36C24226Q0399 0001.docx

DOCX document 107 KB Posted

Attached to
F103--Water Quality Management (Base 4) Federal contract opportunity
Solicitation number
36C24226Q0399
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 2

About this file

This is an amendment to a Request for Quotation (RFQ) for water quality management services issued by the Department of Veterans Affairs New York Harbor Healthcare System. The solicitation number is 36C24226Q0399, with a response deadline of April 9, 2026 at 3:00 PM Eastern Time. The requirement covers three campuses: Manhattan, Brooklyn, and St. Albans, with services spanning a base period from May 1, 2026 to April 30, 2027, plus four one-year option periods extending through April 30, 2031. The NAICS code is 541380 (Testing Laboratories and Services) with a small business size standard of $19.0 million, and the solicitation is set aside for Service-Disabled Veteran-Owned Small Businesses (SDVOSBs).

The amendment responds to vendor inquiries and provides critical clarifications: the VA will supply water fountain filters, Brooklyn Retherm units are now included in the requirement across all three campuses, and updated sterile processing water testing requirements have been adopted per ST108 standards. Services required include dental waterline testing (quarterly at all three campuses), legionella culture testing (quarterly plus non-routine testing), potable water testing, sterile processing service water testing (with updated sampling schedules for HPC bacteria, pH, TOC, endotoxins, and chloride/iron/copper/manganese/hardness), automated monitoring of incoming potable water, operation and maintenance of monochloramine domestic water treatment systems at multiple building locations, ice machine and retherm unit cleaning and disinfection (quarterly), laundry wastewater testing (St. Albans only), and utility water treatment for cooling tower and boiler systems. Pricing is required on a line-item basis with unit prices and extended amounts, plus a separate cost estimate for chemical delivery and storage identifying each supply item with annual quantities and unit pricing.

View the file

Other files for this federal contract opportunity

Other files attached to F103--Water Quality Management (Base 4), newest first.
File Type Posted
36C24226Q0399 0002.docx DOCX document
Chemical Delivery and Storage Price List.xlsx XLSX spreadsheet
36C24226Q0399.docx DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SUBJECT*

FY26 | Water Quality Management (Base +4)

GENERAL INFORMATION

CONTRACTING OFFICE’S ZIP CODE*
14215
SOLICITATION NUMBER*
36C24226Q0399
RESPONSE DATE/TIME/ZONE
04-09-2026 3:00pm EASTERN TIME, NEW YORK, USA
ARCHIVE
99 DAYS AFTER THE RESPONSE DATE
RECOVERY ACT FUNDS
N
SET-ASIDE
SDVOSBC
PRODUCT SERVICE CODE*
F103
NAICS CODE*
541380
CONTRACTING OFFICE ADDRESS
Department of Veterans Affairs

Network Contracting Office (NCO) 2 3495 Bailey Avenue Building 3, 2nd floor Buffalo NY 14215

POINT OF CONTACT*

Contract Specialist Chris Weider Christopher.Weider@va.gov

PLACE OF PERFORMANCE

ADDRESS
Department of Veteran Affairs

New York Harbor Healthcare System

423 E. 23rd Street

New York NY

POSTAL CODE
10010
COUNTRY
USA

ADDITIONAL INFORMATION

AGENCY’S URL

URL DESCRIPTION

AGENCY CONTACT’S EMAIL ADDRESS

EMAIL DESCRIPTION

DESCRIPTION

a. The purpose of this amendment is to respond to vendor inquiries and extend the response deadline.

b. The period for questions is now closed.

c. The solicitation response deadline is hereby extended to 3:00 pm ET Thursday, April 9, 2026.

d. Question: Quarterly water fountain maintenance requires filter replacement. Please confirm whether the VA will supply the filters.

Answer: The VA will supply the filters.

e. Question: Please confirm that Brooklyn Retherm units are to be included in our quotation, as they are for Manhattan and St. Albans.

Answer: Yes, Brooklyn Retherm units are included in this requirement. The chart on page one of the SOW is hereby updated:
Requirement Category
New York Campus
Brooklyn Campus
St Albans Campus
Dental Waterline Testing
Yes
Yes
Yes
Legionella Water Testing
Yes
Yes
Yes
Potable Water Testing
Yes
Yes
Yes
Sterile Processing Service Water Testing
Yes
Yes
No
Automated Monitoring of Incoming Potable Water
Yes
Yes
Yes
Operation & Maintenance of Monochloramine Domestic Water Treatment System
Yes
Yes
Yes
Ice Machines Cleaning & Disinfection Quarterly
Yes
Yes
Yes
Laundry Wastewater Testing
No
No
Yes
Utility Water Treatment (Cooling Tower and Boiler Systems)
Cooling only
Cooling & Boiler
Boiler only
Water Fountain/Dispenser Maintenance, Cleaning, Disinfecting (quarterly)
Yes
Yes
Yes
Retherm Units Maintenance, Cleaning, Disinfecting (quarterly)
Yes
Yes
Yes

f. Question: Please confirm whether the updated ST108 requirements should be adopted for sterile processing.

Answer: Yes, please see the updated table below and an updated Price/Cost Schedule is attached.
Sampling Schedule: Sterile Processing Water Testing
Location
Parameters to be Tested
Number of Samples per event
Sampling Frequency
# of samples per year
Locations in Sterile Processing Suite to be Designated
Heterotrophic Plate Count (HPC) Bacteria
6 (Manhattan)

4 (Brooklyn)

Monthly
72 (Manhattan)

48 (Brooklyn)

Locations in Sterile Processing Suite to be Designated
pH
2 (Manhattan)

2 (Brooklyn)

Monthly
24 (Manhattan)

24 (Brooklyn)

Locations in Sterile Processing Suite to be Designated
Total Organic Carbon (TOC)
6 (Manhattan)

4 (Brooklyn)

Annually
6 (Manhattan)

4 (Brooklyn)

Locations in Sterile Processing Suite to be Designated
Endotoxins

4 (Manhattan) 2 (Brooklyn)

Monthly
48 (Manhattan)

12 (Brooklyn)

Main Feedwater Lines Entering Facility
Chloride, Iron, Copper, Manganese, Hardness
4 (Manhattan)

2 (Brooklyn)

Annually
4 (Manhattan)

2 (Brooklyn)

Amendment to a Previous Combined Solicitation

Amendment to a Previous Combined Solicitation

g. More previously asked questions will be answered in a future amendment.

*= Required Field
Amendment to a Previous Combined Solicitation

Page 1 of

Amendment to a Previous Combined Solicitation

Page 1 of Page 1 of

A.1 PRICE/COST SCHEDULE

ITEM INFORMATION

ITEM NUMBER
DESCRIPTION OF SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
1.00
YR
__________________
__________________

Dental Waterline Testing Contract Period: Base POP Begin: 05-01-2026 POP End: 04-30-2027 PRINCIPAL NAICS CODE: 541380 - Testing Laboratories and Services PRODUCT/SERVICE CODE: F103 - Environmental Systems Protection - Water Quality Support

0001AA

4.00
QTR
__________________
__________________

Quarterly Testing: Manhattan Campus

POP Begin: 05-01-2026 POP End: 04-30-2027 PRINCIPAL NAICS CODE: 541380 - Testing Laboratories and Services PRODUCT/SERVICE CODE: F103 - Environmental Systems Protection - Water Quality Support Dental Chairs: 23 + 1 portable unit Lines per chair: 6 + 4 (portable unit) Samples per quarter: 138 + 4 (portable unit) = 142

0001AB

4.00
QTR
__________________
__________________

Quarterly Testing: Brooklyn Campus

POP Begin: 05-01-2026 POP End: 04-30-2027 PRINCIPAL NAICS CODE: 541380 - Testing Laboratories and Services PRODUCT/SERVICE CODE: F103 - Environmental Systems Protection - Water Quality Support Dental Chairs: 10 + 2 portable units Lines per chair: 6 + 4 (portable units) Samples per quarter: 60 + 8 (portable units) = 68

