Y1DA--NRM-CONST Proj#632-22-900 Upgrade Boiler Plant
Solicitation number
36C24225R0045
Issued by

About this file

This is a Request for Proposal (RFP) for a Department of Veterans Affairs project to upgrade the boiler plant at the Northport VA Medical Center in Northport, New York. The solicitation is a 100% set-aside for Service-Disabled Veteran-Owned Small Businesses (SDVOSB) with a project value between $20-50 million and a completion time of 1,092 calendar days. The project involves demolishing and replacing the existing boiler plant equipment installed in 1968, which provides high-pressure steam and heating hot water for the main hospital and campus buildings.

Key project requirements include installing temporary steam-generating equipment, removing existing systems, constructing a new steam generation system with boilers, pumps, piping, and ancillary equipment, and renovating the boiler plant building. The project also involves integrating with an existing Combined Heat and Power Plant, improving employee service areas, and implementing comprehensive commissioning of systems including boilers, controls, HVAC, electrical, fire alarm, and security systems. The solicitation requires detailed technical capability, past performance, and schedule submissions. Proposals are due by 11:00am EST on July 9, 2025, with one mandatory site visit scheduled for June 16, 2025.

View the file

Other files

Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PROJECT # 632-22-900

Upgrade Existing Boiler Plant

Northport VA Medical Center

79 Middleville Rd, Northport, NY 11768

SPECIFICATIONS

BID DOCUMENTS

April 24, 2025

PREPARED BY

NORTHPORT VA MEDICAL CENTER

UPGRADE EXISTING BOILER PLANT

PROJECT NO. 632-22-900

06-01-24

TABLE OF CONTENTS

00 01 10 - 1

DEPARTMENT OF VETERANS AFFAIRS

VHA MASTER SPECIFICATIONS

TABLE OF CONTENTS

Section 00 01 10

SECTION NO DIVISION AND SECTION TITLES DATE

DIVISION 00 - SPECIAL SECTIONS

00 01 15 List of Drawing Sheets 05-20

DIVISION 01 - GENERAL REQUIREMENTS

01 00 00 General Requirements 11-21

01 32 00 Construction Documentation

01 32 16.13 Network Analysis Schedules – Large VISN 2 Construction

Project Design-Bid-Build

05-22

01 33 23 Shop Drawings, Product Data, and Samples 11-23

Submittal Register w/ Critical Submittals

01 35 26 Safety Requirements for Major Projects 05-24

01 42 19 Reference Standards 11-20

01 45 00 Quality Control 02-21

01 45 29 Testing Laboratory Services 11-18

01 45 35 Special Inspections 06-21

01 57 19 Temporary Environmental Controls 01-21

01 74 19 Construction Waste Management 04-22

01 81 13 Sustainable Construction Requirements 10-17

01 91 00 General Commissioning Requirements 04-22

DIVISION 02 – EXISTING CONDITIONS

02 21 13 Site Surveys 12-23

02 82 11 Traditional Asbestos Abatement 01-21

02 82 13.21 Asbestos Roofing Abatement 01-21

02 82 13.31 Asbestos Transite Abatement 01-21

02 83 33.13 Lead-Based Paint Removal and Disposal 01-21

DIVISION 03 – CONCRETE

03 30 53 (Short-Form) Cast-in-Place Concrete 01-21

DIVISION 04 – MASONRY

04 01 00 Maintenance of Masonry 01-21

04 05 13 Masonry Mortaring 10-17

04 05 16 Masonry Grouting 01-21

04 20 00 Unit Masonry 08-17

DIVISION 05 – METALS

05 12 00 Structural Steel Framing 11-18

PROJECT NO. 632-22-900

06-01-24

TABLE OF CONTENTS

00 01 10 - 2

SECTION NO DIVISION AND SECTION TITLES DATE

05 31 00 Steel Decking 01-21

05 50 00 Metal Fabrications 08-18

05 51 00 Metal Stairs 01-21

DIVISION 06 – WOOD, PLASTICS AND COMPOSITES

06 10 00 Rough Carpentry 10-17

DIVISION 07 - THERMAL AND MOISTURE PROTECTION

07 01 50.19 Preparation for Re-Roofing 01-21

07 21 13 Thermal Insulation 01-21

07 22 00 Roof and Deck Insulation 01-21

07 51 13.13 Cold-Applied Built-Up Asphalt Roofing 12-21

07 60 00 Flashing and Sheet Metal 01-21

07 71 00 Roof Specialties 01-21

07 72 00 Roof Accessories 01-21

07 81 00 Applied Fireproofing 07-23

07 84 00 Firestopping 01-21

07 92 00 Joint Sealants 04-22

DIVISION 08 - OPENINGS

08 11 13 Hollow Metal Doors and Frames 01-21

08 31 13 Access Doors and Frames 04-22

08 33 00 Coiling Doors and Grilles 01-21

08 41 13 Aluminum-Framed Entrances and Storefronts 01-21

08 71 00 Door Hardware 03-24

08 80 00 Glazing 01-21

08 90 00 Louvers and Vents 01-21

DIVISION 09 – FINISHES

09 05 16 Subsurface Preparation for Floor Finishes 01-21

09 22 16 Non-Structural Metal Framing 06-18

09 29 00 Gypsum Board 04-20

09 30 13 Ceramic/Porcelain Tiling 01-21

09 51 00 Acoustical Ceilings 12-18

09 65 13 Resilient Base and Accessories 01-21

09 67 23.60 Resinous Urethane and Epoxy Mortar Flooring (RES-6A and RES 6B)

01-21

09 91 00 Painting 01-21

DIVISION 10 – SPECIALTIES

10 14 00 Signage 01-21

10 21 13 Toilet Compartments 01-21

10 28 00 Toilet, Bath, and Laundry Accessories 01-21

10 44 13 Fire Extinguisher Cabinets 08-18

10 51 26 HDPE Lockers

PROJECT NO. 632-22-900

06-01-24

TABLE OF CONTENTS

00 01 10 - 3

DIVISION 11 – EQUIPMENT

11 05 12 General Motor Requirements for Equipment 01-21

11 12 00 Parking Control Equipment 01-21

DIVISION 12 – FURNISHINGS

12 31 00 Manufactured Metal Casework 01-21

12 32 00 Manufactured Wood Casework 01-21

12 36 00 Countertops 12-23

DIVISION 13 - SPECIAL CONSTRUCTION

13 05 41 Seismic Restraint Requirements for Non-Structural

Components

01-21

DIVISION 14– CONVEYING EQUIPEMENT

DIVISION 21- FIRE SUPPRESSION

21 08 00 Commissioning of Fire Suppression System 11-16

21 13 13 Wet-Pipe Sprinkler Systems 06-15

DIVISION 22 – PLUMBING

22 05 11 Common Work Results for Plumbing 01-23

22 05 19 Meters and Gages for Plumbing Piping 09-20

22 05 23 General-Duty Valves for Plumbing Piping 11-

22 07 11 Plumbing Insulation 09-19

22 08 00 Commissioning of Plumbing Systems 11-16

22 11 00 Facility Water Distribution 05-21

22 13 00 Facility Sanitary and Vent Piping 09-20

22 13 23 Sanitary Waste Interceptors 09-20

22 14 00 Facility Storm Drainage 09-15

22 15 00 General Service Compressed-Air Systems 09-20

22 31 11 Water Softeners 09-15

22 34 00 Fuel-Fired Domestic Water Heaters 09-20

22 40 00 Plumbing Fixtures 05-24

DIVISION 23 – HEATING, VENTILATING, AND AIR

CONDITIONING (HVAC)

