36C24226Q0399.docx

DOCX document 172 KB Posted

Attached to
F103--Water Quality Management (Base 4) Federal contract opportunity
Solicitation number
36C24226Q0399
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 2

About this file

This is a Combined Synopsis/Solicitation and Statement of Work for water quality management services issued by the Department of Veterans Affairs New York Harbor Healthcare System. The solicitation is an RFQ set aside for Service-Disabled Veteran-Owned Small Businesses (SDVOSBs) with a NAICS code of 541380 (Testing Laboratories and Services) and a small business size standard of $19.0 million. The response deadline is March 27, 2026, at 3:00 PM Eastern Time. The contract covers a one-year base period beginning May 1, 2026, through April 30, 2027, with four option years. The scope encompasses comprehensive water quality management services across three VA facility locations: Manhattan (423 E. 23rd Street, New York, NY 10010), Brooklyn (800 Poly Place, Brooklyn, NY 11209), and St. Albans (179-00 Linden Boulevard, Jamaica, NY 11434).

The required services include dental waterline testing (quarterly), legionella water testing (quarterly and non-routine per CDC protocols), potable water testing of drinking fountains (quarterly), sterile processing water testing (quarterly with specialized parameters), automated monitoring of incoming potable water with remote web-based access, operation and maintenance of monochloramine domestic water treatment systems, quarterly ice machine and retherm unit cleaning and disinfection, laundry wastewater testing, and utility water treatment for cooling tower and boiler systems. Key qualifications require the contractor to be full-time in water treatment services, maintain an accredited laboratory with weekly turnaround reporting capability, provide two local representatives with minimum five years' experience, and hold NYSDOH Environmental Laboratory Approval Program (ELAP) certification and CDC ELITE certification for legionella testing. Specific line items detail testing frequencies, sample quantities, and locations across all three campuses, with pricing to be submitted on an NSP (Not-to-Exceed/Schedule Price) basis. The contract specialist is Chris Weider at (716) 862-7461 x22470, and the contract will be archived 99 days after the response date.

View the file

Other files for this federal contract opportunity

Other files attached to F103--Water Quality Management (Base 4), newest first.
File Type Posted
36C24226Q0399 0002.docx DOCX document
36C24226Q0399 0001.docx DOCX document
Chemical Delivery and Storage Price List.xlsx XLSX spreadsheet

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SUBJECT*

Water Quality Management (Base 4)

GENERAL INFORMATION

CONTRACTING OFFICE’S ZIP CODE*
14215
SOLICITATION NUMBER*
36C24226Q0399
RESPONSE DATE/TIME/ZONE
03-27-2026 3:00pm EASTERN TIME, NEW YORK, USA
ARCHIVE
99 DAYS AFTER THE RESPONSE DATE
RECOVERY ACT FUNDS
N
SET-ASIDE
SDVOSBC
PRODUCT SERVICE CODE*
F103
NAICS CODE*
541380
CONTRACTING OFFICE ADDRESS
Department of Veterans Affairs

Network Contracting Office (NCO) 2 3495 Bailey Avenue Building 3, 2nd floor Buffalo NY 14215

POINT OF CONTACT*

Contract Specialist Chris Weider Christopher.Weider@va.gov

(716) 862-7461 x22470

PLACE OF PERFORMANCE

ADDRESS
Department of Veterans Affairs

New York Harbor Healthcare System

423 E. 23rd Street

New York NY

POSTAL CODE
10010

COUNTRY

ADDITIONAL INFORMATION

AGENCY’S URL

URL DESCRIPTION

AGENCY CONTACT’S EMAIL ADDRESS

EMAIL DESCRIPTION

Combined Synopsis/Solicitation Notice Combined Synopsis/Solicitation Notice

DESCRIPTION

*= Required Field
Combined Synopsis/Solicitation Notice

Combined Synopsis/Solicitation Notice

Description This is a combined synopsis/solicitation for commercial products and commercial services prepared in accordance with the format Revolutionary FAR Overhaul (RFO) in Federal Acquisition Regulation (FAR) subpart 12.202, “Streamlined Procedures for Evaluation and Solicitation for Commercial Products and Commercial Services,” as supplemented with additional information included in this notice. This announcement constitutes the only solicitation; quotes are being requested, and a written solicitation document will not be issued.

This solicitation is issued as an RFQ. The solicitation document and incorporated provisions and clauses are those in effect through Federal Acquisition Circular 2025-06.

This solicitation is set aside for SDVOSBs.

The associated North American Industrial Classification System (NAICS) code for this procurement is 541380, with a small business size standard of $19.0 million.

The FSC/PSC is F103.

The VA New York Harbor Healthcare System (Manhattan, Brooklyn, and St Albans) has a requirement for water quality management services including: dental waterline testing; legionella water testing; potable water testing; sterile processing water testing; automated monitoring of incoming potable water; operation and maintenance of monochloramine domestic water treatment system; ice machine cleaning and disinfection; laundry wastewater testing; utility water treatment (cooling tower and boiler systems); water fountain/dispenser maintenance, cleaning, disinfecting; and retherm units maintenance, cleaning, disinfecting services.

Price/Cost Schedule

All interested companies shall provide quotations for the following:

ITEM NUMBER
DESCRIPTION OF SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
1.00
YR
_____NSP__________
Price Sub Line Items

Dental Waterline Testing Contract Period: Base POP Begin: 05-01-2026 POP End: 04-30-2027 PRINCIPAL NAICS CODE: 541380 - Testing Laboratories and Services PRODUCT/SERVICE CODE: F103 - Environmental Systems Protection - Water Quality Support

0001AA

4.00
QTR
__________________
__________________

Quarterly Testing: Manhattan Campus

POP Begin: 05-01-2026 POP End: 04-30-2027 PRINCIPAL NAICS CODE: 541380 - Testing Laboratories and Services PRODUCT/SERVICE CODE: F103 - Environmental Systems Protection - Water Quality Support Dental Chairs: 23 + 1 portable unit Lines per chair: 6 + 4 (portable unit) Samples per quarter: 138 + 4 (portable unit) = 142

0001AB

4.00
QTR
__________________
__________________

Quarterly Testing: Brooklyn Campus

POP Begin: 05-01-2026 POP End: 04-30-2027 PRINCIPAL NAICS CODE: 541380 - Testing Laboratories and Services PRODUCT/SERVICE CODE: F103 - Environmental Systems Protection - Water Quality Support Dental Chairs: 10 + 2 portable units Lines per chair: 6 + 4 (portable units) Samples per quarter: 60 + 8 (portable units) = 68

0001AC

4.00
QTR
__________________
__________________

Quarterly Testing: St Albans Campus

POP Begin: 05-01-2026 POP End: 04-30-2027 PRINCIPAL NAICS CODE: 541380 - Testing Laboratories and Services PRODUCT/SERVICE CODE: F103 - Environmental Systems Protection - Water Quality Support Dental Chairs: 6 + 2 portable units Lines per chair: 8 + 4 (portable units) Samples per quarter: 48 + 8 (portable units) = 56

1.00
YR
_____NSP__________
Price Sub Line Items

Legionella Water Testing

POP Begin: 05-01-2026 POP End: 04-30-2027

0002AA

4.00
QTR
__________________
__________________

Quarterly Testing: Manhattan Campus (legionella culture) * per CDC protocols Contract Period: Base POP Begin: 05-01-2026 POP End: 04-30-2027 PRINCIPAL NAICS CODE: 541380 - Testing Laboratories and Services

55 Samples per quarter

0002AB

4.00
QTR
__________________
__________________

Quarterly Testing: Brooklyn Campus

Contract Period: Base POP Begin: 05-01-2026 POP End: 04-30-2027 PRINCIPAL NAICS CODE: 541380 - Testing Laboratories and Services

45 Samples per quarter

0002AC

4.00
QTR
__________________
__________________

Quarterly Testing: St Albans Campus

Contract Period: Base POP Begin: 05-01-2026 POP End: 04-30-2027 PRINCIPAL NAICS CODE: 541380 - Testing Laboratories and Services

50 Samples per quarter

0002AD

40.00
EA
__________________
__________________

Non-routine testing (legionella culture) * per CDC protocols.

