensure they do not compromise any of these systems or other elements of the life safety system such as removal of a ceiling tile.
C. No tools or equipment shall be left unattended.
D. All work areas must be clean at the close of the day and shall be left in the same condition as before work started.
E. Contractor shall obtain all necessary New York State and Federal licenses and/or permits associated with this procurement. Contractor shall take all precautions necessary to protect persons and property from injury or damage.
B.3.6 Deliverables
A. Once drafted LOTO procedures are approved by COR, Contractor shall print in full color, laminated with 10 mil lamination material, and mounted to a 6-ring binder, flip-chart baseplate. Contractor shall also provide a separate binder containing all LOTO procedures for each campus organized by location and equipment type.
B. Contractor shall provide and install equipment specific energy source identification tags.
These tags shall be constructed with 20-gauge aluminum, dimensions of 2 inch by 3.5 inch with ¼ inch radiused corners, including at minimum:
a. Item name
b. Energy type
c. Energy icon
d. VA logo
C. Tags shall be installed using aircraft stainless steel safety wire when attached to pipes and 3M double-sided tape on flat surfaces.
D. Contractor shall provide and mount a flip-chart baseplate on all equipment. The baseplate shall be constructed with 26-gauge aluminum, dimensions of 8 inch by 12 inch with ¼ inch radiused corners, including at minimum:
a. Printed information using anti-UV ink.
b. 6-ring binder to house procedures.
c. Overhead graphic representation of equipment layout, identifying the location of all energy sources printed directly to the flip-chart baseplate.
d. Visual reference for lockout point locations.
e. Room layouts for remote LOTO points.
f. Compass icon.
g. Energy icons that match the Brady Link360 procedures.
E. Contractor shall provide and install tags on all outdoor equipment. Information shall be printed in anti-UV ink. The tags shall be constructed of 26-gauge aluminum, dimensions of 3 inch by 5 inch with ¼ inch radiused corners, including at minimum:
a. Item name
b. QR code linked to the digital Brady Link360 LOTO procedure
c. VA logo.
F. Contractor shall provide initial training for up to 15 VA employees, designated by the COR. Training shall include at minimum:
a. Brady Link360 software and overall LOTO program usage.
b. Creation of new procedures for future equipment.
c. Updates to existing procedures due to modifications.
d. Identification of energy sources and required data for procedure development.
G. Contractor shall provide annual training for up to 90 VA employees, designated by the COR. Annual training shall include at minimum:
a. A minimum of two (2) hours of instructor-led classroom instruction with a hands-on application component to take place throughout the facility to cover various examples of LOTO.
b. Training shall be provided in four (4) individual sessions over the span of two (2) days, with 20-30 unique employees in each session.
c. Provide certificates to employees showing completion of the annual training requirement and provide a digital copy for facilities records.
H. Contractor shall provide annual competency certification for up to 90 VA employees, designated by the COR. Competency certification shall include at minimum:
a. A qualified inspector observing authorized employees implementing LOTO on equipment/items to ensure they are competent in all steps.
b. Review each employee’s understanding of their specific responsibilities under the
ECP.
c. Corrective actions of any deficiencies found during the observation.
i. Incorrect energy isolation, improper lock application, or other dangerous issues shall be addressed and corrected immediately.
d. Provide documentation showing the employee is fully competent and understands the ECP and is capable of safety implementing LOTO.
I. Contractor shall perform annual audits to review all LOTO procedures ensuring the facility remains in compliance with any future changes to the codes, policies, regulations, and standards.
a. Update the reviewed date on all LOTO procedures in Brady Link360.
b. Update all procedures that required revision and reprint the procedures.
B.3.7 Sample LOTO Procedures and Energy Source Labeling Requirements
B.3 SCOPE OF WORK (SOW)
B.3.1 Summary
B.3.2 General
1. Name of equipment and EE number if applicable.
2. Location of equipment.
3. Primary and secondary types of hazardous energy (electrical, steam, water, thermal, stored pressure, etc.)
4. Magnitude of energy source (volts, psi, etc.)
5. Specific location of each disconnects (north side, front side, etc.)
6. Method of LOTO isolation techniques.
7. Type of LOTO device required (padlock, clamshell, circuit breaker, lockout device, etc.)
8. Verification step to ensure the LOTO was performed correctly.
9. Photos of the isolation points for clear identification.
10. Graphic illustrations of an overhead layout of the equipment, identifying the location of all primary and secondary energy source.
i. Graphic illustrations shall be printed on an aluminum sign base with a 6-ring binder attached to it housing the procedures. (See section B.3.6 below).
11. Authorized department to perform LOTO procedures.
12. Description of steps to restore equipment to service.
13. The specific department required to be notified before shutdown and startup.
14. Personal Protective Equipment (PPE) to be donned.
15. Hazardous warnings such as confined space areas or ladders.
16. Specific location of each disconnect.
17. QR code linked to Brady Link360 for digital procedure retrieval using mobile device.
B.3.3 Schedule
A. Contractor shall provide a proposed performance schedule/checklist with their quote proposal. The schedule/checklist shall be in the form of a progress chart of suitable scale to indicate the work scheduled for completion by any given date during t...
1. The following are Federal Holidays observed by the facility and the Contractor shall not expect access to the VA Facility of VA employees on these dates unless notified otherwise by the COR.
a) https://www.opm.gov/policy-data-oversight/pay-leave/federal-holidays/
B. Contractor shall report to COR (or designee) before and after performance of service and provide debrief of service performed.
C. The facility is a health care facility providing critical care 24 hours a day, and as such, disruptions in operations are not feasible and will need to be coordinated closely with the COR. Electrical work requiring shutdown may not be feasible and ...
1. If it becomes difficult for the Contractor to complete the required services due to patient care related activities or security issues, the Contractor shall not be obligated to complete the work in the area of concern at the time of their scheduled...
D. All electrical work not requiring an electrical shutdown or work outside of normal business hours shall be performed between 7:00am to 4:30pm, Monday through Friday.
E. Tasks requiring utility shutdowns may need to be conducted on weekends and/or outside of normal business hours. Utility shutdowns will be minimized to as short of duration as possible. All shutdown requests will require detailed work plans and sche...
B.3.5 Safety