23 05 10 Common Work Results for Boiler Plant and Steam

Generation

06-24

23 05 10.1 VHA Boiler and Associated Plant Safety Device Testing

Manual – 8th Edition

03-24

23 05 11 Common Work Results for HVAC 03-23

PROJECT NO. 632-22-900

06-01-24

TABLE OF CONTENTS

00 01 10 - 4

SECTION NO DIVISION AND SECTION TITLES DATE

23 05 12 General Motor Requirements for HVAC and Steam

Generation Equipment

03-23

23 05 41 Noise and Vibration Control for HVAC Piping and

Equipment

03-23

23 05 51 Noise and Vibration Control for Boiler Plant 03-22

23 05 93 Testing, Adjusting, and Balancing for HVAC 03-23

23 07 11 HVAC and Boiler Plant Insulation 02-20

23 08 00 Commissioning of HVAC Systems 03-23

23 08 11 Demonstrations and Tests for Boiler Plant 04-20

23 09 11 Instrumentation and Control for Boiler Plant 04-24

23 09 11.1 Master Points List 04-25

23 09 23 Direct-Digital Control System for HVAC 03-23

23 10 00 Facility Fuel Systems 04-20

23 11 23 Facility Natural-Gas Piping 04-20

23 21 11 Boiler Plant Piping Systems 03-24

23 21 13 Hydronic Piping 03-23 23 21 23 Hydronic Pumps 03-23

23 22 13 Steam and Condensate Heating Piping 03-24

23 22 23 Steam Condensate Pumps 04-20 23 23 00 Refrigerant Piping 03-24

23 25 00 HVAC Water Treatment 03-23

23 31 00 HVAC Ducts and Casings 03-23

23 34 00 HVAC Fans 03-23

23 36 00 Air Terminal Units 03-23

23 37 00 Air Outlets and Inlets 03-23

23 50 11 Boiler Plant Mechanical Equipment 03-22

23 51 00 Breechings, Chimneys, and Stacks 04-20

23 52 33 Water Tube Boilers 11-23

23 72 00 Air-to-Air Energy Recovery Equipment 03-24

23 73 00 Indoor Central-Station Air-Handling Units 03-23

23 81 00 Decentralized Unitary HVAC Equipment 03-24

23 82 00 Convection Heating and Cooling Units 03-23

23 82 16 Air Coils 03-24

DIVISION 25 – INTEGRATED AUTOMATION

DIVISION 26 – ELECTRICAL

26 05 11 Requirements for Electrical Installations 11-22

26 05 13 Medium-Voltage Cables 11-22

26 05 19 Low-Voltage Electrical Power Conductors and Cables 11-22

26 05 26 Grounding and Bonding for Electrical Systems 11-22

26 05 33 Raceway and Boxes for Electrical Systems 11-22

26 05 41 Underground Electrical Construction 11-22

26 05 73 Overcurrent Protective Device Coordination Study 11-22

26 08 00 Commissioning of Electrical Systems 11-22

26 09 23 Lighting Controls 11-22

26 11 16 Secondary Unit Substations 11-22

26 13 16 Medium-Voltage Fusible Interrupter Switches 11-22

PROJECT NO. 632-22-900

06-01-24

TABLE OF CONTENTS

00 01 10 - 5

SECTION NO DIVISION AND SECTION TITLES DATE

26 22 00 Low-Voltage Transformers 11-22

26 24 13 Distribution Switchboards 11-22

26 24 16 Panelboards 11-22

26 27 26 Wiring Devices 11-22

26 29 11 Motor Controllers 11-22

26 29 21 Enclosed Switches and Circuit Breakers 11-22

26 32 13 Engine Generators 11-22

26 36 23 Automatic Transfer Switches 11-22

26 41 00 Facility Lightning Protection 11-22

26 43 13 Surge Protective Devices 11-22

26 51 00 Interior Lighting 03-24

26 56 00 Exterior Lighting 01-22

DIVISION 27 – COMMUNICATIONS

27 05 11 Requirements for Communications Installations 09-19

27 05 26i Grounding and Bonding for Communications Systems 12-22

27 05 33i Conduits and Backboxes for Communications Systems 12-22

27 05 36i Cable Trays for Communications Systems 12-22

27 05 53i Identification for Communications Systems 12-22

27 08 00 Commissioning of Communications Systems 11-16

27 10 00i Structured Cabling 12-22

27 11 00 Telecommunications Room Fittings 06-15

27 11 16i Communications Cabinets, Racks, Frames, And Enclosures

27 16 19i Communications Patch Cords, Station Cords, And Cross-

Connect Wire

12-22

27 11 26i Communications Rack Mounted Power Protection And Power

Strips

12-22

27 13 13.13i Communications Copper Cable Splicing And Terminations 12-22

27 13 13i Communications Copper Backbone Cabling 12-22

27 13 23.13i Communications Optical Fiber Splicing And Terminations 12-22

27 13 23i Communications Optical Fiber Backbone Cabling 12-22

27 15 13i Communications Copper Horizontal Cabling 12-22

27 16 19i Communications Patch Cords, Station Cords, And Cross

Connect Wire

12-22

DIVISION 28 – ELECTRONIC SAFETY AND SECURITY

28 05 00 Common Work Results for Electronic Safety and Security 04-18

28 05 13 Conductors and Cables for Electronic Safety and

Security

10-18

28 05 26 Grounding and Bonding for Electronic Safety and

Security

09-11

28 05 28.33 Conduits and Backboxes for Electronic Safety and

Security

09-11

28 13 00 Physical Access Control System 10-11

28 23 00 Video Surveillance 09-11

28 31 00 Fire Detection and Alarm 10-11

PROJECT NO. 632-22-900

06-01-24

TABLE OF CONTENTS

00 01 10 - 6

DIVISION 31 – EARTHWORK

31 20 00 Earthwork 08-23

31 23 19 Dewatering 10-12

DIVISION 32 – EXTERIOR IMPROVEMENTS

32 05 23 Cement and Concrete for Exterior Improvements 08-16

32 12 16 Asphalt Paving 09-15

32 17 23 Pavement Markings 08-16

32 90 00 Planting 08-16

DIVISION 33 – UTILITIES

33 08 00 Commissioning of Site Utility Systems 11-16

33 10 00 Water Utilities 03-17

33 30 00 Sanitary Sewer Utilities 06-13

DIVISION 34 – TRANSPORTATION

DIVISION 48 – Electrical Power Generation

PROJECT NO. 632-22-900

05-01-20

LIST OF DRAWING SHEETS

00 01 15 - 1

SECTION 00 01 15

LIST OF DRAWING SHEETS

The drawings listed below accompanying this specification form a part of the contract.