0001AC

4.00
QTR
__________________
__________________

Quarterly Testing: St Albans Campus

POP Begin: 05-01-2026 POP End: 04-30-2027 PRINCIPAL NAICS CODE: 541380 - Testing Laboratories and Services PRODUCT/SERVICE CODE: F103 - Environmental Systems Protection - Water Quality Support Dental Chairs: 6 + 2 portable units Lines per chair: 8 + 4 (portable units) Samples per quarter: 48 + 8 (portable units) = 56

1.00
YR
__________________
__________________

Legionella Water Testing

POP Begin: 05-01-2026 POP End: 04-30-2027

0002AA

4.00
QTR
__________________
__________________

Quarterly Testing: Manhattan Campus (legionella culture) * per CDC protocols Contract Period: Base POP Begin: 05-01-2026 POP End: 04-30-2027 PRINCIPAL NAICS CODE: 541380 - Testing Laboratories and Services

55 Samples per quarter

0002AB

4.00
QTR
__________________
__________________

Quarterly Testing: Brooklyn Campus

Contract Period: Base POP Begin: 05-01-2026 POP End: 04-30-2027 PRINCIPAL NAICS CODE: 541380 - Testing Laboratories and Services

45 Samples per quarter

0002AC

4.00
QTR
__________________
__________________

Quarterly Testing: St Albans Campus

Contract Period: Base POP Begin: 05-01-2026 POP End: 04-30-2027 PRINCIPAL NAICS CODE: 541380 - Testing Laboratories and Services

50 Samples per quarter

0002AD

40.00
EA
__________________
__________________

Non-routine testing (legionella culture) * per CDC protocols.

Frequency as specified by the COR Contract Period: Base POP Begin: 05-01-2026 POP End: 04-30-2027 PRINCIPAL NAICS CODE: 541380 - Testing Laboratories and Services PRODUCT/SERVICE CODE: F103 - Environmental Systems Protection - Water Quality Support Quantify l. pneumophila and identify the presence or absence of other legionella species.

0002AE

10.00
EA
__________________
__________________

Non-routine testing (legionella pneumophila serotyping or non-pneumophilia legionella identification)** per CDC protocols.

Frequency as specified by the COR.

Contract Period: Base POP Begin: 05-01-2026 POP End: 04-30-2027

1.00
YR
__________________
__________________

Potable Water Testing

POP Begin: 05-01-2026 POP End: 04-30-2027

0003AA

4.00
QTR
__________________
__________________

Manhattan Public Water Fountains (Copper, Lead, Total Coliform, e. coliform)

POP Begin: 05-01-2026 POP End: 04-30-2027 PRINCIPAL NAICS CODE: 541380 - Testing Laboratories and Services

10 samples per quarter

0003AB

4.00
QTR
__________________
__________________

Brooklyn Public Water Fountains to be Designated (Copper, Lead, Total Coliform, e. coliform)

POP Begin: 05-01-2026 POP End: 04-30-2027 PRINCIPAL NAICS CODE: 541380 - Testing Laboratories and Services

0003AC

4.00
QTR
__________________
__________________

St. Albans Public Water Fountains to be Designated (Copper, Lead, Total Coliform, e. coliform)

POP Begin: 05-01-2026 POP End: 04-30-2027 PRINCIPAL NAICS CODE: 541380 - Testing Laboratories and Services

0003AD

4.00
QTR
__________________
__________________

Manhattan Daycare Fountains (Copper, Lead, Total Coliform, e. coliform)

POP Begin: 05-01-2026 POP End: 04-30-2027 PRINCIPAL NAICS CODE: 541380 - Testing Laboratories and Services

4 samples per quarter

0003AE

4.00
QTR
__________________
__________________

Brooklyn Daycare Fountains (Copper, Lead, Total Coliform, e. coliform)

POP Begin: 05-01-2026 POP End: 04-30-2027 PRINCIPAL NAICS CODE: 541380 - Testing Laboratories and Services

1.00
YR
__________________
__________________

Water Fountain Quarterly Maintenance

POP Begin: 05-01-2026 POP End: 04-30-2027

0004AA

4.00
QTR
__________________
__________________

Manhattan Campus Quarterly Maintenance

POP Begin: 05-01-2026 POP End: 04-30-2027 PRINCIPAL NAICS CODE: 541380 - Testing Laboratories and Services

16 Water Fountains

0004AB

4.00
QTR
__________________
__________________

Brooklyn Campus Quarterly Maintenance

POP Begin: 05-01-2026 POP End: 04-30-2027 PRINCIPAL NAICS CODE: 541380 - Testing Laboratories and Services

51 Water Fountains

0004AC

4.00
QTR
__________________
__________________

St. Albans Campus Quarterly Maintenance

POP Begin: 05-01-2026 POP End: 04-30-2027 PRINCIPAL NAICS CODE: 541380 - Testing Laboratories and Services

19 water fountains

1.00
YR
__________________
__________________

Sterile Processing Service Water Testing

POP Begin: 05-01-2026 POP End: 04-30-2027

0005AA

12.00
MO
__________________
__________________

Heterotrophic Plate Count (HPC) Bacteria Test Sample; 10 samples per month

POP Begin: 05-01-2026 POP End: 04-30-2027 PRINCIPAL NAICS CODE: 541380 - Testing Laboratories and Services PRODUCT/SERVICE CODE: F103 - Environmental Systems Protection - Water Quality Support Manhattan: 6 Samples Brooklyn: 4 Samples

0005AB

12.00
MO
__________________
__________________

pH Test Sample; 4 samples per month

POP Begin: 05-01-2026 POP End: 04-30-2027 PRINCIPAL NAICS CODE: 541380 - Testing Laboratories and Services PRODUCT/SERVICE CODE: F103 - Environmental Systems Protection - Water Quality Support Manhattan: 2 Samples Brooklyn: 2 Samples

0005AC

1.00
JB
__________________
__________________

Total Organic Carbon (TOC) Test Sample; 10 samples annually

POP Begin: 05-01-2026 POP End: 04-30-2027 PRINCIPAL NAICS CODE: 541380 - Testing Laboratories and Services PRODUCT/SERVICE CODE: F103 - Environmental Systems Protection - Water Quality Support

0005AD

12.00
MO
__________________
__________________

Endotoxins Test Sample; 6 samples monthly

POP Begin: 05-01-2026 POP End: 04-30-2027 PRINCIPAL NAICS CODE: 541380 - Testing Laboratories and Services PRODUCT/SERVICE CODE: F103 - Environmental Systems Protection - Water Quality Support Manhattan: 4 Samples

0005AE

1.00
JB
__________________
__________________

Chloride, Iron, Copper, Manganese, Hardness Test Sample; 6 samples annually

POP Begin: 05-01-2026 POP End: 04-30-2027 PRINCIPAL NAICS CODE: 541380 - Testing Laboratories and Services PRODUCT/SERVICE CODE: F103 - Environmental Systems Protection - Water Quality Support

1.00
YR
__________________
__________________

Automated Monitoring of Incoming Potable

POP Begin: 05-01-2026 POP End: 04-30-2027 PRINCIPAL NAICS CODE: 541380 - Testing Laboratories and Services

As required by VHA Directive 1061 - incoming water pressure, temperature, pH, dissolved solids, and oxidant residual

0006AA

12.00
MO
__________________
__________________

Automated Monitoring of Manhattan - Building 1

POP Begin: 05-01-2026 POP End: 04-30-2027

0006AB

12.00
MO
__________________
__________________

Automated Monitoring of Manhattan - Building 6

POP Begin: 05-01-2026 POP End: 04-30-2027

0006AC

12.00
MO
__________________
__________________

Automated Monitoring of Brooklyn - Building 1

POP Begin: 05-01-2026 POP End: 04-30-2027

0006AD

12.00
MO
__________________
__________________

Automated Monitoring of St. Albans - Main Pumphouse

POP Begin: 05-01-2026 POP End: 04-30-2027

0006AE

12.00
MO
__________________
__________________

Automated Monitoring of St. Albans - Baisley Boulevard

POP Begin: 05-01-2026 POP End: 04-30-2027

1.00
YR
__________________
__________________

Operation and Maintenance of Monochloramine Domestic Water Treatment System

POP Begin: 05-01-2026 POP End: 04-30-2027 PRINCIPAL NAICS CODE: 541380 - Testing Laboratories and Services

Base period Includes provision and installation.