Frequency as specified by the COR Contract Period: Base POP Begin: 05-01-2026 POP End: 04-30-2027 PRINCIPAL NAICS CODE: 541380 - Testing Laboratories and Services PRODUCT/SERVICE CODE: F103 - Environmental Systems Protection - Water Quality Support Quantify l. pneumophila and identify the presence or absence of other legionella species.

0002AE

10.00
EA
__________________
__________________

Non-routine testing (legionella pneumophila serotyping or non-pneumophilia legionella identification)** per CDC protocols.

Frequency as specified by the COR.

Contract Period: Base POP Begin: 05-01-2026 POP End: 04-30-2027

1.00
YR
_____NSP__________
Price Sub Line Items

Potable Water Testing

POP Begin: 05-01-2026 POP End: 04-30-2027

0003AA

4.00
QTR
__________________
__________________

Manhattan Public Water Fountains (Copper, Lead, Total Coliform, e. coliform)

POP Begin: 05-01-2026 POP End: 04-30-2027 PRINCIPAL NAICS CODE: 541380 - Testing Laboratories and Services

10 samples per quarter

0003AB

4.00
QTR
__________________
__________________

Brooklyn Public Water Fountains to be Designated (Copper, Lead, Total Coliform, e. coliform)

POP Begin: 05-01-2026 POP End: 04-30-2027 PRINCIPAL NAICS CODE: 541380 - Testing Laboratories and Services

0003AC

4.00
QTR
__________________
__________________

St. Albans Public Water Fountains to be Designated (Copper, Lead, Total Coliform, e. coliform)

POP Begin: 05-01-2026 POP End: 04-30-2027 PRINCIPAL NAICS CODE: 541380 - Testing Laboratories and Services

0003AD

4.00
QTR
__________________
__________________

Manhattan Daycare Fountains (Copper, Lead, Total Coliform, e. coliform)

POP Begin: 05-01-2026 POP End: 04-30-2027 PRINCIPAL NAICS CODE: 541380 - Testing Laboratories and Services

4 samples per quarter

0003AE

4.00
QTR
__________________
__________________

Brooklyn Daycare Fountains (Copper, Lead, Total Coliform, e. coliform)

POP Begin: 05-01-2026 POP End: 04-30-2027 PRINCIPAL NAICS CODE: 541380 - Testing Laboratories and Services

1.00
YR
_____NSP__________
Price Sub Line Items

Water Fountain Quarterly Maintenance

POP Begin: 05-01-2026 POP End: 04-30-2027

0004AA

4.00
QTR
__________________
__________________

Manhattan Campus Quarterly Maintenance

POP Begin: 05-01-2026 POP End: 04-30-2027 PRINCIPAL NAICS CODE: 541380 - Testing Laboratories and Services

16 Water Fountains

0004AB

4.00
QTR
__________________
__________________

Brooklyn Campus Quarterly Maintenance

POP Begin: 05-01-2026 POP End: 04-30-2027 PRINCIPAL NAICS CODE: 541380 - Testing Laboratories and Services

51 Water Fountains

0004AC

4.00
QTR
__________________
__________________

St. Albans Campus Quarterly Maintenance

POP Begin: 05-01-2026 POP End: 04-30-2027 PRINCIPAL NAICS CODE: 541380 - Testing Laboratories and Services

19 water fountains

1.00
YR
_____NSP__________
Price Sub Line Items

Sterile Processing Service Water Testing

POP Begin: 05-01-2026 POP End: 04-30-2027

0005AA

4.00
QTR
__________________
__________________

Heterotrophic Plate Count (HPC) Bacteria Test Sample; 10 samples per quarter

POP Begin: 05-01-2026 POP End: 04-30-2027 PRINCIPAL NAICS CODE: 541380 - Testing Laboratories and Services PRODUCT/SERVICE CODE: F103 - Environmental Systems Protection - Water Quality Support Manhattan: 6 Samples Brooklyn: 4 Samples

0005AB

4.00
QTR
__________________
__________________

pH Test Sample; 4 samples per quarter

POP Begin: 05-01-2026 POP End: 04-30-2027 PRINCIPAL NAICS CODE: 541380 - Testing Laboratories and Services PRODUCT/SERVICE CODE: F103 - Environmental Systems Protection - Water Quality Support Manhattan: 2 Samples Brooklyn: 2 Samples

0005AC

2.00
JB
__________________
__________________

Total Organic Carbon (TOC) Test Sample; 10 samples bi-annually

POP Begin: 05-01-2026 POP End: 04-30-2027 PRINCIPAL NAICS CODE: 541380 - Testing Laboratories and Services PRODUCT/SERVICE CODE: F103 - Environmental Systems Protection - Water Quality Support

0005AD

1.00
YR
__________________
__________________

Endotoxins Test Sample; 6 samples annually

POP Begin: 05-01-2026 POP End: 04-30-2027 PRINCIPAL NAICS CODE: 541380 - Testing Laboratories and Services PRODUCT/SERVICE CODE: F103 - Environmental Systems Protection - Water Quality Support Manhattan: 4 Samples

0005AE

1.00
YR
__________________
__________________

Chloride, Iron, Copper, Manganese, Hardness Test Sample; 6 samples annually

POP Begin: 05-01-2026 POP End: 04-30-2027 PRINCIPAL NAICS CODE: 541380 - Testing Laboratories and Services PRODUCT/SERVICE CODE: F103 - Environmental Systems Protection - Water Quality Support

1.00
YR
_______NSP_______
Price Sub Line Items

Automated Monitoring of Incoming Potable

POP Begin: 05-01-2026 POP End: 04-30-2027 PRINCIPAL NAICS CODE: 541380 - Testing Laboratories and Services

As required by VHA Directive 1061 - incoming water pressure, temperature, pH, dissolved solids, and oxidant residual

0006AA

12.00
MO
__________________
__________________

Automated Monitoring of Manhattan - Building 1

POP Begin: 05-01-2026 POP End: 04-30-2027

0006AB

12.00
MO
__________________
__________________

Automated Monitoring of Manhattan - Building 6

POP Begin: 05-01-2026 POP End: 04-30-2027

0006AC

12.00
MO
__________________
__________________

Automated Monitoring of Brooklyn - Building 1

POP Begin: 05-01-2026 POP End: 04-30-2027

0006AD

12.00
MO
__________________
__________________

Automated Monitoring of St. Albans - Main Pumphouse

POP Begin: 05-01-2026 POP End: 04-30-2027

0006AE

12.00
MO
__________________
__________________

Automated Monitoring of St. Albans - Baisley Boulevard

POP Begin: 05-01-2026 POP End: 04-30-2027

1.00
YR
______NSP_________
Price Sub Line Items

Operation and Maintenance of Monochloramine Domestic Water Treatment System

POP Begin: 05-01-2026 POP End: 04-30-2027 PRINCIPAL NAICS CODE: 541380 - Testing Laboratories and Services

Base period Includes provision and installation.