Drawing No. Title

GENERAL

GI000 COVER SHEET

GI001 SYMBOLS AND ABBREVIATIONS

GI002 WALL TYPES

GI003 ACCESSIBILITY REQUIREMENTS

GI004 ACCESSIBILITY REQUIREMENTS

GI101 LIFE SAFETY PLAN

GI110 SITE PHASING PLAN

GENERAL: 7

HAZARDOUS MATERIALS

ASB-1 BOILER HOUSE ASBESTOS ABATEMENT PLAN

ASB-2 BOILER HOUSE ROOF ASBESTOS ABATEMENT PLAN

LB-1 BOILER HOUSE LEAD PAINT LOCATIONS

HAZARDOUS MATERIALS: 3

CIVIL

C100 CIVIL DETAILS

C101 CIVIL DETAILS

C200 EXISTING SITE PLAN - EAST

C201 EXISTING SITE PLAN - WEST

C210 SITE DEMOLITION PLAN - EAST

C211 SITE DEMOLITION PLAN - WEST

C300 CONSTRUCTION PHASE SITE PLAN - EAST

C301 CONSTRUCTION PHASE SITE PLAN - WEST

C400 SITE LAYOUT PLAN - EAST

C401 SITE LAYOUT PLAN - WEST

C500 SITE UTILITY PLAN - EAST

C501 SITE UTILITY PLAN - WEST

C600 SITE GRADING PLAN - EAST

PROJECT NO. 632-22-900

05-01-20

LIST OF DRAWING SHEETS

00 01 15 - 2

C601 SITE GRADING PLAN - WEST

CIVIL: 14

STRUCTURAL

SI001 STRUCTURAL GENERAL NOTES

SB101 SLAB AND FOUNDATION PLAN

SF101 MEZZANINE FRAMING AND SLAB PLAN

SF102 ROOF FRAMING PLAN

S501 SECTIONS AND DETAILS

STRUCTURAL: 5

ARCHITECTURE

AD101 DEMOLITION PLANS

AE101 FLOOR PLANS

AE111 ENLARGED PLANS

AE131 ROOF PLAN AND DETAILS

AC141 REFLECTED CEILING PLANS

AE201 EXTERIOR ELEVATIONS AND FACADE DETAILS

AE301 BUILDING SECTIONS

AE311 WALL SECTIONS

AE411 INTERIOR ELEVATIONS

AE501 DETAILS

AE601 DOOR SCHEDULE AND DETAILS

AE602 GLAZING ELEVATIONS AND DETAILS

AE701 FINISH FLOOR PLANS AND SCHEDULE

AW711 SIGNAGE PLAN AND DETAILS

AQ731 EQUIPMENT PLANS

AE901 RENDERINGS

ARCHITECTURE: 17

FIRE SUPPRESSION

F001 FIRE SUPPRESSION LEGEND AND GENERAL NOTES

FX101 FIRST FLOOR - FIRE SUPPRESSION

FX102 MEZZANINE - FIRE SUPPRESSION

FIRE SUPPRESSION: 3

PLUMBING

PROJECT NO. 632-22-900

05-01-20

LIST OF DRAWING SHEETS

00 01 15 - 3

P001 PLUMBING LEGEND & GENERAL NOTES

PD100 UNDERSLAB DEMOLITION PLAN

PD101 FIRST FLOOR DEMOLITION PLAN

PD102 MEZZANINE DEMOLITION PLAN

PP100 UNDERSLAB PLAN - DRAINAGE

PP101 FIRST FLOOR NEW WORK PLAN

PP102 MEZZANINE NEW WORK PLAN

PP103 ROOF NEW WORK PLAN

P501 DETAILS

P601 SCHEDULES AND DETAILS

P901 ISOMETRIC - DRAINAGE

P902 ISOMETIRC - STORM

P903 ISOMETRIC - DISTRIBUTION

PLUMBING: 13

MECHANICAL

M001 HVAC LEGENDS AND GENERAL NOTES

MD101 FIRST FLOOR - HVAC DEMOLITION PLAN

MD102 MEZZANINE AND LOWER ROOF - HVAC DEMOLITION PLAN

MD103 UPPER ROOF - HVAC DEMOLITION PLAN

M101 FIRST FLOOR - HVAC NEW WORK PLAN

M102 MEZZANINE, LOWER LEVEL, LOWER ROOF - HVAC NEW WORK PLAN

M103 UPPER ROOF - HVAC NEW WORK PLAN

M200 FIRST FLOOR - FUEL OIL DEMOLITION & NEW WORK PLANS

M501 HVAC DETAILS

M502 HVAC DETAILS

M503 HVAC DETAILS

M504 HVAC DETAILS

M601 HVAC SCHEDULES

M602 HVAC SCHEDULES

M603 HVAC SCHEDULES

M801 HVAC CONTROLS

M802 HVAC CONTROLS

M803 HVAC CONTROLS

M804 HVAC CONTROLS

M805 HVAC CONTROLS

MP001 BOILER PLANT NOTES, LEGENDS, AND ABBREVIATIONS

PROJECT NO. 632-22-900

05-01-20

LIST OF DRAWING SHEETS

00 01 15 - 4

MP100 BASEMENT FLOOR PLAN - DEMOLITION

MP101A FIRST FLOOR PLAN - DEMOLITION

MP101B FIRST FLOOR - PART PLANS - DEMOLITION

MP102 MEZZANINE FLOOR PLAN - DEMOLITION

MP200 BASEMENT FLOOR PLAN - NEW WORK

MP201A FIRST FLOOR PLAN - NEW WORK

MP201B FIRST FLOOR - PART PLANS - NEW WORK

MP202 MEZZANINE FLOOR PLAN - NEW WORK

MP203 ROOF PLAN - NEW WORK

MP204 TEMPORARY BOILER PLAN - PHASE 1 - NEW WORK

MP301 BOILER - MECHANICAL SECTIONS & ISOMETRIC - NEW WORK

MP302 FEEDWATER - MECHANICAL SECTIONS & ISOMETRIC - NEW WORK

MP303 CST - MECHANICAL SECTION AND ISOMETRIC - NEW WORK

MP304 CBDFT & STEAM HEADER - MECHANICAL SECTIONS AND ISOMETRICS -

NEW WORK

MP305 PRV STATIONS - SECTIONS AND ISOMETRIC - NEW WORK

MP306 SAMPLE COOLERS - SECTION AND ISOMETRIC - NEW WORK

MP307 STEAM & COND PHASE 1 - PART PLANS AND ISOMETRICS - DEMOLITION

& NEW WORK

MP308 STEAM & COND PHASE 2 - PART PLANS AND ISOMETRICS - DEMOLITION

& NEW WORK