0007AA

12.00
MO
__________________
__________________

Manhattan, Building 1, Ground Floor South Tank Room

POP Begin: 05-01-2026 POP End: 04-30-2027

0007AB

12.00
MO
__________________
__________________

Manhattan, Building 6, Clinical Addition Mechanical Room

POP Begin: 05-01-2026 POP End: 04-30-2027

0007AC

12.00
MO
__________________
__________________

Brooklyn, Building 1, Basement North Mechanical Room

POP Begin: 05-01-2026 POP End: 04-30-2027

0007AD

12.00
MO
__________________
__________________

St. Albans Main Pumphouse

POP Begin: 05-01-2026 POP End: 04-30-2027

0007AE

12.00
MO
__________________
__________________

St Albans, Building 89, Basement

POP Begin: 05-01-2026 POP End: 04-30-2027

0007AF

12.00
MO
__________________
__________________

St Albans, Building 86, Basement

POP Begin: 05-01-2026 POP End: 04-30-2027

0007AG

12.00
MO
__________________
__________________

St Albans, Building 87, Basement

POP Begin: 05-01-2026 POP End: 04-30-2027

1.00
YR
__________________
__________________

Cleaning and Disinfecting of Ice Machines and Retherm Units

POP Begin: 05-01-2026 POP End: 04-30-2027

0008AA

4.00
QTR
__________________
__________________

Quarterly Cleaning and Disinfecting of Ice Machines in Manhattan

POP Begin: 05-01-2026 POP End: 04-30-2027

0008AB

4.00
QTR
__________________
__________________

Quarterly Cleaning and Disinfecting of Ice Machines in Brooklyn

POP Begin: 05-01-2026 POP End: 04-30-2027

0008AC

4.00
QTR
__________________
__________________

Quarterly Cleaning and Disinfecting of Ice Machines in St. Albans

POP Begin: 05-01-2026 POP End: 04-30-2027

0008AD

4.00
QTR
__________________
__________________

Quarterly Maintenance, Cleaning, and Disinfecting of Retherm Units in Manhattan

POP Begin: 05-01-2026 POP End: 04-30-2027

0008AE

4.00
QTR
__________________
__________________

Quarterly Maintenance, Cleaning, and Disinfecting of Retherm Units in Brooklyn

POP Begin: 05-01-2026 POP End: 04-30-2027

0008AF

4.00
QTR
__________________
__________________

Quarterly Maintenance, Cleaning, and Disinfecting of Retherm Units in St. Albans

POP Begin: 05-01-2026 POP End: 04-30-2027

1.00
YR
__________________
__________________

Laundry Wastewater Testing

POP Begin: 05-01-2026 POP End: 04-30-2027

0009AA

12.00
MO
__________________
__________________

Sampling for pH: Collect and analyze 4 grab samples, at least one hour apart

POP Begin: 05-01-2026 POP End: 04-30-2027

0009AB

2.00
JB
__________________
__________________

Sampling for Metals: (cadmium, chromium, copper, lead, mercury, molybdenum, nickel, silver and zinc) – Collect and analyze one composite sample per day for 4 days)

POP Begin: 05-01-2026 POP End: 04-30-2027

0009AC

2.00
JB
__________________
__________________

Sampling for Cyanide: Collect 4 grab samples per day, at least 1 hour apart for 4 days. The laboratory shall composite each day’s grab samples and analyze the composite sample for each of the 4 sampling days.

Contract Period: Base POP Begin: 05-01-2026 POP End: 04-30-2027

0009AD

2.00
JB
__________________
__________________

Sampling for Non–Polar Material: Collect 4 grab samples per day, at least 1 hour apart for 4 days.

POP Begin: 05-01-2026 POP End: 04-30-2027

1.00
YR
__________________
__________________

Manhattan Campus: Utility Water Treatment (Cooling Tower Systems)

POP Begin: 05-01-2026 POP End: 04-30-2027

0010AA

14.00
JB
__________________
__________________

Manhattan Campus: Cooling Tower Water Treatment and Testing

POP Begin: 05-01-2026 POP End: 04-30-2027 PRINCIPAL NAICS CODE: 541380 - Testing Laboratories and Services

Twice per month during the cooling season, designated as April 1 through October 31 of each year

0010AB

4.00
JB
__________________
__________________

Manhattan Campus: Cooling Tower Bacterial Water Quality Testing for Legionella

POP Begin: 05-01-2026 POP End: 04-30-2027 PRINCIPAL NAICS CODE: 541380 - Testing Laboratories and Services

Once at seasonal system startup, then every two months during cooling season

0010AC

4.00
JB
__________________
__________________

Manhattan Campus: Cooling Tower Bacterial Water Quality Testing for Heterotrophic Plate Count (HPC) Bacteria

POP Begin: 05-01-2026 POP End: 04-30-2027 PRINCIPAL NAICS CODE: 541380 - Testing Laboratories and Services

0010AD

12.00
MO
__________________
__________________

Manhattan Campus: Biological control testing: total count on the towers and the main chill loops

POP Begin: 05-01-2026 POP End: 04-30-2027

0010AE

4.00
QTR
__________________
__________________

Manhattan Campus: Anaerobic bacteria tests on the main chill system

POP Begin: 05-01-2026 POP End: 04-30-2027

0010AF

14.00
JB
__________________
__________________

Manhattan Campus: Routine monitoring of Main chilled water loop

POP Begin: 05-01-2026 POP End: 04-30-2027 PRINCIPAL NAICS CODE: 541380 - Testing Laboratories and Services

Twice per month during the cooling season, designated as April 1 through October 31 of each year.

0010AG

3.00
JB
__________________
__________________

Manhattan Campus: Cooling Tower basins vacuum cleaning

POP Begin: 05-01-2026 POP End: 04-30-2027 PRINCIPAL NAICS CODE: 541380 - Testing Laboratories and Services

Every three months during operation

0010AH

2.00
JB
__________________
__________________

Manhattan Campus: Cooling Towers Clean and Sterilize

POP Begin: 05-01-2026 POP End: 04-30-2027 PRINCIPAL NAICS CODE: 541380 - Testing Laboratories and Services

Twice a year

1.00
YR
__________________
__________________

Brooklyn Campus: Utility Water Treatment (Cooling Tower and Boiler Systems)

POP Begin: 05-01-2026 POP End: 04-30-2027

0011AA

14.00
JB
__________________
__________________

Brooklyn Campus: Cooling Tower Water Treatment and Testing

POP Begin: 05-01-2026 POP End: 04-30-2027 PRINCIPAL NAICS CODE: 541380 - Testing Laboratories and Services

0011AB

4.00
JB
__________________
__________________

Brooklyn Campus: Cooling Tower Bacterial Water Quality Testing for Legionella

POP Begin: 05-01-2026 POP End: 04-30-2027 PRINCIPAL NAICS CODE: 541380 - Testing Laboratories and Services

0011AC

4.00
JB
__________________
__________________

Brooklyn Campus: Cooling Tower Bacterial Water Quality Testing for Heterotrophic Plate Count (HPC) Bacteria