0007AA

12.00
MO
__________________
__________________

Manhattan, Building 1, Ground Floor South Tank Room

POP Begin: 05-01-2026 POP End: 04-30-2027

0007AB

12.00
MO
__________________
__________________

Manhattan, Building 6, Clinical Addition Mechanical Room

POP Begin: 05-01-2026 POP End: 04-30-2027

0007AC

12.00
MO
__________________
__________________

Brooklyn, Building 1, Basement North Mechanical Room

POP Begin: 05-01-2026 POP End: 04-30-2027

0007AD

12.00
MO
__________________
__________________

St. Albans Main Pumphouse

POP Begin: 05-01-2026 POP End: 04-30-2027

0007AE

12.00
MO
__________________
__________________

St Albans, Building 89, Basement

POP Begin: 05-01-2026 POP End: 04-30-2027

0007AF

12.00
MO
__________________
__________________

St Albans, Building 86, Basement

POP Begin: 05-01-2026 POP End: 04-30-2027

0007AG

12.00
MO
__________________
__________________

St Albans, Building 87, Basement

POP Begin: 05-01-2026 POP End: 04-30-2027

1.00
YR
______NSP_________
Price Sub Line Items

Cleaning and Disinfecting of Ice Machines and Retherm Units

POP Begin: 05-01-2026 POP End: 04-30-2027

0008AA

4.00
QTR
__________________
__________________

Quarterly Cleaning and Disinfecting of Ice Machines in Manhattan

POP Begin: 05-01-2026 POP End: 04-30-2027

0008AB

4.00
QTR
__________________
__________________

Quarterly Cleaning and Disinfecting of Ice Machines in Brooklyn

POP Begin: 05-01-2026 POP End: 04-30-2027

0008AC

4.00
QTR
__________________
__________________

Quarterly Cleaning and Disinfecting of Ice Machines in St. Albans

POP Begin: 05-01-2026 POP End: 04-30-2027

0008AD

4.00
QTR
__________________
__________________

Quarterly Maintenance, Cleaning, and Disinfecting of Retherm Units in Manhattan

POP Begin: 05-01-2026 POP End: 04-30-2027

0008AE

4.00
QTR
__________________
__________________

Quarterly Maintenance, Cleaning, and Disinfecting of Retherm Units in Brooklyn

POP Begin: 05-01-2026 POP End: 04-30-2027

0008AF

4.00
QTR
__________________
__________________

Quarterly Maintenance, Cleaning, and Disinfecting of Retherm Units in St. Albans

POP Begin: 05-01-2026 POP End: 04-30-2027

1.00
YR
______NSP_________
Price Sub Line Items

Laundry Wastewater Testing

POP Begin: 05-01-2026 POP End: 04-30-2027

0009AA

12.00
MO
__________________
__________________

Sampling for pH: Collect and analyze 4 grab samples, at least one hour apart

POP Begin: 05-01-2026 POP End: 04-30-2027

0009AB

2.00
JB
__________________
__________________

Sampling for Metals: (cadmium, chromium, copper, lead, mercury, molybdenum, nickel, silver and zinc) – Collect and analyze one composite sample per day for 4 days)

POP Begin: 05-01-2026 POP End: 04-30-2027

0009AC

2.00
JB
__________________
__________________

Sampling for Cyanide: Collect 4 grab samples per day, at least 1 hour apart for 4 days. The laboratory shall composite each day’s grab samples and analyze the composite sample for each of the 4 sampling days.

Contract Period: Base POP Begin: 05-01-2026 POP End: 04-30-2027

0009AD

2.00
JB
__________________
__________________

Sampling for Non–Polar Material: Collect 4 grab samples per day, at least 1 hour apart for 4 days.

POP Begin: 05-01-2026 POP End: 04-30-2027

1.00
YR
______NSP_________
Price Sub Line Items

Manhattan Campus: Utility Water Treatment (Cooling Tower Systems)

POP Begin: 05-01-2026 POP End: 04-30-2027

0010AA

14.00
JB
__________________
__________________

Manhattan Campus: Cooling Tower Water Treatment and Testing

POP Begin: 05-01-2026 POP End: 04-30-2027 PRINCIPAL NAICS CODE: 541380 - Testing Laboratories and Services

Twice per month during the cooling season, designated as April 1 through October 31 of each year

0010AB

4.00
JB
__________________
__________________

Manhattan Campus: Cooling Tower Bacterial Water Quality Testing for Legionella

POP Begin: 05-01-2026 POP End: 04-30-2027 PRINCIPAL NAICS CODE: 541380 - Testing Laboratories and Services

Once at seasonal system startup, then every two months during cooling season

0010AC

4.00
JB
__________________
__________________

Manhattan Campus: Cooling Tower Bacterial Water Quality Testing for Heterotrophic Plate Count (HPC) Bacteria

POP Begin: 05-01-2026 POP End: 04-30-2027 PRINCIPAL NAICS CODE: 541380 - Testing Laboratories and Services

0010AD

12.00
MO
__________________
__________________

Manhattan Campus: Biological control testing: total count on the towers and the main chill loops

POP Begin: 05-01-2026 POP End: 04-30-2027

0010AE

4.00
QTR
__________________
__________________

Manhattan Campus: Anaerobic bacteria tests on the main chill system

POP Begin: 05-01-2026 POP End: 04-30-2027

0010AF

14.00
JB
__________________
__________________

Manhattan Campus: Routine monitoring of Main chilled water loop

POP Begin: 05-01-2026 POP End: 04-30-2027 PRINCIPAL NAICS CODE: 541380 - Testing Laboratories and Services

Twice per month during the cooling season, designated as April 1 through October 31 of each year.

0010AG

3.00
JB
__________________
__________________

Manhattan Campus: Cooling Tower basins vacuum cleaning

POP Begin: 05-01-2026 POP End: 04-30-2027 PRINCIPAL NAICS CODE: 541380 - Testing Laboratories and Services

Every three months during operation

0010AH

2.00
JB
__________________
__________________

Manhattan Campus: Cooling Towers Clean and Sterilize

POP Begin: 05-01-2026 POP End: 04-30-2027 PRINCIPAL NAICS CODE: 541380 - Testing Laboratories and Services

Twice a year

1.00
YR
_____NSP__________
Price Sub Line Items

Brooklyn Campus: Utility Water Treatment (Cooling Tower and Boiler Systems)

POP Begin: 05-01-2026 POP End: 04-30-2027

0011AA

14.00
JB
__________________
__________________

Brooklyn Campus: Cooling Tower Water Treatment and Testing

POP Begin: 05-01-2026 POP End: 04-30-2027 PRINCIPAL NAICS CODE: 541380 - Testing Laboratories and Services

0011AB

4.00
JB
__________________
__________________

Brooklyn Campus: Cooling Tower Bacterial Water Quality Testing for Legionella

POP Begin: 05-01-2026 POP End: 04-30-2027 PRINCIPAL NAICS CODE: 541380 - Testing Laboratories and Services

0011AC

4.00
JB
__________________
__________________

Brooklyn Campus: Cooling Tower Bacterial Water Quality Testing for Heterotrophic Plate Count (HPC) Bacteria

POP Begin: 05-01-2026 POP End: 04-30-2027 PRINCIPAL NAICS CODE: 541380 - Testing Laboratories and Services

0011AD

12.00
MO
__________________
__________________

Brooklyn Campus: Biological control testing: total count on the towers and the main chill loops

POP Begin: 05-01-2026 POP End: 04-30-2027

0011AE

4.00
QTR
__________________
__________________

Brooklyn Campus: Anaerobic bacteria tests on the main chill system

POP Begin: 05-01-2026 POP End: 04-30-2027

0011AF

14.00
JB
__________________
__________________

Brooklyn Campus: Routine monitoring of Main/OPC chilled water loop

POP Begin: 05-01-2026 POP End: 04-30-2027 PRINCIPAL NAICS CODE: 541380 - Testing Laboratories and Services

0011AG

6.00
MO
__________________
__________________

Brooklyn Campus: Routine monitoring of other closed systems

POP Begin: 05-01-2026 POP End: 04-30-2027 PRINCIPAL NAICS CODE: 541380 - Testing Laboratories and Services

Other closed systems will be tested monthly until the proper residual is maintained and quarterly thereafter. Use the quarterly line number when this metric is met (reference Appendix B.4)