MP309 STEAM & COND PHASE 3 - PART PLANS AND ISOMETRICS - DEMOLITION

& NEW WORK

MP310 FUEL OIL PHASING - PART PLANS AND ISOMETRICS - DEMOLITION &

NEW WORK

MP311 NATURAL GAS PHASING - PART PLANS AND ISOMETRICS - DEMOLITION

AND NEW WORK

MP401 HPS SYSTEM HEADER - FLOW DIAGRAM - DEMOLITION

MP402 HPS SYSTEM (ATOMIZATION) - FLOW DIAGRAM - DEMOLITION

MP403 HPS SYSTEM HEATING - FLOW DIAGRAM - DEMOLITION

MP404 LPS SYSTEM HEATING - FLOW DIAGRAM - DEMOLITION

MP405 CONDENSATE SYSTEM - FLOW DIAGRAM - DEMOLITION

MP406 FEEDWATER SYSTEM - FLOW DIAGRAM - DEMOLITION

MP408 NG, LPG, & FO SYSTEMS - FLOW DIAGRAM - DEMOLITION

MP410 BLOWOFF SYSTEM - FLOW DIAGRAM - DEMOLITION

MP411 CF SYSTEM & SAMPLE COOLERS - FLOW DIAGRAM - DEMOLITION

MP413 TYPICAL BOILER TRAIN (BLRS 1-4) - FLOW DIAGRAM - DEMOLITION

MP414 TYPICAL BOILER TRIM (BLRS 1-4) - FLOW DIAGRAM - DEMOLITION

MP415 HRSG TRAIN AND TRIM - FLOW DIAGRAM - DEMOLITION

PROJECT NO. 632-22-900

05-01-20

LIST OF DRAWING SHEETS

00 01 15 - 5

MP500 OVERALL SYSTEM - FLOW DIAGRAM - NEW WORK

MP501 HPS SYSTEM HEADER - FLOW DIAGRAM - NEW WORK

MP505 CONSENSATE SYSTEM - FLOW DIAGRAM - NEW WORK

MP506 FEEDWATER SYSTEM - FLOW DIAGRAM - NEW WORK

MP508 NG, LPG, & FO SYSTEMS - FLOW DIAGRAM - NEW WORK

MP510 CBD & BLOWOFF SYSTEM - FLOW DIAGRAM - NEW WORK

MP511 CHEMICAL FEED SYSTEM - FLOW DIAGRAM - NEW WORK

MP512 TEMPORARY BOILER - FLOW DIAGRAM - NEW WORK

MP513 TYPICAL BOILER TRAIN (BLRS 1, 2, & 3) - FLOW DIAGRAM - NEW

WORK

MP514 TYPICAL BOILER TRIM (BLRS 1, 2, & 3) - FLOW DIAGRAM - NEW

WORK

MP515 HRSG TRAIN & TRIM - FLOW DIAGRAM - NEW WORK

MP516 STEAM & COND PHASING - FLOW DIAGRAM - DEMOLITION & NEW WORK

MP517 NG & FO PHASING - FLOW DIAGRAM - DEMOLITION & NEW WORK

MP601 BOILER DETAILS

MP602 BOILER DETAILS

MP603 BOILER DETAILS

MP604 BOILER DETAILS

MP605 BOILER DETAILS

MP606 BOILER DETAILS

MP700 MECHANICAL SCHEDULES

MP701 MECHANICAL SCHEDULES

MP702 MECHANICAL SCHEDULES

MP703 MECHANICAL SCHEDULES

MP801 CONTROLS SYSTEM ARCHITECTURE - SCHEMATIC - NEW WORK

MP802 EMERGENCY STOP DETAILS

MP803 HAZARDOUS GAS DETECTION SYSTEM DETAILS

MECHANICAL: 80

ELECTRICAL

E001 ELECTRICAL LEGEND

ES100 ELECTRICAL SITE PLAN

ED100 ELECTRICAL DEMOLITION PLAN - BASEMENT FLOOR

ED101 ELECTRICAL DEMOLITION PLAN - FIRST FLOOR

ED102 ELECTRICAL DEMOLITION PLAN - MEZZANINE FLOOR

ED103 ELECTRICAL DEMOLITION PLAN - ROOF LEVEL

PROJECT NO. 632-22-900

05-01-20

LIST OF DRAWING SHEETS

00 01 15 - 6

EL100 ELECTRICAL LIGHTING PLAN - BASEMENT AND FIRST FLOOR

EL101 ELECTRICAL LIGHTING PLAN - MEZZANINE FLOOR

EP100 ELECTRICAL POWER PLAN - BASEMENT AND FIRST FLOOR

EP101 ELECTRICAL POWER PLAN - MEZZANINE FLOOR

EP102 ELECTRICAL POWER PLAN - UPPER ROOF

EY100 FIRE ALARM PLAN - BASEMENT AND FIRST FLOOR

EY101 FIRE ALARM PLAN - MEZZANINE FLOOR

EE500 SINGLE LINE DIAGRAM

EE501 ELECTRICAL SCHEDULES

EE502 PANELBOARD SCHEDULES

EE503 PANELBOARD SCHEDULES

EE600 ELECTRICAL DETAILS

EE601 ELECTRICAL DETAILS

ELECTRICAL: 19

TECHNOLOGY

T001 TECHNOLOGY LEGEND SHEET

T002 TECHNOLOGY SITE PLAN

T003 TECHNOLOGY DETAILS

T004 TECHNOLOGY DETAILS

T005 TECHNOLOGY DETAILS

T006 TECHNOLOGY DETAILS

TD101 FIRST FLOOR - TECHNOLOGY DEMOLITION PLAN

T101 FIRST FLOOR - TECHNOLOGY NEW WORK PLAN

T102 FIRST FLOOR - TECHNOLOGY PATHWAYS

T103 MEZZANINE - TECHNOLOGY NEW WORK PLAN

T401 ENLARGED SIGNALS ROOM PLAN

TECHNOLOGY: 11

- - - E N D - - -

PROJECT NO. 632-22-900

11-01-21

GENERAL REQUIREMENTS

01 00 00 - 1

SECTION 01 00 00

GENERAL REQUIREMENTS

GENERAL

1.1 SAFETY REQUIREMENTS

A. Refer to section 01 35 26, SAFETY REQUIREMENTS for safety and infection control requirements.

1.2 GENERAL INTENTION

A. Contractor shall completely prepare site for building operations, including demolition and removal of existing structures, and furnish labor and materials and perform work to upgrade the existing boiler plant as required by drawings and specifications.