POP Begin: 05-01-2026 POP End: 04-30-2027 PRINCIPAL NAICS CODE: 541380 - Testing Laboratories and Services

0011AD

12.00
MO
__________________
__________________

Brooklyn Campus: Biological control testing: total count on the towers and the main chill loops

POP Begin: 05-01-2026 POP End: 04-30-2027

0011AE

4.00
QTR
__________________
__________________

Brooklyn Campus: Anaerobic bacteria tests on the main chill system

POP Begin: 05-01-2026 POP End: 04-30-2027

0011AF

14.00
JB
__________________
__________________

Brooklyn Campus: Routine monitoring of Main/OPC chilled water loop

POP Begin: 05-01-2026 POP End: 04-30-2027 PRINCIPAL NAICS CODE: 541380 - Testing Laboratories and Services

0011AG

6.00
MO
__________________
__________________

Brooklyn Campus: Routine monitoring of other closed systems

POP Begin: 05-01-2026 POP End: 04-30-2027 PRINCIPAL NAICS CODE: 541380 - Testing Laboratories and Services

Other closed systems will be tested monthly until the proper residual is maintained and quarterly thereafter. Use the quarterly line number when this metric is met (reference Appendix B.4)

0011AH

3.00
QTR
__________________
__________________

Brooklyn Campus: Routine monitoring of other closed systems

POP Begin: 05-01-2026 POP End: 04-30-2027 PRINCIPAL NAICS CODE: 541380 - Testing Laboratories and Services

Use this line item when the proper residual is maintained (reference Appendix B.4)

0011AJ

3.00
JB
__________________
__________________

Brooklyn Campus: Cooling Tower basins vacuum cleaning

POP Begin: 05-01-2026 POP End: 04-30-2027 PRINCIPAL NAICS CODE: 541380 - Testing Laboratories and Services

0011AK

2.00
JB
__________________
__________________

Brooklyn Campus: Cooling Towers Clean and Sterilize

POP Begin: 05-01-2026 POP End: 04-30-2027 PRINCIPAL NAICS CODE: 541380 - Testing Laboratories and Services

0011AL

24.00
JB
__________________
__________________

Brooklyn Campus: Boiler Water Treatment and Testing

POP Begin: 05-01-2026 POP End: 04-30-2027 PRINCIPAL NAICS CODE: 541380 - Testing Laboratories and Services

Twice per month

1.00
YR
__________________
__________________

St Albans Campus: Utility Water Treatment (Cooling Tower and Boiler Systems)

POP Begin: 05-01-2026 POP End: 04-30-2027

0012AA

24.00
JB
__________________
__________________

St Albans Campus: Boiler Water Treatment and Testing

POP Begin: 05-01-2026 POP End: 04-30-2027 PRINCIPAL NAICS CODE: 541380 - Testing Laboratories and Services

1.00
YR
__________________
__________________

Chemical Delivery & Storage

POP Begin: 05-01-2026 POP End: 04-30-2027 PRINCIPAL NAICS CODE: 541380 - Testing Laboratories and Services

Provide a separate cost estimate for the year that identifies each supply item by line, with estimated quantity for one year of use, the unit price, and the calculated amount on that supply line (i.e. Supply X, 5 Gallons, $10.00 per gallon, $50.00 total)

1.00
YR
__________________
__________________

Dental Waterline Testing Contract Period: Option 1 POP Begin: 05-01-2027 POP End: 04-30-2028

1001AA

4.00
QTR
__________________
__________________

Quarterly Testing: Manhattan Campus

POP Begin: 05-01-2027 POP End: 04-30-2028 PRINCIPAL NAICS CODE: 541380 - Testing Laboratories and Services PRODUCT/SERVICE CODE: F103 - Environmental Systems Protection - Water Quality Support Dental Chairs: 23 + 1 portable unit

1001AB

4.00
QTR
__________________
__________________

Quarterly Testing: Brooklyn Campus

POP Begin: 05-01-2027 POP End: 04-30-2028 PRINCIPAL NAICS CODE: 541380 - Testing Laboratories and Services PRODUCT/SERVICE CODE: F103 - Environmental Systems Protection - Water Quality Support Dental Chairs: 10 + 2 portable units

1001AC

4.00
QTR
__________________
__________________

Quarterly Testing: St Albans Campus

POP Begin: 05-01-2027 POP End: 04-30-2028 PRINCIPAL NAICS CODE: 541380 - Testing Laboratories and Services PRODUCT/SERVICE CODE: F103 - Environmental Systems Protection - Water Quality Support Dental Chairs: 6 + 2 portable units

1.00
YR
__________________
__________________

Legionella Water Testing

POP Begin: 05-01-2027 POP End: 04-30-2028

1002AA

4.00
QTR
__________________
__________________

Quarterly Testing: Manhattan Campus

Contract Period: Option 1 POP Begin: 05-01-2027 POP End: 04-30-2028 PRINCIPAL NAICS CODE: 541380 - Testing Laboratories and Services

1002AB

4.00
QTR
__________________
__________________

Quarterly Testing: Brooklyn Campus

Contract Period: Option 1 POP Begin: 05-01-2027 POP End: 04-30-2028 PRINCIPAL NAICS CODE: 541380 - Testing Laboratories and Services

1002AC

4.00
QTR
__________________
__________________

Quarterly Testing: St Albans Campus

Contract Period: Option 1 POP Begin: 05-01-2027 POP End: 04-30-2028 PRINCIPAL NAICS CODE: 541380 - Testing Laboratories and Services

1002AD

40.00
EA
__________________
__________________

Non-routine testing (legionella culture) * per CDC protocols.

Contract Period: Option 1 POP Begin: 05-01-2027 POP End: 04-30-2028 PRINCIPAL NAICS CODE: 541380 - Testing Laboratories and Services PRODUCT/SERVICE CODE: F103 - Environmental Systems Protection - Water Quality Support

1002AE

10.00
EA
__________________
__________________

Non-routine testing (legionella pneumophila serotyping or non-pneumophilia legionella identification)** per CDC protocols.

Contract Period: Option 1 POP Begin: 05-01-2027 POP End: 04-30-2028

1.00
YR
__________________
__________________

Potable Water Testing

POP Begin: 05-01-2027 POP End: 04-30-2028

1003AA

4.00
QTR
__________________
__________________

Manhattan Public Water Fountains (Copper, Lead, Total Coliform, e. coliform)

POP Begin: 05-01-2027 POP End: 04-30-2028 PRINCIPAL NAICS CODE: 541380 - Testing Laboratories and Services

1003AB

4.00
QTR
__________________
__________________

Brooklyn Public Water Fountains to be Designated (Copper, Lead, Total Coliform, e. coliform)

POP Begin: 05-01-2027 POP End: 04-30-2028 PRINCIPAL NAICS CODE: 541380 - Testing Laboratories and Services

1003AC

4.00
QTR
__________________
__________________

St. Albans Public Water Fountains to be Designated (Copper, Lead, Total Coliform, e. coliform)

POP Begin: 05-01-2027 POP End: 04-30-2028 PRINCIPAL NAICS CODE: 541380 - Testing Laboratories and Services

1003AD

4.00
QTR
__________________
__________________

Manhattan Daycare Fountains (Copper, Lead, Total Coliform, e. coliform)

POP Begin: 05-01-2027 POP End: 04-30-2028 PRINCIPAL NAICS CODE: 541380 - Testing Laboratories and Services

1003AE

4.00
QTR
__________________
__________________

Brooklyn Daycare Fountains (Copper, Lead, Total Coliform, e. coliform)

POP Begin: 05-01-2027 POP End: 04-30-2028 PRINCIPAL NAICS CODE: 541380 - Testing Laboratories and Services