0011AH

3.00
QTR
__________________
__________________

Brooklyn Campus: Routine monitoring of other closed systems

POP Begin: 05-01-2026 POP End: 04-30-2027 PRINCIPAL NAICS CODE: 541380 - Testing Laboratories and Services

Use this line item when the proper residual is maintained (reference Appendix B.4)

0011AJ

3.00
JB
__________________
__________________

Brooklyn Campus: Cooling Tower basins vacuum cleaning

POP Begin: 05-01-2026 POP End: 04-30-2027 PRINCIPAL NAICS CODE: 541380 - Testing Laboratories and Services

0011AK

2.00
JB
__________________
__________________

Brooklyn Campus: Cooling Towers Clean and Sterilize

POP Begin: 05-01-2026 POP End: 04-30-2027 PRINCIPAL NAICS CODE: 541380 - Testing Laboratories and Services

0011AL

24.00
JB
__________________
__________________

Brooklyn Campus: Boiler Water Treatment and Testing

POP Begin: 05-01-2026 POP End: 04-30-2027 PRINCIPAL NAICS CODE: 541380 - Testing Laboratories and Services

Twice per month

1.00
YR
_____NSP__________
Price Sub Line Items

St Albans Campus: Utility Water Treatment (Cooling Tower and Boiler Systems)

POP Begin: 05-01-2026 POP End: 04-30-2027

0012AA

24.00
JB
__________________
__________________

St Albans Campus: Boiler Water Treatment and Testing

POP Begin: 05-01-2026 POP End: 04-30-2027 PRINCIPAL NAICS CODE: 541380 - Testing Laboratories and Services

1.00
YR
_____NSP__________
Use Chemical Pricing Sheet Attached

Chemical Delivery & Storage

POP Begin: 05-01-2026 POP End: 04-30-2027 PRINCIPAL NAICS CODE: 541380 - Testing Laboratories and Services

Provide a separate cost estimate for the year that identifies each supply item by line, with estimated quantity for one year of use, the unit price, and the calculated amount on that supply line (i.e. Supply X, 5 Gallons, $10.00 per gallon, $50.00 total)

1.00
YR
_____NSP__________
Price Sub Line Items

Dental Waterline Testing Contract Period: Option 1 POP Begin: 05-01-2027 POP End: 04-30-2028

1001AA

4.00
QTR
__________________
__________________

Quarterly Testing: Manhattan Campus

POP Begin: 05-01-2027 POP End: 04-30-2028 PRINCIPAL NAICS CODE: 541380 - Testing Laboratories and Services PRODUCT/SERVICE CODE: F103 - Environmental Systems Protection - Water Quality Support Dental Chairs: 23 + 1 portable unit

1001AB

4.00
QTR
__________________
__________________

Quarterly Testing: Brooklyn Campus

POP Begin: 05-01-2027 POP End: 04-30-2028 PRINCIPAL NAICS CODE: 541380 - Testing Laboratories and Services PRODUCT/SERVICE CODE: F103 - Environmental Systems Protection - Water Quality Support Dental Chairs: 10 + 2 portable units

1001AC

4.00
QTR
__________________
__________________

Quarterly Testing: St Albans Campus

POP Begin: 05-01-2027 POP End: 04-30-2028 PRINCIPAL NAICS CODE: 541380 - Testing Laboratories and Services PRODUCT/SERVICE CODE: F103 - Environmental Systems Protection - Water Quality Support Dental Chairs: 6 + 2 portable units

1.00
YR
_____NSP__________
Price Sub Line Items

Legionella Water Testing

POP Begin: 05-01-2027 POP End: 04-30-2028

1002AA

4.00
QTR
__________________
__________________

Quarterly Testing: Manhattan Campus

Contract Period: Option 1 POP Begin: 05-01-2027 POP End: 04-30-2028 PRINCIPAL NAICS CODE: 541380 - Testing Laboratories and Services

1002AB

4.00
QTR
__________________
__________________

Quarterly Testing: Brooklyn Campus

Contract Period: Option 1 POP Begin: 05-01-2027 POP End: 04-30-2028 PRINCIPAL NAICS CODE: 541380 - Testing Laboratories and Services

1002AC

4.00
QTR
__________________
__________________

Quarterly Testing: St Albans Campus

Contract Period: Option 1 POP Begin: 05-01-2027 POP End: 04-30-2028 PRINCIPAL NAICS CODE: 541380 - Testing Laboratories and Services

1002AD

40.00
EA
__________________
__________________

Non-routine testing (legionella culture) * per CDC protocols.

Contract Period: Option 1 POP Begin: 05-01-2027 POP End: 04-30-2028 PRINCIPAL NAICS CODE: 541380 - Testing Laboratories and Services PRODUCT/SERVICE CODE: F103 - Environmental Systems Protection - Water Quality Support

1002AE

10.00
EA
__________________
__________________

Non-routine testing (legionella pneumophila serotyping or non-pneumophilia legionella identification)** per CDC protocols.

Contract Period: Option 1 POP Begin: 05-01-2027 POP End: 04-30-2028

1.00
YR
_____NSP__________
Price Sub Line Items

Potable Water Testing

POP Begin: 05-01-2027 POP End: 04-30-2028

1003AA

4.00
QTR
__________________
__________________

Manhattan Public Water Fountains (Copper, Lead, Total Coliform, e. coliform)

POP Begin: 05-01-2027 POP End: 04-30-2028 PRINCIPAL NAICS CODE: 541380 - Testing Laboratories and Services

1003AB

4.00
QTR
__________________
__________________

Brooklyn Public Water Fountains to be Designated (Copper, Lead, Total Coliform, e. coliform)

POP Begin: 05-01-2027 POP End: 04-30-2028 PRINCIPAL NAICS CODE: 541380 - Testing Laboratories and Services

1003AC

4.00
QTR
__________________
__________________

St. Albans Public Water Fountains to be Designated (Copper, Lead, Total Coliform, e. coliform)

POP Begin: 05-01-2027 POP End: 04-30-2028 PRINCIPAL NAICS CODE: 541380 - Testing Laboratories and Services

1003AD

4.00
QTR
__________________
__________________

Manhattan Daycare Fountains (Copper, Lead, Total Coliform, e. coliform)

POP Begin: 05-01-2027 POP End: 04-30-2028 PRINCIPAL NAICS CODE: 541380 - Testing Laboratories and Services

1003AE

4.00
QTR
__________________
__________________

Brooklyn Daycare Fountains (Copper, Lead, Total Coliform, e. coliform)

POP Begin: 05-01-2027 POP End: 04-30-2028 PRINCIPAL NAICS CODE: 541380 - Testing Laboratories and Services

1.00
YR
_____NSP__________
Price Sub Line Items

Water Fountain Quarterly Maintenance

POP Begin: 05-01-2027 POP End: 04-30-2028

1004AA

4.00
QTR
__________________
__________________

Manhattan Campus Quarterly Maintenance

POP Begin: 05-01-2027 POP End: 04-30-2028 PRINCIPAL NAICS CODE: 541380 - Testing Laboratories and Services

1004AB

4.00
QTR
__________________
__________________

Brooklyn Campus Quarterly Maintenance

POP Begin: 05-01-2027 POP End: 04-30-2028 PRINCIPAL NAICS CODE: 541380 - Testing Laboratories and Services

1004AC

4.00
QTR
__________________
__________________

St. Albans Campus Quarterly Maintenance

POP Begin: 05-01-2027 POP End: 04-30-2028 PRINCIPAL NAICS CODE: 541380 - Testing Laboratories and Services

1.00
YR
_____NSP__________
Price Sub Line Items

Sterile Processing Service Water Testing

POP Begin: 05-01-2027 POP End: 04-30-2028

1005AA

4.00
QTR
__________________
__________________

Heterotrophic Plate Count (HPC) Bacteria Test Sample; 10 samples per quarter

POP Begin: 05-01-2027 POP End: 04-30-2028 PRINCIPAL NAICS CODE: 541380 - Testing Laboratories and Services PRODUCT/SERVICE CODE: F103 - Environmental Systems Protection - Water Quality Support