B. Visits to the site by Bidders may be made only by appointment with the

COR.

C. Offices of FFE-Heapy-JV, as Architect-Engineers, will render certain technical services during construction. Such services shall be considered as advisory to the Government and shall not be construed as expressing or implying a contractual act of the Government without affirmations by Contracting Officer or his duly authorized representative.

D. Before placement and installation of work subject to tests by testing laboratory retained by Department of Veterans Affairs, the Contractor shall notify the COR in sufficient time to enable testing laboratory personnel to be present at the site in time for proper taking and testing of specimens and field inspection. Such prior notice shall be not less than three workdays unless otherwise designated by the COR.

E. All employees of general contractor and subcontractors shall comply with VA security management program and obtain permission of the VA police, be identified by project and employer, and restricted from unauthorized access.

1.3 STATEMENT OF BID ITEM(S)

A. ITEM I, GENERAL CONSTRUCTION BASE BID: Work includes

1. Demolition of all equipment and supporting utilities in the existing boiler plant.

2. General construction, alterations, and refurbishment as needed of architectural elements within the existing building.

PROJECT NO. 632-22-900

11-01-21

GENERAL REQUIREMENTS

01 00 00 - 2

3. Installation of new steam generation equipment along with supporting utility systems and equipment as required by the drawings and specifications.

Reconfigure walks, grading, drainage, and utilities necessary for temporary boiler plant.

B. ALTERNATE NO.1: BASE BID except delete all steam and condensate piping in place to serve Building 92.

1.4 SPECIFICATIONS AND DRAWINGS FOR CONTRACTOR

A. Drawings and contract documents may be obtained from the website where the solicitation is posted. Additional copies will be at Contractor's expense.

1.5 CONSTRUCTION SECURITY REQUIREMENTS

A. Security Plan:

1. The security plan defines both physical and administrative security procedures that will remain effective for the entire duration of the project.

2. The General Contractor is responsible for assuring that all sub-contractors working on the project and their employees also comply with these regulations.

B. Security Procedures:

1. General Contractor’s employees shall not enter the project site without appropriate badge. They may also be subject to inspection of their personal effects when entering or leaving the project site.

2. Before starting work the General Contractor shall give one week’s notice to the Contracting Officer so that security arrangements can be provided for the employees. This notice is separate from any notices required for utility shutdown described later in this section.

3. No photography of VA premises is allowed without written permission of the Contracting Officer. Patients and staff are not to be photographed at any time.

4. VA reserves the right to close down or shut down the project site and order General Contractor’s employees off the premises in the event of a national emergency. The General Contractor may return to the site only with the written approval of the Contracting Officer.

C. Key Control:

PROJECT NO. 632-22-900

11-01-21

GENERAL REQUIREMENTS

01 00 00 - 3

1. The General Contractor shall provide duplicate keys and lock combinations to the Contracting officers representative (COR) for the purpose of security inspections of every area of project including tool boxes and parked machines and take any emergency action.

2. The General Contractor shall turn over all permanent lock cylinders to the VA locksmith for permanent installation.

3. The General Contractor shall install construction period lock cores and provide access keys to the VA COR and Police Dept. See Section

08 71 00, DOOR HARDWARE and coordinate.

D. Document Control:

1. Before starting any work, the General Contractor/Sub Contractors shall submit an electronic security memorandum describing the approach to following goals and maintaining confidentiality of

“sensitive information”.

2. The General Contractor is responsible for safekeeping of all drawings, project manual and other project information. This information shall be shared only with those with a specific need to accomplish the project.

3. Certain documents, sketches, videos or photographs and drawings may be marked “Law Enforcement Sensitive” or “Sensitive Unclassified”.

Secure such information in separate containers and limit the access to only those who will need it for the project. Return the information to the Contracting Officer upon request.

4. These security documents shall not be removed or transmitted from the project site without the written approval of Contracting

Officer.

5. All paper waste or electronic media such as CD’s and diskettes shall be shredded and destroyed in a manner acceptable to the VA.

6. Notify Contracting Officer and Site Security Officer immediately when there is a loss or compromise of “sensitive information”.

7. All electronic information shall be stored in specified location following VA standards and procedures using an Engineering Document

Management Software (EDMS).

a. Security, access and maintenance of all project drawings, both scanned and electronic shall be performed and tracked through the EDMS system.

PROJECT NO. 632-22-900

11-01-21

GENERAL REQUIREMENTS

01 00 00 - 4

b. “Sensitive information” including drawings and other documents may be attached to e-mail provided all VA encryption procedures are followed.

E. Motor Vehicle Restrictions

1. Vehicle authorization request shall be required for any vehicle entering the site and such request shall be submitted 24 hours before the date and time of access. Access shall be restricted to picking up and dropping off materials and supplies.

2. A limited number of permits shall be issued for General Contractor and its employees for parking in designated areas only. Contractor to coordinate with VA Medical Center Facility Manager.

1.6 OPERATIONS AND STORAGE AREAS (FAR 52.236-10)

A. The Contractor shall confine all operations (including storage of materials) on Government premises to areas authorized or approved by the Contracting Officer. The Contractor shall hold and save the

Government, its officers and agents, free and harmless from liability of any nature occasioned by the Contractor's performance.

B. Temporary buildings (e.g., storage sheds, shops, offices) and utilities may be erected by the Contractor only with the approval of the

Contracting Officer and shall be built with labor and materials furnished by the Contractor without expense to the Government. The temporary buildings and utilities shall remain the property of the

Contractor and shall be removed by the Contractor at its expense upon completion of the work. With the written consent of the Contracting

Officer, the buildings and utilities may be abandoned and need not be removed.

C. The Contractor shall, under regulations prescribed by the Contracting

Officer, use only established roadways, or use temporary roadways constructed by the Contractor when and as authorized by the Contracting

Officer. When materials are transported in prosecuting the work, vehicles shall not be loaded beyond the loading capacity recommended by the manufacturer of the vehicle or prescribed by any Federal, State, or local law or regulation. When it is necessary to cross curbs or sidewalks, the Contractor shall protect them from damage. The

Contractor shall repair or pay for the repair of any damaged curbs, sidewalks, or roads.

PROJECT NO. 632-22-900

11-01-21

GENERAL REQUIREMENTS

01 00 00 - 5

D. Working space and space available for storing materials shall be as determined by the COR.

E. Workers are subject to rules of Medical Center applicable to their conduct.

F. Execute work in such a manner as to interfere as little as possible with work being done by others. Keep roads clear of construction materials, debris, standing construction equipment and vehicles at all times.

G. Execute work so as to interfere as little as possible with normal functioning of Medical Center as a whole, including operations of utility services, fire protection systems and any existing equipment, and with work being done by others.