1.00
YR
__________________
__________________

Water Fountain Quarterly Maintenance

POP Begin: 05-01-2027 POP End: 04-30-2028

1004AA

4.00
QTR
__________________
__________________

Manhattan Campus Quarterly Maintenance

POP Begin: 05-01-2027 POP End: 04-30-2028 PRINCIPAL NAICS CODE: 541380 - Testing Laboratories and Services

1004AB

4.00
QTR
__________________
__________________

Brooklyn Campus Quarterly Maintenance

POP Begin: 05-01-2027 POP End: 04-30-2028 PRINCIPAL NAICS CODE: 541380 - Testing Laboratories and Services

1004AC

4.00
QTR
__________________
__________________

St. Albans Campus Quarterly Maintenance

POP Begin: 05-01-2027 POP End: 04-30-2028 PRINCIPAL NAICS CODE: 541380 - Testing Laboratories and Services

1.00
YR
__________________
__________________

Sterile Processing Service Water Testing

POP Begin: 05-01-2027 POP End: 04-30-2028

1005AA

12.00
MO
__________________
__________________

Heterotrophic Plate Count (HPC) Bacteria Test Sample; 10 samples per month

POP Begin: 05-01-2027 POP End: 04-30-2028 PRINCIPAL NAICS CODE: 541380 - Testing Laboratories and Services PRODUCT/SERVICE CODE: F103 - Environmental Systems Protection - Water Quality Support

1005AB

12.00
MO
__________________
__________________

pH Test Sample; 4 samples per month

POP Begin: 05-01-2027 POP End: 04-30-2028 PRINCIPAL NAICS CODE: 541380 - Testing Laboratories and Services PRODUCT/SERVICE CODE: F103 - Environmental Systems Protection - Water Quality Support

1005AC

1.00
JB
__________________
__________________

Total Organic Carbon (TOC) Test Sample; 10 samples annually

POP Begin: 05-01-2027 POP End: 04-30-2028 PRINCIPAL NAICS CODE: 541380 - Testing Laboratories and Services PRODUCT/SERVICE CODE: F103 - Environmental Systems Protection - Water Quality Support

1005AD

12.00
MO
__________________
__________________

Endotoxins Test Sample; 6 samples monthly

POP Begin: 05-01-2027 POP End: 04-30-2028 PRINCIPAL NAICS CODE: 541380 - Testing Laboratories and Services PRODUCT/SERVICE CODE: F103 - Environmental Systems Protection - Water Quality Support

1005AE

1.00
JB
__________________
__________________

Chloride, Iron, Copper, Manganese, Hardness Test Sample; 6 samples annually

POP Begin: 05-01-2027 POP End: 04-30-2028 PRINCIPAL NAICS CODE: 541380 - Testing Laboratories and Services PRODUCT/SERVICE CODE: F103 - Environmental Systems Protection - Water Quality Support

1.00
YR
__________________
__________________

Automated Monitoring of Incoming Potable

POP Begin: 05-01-2027 POP End: 04-30-2028 PRINCIPAL NAICS CODE: 541380 - Testing Laboratories and Services

As required by VHA Directive 1061 - incoming water pressure, temperature, pH, dissolved solids, and oxidant residual

1006AA

12.00
MO
__________________
__________________

Automated Monitoring of Manhattan - Building 1

POP Begin: 05-01-2027 POP End: 04-30-2028

1006AB

12.00
MO
__________________
__________________

Automated Monitoring of Manhattan - Building 6

POP Begin: 05-01-2027 POP End: 04-30-2028

1006AC

12.00
MO
__________________
__________________

Automated Monitoring of Brooklyn - Building 1

POP Begin: 05-01-2027 POP End: 04-30-2028

1006AD

12.00
MO
__________________
__________________

Automated Monitoring of St. Albans - Main Pumphouse

POP Begin: 05-01-2027 POP End: 04-30-2028

1006AE

12.00
MO
__________________
__________________

Automated Monitoring of St. Albans - Baisley Boulevard

POP Begin: 05-01-2027 POP End: 04-30-2028

1.00
YR
__________________
__________________

Operation and Maintenance of Monochloramine Domestic Water Treatment System

POP Begin: 05-01-2027 POP End: 04-30-2028 PRINCIPAL NAICS CODE: 541380 - Testing Laboratories and Services

1007AA

12.00
MO
__________________
__________________

Manhattan, Building 1, Ground Floor South Tank Room

POP Begin: 05-01-2027 POP End: 04-30-2028

1007AB

12.00
MO
__________________
__________________

Manhattan, Building 6, Clinical Addition Mechanical Room

POP Begin: 05-01-2027 POP End: 04-30-2028

1007AC

12.00
MO
__________________
__________________

Brooklyn, Building 1, Basement North Mechanical Room

POP Begin: 05-01-2027 POP End: 04-30-2028

1007AD

12.00
MO
__________________
__________________

St. Albans Main Pumphouse

POP Begin: 05-01-2027 POP End: 04-30-2028

1007AE

12.00
MO
__________________
__________________

St Albans, Building 89, Basement

POP Begin: 05-01-2027 POP End: 04-30-2028

1007AF

12.00
MO
__________________
__________________

St Albans, Building 86, Basement

POP Begin: 05-01-2027 POP End: 04-30-2028

1007AG

12.00
YR
__________________
__________________

St Albans, Building 87, Basement

POP Begin: 05-01-2027 POP End: 04-30-2028

1.00
YR
__________________
__________________

Cleaning and Disinfecting of Ice Machines and Retherm Units

POP Begin: 05-01-2027 POP End: 04-30-2028

1008AA

4.00
QTR
__________________
__________________

Quarterly Cleaning and Disinfecting of Ice Machines in Manhattan

POP Begin: 05-01-2027 POP End: 04-30-2028

1008AB

4.00
QTR
__________________
__________________

Quarterly Cleaning and Disinfecting of Ice Machines in Brooklyn

POP Begin: 05-01-2027 POP End: 04-30-2028

1008AC

4.00
QTR
__________________
__________________

Quarterly Cleaning and Disinfecting of Ice Machines in St. Albans

POP Begin: 05-01-2027 POP End: 04-30-2028

1008AD

4.00
QTR
__________________
__________________

Quarterly Maintenance, Cleaning, and Disinfecting of Retherm Units in Manhattan

POP Begin: 05-01-2027 POP End: 04-30-2028

1008AE

4.00
QTR
__________________
__________________

Quarterly Maintenance, Cleaning, and Disinfecting of Retherm Units in Brooklyn

POP Begin: 05-01-2027 POP End: 04-30-2028

1008AF

4.00
QTR
__________________
__________________

Quarterly Maintenance, Cleaning, and Disinfecting of Retherm Units in St. Albans

POP Begin: 05-01-2027 POP End: 04-30-2028

1.00
YR
__________________
__________________

Laundry Wastewater Testing

POP Begin: 05-01-2027 POP End: 04-30-2028

1009AA

12.00
MO
__________________
__________________

Sampling for pH: Collect and analyze 4 grab samples, at least one hour apart

POP Begin: 05-01-2027 POP End: 04-30-2028

1009AB

2.00
JB
__________________
__________________

Sampling for Metals: (cadmium, chromium, copper, lead, mercury, molybdenum, nickel, silver and zinc) – Collect and analyze one composite sample per day for 4 days)

POP Begin: 05-01-2027 POP End: 04-30-2028

1009AC

2.00
JB
__________________
__________________

Sampling for Cyanide: Collect 4 grab samples per day, at least 1 hour apart for 4 composite sample for each of the 4 sampling days.

Contract Period: Option 1 POP Begin: 05-01-2027 POP End: 04-30-2028

1009AD

2.00
JB
__________________
__________________

Sampling for Non–Polar Material: Collect 4 grab samples per day, at least 1 hour apart for 4 days.