1005AB

4.00
QTR
__________________
__________________

pH Test Sample; 4 samples per quarter

POP Begin: 05-01-2027 POP End: 04-30-2028 PRINCIPAL NAICS CODE: 541380 - Testing Laboratories and Services PRODUCT/SERVICE CODE: F103 - Environmental Systems Protection - Water Quality Support

1005AC

2.00
JB
__________________
__________________

Total Organic Carbon (TOC) Test Sample; 10 samples bi-annually

POP Begin: 05-01-2027 POP End: 04-30-2028 PRINCIPAL NAICS CODE: 541380 - Testing Laboratories and Services PRODUCT/SERVICE CODE: F103 - Environmental Systems Protection - Water Quality Support

1005AD

1.00
YR
__________________
__________________

Endotoxins Test Sample; 6 samples annually

POP Begin: 05-01-2027 POP End: 04-30-2028 PRINCIPAL NAICS CODE: 541380 - Testing Laboratories and Services PRODUCT/SERVICE CODE: F103 - Environmental Systems Protection - Water Quality Support

1005AE

1.00
YR
__________________
__________________

Chloride, Iron, Copper, Manganese, Hardness Test Sample; 6 samples annually

POP Begin: 05-01-2027 POP End: 04-30-2028 PRINCIPAL NAICS CODE: 541380 - Testing Laboratories and Services PRODUCT/SERVICE CODE: F103 - Environmental Systems Protection - Water Quality Support

1.00
YR
_____NSP__________
Price Sub Line Items

Automated Monitoring of Incoming Potable

POP Begin: 05-01-2027 POP End: 04-30-2028 PRINCIPAL NAICS CODE: 541380 - Testing Laboratories and Services

As required by VHA Directive 1061 - incoming water pressure, temperature, pH, dissolved solids, and oxidant residual

1006AA

12.00
MO
__________________
__________________

Automated Monitoring of Manhattan - Building 1

POP Begin: 05-01-2027 POP End: 04-30-2028

1006AB

12.00
MO
__________________
__________________

Automated Monitoring of Manhattan - Building 6

POP Begin: 05-01-2027 POP End: 04-30-2028

1006AC

12.00
MO
__________________
__________________

Automated Monitoring of Brooklyn - Building 1

POP Begin: 05-01-2027 POP End: 04-30-2028

1006AD

12.00
MO
__________________
__________________

Automated Monitoring of St. Albans - Main Pumphouse

POP Begin: 05-01-2027 POP End: 04-30-2028

1006AE

12.00
MO
__________________
__________________

Automated Monitoring of St. Albans - Baisley Boulevard

POP Begin: 05-01-2027 POP End: 04-30-2028

1.00
YR
_____NSP__________
Price Sub Line Items

Operation and Maintenance of Monochloramine Domestic Water Treatment System

POP Begin: 05-01-2027 POP End: 04-30-2028 PRINCIPAL NAICS CODE: 541380 - Testing Laboratories and Services

1007AA

12.00
MO
__________________
__________________

Manhattan, Building 1, Ground Floor South Tank Room

POP Begin: 05-01-2027 POP End: 04-30-2028

1007AB

12.00
MO
__________________
__________________

Manhattan, Building 6, Clinical Addition Mechanical Room

POP Begin: 05-01-2027 POP End: 04-30-2028

1007AC

12.00
MO
__________________
__________________

Brooklyn, Building 1, Basement North Mechanical Room

POP Begin: 05-01-2027 POP End: 04-30-2028

1007AD

12.00
MO
__________________
__________________

St. Albans Main Pumphouse

POP Begin: 05-01-2027 POP End: 04-30-2028

1007AE

12.00
MO
__________________
__________________

St Albans, Building 89, Basement

POP Begin: 05-01-2027 POP End: 04-30-2028

1007AF

12.00
MO
__________________
__________________

St Albans, Building 86, Basement

POP Begin: 05-01-2027 POP End: 04-30-2028

1007AG

12.00
YR
__________________
__________________

St Albans, Building 87, Basement

POP Begin: 05-01-2027 POP End: 04-30-2028

1.00
YR
_____NSP__________
Price Sub Line Items

Cleaning and Disinfecting of Ice Machines and Retherm Units

POP Begin: 05-01-2027 POP End: 04-30-2028

1008AA

4.00
QTR
__________________
__________________

Quarterly Cleaning and Disinfecting of Ice Machines in Manhattan

POP Begin: 05-01-2027 POP End: 04-30-2028

1008AB

4.00
QTR
__________________
__________________

Quarterly Cleaning and Disinfecting of Ice Machines in Brooklyn

POP Begin: 05-01-2027 POP End: 04-30-2028

1008AC

4.00
QTR
__________________
__________________

Quarterly Cleaning and Disinfecting of Ice Machines in St. Albans

POP Begin: 05-01-2027 POP End: 04-30-2028

1008AD

4.00
QTR
__________________
__________________

Quarterly Maintenance, Cleaning, and Disinfecting of Retherm Units in Manhattan

POP Begin: 05-01-2027 POP End: 04-30-2028

1008AE

4.00
QTR
__________________
__________________

Quarterly Maintenance, Cleaning, and Disinfecting of Retherm Units in Brooklyn

POP Begin: 05-01-2027 POP End: 04-30-2028

1008AF

4.00
QTR
__________________
__________________

Quarterly Maintenance, Cleaning, and Disinfecting of Retherm Units in St. Albans

POP Begin: 05-01-2027 POP End: 04-30-2028

1.00
YR
_____NSP__________
Price Sub Line Items

Laundry Wastewater Testing

POP Begin: 05-01-2027 POP End: 04-30-2028

1009AA

12.00
MO
__________________
__________________

Sampling for pH: Collect and analyze 4 grab samples, at least one hour apart

POP Begin: 05-01-2027 POP End: 04-30-2028

1009AB

2.00
JB
__________________
__________________

Sampling for Metals: (cadmium, chromium, copper, lead, mercury, molybdenum, nickel, silver and zinc) – Collect and analyze one composite sample per day for 4 days)

POP Begin: 05-01-2027 POP End: 04-30-2028

1009AC

2.00
JB
__________________
__________________

Sampling for Cyanide: Collect 4 grab samples per day, at least 1 hour apart for 4 composite sample for each of the 4 sampling days.

Contract Period: Option 1 POP Begin: 05-01-2027 POP End: 04-30-2028

1009AD

2.00
JB
__________________
__________________

Sampling for Non–Polar Material: Collect 4 grab samples per day, at least 1 hour apart for 4 days.

POP Begin: 05-01-2027 POP End: 04-30-2028

1.00
YR
_____NSP__________
Price Sub Line Items

Manhattan Campus: Utility Water Treatment (Cooling Tower Systems)

POP Begin: 05-01-2027 POP End: 04-30-2028

1010AA

14.00
JB
__________________
__________________

Manhattan Campus: Cooling Tower Water Treatment and Testing

POP Begin: 05-01-2027 POP End: 04-30-2028 PRINCIPAL NAICS CODE: 541380 - Testing Laboratories and Services

1010AB

4.00
JB
__________________
__________________

Manhattan Campus: Cooling Tower Bacterial Water Quality Testing for Legionella

POP Begin: 05-01-2027 POP End: 04-30-2028 PRINCIPAL NAICS CODE: 541380 - Testing Laboratories and Services

1010AC

4.00
JB
__________________
__________________

Manhattan Campus: Cooling Tower Bacterial Water Quality Testing for Heterotrophic Plate Count (HPC) Bacteria

POP Begin: 05-01-2027 POP End: 04-30-2028 PRINCIPAL NAICS CODE: 541380 - Testing Laboratories and Services