1. Do not store materials and equipment in other than assigned areas.

2. Schedule delivery of materials and equipment to immediate construction working areas within buildings in use by Department of

Veterans Affairs in quantities sufficient for not more than two work days. Provide unobstructed access to Medical Center areas required to remain in operation.

3. Where access by Medical Center personnel to vacated portions of buildings is not required, storage of Contractor's materials and equipment will be permitted subject to fire and safety requirements.

H. Utilities Services: Where necessary to cut existing pipes, electrical wires, conduits, cables, etc., of utility services, or of fire protection systems or communications systems (except telephone), they shall be cut and capped at suitable places where shown; or, in absence of such indication, where directed by COR. All such actions shall be coordinated with the COR or Utility Company involved:

1. Whenever it is required that a connection fee be paid to a public utility provider for new permanent service to the construction project, for such items as water, sewer, electricity, gas or steam, payment of such fee shall be the responsibility of the Government and not the Contractor.

I. Phasing:

1. The Medical Center must maintain its operation 24 hours a day 7 days a week. Therefore, any interruption in service must be scheduled and coordinated with the COR to ensure that no lapses in operation occur.

It is the CONTRACTOR'S responsibility to develop a work plan and

PROJECT NO. 632-22-900

11-01-21

GENERAL REQUIREMENTS

01 00 00 - 6 schedule detailing, at a minimum, the procedures to be employed, the equipment and materials to be used, the interim life safety measure to be used during the work, and a schedule defining the duration of the work with milestone subtasks. The work to be outlined shall include, but not be limited to:

2. To ensure such executions, Contractor shall furnish the COR with a schedule of approximate phasing dates on which the Contractor intends to accomplish work in each specific area of site, building or portion thereof. In addition, Contractor shall notify the COR two weeks in advance of the proposed date of starting work in each specific area of site, building or portion thereof. Reference plans for phasing parameters.

J. Construction Fence: Before construction operations begin, Contractor shall provide a chain link construction fence, 2.1m (seven feet) minimum height, around the construction area indicated on the drawings.

Provide gates as required for access with necessary hardware, including hasps and padlocks. Fasten fence fabric to terminal posts with tension bands and to line posts and top and bottom rails with tie wires spaced at maximum 375mm (15 inches). Bottom of fences shall extend to 25mm

(one inch) above grade. Remove the fence when directed by COR.

K. When a building and/or construction site is turned over to Contractor, Contractor shall accept entire responsibility including upkeep and maintenance therefore:

1. Contractor shall maintain a minimum temperature of 4 degrees C (40 degrees F) at all times, except as otherwise specified.

2. Contractor shall maintain in operating condition existing fire protection and alarm equipment. In connection with fire alarm equipment, Contractor shall make arrangements for pre-inspection of site with Fire Department or Company (Department of Veterans Affairs or municipal) whichever will be required to respond to an alarm from

Contractor's employee or watchman.

L. Utilities Services: Maintain existing utility services for Medical

Center at all times. Provide temporary facilities, labor, materials, equipment, connections, and utilities to assure uninterrupted services.

Where necessary to cut existing water, steam, gases, sewer or air pipes, or conduits, wires, cables, etc. of utility services or of fire protection systems and communications systems (including telephone), PROJECT NO. 632-22-900

11-01-21

GENERAL REQUIREMENTS

01 00 00 - 7 they shall be cut and capped at suitable places where shown; or, in absence of such indication, where directed by COR.

1. No utility service such as water, gas, steam, sewers or electricity, or fire protection systems and communications systems may be interrupted without prior approval of COR. Electrical work shall be accomplished with all affected circuits or equipment de-energized.

When an electrical outage cannot be accomplished, work on any energized circuits or equipment shall not commence without a detailed work plan, the Medical Center Director’s prior knowledge and written approval. Refer to specification Sections 26 05 11, REQUIREMENTS FOR ELECTRICAL INSTALLATIONS, 27 05 11 REQUIREMENTS FOR

COMMUNICATIONS INSTALLATIONS and 28 05 00, COMMON WORK RESULTS FOR

ELECTRONIC SAFETY AND SECURITY for additional requirements.

2. Contractor shall submit a request to interrupt any such services to

COR, in writing, 7 days in advance of proposed interruption. Request shall state reason, date, exact time of, and approximate duration of such interruption.

3. Contractor will be advised (in writing) of approval of request, or of which other date and/or time such interruption will cause least inconvenience to operations of Medical Center. Interruption time approved by Medical Center may occur at other than Contractor's normal working hours.

4. Major interruptions of any system must be requested, in writing, at least 15 calendar days prior to the desired time and shall be performed as directed by the COR.

5. In case of a contract construction emergency, service will be interrupted on approval of COR. Such approval will be confirmed in writing as soon as practical.

6. Whenever it is required that a connection fee be paid to a public utility provider for new permanent service to the construction project, for such items as water, sewer, electricity, gas or steam, payment of such fee shall be the responsibility of the Government and not the Contractor.

M. Abandoned Lines: All service lines such as wires, cables, conduits, ducts, pipes and the like, and their hangers or supports, shall be removed back to their source. Those which are indicated to be abandoned but are not required to be entirely removed, shall be sealed, capped or

PROJECT NO. 632-22-900

11-01-21

GENERAL REQUIREMENTS

01 00 00 - 8 plugged at the main, branch or panel they originate from. The lines shall not be capped in finished areas, but shall be removed and sealed, capped or plugged in ceilings, within furred spaces, in unfinished areas, or within walls or partitions; so that they are completely behind the finished surfaces.

N. To minimize interference of construction activities with flow of

Medical Center traffic, comply with the following:

1. Keep roads, walks and entrances to grounds, to parking and to occupied areas of buildings clear of construction materials, debris and standing construction equipment and vehicles. Wherever excavation for new utility lines cross existing roads, at least one lane must be open to traffic at all times with approval.

2. Method and scheduling of required cutting, altering and removal of existing roads, walks and entrances must be approved by the COR.

O. Coordinate the work for this contract with other construction operations as directed by COR. This includes the scheduling of traffic and the use of roadways, as specified in Article, USE OF ROADWAYS.

1.7 DISPOSAL AND RETENTION

A. Materials and equipment accruing from work removed and from demolition of buildings or structures, or parts thereof, shall be disposed of as follows:

1. Reserved items which are to remain property of the Government are identified by attached tags or noted on drawings or in specifications as items to be stored. Items that remain property of the Government shall be removed or dislodged from present locations in such a manner as to prevent damage which would be detrimental to re-installation and reuse. Store such items where directed by COR.

2. Items not reserved shall become property of the Contractor and be removed by Contractor from Medical Center.

3. Items of portable equipment and furnishings located in rooms and spaces in which work is to be done under this contract shall remain the property of the Government. When rooms and spaces are vacated by the Department of Veterans Affairs during the alteration period, such items which are NOT required by drawings and specifications to be either relocated or reused will be removed by the Government in advance of work to avoid interfering with Contractor's operation.

