About this file
This is an Amendment to a Previous Combined Solicitation providing responses to vendor questions and revisions to the scope of work for fire alarm service and upgrade contracts. The Department of Veterans Affairs Network Contracting Office is seeking maintenance, repair, safety inspections, and testing services for fire alarm systems at three locations: VA New York Harbor Healthcare System facilities in Manhattan (423 E. 23rd Street, New York, NY 10010), Brooklyn (800 Poly Place, Brooklyn, NY 11209), and St. Albans Community Living Center (179-00 Linden Boulevard, Jamaica, Queens, NY 11425). The solicitation is issued as an RFQ with responses due by April 10, 2026, at 3:00 PM Eastern Time. This procurement is set aside for Service-Disabled Veteran-Owned Small Businesses (SDVOSBs) and uses NAICS code 561621 with a $25.0 million small business size standard and FSC/PSC code J063. The base contract period runs from May 1, 2026, through April 30, 2027.
The amendment clarifies key scope requirements and addresses vendor inquiries. Deficiencies discovered after the initial 10-day inspection window will be covered under Section J. Repairs. Building 65 at St. Albans Community Living Center will be bypassed due to needed building repairs, and fire alarm inspection and testing will not be required for that building while it remains out of service, though testing may resume when the building is restored at an unknown date. Elevator recalls may be performed during normal operating hours. The inspection cycles in Section G.i have been revised to specify Quarterly inspections of supervisory signal devices and impact-delivered alarm devices, and Semi-Annual inspections of control equipment, initiating devices, notification appliances, power supplies, and test printers. Vendors are instructed to base quotes on quantities and information in the Statement of Work, which takes precedence over supplemental inspection report summaries provided for reference only.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C24226Q0336 0002.docx | DOCX document | |
| Inspection Report Summaries.pdf | ||
| 36C24226Q0336.docx | DOCX document | |
| Site Visit Info - Fire Alarm.pdf | ||
| Battery_Price_Schedule.pdf | ||
| NYH Battery Inventory.pdf | ||
| St Albans Equip. Inventory.pdf | ||
| Brooklyn Equip. Inventory List.pdf | ||
| Manhattan Equip. Inventory List.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Amendment to a Previous Combined Solicitation
Amendment to a Previous Combined Solicitation
| SUBJECT* |
| Fire Alarm Service and Upgrade | Base 4 |
GENERAL INFORMATION
| CONTRACTING OFFICE’S ZIP CODE* |
| 14215 |
| SOLICITATION NUMBER* |
| 36C24226Q0336 |
| RESPONSE DATE/TIME/ZONE |
| 04-10-2026 3:00pm EASTERN TIME, NEW YORK, USA |
| ARCHIVE |
| 90 DAYS AFTER THE RESPONSE DATE |
| RECOVERY ACT FUNDS |
| N |
| SET-ASIDE |
| SDVOSBC |
| PRODUCT SERVICE CODE* |
| J063 |
| NAICS CODE* |
| 561621 |
| CONTRACTING OFFICE ADDRESS |
| Department of Veterans Affairs |
Network Contracting Office (NCO) 2 3495 Bailey Avenue Building 3, 2nd floor Buffalo NY 14215
POINT OF CONTACT*
Contract Specialist Chris Weider Christopher.Weider@va.gov
PLACE OF PERFORMANCE
| ADDRESS |
| Department of Veterans Affairs |
New York Harbor Healthcare System
423 E. 23rd Street
New York NY
| POSTAL CODE |
| 10010 |
| COUNTRY |
| USA |
ADDITIONAL INFORMATION
AGENCY’S URL
URL DESCRIPTION
AGENCY CONTACT’S EMAIL ADDRESS
EMAIL DESCRIPTION
DESCRIPTION
a. The purpose of this amendment is to answer questions submitted by interested vendors.
b. The period for questions is now closed.
c. See questions and answers below:
a. Please clarify how deficiencies discovered after the initial 10-day window will be covered under this contract.
Any deficiency requiring repair that is discovered after the initial 10-day window will be covered under Section J. Repairs.
b. Can the previous annual inspection reports for these fire alarm systems be provided?
See attached inspection report summaries.
These summaries are provided as supplemental information and should not be used as a reference or basis for pricing. Quotes should be based on the quantities and information provided in the SOW. The information presented in the SOW should take precedence over any conflicting information discovered in the inspection report summaries.
Note, the discrepancy identified in the St Albans report is currently being addressed and is expected to be fully corrected prior to the start of this contract. The work required to correct the deficiency identified in the St Albans report summary is not included in this requirement.
c. For our awareness and clarity of the scope of work, can you explain why we are to bypass building 65 at the St. Albans CLC?
The Building 65 fire alarm system is down because of needed building repairs. System must be bypassed to allow for all alarms, troubles, etc. to be separated from the main fire alarm panel.
i. Does this mean we are not responsible for inspection and testing of devices in building 65 at the St. Albans CLC?
Fire alarm inspection and testing will not be required while the building is not in service. Fire alarm inspection and testing may be required when the building is restored (date unknown).
d. Are the elevator recalls done during normal operating hours or are they scheduled after hours?
Elevator recalls may be performed during normal operating hours
d. Scope of Work Section G.i. Inspection Cycles, Sub-sections 1 and 2 are hereby revised to the following:
1. Quarterly:
a. Supervisory Signal Devices: Testing of tamper switches, valve supervisory switches, and other supervisory devices.
b. Impact-Delivered Alarm Devices: Testing of devices like pressure switches that deliver alarms upon impact.
2. Semi-Annually:
a. Control Equipment: Visual inspection to ensure that the fire alarm control panel and any other control equipment are in proper condition.
b. Initiating Devices: Testing of manual pull stations, smoke detectors, heat detectors, and other initiating devices to ensure they are functioning correctly.
c. Notification Appliances: Testing of horns, bells, and other notification devices to ensure they are operational.
d. Power Supplies: Inspecting batteries and other power components to ensure they are properly charged and functional.
e. Test printers to ensure they remain operational.
See attached document: Inspection Report Summaries.