1010AD

12.00
MO
__________________
__________________

Manhattan Campus: Biological control testing: total count on the towers and the main chill loops

POP Begin: 05-01-2027 POP End: 04-30-2028

1010AE

4.00
QTR
__________________
__________________

Manhattan Campus: Anaerobic bacteria tests on the main chill system

POP Begin: 05-01-2027 POP End: 04-30-2028

1010AF

14.00
YR
__________________
__________________

Manhattan Campus: Routine monitoring of Main chilled water loop

POP Begin: 05-01-2027 POP End: 04-30-2028 PRINCIPAL NAICS CODE: 541380 - Testing Laboratories and Services

1010AG

3.00
JB
__________________
__________________

Manhattan Campus: Cooling Tower basins vacuum cleaning

POP Begin: 05-01-2027 POP End: 04-30-2028 PRINCIPAL NAICS CODE: 541380 - Testing Laboratories and Services

1010AH

2.00
JB
__________________
__________________

Manhattan Campus: Cooling Towers Clean and Sterilize

POP Begin: 05-01-2027 POP End: 04-30-2028 PRINCIPAL NAICS CODE: 541380 - Testing Laboratories and Services

1.00
YR
_____NSP__________
Price Sub Line Items

Brooklyn Campus: Utility Water Treatment (Cooling Tower and Boiler Systems)

POP Begin: 05-01-2027 POP End: 04-30-2028

1011AA

14.00
JB
__________________
__________________

Brooklyn Campus: Cooling Tower Water Treatment and Testing

POP Begin: 05-01-2027 POP End: 04-30-2028 PRINCIPAL NAICS CODE: 541380 - Testing Laboratories and Services

1011AB

4.00
JB
__________________
__________________

Brooklyn Campus: Cooling Tower Bacterial Water Quality Testing for Legionella

POP Begin: 05-01-2027 POP End: 04-30-2028 PRINCIPAL NAICS CODE: 541380 - Testing Laboratories and Services

1011AC

4.00
JB
__________________
__________________

Brooklyn Campus: Cooling Tower Bacterial Water Quality Testing for Heterotrophic Plate Count (HPC) Bacteria

POP Begin: 05-01-2027 POP End: 04-30-2028 PRINCIPAL NAICS CODE: 541380 - Testing Laboratories and Services

1011AD

12.00
MO
__________________
__________________

Brooklyn Campus: Biological control testing: total count on the towers and the main chill loops

POP Begin: 05-01-2027 POP End: 04-30-2028

1011AE

4.00
QTR
__________________
__________________

Brooklyn Campus: Anaerobic bacteria tests on the main chill system

POP Begin: 05-01-2027 POP End: 04-30-2028

1011AF

14.00
YR
__________________
__________________

Brooklyn Campus: Routine monitoring of Main/OPC chilled water loop

POP Begin: 05-01-2027 POP End: 04-30-2028 PRINCIPAL NAICS CODE: 541380 - Testing Laboratories and Services

1011AG

6.00
MO
__________________
__________________

Brooklyn Campus: Routine monitoring of other closed systems

POP Begin: 05-01-2027 POP End: 04-30-2028 PRINCIPAL NAICS CODE: 541380 - Testing Laboratories and Services

Other closed systems will be tested monthly until the proper residual is maintained and quarterly thereafter. Use the quarterly line number when this metric is met (reference Appendix B.4)

1011AH

3.00
QTR
__________________
__________________

Brooklyn Campus: Routine monitoring of other closed systems

POP Begin: 05-01-2027 POP End: 04-30-2028 PRINCIPAL NAICS CODE: 541380 - Testing Laboratories and Services

1011AJ

3.00
JB
__________________
__________________

Brooklyn Campus: Cooling Tower basins vacuum cleaning

POP Begin: 05-01-2027 POP End: 04-30-2028 PRINCIPAL NAICS CODE: 541380 - Testing Laboratories and Services

1011AK

2.00
JB
__________________
__________________

Brooklyn Campus: Cooling Towers Clean and Sterilize

POP Begin: 05-01-2027 POP End: 04-30-2028 PRINCIPAL NAICS CODE: 541380 - Testing Laboratories and Services

1011AL

24.00
JB
__________________
__________________

Brooklyn Campus: Boiler Water Treatment and Testing

POP Begin: 05-01-2027 POP End: 04-30-2028 PRINCIPAL NAICS CODE: 541380 - Testing Laboratories and Services

1.00
YR
_____NSP__________
Price Sub Line Items

St Albans Campus: Utility Water Treatment (Cooling Tower and Boiler Systems)

POP Begin: 05-01-2027 POP End: 04-30-2028

1012AA

24.00
JB
__________________
__________________

St Albans Campus: Boiler Water Treatment and Testing

POP Begin: 05-01-2027 POP End: 04-30-2028 PRINCIPAL NAICS CODE: 541380 - Testing Laboratories and Services

1.00
YR
_____NSP__________
Use Chemical Pricing Sheet Attached

Chemical Delivery & Storage

POP Begin: 05-01-2027 POP End: 04-30-2028 PRINCIPAL NAICS CODE: 541380 - Testing Laboratories and Services

Provide a separate cost estimate for the year that identifies each supply item by line, with estimated quantity for one year of use, the unit price, and the calculated amount on that supply line (i.e. Supply X, 5 Gallons, $10.00 per gallon, $50.00 total)

1.00
YR
_____NSP__________
Price Sub Line Items

Dental Waterline Testing Contract Period: Option 2 POP Begin: 05-01-2028 POP End: 04-30-2029

2001AA

4.00
QTR
__________________
__________________

Quarterly Testing: Manhattan Campus

POP Begin: 05-01-2028 POP End: 04-30-2029 PRINCIPAL NAICS CODE: 541380 - Testing Laboratories and Services PRODUCT/SERVICE CODE: F103 - Environmental Systems Protection - Water Quality Support Dental Chairs: 23 + 1 portable unit

2001AB

4.00
QTR
__________________
__________________

Quarterly Testing: Brooklyn Campus

POP Begin: 05-01-2028 POP End: 04-30-2029 PRINCIPAL NAICS CODE: 541380 - Testing Laboratories and Services PRODUCT/SERVICE CODE: F103 - Environmental Systems Protection - Water Quality Support Dental Chairs: 10 + 2 portable units

2001AC

4.00
QTR
__________________
__________________

Quarterly Testing: St Albans Campus

POP Begin: 05-01-2028 POP End: 04-30-2029 PRINCIPAL NAICS CODE: 541380 - Testing Laboratories and Services PRODUCT/SERVICE CODE: F103 - Environmental Systems Protection - Water Quality Support Dental Chairs: 6 + 2 portable units

1.00
YR
_____NSP__________
Price Sub Line Items

Legionella Water Testing

POP Begin: 05-01-2028 POP End: 04-30-2029

2002AA

4.00
QTR
__________________
__________________

Quarterly Testing: Manhattan Campus

Contract Period: Option 2 POP Begin: 05-01-2028 POP End: 04-30-2029 PRINCIPAL NAICS CODE: 541380 - Testing Laboratories and Services

2002AB

4.00
QTR
__________________
__________________

Quarterly Testing: Brooklyn Campus

Contract Period: Option 2 POP Begin: 05-01-2028 POP End: 04-30-2029 PRINCIPAL NAICS CODE: 541380 - Testing Laboratories and Services

2002AC

4.00
QTR
__________________
__________________

Quarterly Testing: St Albans Campus

Contract Period: Option 2 POP Begin: 05-01-2028 POP End: 04-30-2029 PRINCIPAL NAICS CODE: 541380 - Testing Laboratories and Services

2002AD

40.00
EA
__________________
__________________

Non-routine testing (legionella culture) * per CDC protocols.