PROJECT NO. 632-22-900

11-01-21

GENERAL REQUIREMENTS

01 00 00 - 9

1.8 PROTECTION OF EXISTING VEGETATION, STRUCTURES, EQUIPMENT, UTILITIES, AND

IMPROVEMENTS (FAR 52.236-9)

A. The Contractor shall preserve and protect all structures, equipment, and vegetation (such as trees, shrubs, and grass) on or adjacent to the work site, which are not to be removed and which do not unreasonably interfere with the work required under this contract. The Contractor shall only remove trees when specifically authorized to do so and shall avoid damaging vegetation that will remain in place. If any limbs or branches of trees are broken during contract performance, or by the careless operation of equipment, or by workers, the Contractor shall trim those limbs or branches with a clean cut and paint the cut with a tree-pruning compound as directed by the Contracting Officer.

B. The Contractor shall protect from damage all existing improvements and utilities at or near the work site and on adjacent property of a third party, the locations of which are made known to or should be known by the Contractor. The Contractor shall repair any damage to those facilities, including those that are the property of a third party, resulting from failure to comply with the requirements of this contract or failure to exercise reasonable care in performing the work. If the

Contractor fails or refuses to repair the damage promptly, the

Contracting Officer may have the necessary work performed and charge the cost to the Contractor.

C. Refer to Section 01 57 19, TEMPORARY ENVIRONMENTAL CONTROLS, for additional requirements on protecting vegetation, soils and the environment. Refer to Articles, "Alterations", "Restoration", and

"Operations and Storage Areas" for additional instructions concerning repair of damage to structures and site improvements.

1.9 RESTORATION

A. Remove, cut, alter, replace, patch and repair existing work as necessary to install new work. Except as otherwise shown or specified, do not cut, alter or remove any structural work, and do not disturb any ducts, plumbing, steam, gas, or electric work without approval of the

COR. Existing work to be altered or extended and that is found to be defective in any way, shall be reported to the COR before it is disturbed. Materials and workmanship used in restoring work, shall conform in type and quality to that of original existing construction, except as otherwise shown or specified.

PROJECT NO. 632-22-900

11-01-21

GENERAL REQUIREMENTS

01 00 00 - 10

B. Upon completion of contract, deliver work complete and undamaged.

Existing work (walls, ceilings, partitions, floors, mechanical and electrical work, lawns, paving, roads, walks, etc.) disturbed or removed as a result of performing required new work, shall be patched, repaired, reinstalled, or replaced with new work, and refinished and left in as good condition as existed before commencing work.

C. At Contractor's own expense, Contractor shall immediately restore to service and repair any damage caused by Contractor's workers to existing piping and conduits, wires, cables, etc., of utility services or of fire protection systems and communications systems (including telephone) which are not scheduled for discontinuance or abandonment.

D. Expense of repairs to such utilities and systems not shown on drawings or locations of which are unknown will be covered by adjustment to contract time and price in accordance with clause entitled "CHANGES"

(FAR 52.243-4) and "DIFFERING SITE CONDITIONS" (FAR 52.236-2).

1.10 PHYSICAL DATA – SOIL CONDITIONS

A. Data and information furnished or referred to below is for the

Contractor's information. The Government shall not be responsible for any interpretation of, or conclusion drawn from the data or information by the Contractor.

1. The indications of physical conditions on the drawings and in the specifications are the result of site investigations by Berding

Surveying.

(FAR 52.236-4)

B. Subsurface conditions have not been sampled.

C. Government does not guarantee that other materials will not be encountered nor that proportions, conditions or character of several materials will not vary from those indicated by explorations. Bidders are expected to examine site of work and logs of borings; and, after investigation, decide for themselves character of materials and make their bids accordingly. Upon proper application to Department of

Veterans Affairs, bidders will be permitted to make subsurface explorations of their own at site.

1.11 PROFESSIONAL SURVEYING SERVICES

A. A registered professional land surveyor or registered civil engineer whose services are retained and paid for by the Contractor shall perform services specified herein and in other specification sections.

PROJECT NO. 632-22-900

11-01-21

GENERAL REQUIREMENTS

01 00 00 - 11

The Contractor shall certify that the land surveyor or civil engineer is not one who is a regular employee of the Contractor, and that the land surveyor or civil engineer has no financial interest in this contract.

1.12 LAYOUT OF WORK

A. The Contractor shall lay out the work from Government established base lines and bench marks, indicated on the drawings, and shall be responsible for all measurements in connection with the layout. The

Contractor shall furnish, at Contractor's own expense, all stakes, templates, platforms, equipment, tools, materials, and labor required to lay out any part of the work. The Contractor shall be responsible for executing the work to the lines and grades that may be established or indicated by the Contracting Officer. The Contractor shall also be responsible for maintaining and preserving all stakes and other marks established by the Contracting Officer until authorized to remove them.

If such marks are destroyed by the Contractor or through Contractor's negligence before their removal is authorized, the Contracting Officer may replace them and deduct the expense of the replacement from any amounts due or to become due to the Contractor.

B. Upon completion of the work, the Contractor shall furnish the COR one electronic copy and reproducible drawings at the scale of the contract drawings, showing the finished grade on the grid developed for constructing the work, including burial monuments and fifty foot stationing along new road centerlines. These drawings shall bear the seal of the registered land surveyor or registered civil engineer.

C. The Contractor shall perform the surveying and layout work of this and other articles and specifications in accordance with the provisions of

Article "Professional Surveying Services".

1.13 AS-BUILT DRAWINGS

A. The contractor shall maintain two full size sets of as-built drawings which will be kept current during construction of the project, to include all contract changes, modifications and clarifications.

B. All variations shall be shown in the same general detail as used in the contract drawings. To ensure compliance, as-built drawings shall be made available for the COR review, as often as requested.

C. Contractor shall deliver two approved completed sets of as-built drawings in the electronic version (scanned PDF) to the COR within 15

PROJECT NO. 632-22-900

11-01-21

GENERAL REQUIREMENTS

01 00 00 - 12 calendar days after each completed phase and after the acceptance of the project by the COR.

D. Paragraphs A, B, & C shall also apply to all shop drawings.

1.14 WARRANTY MANAGEMENT

A. Warranty Management Plan: Develop a warranty management plan which contains information relevant to FAR 52.246-21 Warranty of Construction in at least 30 days before the planned pre-warranty conference, submit four sets of the warranty management plan. Include within the warranty management plan all required actions and documents to assure that the

Government receives all warranties to which it is entitled. The plan must be in narrative form and contain sufficient detail to render it suitable for use by future maintenance and repair personnel, whether tradesman, or of engineering background, not necessarily familiar with this contract. The term “status” as indicated below must include due date and whether item has been submitted or was approved. Warranty information made available during the construction phase must be submitted to the Contracting Officer for approval prior to each monthly invoice for payment. Assemble approved information in a binder and turn over to the Government upon acceptance of the work. The construction warranty period will begin on the date of the project acceptance and continue for the product warranty period. A joint 4 month and 9 month warranty inspection will be conducted, measured from time of acceptance, by the Contactor and the Contracting Officer. Include in the warranty management plan, but not limited to, the following:

1. Roles and responsibilities of all personnel associated with the warranty process, including points of contact and telephone numbers within the company of the Contractor, subcontractors, manufacturers or suppliers involved.

2. Furnish with each warranty the name, address and telephone number of each of the guarantor’s representatives nearest project location.

3. Listing and status of delivery of all Certificates of Warranty for extended warranty items, to include roofs, HVAC balancing, pumps, motors, transformers and for all commissioned systems such as fire protection and alarm systems, sprinkler systems and lightning protection systems, etc.

4. A list for each warranted equipment item, feature of construction or system indicating:

PROJECT NO. 632-22-900

11-01-21

GENERAL REQUIREMENTS

01 00 00 - 13

a. Name of item.

b. Model and serial numbers.

c. Location where installed.

d. Name and phone numbers of manufacturers and suppliers.

e. Name and phone numbers of manufacturers or suppliers.

f. Names, addresses and phone numbers of sources of spare parts.

g. Warranties and terms of warranty. Include one-year overall warranty of construction, including the starting date of warranty of construction. Items which have extended warranties must be indicated with separate warranty expiration dates.

h. Starting point and duration of warranty period.

i. Summary of maintenance procedures required to continue the warranty in force.

j. Cross-reference to specific pertinent Operation and Maintenance manuals.

k. Organizations, names and phone numbers of persons to call for warranty service.

l. Typical response time and repair time expected for various warranted equipment.

5. The plans for attendance at the 4 and 9-month post construction warranty inspections conducted by the government.

6. Procedure and status of tagging of all equipment covered by extended warranties.

7. Copies of instructions to be posted near selected pieces of equipment where operation is critical for warranty and/or safety reasons.

B. Performance & Payment Bonds: The Performance & Payment Bonds must remain effective throughout the construction period.

1. In the event the Contractor fails to commence and diligently pursue any construction warranty work required, the Contracting Officer will have the work performed by others, and after completion of the work, will charge the remaining construction warranty funds of expenses incurred by the Government while performing the work, including, but not limited to administrative expenses.

2. In the event sufficient funds are not available to cover the construction warranty work performed by the Government at the

PROJECT NO. 632-22-900

11-01-21

GENERAL REQUIREMENTS

01 00 00 - 14 contractor’s expenses, the Contracting Officer will have the right to recoup expenses from the bonding company.

3. Following oral or written notification of required construction warranty repair work, the Contractor shall respond in a timely manner. Written verification will follow oral instructions. Failure to respond will be cause for the Contracting Officer to proceed against the Contractor.

C. Pre-Warranty Conference: Prior to contract completion, and at a time designated by the Contracting Officer, the Contractor shall meet with the Contracting Officer to develop a mutual understanding with respect to the requirements of this section. Communication procedures for

Contractor notification of construction warranty defects, priorities with respect to the type of defect, reasonable time required for

Contractor response, and other details deemed necessary by the

Contracting Officer for the execution of the construction warranty will be established/ reviewed at this meeting. In connection with these requirements and at the time of the Contractor’s quality control completion inspection, furnish the name, telephone number and address of a licensed and bonded company which is authorized to initiate and pursue construction warranty work action on behalf of the Contractor.

This point of contract will be located within the local service area of the warranted construction, be continuously available and be responsive to Government inquiry on warranty work action and status. This requirement does not relieve the Contractor of any of its responsibilities in conjunction with other portions of this provision.

D. Contractor’s Response to Construction Warranty Service Requirements:

E. Following oral or written notification by the Contracting Officer, the

Contractor shall respond to construction warranty service requirements in accordance with the “Construction Warranty Service Priority List” and the three categories of priorities listed below. Submit a report on any warranty item that has been repaired during the warranty period.

Include within the report the cause of the problem, date reported, corrective action taken, and when the repair was completed. If the

Contractor does not perform the construction warranty within the timeframe specified, the Government will perform the work and back charge the construction warranty payment item established.

PROJECT NO. 632-22-900

11-01-21

GENERAL REQUIREMENTS

01 00 00 - 15

1. First Priority Code 1. Perform onsite inspection to evaluate situation, and determine course of action within 4 hours, initiate work within 6 hours and work continuously to completion or relief.

2. Second Priority Code 2. Perform onsite inspection to evaluate situation, and determine course of action within 8 hours, initiate work within 24 hours and work continuously to completion or relief.

3. Third Priority Code 3. All other work to be initiated within 3 work days and work continuously to completion or relief.

1. The “Construction Warranty Service Priority List” is as follows:

a. Code 1-Life Safety Systems

i. Fire suppression systems.

ii. Fire alarm system(s).

b. Code 1-Air Conditioning Systems

i. Air conditioning leak in part of the building, if causing damage.

ii. Air conditioning system not cooling properly.

c. Code 1 Doors

i. Overhead doors not operational, causing a security, fire or safety problem.

ii. Interior, exterior personnel doors or hardware, not functioning properly, causing security, fire or safety problem.

d. Code 3-Doors

i. Overhead doors not operational.

ii. Interior/exterior personnel doors or hardware not functioning properly.

e. Code 1-Electrical

i. Power failure (entire area or any building operational after 1600 hours).

ii. Security lights.

iii. Smoke detectors.

f. Code 2-Electrical

i. Power failure (no power to a room or part of building).

Receptacle and lights not operational (in a room or part of building).

g. Code 3-Electrical

i. Exterior lights not operational.

PROJECT NO. 632-22-900

11-01-21

GENERAL REQUIREMENTS

01 00 00 - 16

h. Code 1-Gas

i. Leaks and pipeline breaks.

i. Code 1-Heat

i. Power failure affecting heat.

j. Code 1-Plumbing

i. Hot water heater failure.

ii. Leaking water supply pipes

k. Code 2-Plumbing

i. Flush valves not operating properly

ii. Fixture drain, supply line or any water pipe leaking.

iii. Toilet leaking at base.

l. Code 3- Plumbing

i. Leaky faucets.

m. Code 3-Interior

i. Floors damaged.

ii. Paint chipping or peeling.

iii. Casework damaged.

n. Code 1-Roof Leaks

i. Damage to property is occurring.

o. Code 2-Water (Exterior)

i. No water to facility.

p. Code 2-Water (Hot)

i. No hot water in portion of building listed.

q. Code 3

i. All work not listed above.

F. Warranty Tags: At the time of installation, tag each warranted item with a durable, oil and water-resistant tag approved by the Contracting

Officer. Attach each tag with a copper wire and spray with a silicone waterproof coating.