POP Begin: 05-01-2027 POP End: 04-30-2028

1.00
YR
__________________
__________________

Manhattan Campus: Utility Water Treatment (Cooling Tower Systems)

POP Begin: 05-01-2027 POP End: 04-30-2028

1010AA

14.00
JB
__________________
__________________

Manhattan Campus: Cooling Tower Water Treatment and Testing

POP Begin: 05-01-2027 POP End: 04-30-2028 PRINCIPAL NAICS CODE: 541380 - Testing Laboratories and Services

1010AB

4.00
JB
__________________
__________________

Manhattan Campus: Cooling Tower Bacterial Water Quality Testing for Legionella

POP Begin: 05-01-2027 POP End: 04-30-2028 PRINCIPAL NAICS CODE: 541380 - Testing Laboratories and Services

1010AC

4.00
JB
__________________
__________________

Manhattan Campus: Cooling Tower Bacterial Water Quality Testing for Heterotrophic Plate Count (HPC) Bacteria

POP Begin: 05-01-2027 POP End: 04-30-2028 PRINCIPAL NAICS CODE: 541380 - Testing Laboratories and Services

1010AD

12.00
MO
__________________
__________________

Manhattan Campus: Biological control testing: total count on the towers and the main chill loops

POP Begin: 05-01-2027 POP End: 04-30-2028

1010AE

4.00
QTR
__________________
__________________

Manhattan Campus: Anaerobic bacteria tests on the main chill system

POP Begin: 05-01-2027 POP End: 04-30-2028

1010AF

14.00
YR
__________________
__________________

Manhattan Campus: Routine monitoring of Main chilled water loop

POP Begin: 05-01-2027 POP End: 04-30-2028 PRINCIPAL NAICS CODE: 541380 - Testing Laboratories and Services

1010AG

3.00
JB
__________________
__________________

Manhattan Campus: Cooling Tower basins vacuum cleaning

POP Begin: 05-01-2027 POP End: 04-30-2028 PRINCIPAL NAICS CODE: 541380 - Testing Laboratories and Services

1010AH

2.00
JB
__________________
__________________

Manhattan Campus: Cooling Towers Clean and Sterilize

POP Begin: 05-01-2027 POP End: 04-30-2028 PRINCIPAL NAICS CODE: 541380 - Testing Laboratories and Services

1.00
YR
__________________
__________________

Brooklyn Campus: Utility Water Treatment (Cooling Tower and Boiler Systems)

POP Begin: 05-01-2027 POP End: 04-30-2028

1011AA

14.00
JB
__________________
__________________

Brooklyn Campus: Cooling Tower Water Treatment and Testing

POP Begin: 05-01-2027 POP End: 04-30-2028 PRINCIPAL NAICS CODE: 541380 - Testing Laboratories and Services

1011AB

4.00
JB
__________________
__________________

Brooklyn Campus: Cooling Tower Bacterial Water Quality Testing for Legionella

POP Begin: 05-01-2027 POP End: 04-30-2028 PRINCIPAL NAICS CODE: 541380 - Testing Laboratories and Services

1011AC

4.00
JB
__________________
__________________

Brooklyn Campus: Cooling Tower Bacterial Water Quality Testing for Heterotrophic Plate Count (HPC) Bacteria

POP Begin: 05-01-2027 POP End: 04-30-2028 PRINCIPAL NAICS CODE: 541380 - Testing Laboratories and Services

1011AD

12.00
MO
__________________
__________________

Brooklyn Campus: Biological control testing: total count on the towers and the main chill loops

POP Begin: 05-01-2027 POP End: 04-30-2028

1011AE

4.00
QTR
__________________
__________________

Brooklyn Campus: Anaerobic bacteria tests on the main chill system

POP Begin: 05-01-2027 POP End: 04-30-2028

1011AF

14.00
YR
__________________
__________________

Brooklyn Campus: Routine monitoring of Main/OPC chilled water loop

POP Begin: 05-01-2027 POP End: 04-30-2028 PRINCIPAL NAICS CODE: 541380 - Testing Laboratories and Services

1011AG

6.00
MO
__________________
__________________

Brooklyn Campus: Routine monitoring of other closed systems

POP Begin: 05-01-2027 POP End: 04-30-2028 PRINCIPAL NAICS CODE: 541380 - Testing Laboratories and Services

Other closed systems will be tested monthly until the proper residual is maintained and quarterly thereafter. Use the quarterly line number when this metric is met (reference Appendix B.4)

1011AH

3.00
QTR
__________________
__________________

Brooklyn Campus: Routine monitoring of other closed systems

POP Begin: 05-01-2027 POP End: 04-30-2028 PRINCIPAL NAICS CODE: 541380 - Testing Laboratories and Services

1011AJ

3.00
JB
__________________
__________________

Brooklyn Campus: Cooling Tower basins vacuum cleaning

POP Begin: 05-01-2027 POP End: 04-30-2028 PRINCIPAL NAICS CODE: 541380 - Testing Laboratories and Services

1011AK

2.00
JB
__________________
__________________

Brooklyn Campus: Cooling Towers Clean and Sterilize

POP Begin: 05-01-2027 POP End: 04-30-2028 PRINCIPAL NAICS CODE: 541380 - Testing Laboratories and Services

1011AL

24.00
JB
__________________
__________________

Brooklyn Campus: Boiler Water Treatment and Testing

POP Begin: 05-01-2027 POP End: 04-30-2028 PRINCIPAL NAICS CODE: 541380 - Testing Laboratories and Services

1.00
YR
__________________
__________________

St Albans Campus: Utility Water Treatment (Cooling Tower and Boiler Systems)

POP Begin: 05-01-2027 POP End: 04-30-2028

1012AA

24.00
JB
__________________
__________________

St Albans Campus: Boiler Water Treatment and Testing

POP Begin: 05-01-2027 POP End: 04-30-2028 PRINCIPAL NAICS CODE: 541380 - Testing Laboratories and Services

1.00
YR
__________________
__________________

Chemical Delivery & Storage

POP Begin: 05-01-2027 POP End: 04-30-2028 PRINCIPAL NAICS CODE: 541380 - Testing Laboratories and Services

Provide a separate cost estimate for the year that identifies each supply item by line, with estimated quantity for one year of use, the unit price, and the calculated amount on that supply line (i.e. Supply X, 5 Gallons, $10.00 per gallon, $50.00 total)

1.00
YR
__________________
__________________

Dental Waterline Testing Contract Period: Option 2 POP Begin: 05-01-2028 POP End: 04-30-2029

2001AA

4.00
QTR
__________________
__________________

Quarterly Testing: Manhattan Campus

POP Begin: 05-01-2028 POP End: 04-30-2029 PRINCIPAL NAICS CODE: 541380 - Testing Laboratories and Services PRODUCT/SERVICE CODE: F103 - Environmental Systems Protection - Water Quality Support Dental Chairs: 23 + 1 portable unit

2001AB

4.00
QTR
__________________
__________________

Quarterly Testing: Brooklyn Campus

POP Begin: 05-01-2028 POP End: 04-30-2029 PRINCIPAL NAICS CODE: 541380 - Testing Laboratories and Services PRODUCT/SERVICE CODE: F103 - Environmental Systems Protection - Water Quality Support Dental Chairs: 10 + 2 portable units

2001AC

4.00
QTR
__________________
__________________

Quarterly Testing: St Albans Campus

POP Begin: 05-01-2028 POP End: 04-30-2029 PRINCIPAL NAICS CODE: 541380 - Testing Laboratories and Services PRODUCT/SERVICE CODE: F103 - Environmental Systems Protection - Water Quality Support Dental Chairs: 6 + 2 portable units

1.00
YR
__________________
__________________

Legionella Water Testing

POP Begin: 05-01-2028 POP End: 04-30-2029

2002AA

4.00
QTR
__________________
__________________

Quarterly Testing: Manhattan Campus

Contract Period: Option 2 POP Begin: 05-01-2028 POP End: 04-30-2029 PRINCIPAL NAICS CODE: 541380 - Testing Laboratories and Services

2002AB

4.00
QTR
__________________
__________________

Quarterly Testing: Brooklyn Campus

Contract Period: Option 2 POP Begin: 05-01-2028 POP End: 04-30-2029 PRINCIPAL NAICS CODE: 541380 - Testing Laboratories and Services

2002AC

4.00
QTR
__________________
__________________

Quarterly Testing: St Albans Campus

Contract Period: Option 2 POP Begin: 05-01-2028 POP End: 04-30-2029 PRINCIPAL NAICS CODE: 541380 - Testing Laboratories and Services

2002AD

40.00
EA
__________________
__________________

Non-routine testing (legionella culture) * per CDC protocols.

Contract Period: Option 2 POP Begin: 05-01-2028 POP End: 04-30-2029 PRINCIPAL NAICS CODE: 541380 - Testing Laboratories and Services PRODUCT/SERVICE CODE: F103 - Environmental Systems Protection - Water Quality Support

2002AE

10.00
EA
__________________
__________________

Non-routine testing (legionella pneumophila serotyping or non-pneumophilia legionella identification)** per CDC protocols.

Contract Period: Option 2 POP Begin: 05-01-2028 POP End: 04-30-2029

1.00
YR
__________________
__________________

Potable Water Testing

POP Begin: 05-01-2028 POP End: 04-30-2029

2003AA

4.00
QTR
__________________
__________________

Manhattan Public Water Fountains (Copper, Lead, Total Coliform, e. coliform)

POP Begin: 05-01-2028 POP End: 04-30-2029 PRINCIPAL NAICS CODE: 541380 - Testing Laboratories and Services

2003AB

4.00
QTR
__________________
__________________

Brooklyn Public Water Fountains to be Designated (Copper, Lead, Total Coliform, e. coliform)

POP Begin: 05-01-2028 POP End: 04-30-2029 PRINCIPAL NAICS CODE: 541380 - Testing Laboratories and Services

2003AC

4.00
QTR
__________________
__________________

St. Albans Public Water Fountains to be Designated (Copper, Lead, Total Coliform, e. coliform)

POP Begin: 05-01-2028 POP End: 04-30-2029 PRINCIPAL NAICS CODE: 541380 - Testing Laboratories and Services

2003AD

4.00
QTR
__________________
__________________

Manhattan Daycare Fountains (Copper, Lead, Total Coliform, e. coliform)

POP Begin: 05-01-2028 POP End: 04-30-2029 PRINCIPAL NAICS CODE: 541380 - Testing Laboratories and Services

2003AE

4.00
QTR
__________________
__________________

Brooklyn Daycare Fountains (Copper, Lead, Total Coliform, e. coliform)

POP Begin: 05-01-2028 POP End: 04-30-2029 PRINCIPAL NAICS CODE: 541380 - Testing Laboratories and Services

1.00
YR
__________________
__________________

Water Fountain Quarterly Maintenance

POP Begin: 05-01-2028 POP End: 04-30-2029

2004AA

4.00
QTR
__________________
__________________

Manhattan Campus Quarterly Maintenance

POP Begin: 05-01-2028 POP End: 04-30-2029 PRINCIPAL NAICS CODE: 541380 - Testing Laboratories and Services

2004AB

4.00
QTR
__________________
__________________

Brooklyn Campus Quarterly Maintenance

POP Begin: 05-01-2028 POP End: 04-30-2029 PRINCIPAL NAICS CODE: 541380 - Testing Laboratories and Services

2004AC

4.00
QTR
__________________
__________________

St. Albans Campus Quarterly Maintenance

POP Begin: 05-01-2028 POP End: 04-30-2029 PRINCIPAL NAICS CODE: 541380 - Testing Laboratories and Services

1.00
YR
__________________
__________________

Sterile Processing Service Water Testing

POP Begin: 05-01-2028 POP End: 04-30-2029

2005AA

12.00
MO
__________________
__________________

Heterotrophic Plate Count (HPC) Bacteria Test Sample; 10 samples per month

POP Begin: 05-01-2028 POP End: 04-30-2029 PRINCIPAL NAICS CODE: 541380 - Testing Laboratories and Services PRODUCT/SERVICE CODE: F103 - Environmental Systems Protection - Water Quality Support

2005AB

12.00
MO
__________________
__________________

pH Test Sample; 4 samples per month

POP Begin: 05-01-2028 POP End: 04-30-2029 PRINCIPAL NAICS CODE: 541380 - Testing Laboratories and Services PRODUCT/SERVICE CODE: F103 - Environmental Systems Protection - Water Quality Support

2005AC

1.00
JB
__________________
__________________

Total Organic Carbon (TOC) Test Sample; 10 samples annually

POP Begin: 05-01-2028 POP End: 04-30-2029 PRINCIPAL NAICS CODE: 541380 - Testing Laboratories and Services PRODUCT/SERVICE CODE: F103 - Environmental Systems Protection - Water Quality Support

2005AD

12.00
MO
__________________
__________________

Endotoxins Test Sample; 6 samples monthly

POP Begin: 05-01-2028 POP End: 04-30-2029 PRINCIPAL NAICS CODE: 541380 - Testing Laboratories and Services PRODUCT/SERVICE CODE: F103 - Environmental Systems Protection - Water Quality Support

2005AE

1.00
JB
__________________
__________________

Chloride, Iron, Copper, Manganese, Hardness Test Sample; 6 samples annually

POP Begin: 05-01-2028 POP End: 04-30-2029 PRINCIPAL NAICS CODE: 541380 - Testing Laboratories and Services PRODUCT/SERVICE CODE: F103 - Environmental Systems Protection - Water Quality Support

1.00
YR
__________________
__________________

Automated Monitoring of Incoming Potable

POP Begin: 05-01-2028 POP End: 04-30-2029 PRINCIPAL NAICS CODE: 541380 - Testing Laboratories and Services

As required by VHA Directive 1061 - incoming water pressure, temperature, pH, dissolved solids, and oxidant residual

2006AA

12.00
MO
__________________
__________________

Automated Monitoring of Manhattan - Building 1

POP Begin: 05-01-2028 POP End: 04-30-2029

2006AB

12.00
MO
__________________
__________________

Automated Monitoring of Manhattan - Building 6

POP Begin: 05-01-2028 POP End: 04-30-2029

2006AC

12.00
MO
__________________
__________________

Automated Monitoring of Brooklyn - Building 1

POP Begin: 05-01-2028 POP End: 04-30-2029

2006AD

12.00
MO
__________________
__________________

Automated Monitoring of St. Albans - Main Pumphouse

POP Begin: 05-01-2028 POP End: 04-30-2029

2006AE

12.00
MO
__________________
__________________

Automated Monitoring of St. Albans - Baisley Boulevard

POP Begin: 05-01-2028 POP End: 04-30-2029

1.00
YR
__________________
__________________

Operation and Maintenance of Monochloramine Domestic Water Treatment System

POP Begin: 05-01-2028 POP End: 04-30-2029 PRINCIPAL NAICS CODE: 541380 - Testing Laboratories and Services

2007AA

12.00
MO
__________________
__________________

Manhattan, Building 1, Ground Floor South Tank Room

POP Begin: 05-01-2028 POP End: 04-30-2029

2007AB

12.00
MO
__________________
__________________

Manhattan, Building 6, Clinical Addition Mechanical Room

POP Begin: 05-01-2028 POP End: 04-30-2029

2007AC

12.00
MO
__________________
__________________

Brooklyn, Building 1, Basement North Mechanical Room

POP Begin: 05-01-2028 POP End: 04-30-2029

2007AD

12.00
MO
__________________
__________________

St. Albans Main Pumphouse

POP Begin: 05-01-2028 POP End: 04-30-2029

2007AE

12.00
MO
__________________
__________________

St Albans, Building 89, Basement

POP Begin: 05-01-2028 POP End: 04-30-2029

2007AF

12.00
MO
__________________
__________________

St Albans, Building 86, Basement

POP Begin: 05-01-2028 POP End: 04-30-2029

2007AG

12.00
YR
__________________
__________________

St Albans, Building 87, Basement

POP Begin: 05-01-2028 POP End: 04-30-2029

1.00
YR
__________________
__________________

Cleaning and Disinfecting of Ice Machines and Retherm Units

POP Begin: 05-01-2028 POP End: 04-30-2029

2008AA

4.00
QTR
__________________
__________________

Quarterly Cleaning and Disinfecting of Ice Machines in Manhattan

POP Begin: 05-01-2028 POP End: 04-30-2029

2008AB

4.00
QTR
__________________
__________________

Quarterly Cleaning and Disinfecting of Ice Machines in Brooklyn

POP Begin: 05-01-2028 POP End: 04-30-2029

2008AC

4.00
QTR
__________________
__________________

Quarterly Cleaning and Disinfecting of Ice Machines in St. Albans

POP Begin: 05-01-2028 POP End: 04-30-2029

2008AD

4.00
QTR
__________________
__________________

Quarterly Maintenance, Cleaning, and Disinfecting of Retherm Units in Manhattan

POP Begin: 05-01-2028 POP End: 04-30-2029

2008AE

4.00
QTR
__________________
__________________

Quarterly Maintenance, Cleaning, and Disinfecting of Retherm Units in Brooklyn

POP Begin: 05-01-2028 POP End: 04-30-2029

2008AF

4.00
QTR
__________________
__________________

Quarterly Maintenance, Cleaning, and Disinfecting of Retherm Units in St. Albans

POP Begin: 05-01-2028 POP End: 04-30-2029

1.00
YR
__________________
__________________

Laundry Wastewater Testing

POP Begin: 05-01-2028 POP End: 04-30-2029

2009AA

12.00
MO
__________________
__________________

Sampling for pH: Collect and analyze 4 grab samples, at least one hour apart

POP Begin: 05-01-2028 POP End: 04-30-2029

2009AB

2.00
JB
__________________
__________________

Sampling for Metals: (cadmium, chromium, copper, lead, mercury, molybdenum, nickel, silver and zinc) – Collect and analyze one composite sample per day for 4 days)

POP Begin: 05-01-2028 POP End: 04-30-2029

2009AC

2.00
JB
__________________
__________________

Sampling for Cyanide: Collect 4 grab samples per day, at least 1 hour apart for 4 composite sample for each of the 4 sampling days.

Contract Period: Option 2 POP Begin: 05-01-2028 POP End: 04-30-2029

2009AD

2.00
JB
__________________
__________________

Sampling for Non–Polar Material: Collect 4 grab samples per day, at least 1 hour apart for 4 days.

POP Begin: 05-01-2028 POP End: 04-30-2029

1.00
YR
__________________
__________________

Manhattan Campus: Utility Water Treatment (Cooling Tower Systems)

POP Begin: 05-01-2028 POP End: 04-30-2029

2010AA

14.00
JB
__________________
__________________

Manhattan Campus: Cooling Tower Water Treatment and Testing

POP Begin: 05-01-2028 POP End: 04-30-2029 PRINCIPAL NAICS CODE: 541380 - Testing Laboratories and Services

2010AB

4.00
JB
__________________
__________________

Manhattan Campus: Cooling Tower Bacterial Water Quality Testing for Legionella

POP Begin: 05-01-2028 POP End: 04-30-2029 PRINCIPAL NAICS CODE: 541380 - Testing Laboratories and Services

2010AC

4.00
JB
__________________
__________________

Manhattan Campus: Cooling Tower Bacterial Water Quality Testing for Heterotrophic Plate Count (HPC) Bacteria

POP Begin: 05-01-2028 POP End: 04-30-2029 PRINCIPAL NAICS CODE: 541380 - Testing Laboratories and Services

2010AD

12.00
MO
__________________
__________________

Manhattan Campus: Biological control testing: total count on the towers and the main chill loops

POP Begin: 05-01-2028 POP End: 04-30-2029

2010AE

4.00
QTR
__________________
__________________

Manhattan Campus: Anaerobic bacteria tests on the main chill system

POP Begin: 05-01-2028 POP End: 04-30-2029

2010AF

14.00
YR
__________________
__________________

Manhattan Campus: Routine monitoring of Main chilled water loop

POP Begin: 05-01-2028 POP End: 04-30-2029 PRINCIPAL NAICS CODE: 541380 - Testing Laboratories and Services

2010AG

3.00
JB
__________________
__________________

Manhattan Campus: Cooling Tower basins vacuum cleaning

POP Begin: 05-01-2028 POP End: 04-30-2029 PRINCIPAL NAICS CODE: 541380 - Testing Laboratories and Services

2010AH

2.00
JB
__________________
__________________

Manhattan Campus: Cooling Towers Clean and Sterilize

POP Begin: 05-01-2028 POP End: 04-30-2029 PRINCIPAL NAICS CODE: 541380 - Testing Laboratories and Services

1.00
YR
__________________
__________________

Brooklyn Campus: Utility Water Treatment (Cooling Tower and Boiler Systems)

POP Begin: 05-01-2028 POP End: 04-30-2029

2011AA

14.00
JB
__________________
__________________

Brooklyn Campus: Cooling Tower Water Treatment and Testing

POP Begin: 05-01-2028 POP End: 04-30-2029 PRINCIPAL NAICS CODE: 541380 - Testing Laboratories and Services

2011AB

4.00
JB
__________________
__________________

Brooklyn Campus: Cooling Tower Bacterial Water Quality Testing for Legionella

POP Begin: 05-01-2028 POP End: 04-30-2029 PRINCIPAL NAICS CODE: 541380 - Testing Laboratories and Services

2011AC

4.00
JB
__________________
__________________

Brooklyn Campus: Cooling Tower Bacterial Water Quality Testing for Heterotrophic Plate Count (HPC) Bacteria

POP Begin: 05-01-2028 POP End: 04-30-2029 PRINCIPAL NAICS CODE: 541380 - Testing Laboratories and Services

2011AD

12.00
MO
__________________
__________________

Brooklyn Campus: Biological control testing: total count on the towers and the main chill loops

POP Begin: 05-01-2028 POP End: 04-30-2029

2011AE

4.00
QTR
__________________
__________________

Brooklyn Campus: Anaerobic bacteria tests on the main chill system

POP Begin: 05-01-2028 POP End: 04-30-2029

2011AF

14.00
YR
__________________
__________________

Brooklyn Campus: Routine monitoring of Main/OPC chilled water loop

POP Begin: 05-01-2028 POP End: 04-30-2029 PRINCIPAL NAICS CODE: 541380 - Testing Laboratories and Services

2011AG

6.00
MO
__________________
__________________

Brooklyn Campus: Routine monitoring of other closed systems

POP Begin: 05-01-2028 POP End: 04-30-2029 PRINCIPAL NAICS CODE: 541380 - Testing Laboratories and Services

Other closed systems will be tested monthly until the proper residual is maintained and quarterly thereafter. Use the quarterly line number when this metric is met (reference Appendix B.4)

2011AH

3.00
QTR
__________________
__________________

Brooklyn Campus: Routine monitoring of other closed systems

POP Begin: 05-01-2028 POP End: 04-30-2029 PRINCIPAL NAICS CODE: 541380 - Testing Laboratories and Services

2011AJ

3.00
JB
__________________
__________________

Brookly…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .