INDEX OF DRAWINGS.docx
DOCX document 23 KB Posted
- Attached to
- Z1DA-- 630A4-26-500 Replace ER AHU Brooklyn Campus Federal contract opportunity
- Solicitation number
- 36C24226B0011
About this file
This file is an Index of Drawings for Project No. 630A4-26-500, Replace ER AHU Brooklyn Campus VAMC. The document serves as a reference guide organizing 28 pages of construction drawings across four disciplines: Mechanical, Electrical, Plumbing, and Architectural. The Mechanical section includes 12 drawings covering mechanical rooms, HVAC schedules, part plans for various facility areas (Ground Floor, Emergency Room, and Eligibility sections), isolation room upgrade details, and supply/exhaust system riser diagrams. The Electrical section comprises 5 drawings detailing power zones A through D and electrical notes, schedules, and symbols. The Plumbing section contains 8 drawings covering Emergency Room as-built riser diagrams, plumbing zone layouts, and details and schedules. The Architectural section includes 3 drawings for basement floor, ground floor, and Emergency Room AHU plans.
The document includes a critical notice stating that all drawings are for reference only due to the potential for facility HVAC systems to change over time and equipment locations to become outdated. The General Contractor is explicitly required to conduct full site investigations and verify existing conditions before commencing any work, as the combination of old and new drawings may contain conflicting information regarding equipment locations and specifications. This comprehensive drawing index supports the 240-calendar-day performance period for the Emergency Room AHU replacement project at the Brooklyn Campus VAMC, which involves installing temporary HVAC capacity, demolishing existing equipment, and installing a new GOVERNAIR Model TL10-10048-E AHU with associated mechanical, electrical, and plumbing work.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| ER Plumbing plan.pdf | ||
| ER AHU Electrical DWGs.pdf | ||
| ER AHU Architectural plans.pdf | ||
| 36C24226B0011 0004.docx | DOCX document | |
| 36C24226B0011 0003.docx | DOCX document | |
| 36C24226B0011 0002.docx | DOCX document | |
| 36C24226B0011 0001.docx | DOCX document | |
| Wage Determination.txt | TXT text file | |
| FAR 52.225-2 Buy American Certification.pdf | ||
| Attachment A - ER HVAC DWGs.pdf | ||
| 630A4-26-500 Replace ER AHU Brooklyn Campus Master SPECS.pdf | ||
| 852.219-77 VA Notice of Limitations on Subcontracting.docx | DOCX document | |
| 36C24226B0011_1.docx | DOCX document | |
| NY Tax Exempt Form.pdf |
Show all 14
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Project No. 630A4-26-500 Replace ER AHU Brooklyn Campus VAMC
INDEX OF DRAWINGS
Please Note.
· Drawings are For Reference Only. Facility HVAC systems are subject to change over the years, and location might be outdated. GC to conduct full site investigations and to verify existing conditions before any work starts.
· The combination of old and new drawings may contain different information and equipment location or upgrade. It reflects certain details throughout the facility. Which becomes handy when it comes to construction.
| PAGES |
| DESCRIPTION |
| DRAWING NUMBER |
| 1 |
| MECHANICAL ROOM (BASEMENT NORTHEAST) |
| I- HI |
| 2 |
| MECHANICAL - SCHEDULES |
| M-501 |
| 3 |
| MECHANICAL - PART PLAN (GROUND FL, NORTHWEST) |
| M-403 |
| 3 |
| MECHANICAL - PART PLAN (GROUND FL, CORE AREA) |
| M-402 |
| 4 |
| MECHANICAL - PART PLAN (GROUND FL, SOUTHEAST) |
| I-H4 |
| 5 |
| MECHANICAL - PART PLAN A (ER, NORTHWEST) |
| M-401 |
| 6 |
| MECHANICAL - PART PLAN B (ER, CORE AREA) |
| M-402 |
| 7 |
| MECHANICAL - PART PLAN D (ELEGIBILITY, CORE AREA) |
| M-404 |
| 8 |
| MECHANICAL - SCHEDULES (duplicated) |
| M-501 |
| 9 |
| MECHANICAL - ER, ISOLUATION RM UPGRADE DETAILS |
| MH-002 |
| 10 |
| MECHANICAL - ER, ISOLUATION RM UPGRADE DETAILS |
| MH-101 |
| 11 |
| MECHANICAL - EXHAUST SYSTEM RAISER DIAGRAM |
| MH-501 |
| 12 |
| MECHANICAL - SUPPLY SYSTEM RAISER DIAGRAM |
| MH-502 |
ELECTRICAL
| 13 |
| POWER-ZONE A-MODEL |
| E-406 |
| 14 |
| POWER-ZONE B-MODEL |
| E-407 |
| 15 |
| POWER-ZONE C-MODEL |
| E-408 |
| 16 |
| POWER-ZONE D-MODEL |
| E-409 |
| 17 |
| ELECTRIC NOTES, SCHEDULES, SYMBOLS-MODEL |
| E-501 |
PLUMBING
| 18 |
| ER AS BUILT RAISER DIAGRAM |
| 19 |
| ER AS-BUILT P-1 |
| P-1 |
| 20 |
| ER P 401 |
| P-401 |
| 21 |
| PLUMBING-ZONE A-MODEL |
| P-401 |
| 22 |
| PLUMBING-ZONE B-MODEL |
| P-402 |
| 23 |
| PLUMBING-ZONE C-MODEL |
| P-403 |
| 24 |
| DETAILS AND SCHEDULES-MODEL |
| P-501 |
| 25 |
| SANITARY RISER-MODEL |
| P-502 |
ARCHITECTURAL
| 26 |
| ARCHITECTURAL PLAN BASEMENT FL |
| BASEMENT FL |
| 27 |
| ARCHITECTURAL PLAN GROUND FL |
| GROUND FL |
| 28 |
| ER AHU ARCHITECTURAL PLANS |