Contract Period: Option 2 POP Begin: 05-01-2028 POP End: 04-30-2029 PRINCIPAL NAICS CODE: 541380 - Testing Laboratories and Services PRODUCT/SERVICE CODE: F103 - Environmental Systems Protection - Water Quality Support

2002AE

10.00
EA
__________________
__________________

Non-routine testing (legionella pneumophila serotyping or non-pneumophilia legionella identification)** per CDC protocols.

Contract Period: Option 2 POP Begin: 05-01-2028 POP End: 04-30-2029

1.00
YR
_____NSP__________
Price Sub Line Items

Potable Water Testing

POP Begin: 05-01-2028 POP End: 04-30-2029

2003AA

4.00
QTR
__________________
__________________

Manhattan Public Water Fountains (Copper, Lead, Total Coliform, e. coliform)

POP Begin: 05-01-2028 POP End: 04-30-2029 PRINCIPAL NAICS CODE: 541380 - Testing Laboratories and Services

2003AB

4.00
QTR
__________________
__________________

Brooklyn Public Water Fountains to be Designated (Copper, Lead, Total Coliform, e. coliform)

POP Begin: 05-01-2028 POP End: 04-30-2029 PRINCIPAL NAICS CODE: 541380 - Testing Laboratories and Services

2003AC

4.00
QTR
__________________
__________________

St. Albans Public Water Fountains to be Designated (Copper, Lead, Total Coliform, e. coliform)

POP Begin: 05-01-2028 POP End: 04-30-2029 PRINCIPAL NAICS CODE: 541380 - Testing Laboratories and Services

2003AD

4.00
QTR
__________________
__________________

Manhattan Daycare Fountains (Copper, Lead, Total Coliform, e. coliform)

POP Begin: 05-01-2028 POP End: 04-30-2029 PRINCIPAL NAICS CODE: 541380 - Testing Laboratories and Services

2003AE

4.00
QTR
__________________
__________________

Brooklyn Daycare Fountains (Copper, Lead, Total Coliform, e. coliform)

POP Begin: 05-01-2028 POP End: 04-30-2029 PRINCIPAL NAICS CODE: 541380 - Testing Laboratories and Services

1.00
YR
_____NSP__________
Price Sub Line Items

Water Fountain Quarterly Maintenance

POP Begin: 05-01-2028 POP End: 04-30-2029

2004AA

4.00
QTR
__________________
__________________

Manhattan Campus Quarterly Maintenance

POP Begin: 05-01-2028 POP End: 04-30-2029 PRINCIPAL NAICS CODE: 541380 - Testing Laboratories and Services

2004AB

4.00
QTR
__________________
__________________

Brooklyn Campus Quarterly Maintenance

POP Begin: 05-01-2028 POP End: 04-30-2029 PRINCIPAL NAICS CODE: 541380 - Testing Laboratories and Services

2004AC

4.00
QTR
__________________
__________________

St. Albans Campus Quarterly Maintenance

POP Begin: 05-01-2028 POP End: 04-30-2029 PRINCIPAL NAICS CODE: 541380 - Testing Laboratories and Services

1.00
YR
_____NSP__________
Price Sub Line Items

Sterile Processing Service Water Testing

POP Begin: 05-01-2028 POP End: 04-30-2029

2005AA

4.00
QTR
__________________
__________________

Heterotrophic Plate Count (HPC) Bacteria Test Sample; 10 samples per quarter

POP Begin: 05-01-2028 POP End: 04-30-2029 PRINCIPAL NAICS CODE: 541380 - Testing Laboratories and Services PRODUCT/SERVICE CODE: F103 - Environmental Systems Protection - Water Quality Support

2005AB

4.00
QTR
__________________
__________________

pH Test Sample; 4 samples per quarter

POP Begin: 05-01-2028 POP End: 04-30-2029 PRINCIPAL NAICS CODE: 541380 - Testing Laboratories and Services PRODUCT/SERVICE CODE: F103 - Environmental Systems Protection - Water Quality Support

2005AC

2.00
JB
__________________
__________________

Total Organic Carbon (TOC) Test Sample; 10 samples bi-annually

POP Begin: 05-01-2028 POP End: 04-30-2029 PRINCIPAL NAICS CODE: 541380 - Testing Laboratories and Services PRODUCT/SERVICE CODE: F103 - Environmental Systems Protection - Water Quality Support

2005AD

1.00
YR
__________________
__________________

Endotoxins Test Sample; 6 samples annually

POP Begin: 05-01-2028 POP End: 04-30-2029 PRINCIPAL NAICS CODE: 541380 - Testing Laboratories and Services PRODUCT/SERVICE CODE: F103 - Environmental Systems Protection - Water Quality Support

2005AE

1.00
YR
__________________
__________________

Chloride, Iron, Copper, Manganese, Hardness Test Sample; 6 samples annually

POP Begin: 05-01-2028 POP End: 04-30-2029 PRINCIPAL NAICS CODE: 541380 - Testing Laboratories and Services PRODUCT/SERVICE CODE: F103 - Environmental Systems Protection - Water Quality Support

1.00
YR
_____NSP__________
Price Sub Line Items

Automated Monitoring of Incoming Potable

POP Begin: 05-01-2028 POP End: 04-30-2029 PRINCIPAL NAICS CODE: 541380 - Testing Laboratories and Services

As required by VHA Directive 1061 - incoming water pressure, temperature, pH, dissolved solids, and oxidant residual

2006AA

12.00
MO
__________________
__________________

Automated Monitoring of Manhattan - Building 1

POP Begin: 05-01-2028 POP End: 04-30-2029

2006AB

12.00
MO
__________________
__________________

Automated Monitoring of Manhattan - Building 6

POP Begin: 05-01-2028 POP End: 04-30-2029

2006AC

12.00
MO
__________________
__________________

Automated Monitoring of Brooklyn - Building 1

POP Begin: 05-01-2028 POP End: 04-30-2029

2006AD

12.00
MO
__________________
__________________

Automated Monitoring of St. Albans - Main Pumphouse

POP Begin: 05-01-2028 POP End: 04-30-2029

2006AE

12.00
MO
__________________
__________________

Automated Monitoring of St. Albans - Baisley Boulevard

POP Begin: 05-01-2028 POP End: 04-30-2029

1.00
YR
_____NSP__________
Price Sub Line Items

Operation and Maintenance of Monochloramine Domestic Water Treatment System

POP Begin: 05-01-2028 POP End: 04-30-2029 PRINCIPAL NAICS CODE: 541380 - Testing Laboratories and Services

2007AA

12.00
MO
__________________
__________________

Manhattan, Building 1, Ground Floor South Tank Room

POP Begin: 05-01-2028 POP End: 04-30-2029

2007AB

12.00
MO
__________________
__________________

Manhattan, Building 6, Clinical Addition Mechanical Room

POP Begin: 05-01-2028 POP End: 04-30-2029

2007AC

12.00
MO
__________________
__________________

Brooklyn, Building 1, Basement North Mechanical Room

POP Begin: 05-01-2028 POP End: 04-30-2029

2007AD

12.00
MO
__________________
__________________

St. Albans Main Pumphouse

POP Begin: 05-01-2028 POP End: 04-30-2029

2007AE

12.00
MO
__________________
__________________

St Albans, Building 89, Basement

POP Begin: 05-01-2028 POP End: 04-30-2029

2007AF

12.00
MO
__________________
__________________

St Albans, Building 86, Basement

POP Begin: 05-01-2028 POP End: 04-30-2029

2007AG

12.00
YR
__________________
__________________

St Albans, Building 87, Basement

POP Begin: 05-01-2028 POP End: 04-30-2029

1.00
YR
_____NSP__________
Price Sub Line Items

Cleaning and Disinfecting of Ice Machines and Retherm Units

POP Begin: 05-01-2028 POP End: 04-30-2029

2008AA

4.00
QTR
__________________
__________________

Quarterly Cleaning and Disinfecting of Ice Machines in Manhattan

POP Begin: 05-01-2028 POP End: 04-30-2029

2008AB

4.00
QTR
__________________
__________________

Quarterly Cleaning and Disinfecting of Ice Machines in Brooklyn

POP Begin: 05-01-2028 POP End: 04-30-2029

2008AC

4.00
QTR
__________________
__________________

Quarterly Cleaning and Disinfecting of Ice Machines in St. Albans

POP Begin: 05-01-2028 POP End: 04-30-2029

2008AD

4.00
QTR
__________________
__________________

Quarterly Maintenance, Cleaning, and Disinfecting of Retherm Units in Manhattan

POP Begin: 05-01-2028 POP End: 04-30-2029

2008AE

4.00
QTR
__________________
__________________

Quarterly Maintenance, Cleaning, and Disinfecting of Retherm Units in Brooklyn

POP Begin: 05-01-2028 POP End: 04-30-2029

2008AF

4.00
QTR
__________________
__________________

Quarterly Maintenance, Cleaning, and Disinfecting of Retherm Units in St. Albans

POP Begin: 05-01-2028 POP End: 04-30-2029

1.00
YR
_____NSP__________
Price Sub Line Items

Laundry Wastewater Testing

POP Begin: 05-01-2028 POP End: 04-30-2029

2009AA

12.00
MO
__________________
__________________

Sampling for pH: Collect and analyze 4 grab samples, at least one hour apart

POP Begin: 05-01-2028 POP End: 04-30-2029

2009AB

2.00
JB
__________________
__________________

Sampling for Metals: (cadmium, chromium, copper, lead, mercury, molybdenum, nickel, silver and zinc) – Collect and analyze one composite sample per day for 4 days)

POP Begin: 05-01-2028 POP End: 04-30-2029

2009AC

2.00
JB
__________________
__________________

Sampling for Cyanide: Collect 4 grab samples per day, at least 1 hour apart for 4 composite sample for each of the 4 sampling days.

Contract Period: Option 2 POP Begin: 05-01-2028 POP End: 04-30-2029

2009AD

2.00
JB
__________________
__________________

Sampling for Non–Polar Material: Collect 4 grab samples per day, at least 1 hour apart for 4 days.

POP Begin: 05-01-2028 POP End: 04-30-2029

1.00
YR
_____NSP__________
Price Sub Line Items

Manhattan Campus: Utility Water Treatment (Cooling Tower Systems)

POP Begin: 05-01-2028 POP End: 04-30-2029

2010AA

14.00
JB
__________________
__________________

Manhattan Campus: Cooling Tower Water Treatment and Testing

POP Begin: 05-01-2028 POP End: 04-30-2029 PRINCIPAL NAICS CODE: 541380 - Testing Laboratories and Services

2010AB

4.00
JB
__________________
__________________

Manhattan Campus: Cooling Tower Bacterial Water Quality Testing for Legionella

POP Begin: 05-01-2028 POP End: 04-30-2029 PRINCIPAL NAICS CODE: 541380 - Testing Laboratories and Services

2010AC

4.00
JB
__________________
__________________

Manhattan Campus: Cooling Tower Bacterial Water Quality Testing for Heterotrophic Plate Count (HPC) Bacteria

POP Begin: 05-01-2028 POP End: 04-30-2029 PRINCIPAL NAICS CODE: 541380 - Testing Laboratories and Services

2010AD

12.00
MO
__________________
__________________

Manhattan Campus: Biological control testing: total count on the towers and the main chill loops

POP Begin: 05-01-2028 POP End: 04-30-2029

2010AE

4.00
QTR
__________________
__________________

Manhattan Campus: Anaerobic bacteria tests on the main chill system

POP Begin: 05-01-2028 POP End: 04-30-2029

2010AF

14.00
YR
__________________
__________________

Manhattan Campus: Routine monitoring of Main chilled water loop

POP Begin: 05-01-2028 POP End: 04-30-2029 PRINCIPAL NAICS CODE: 541380 - Testing Laboratories and Services

2010AG

3.00
JB
__________________
__________________

Manhattan Campus: Cooling Tower basins vacuum cleaning

POP Begin: 05-01-2028 POP End: 04-30-2029 PRINCIPAL NAICS CODE: 541380 - Testing Laboratories and Services

2010AH

2.00
JB
__________________
__________________

Manhattan Campus: Cooling Towers Clean and Sterilize

POP Begin: 05-01-2028 POP End: 04-30-2029 PRINCIPAL NAICS CODE: 541380 - Testing Laboratories and Services

1.00
YR
_____NSP__________
Price Sub Line Items

Brooklyn Campus: Utility Water Treatment (Cooling Tower and Boiler Systems)

POP Begin: 05-01-2028 POP End: 04-30-2029

2011AA

14.00
JB
__________________
__________________

Brooklyn Campus: Cooling Tower Water Treatment and Testing

POP Begin: 05-01-2028 POP End: 04-30-2029 PRINCIPAL NAICS CODE: 541380 - Testing Laboratories and Services

2011AB

4.00
JB
__________________
__________________

Brooklyn Campus: Cooling Tower Bacterial Water Quality Testing for Legionella

POP Begin: 05-01-2028 POP End: 04-30-2029 PRINCIPAL NAICS CODE: 541380 - Testing Laboratories and Services

2011AC

4.00
JB
__________________
__________________

Brooklyn Campus: Cooling Tower Bacterial Water Quality Testing for Heterotrophic Plate Count (HPC) Bacteria

POP Begin: 05-01-2028 POP End: 04-30-2029 PRINCIPAL NAICS CODE: 541380 - Testing Laboratories and Services

2011AD

12.00
MO
__________________
__________________

Brooklyn Campus: Biological control testing: total count on the towers and the main chill loops

POP Begin: 05-01-2028 POP End: 04-30-2029

2011AE

4.00
QTR
__________________
__________________

Brooklyn Campus: Anaerobic bacteria tests on the main chill system

POP Begin: 05-01-2028 POP End: 04-30-2029

2011AF

14.00
YR
__________________
__________________

Brooklyn Campus: Routine monitoring of Main/OPC chilled water loop

POP Begin: 05-01-2028 POP End: 04-30-2029 PRINCIPAL NAICS CODE: 541380 - Testing Laboratories and Services

2011AG

6.00
MO
__________________
__________________

Brooklyn Campus: Routine monitoring of other closed systems

POP Begin: 05-01-2028 POP End: 04-30-2029 PRINCIPAL NAICS CODE: 541380 - Testing Laboratories and Services

Other closed systems will be tested monthly until the proper residual is maintained and quarterly thereafter. Use the quarterly line number when this metric is met (reference Appendix B.4)

2011AH

3.00
QTR
__________________
__________________

Brooklyn Campus: Routine monitoring of other closed systems

POP Begin: 05-01-2028 POP End: 04-30-2029 PRINCIPAL NAICS CODE: 541380 - Testing Laboratories and Services

2011AJ

3.00
JB
__________________
__________________

Brooklyn Campus: Cooling Tower basins vacuum cleaning

POP Begin: 05-01-2028 POP End: 04-30-2029 PRINCIPAL NAICS CODE: 541380 - Testing Laboratories and Services

2011AK

2.00
JB
__________________
__________________

Brooklyn Campus: Cooling Towers Clean and Sterilize

POP Begin: 05-01-2028 POP End: 04-30-2029 PRINCIPAL NAICS CODE: 541380 - Testing Laboratories and Services

2011AL

24.00
JB
__________________
__________________

Brooklyn Campus: Boiler Water Treatment and Testing

POP Begin: 05-01-2028 POP End: 04-30-2029 PRINCIPAL NAICS CODE: 541380 - Testing Laboratories and Services

1.00
YR
_____NSP__________
Price Sub Line Items

St Albans Campus: Utility Water Treatment (Cooling Tower and Boiler Systems)

POP Begin: 05-01-2028 POP End: 04-30-2029

2012AA

24.00
JB

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .