One-Line Diagram - Bath VA Medical Center.pdf

PDF 1 MB Posted

Attached to
J059--FY25 Service - Electrical Study (1X)
Solicitation number
36C24225Q0673
Issued by

About this file

The file contains two electrical one-line diagram sheets for the Bath VA Medical Center's electrical distribution system, dated 8/11/17. The first sheet (E002) is a man hole information diagram showing the campus electrical infrastructure layout, including east and west electrical loops, transformers (T1-T18), man holes (MH1-MH20), and various electrical conduits and feed-through connections. The second sheet (E001) is a detailed one-line electrical diagram presenting the interconnected electrical system with specific transformer details, including multiple transformers ranging from 25 KVA to 750 KVA at various voltage configurations (120/240V, 480V, 12.5 KV), circuit breakers, and loop switches.

These diagrams are part of a Request for Quote (RFQ) 36C24225Q0673 for an electrical study of the Bath and Canandaigua VA Medical Centers' electrical power distribution systems, to be conducted once every three years. The solicitation is issued by the Department of Veterans Affairs Veterans Health Administration, with quotes due by August 7th, 2025 at 12:00 PM EST. A mandatory site visit is scheduled for July 31st, 2025 at 9:00 AM EST, requiring contractors to email the Contracting Officer by July 30th, 2025 to confirm attendance. The VA will provide comprehensive equipment lists and one-line diagrams to support the electrical study.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ELECTRIC SUPPLY

29A

LS 16

INCOMING 12.5 KV

LS15

T2-1 T2-2

T1-2

LS4

T3

T1 8-

1T18-2

T10

WEST LOOP

EAST & WEST LOOP INTERSECTION

AT SWITCH GEAR

EAST LOOP

EAST LOOP

EA

ST

LO

OP

T17-2

EA

ST

L

OO

P

EAST LOOP

EAST LOOP

LS3

T9

T7

T6

T5

T4

LS5

LS1

T1-1

LS2

LS17

WEST LOOPWEST LOOPWEST LOOP

LS18

T16-1

LS6

LS7

LS9

LS8

T8

T13

LS13

T12

LS12

LS11

T15

LS14

LS10

T11

T17-1

T16-2

MHA2-4

EH1

MHPL-4

MHA2-3

MH14

MH15

MH13

MH16

MH18

MH20

MH1

EPS1

MH3

MH6

MH7

MH4

MH5

MH8

MH9

MH9B

MH10

MH12

MH11

EMH1

MH4B

7 ELBOWS

FEED THRU

FEED THRU W/

3 BUTT SPLICES

FEED THRU

9 ELBOWS

FEED THRU

6 ELBOWS

FEED THRU

FEED THRU

FEED THRU W/

3 BUTT SPLICES

FEED THRU

FEED THRU

FEED THRU

9 ELBOWS

FEED THRU

EW2

FEED THRU

FEED THRU

FEED

THRU

FEED THRU

W/ 3 BUTT

SPLICES

FEED

THRU

FEED THRU

FEED THRU

FEED THRU

FEED

THRU

9 ELBOWS

FEED THRU

FEED THRU MH4C

T14

TRANSFORMER

LOOP SWITCH

MAN HOLE

FEED THRU

MH10

ABANDONED

H2

ABANDONED

E11

ABANDONED

E10

ABANDONED

H4

ABANDONED

W3

ABANDONED

W4

ABANDONED

ABANDONED

E1

ABANDONED

E3A

ABANDONED

E3

ABANDONED

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

E002

Man Hole Information

A

DESIGN

Office of

Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

ELECTRICAL

MAINTENANCE

Bath, NY

528A6-17-637

Building Number

8/11/17 Mortensen Steve W.Revisions: Date:

NOTE:

USERS OF THESE DRAWINGS ARE RESPONSIBLE FOR VERIFYING

EXISTING DIMENSIONS AND CONDITIONS IN THE FIELD

o n e e i g h t h i n c h o n e f o o t t h r e e i n c h e s e f o t o n e a n d o n e h a l f i n c h e o t o n e i n c e f o o t t h r e e q u a r t e r s i n c o t o a l f i n o t t h r e e e i g h t h s i n c e f o o t o n e q u a r t e r i n c e f o t

POWER CO. METERING

TRANSFORMERS AND

BILLING METER MOUNTED

ON TERMINAL POLE.

SEE DWF VAC-514-590

FOR DETAILS

NYSEG/RG&E. 12.47KV

3 PHASE "SOLIDLY

GROUNDED" WYE WITH

STATIC/NEUTRAL WIRE

MTR

CB

CB 400A

CB

29A 35

34N

34S

GEN

76N

76S

PARK

E W

54 55

52 53

929310424201475 17

16 18

78N 78S 103

STC

5A

25 KVA

120/240V

5A

HOUSING

5A

25 KVA

120/240V

200A

80A

50A

200A

100A

5A

10A

18A 100A

20A

100A 100A

150A

40A

40A

175A 175A

15A

100A

100A 20A

10A 100A

10A

100A 50A

5A

15A

3 4

10A 10A

LOAD BANK

CONNECT

300 KVA

120/208V

750 KVA

480V

750 KVA

480V

112.5 KVA

120/208V

50 KVA

120/240V

150 KVA

120/208V

500 KVA

120/208V

300 KVA

480/277V

225 KVA

120/208V

167 KVA

120/240V

750 KVA

480V/277V

500 KVA

120/208V

75 KVA

120/208V

112.5 KVA

120/208V

75 KVA

120/208V

300 KVA

120/208V

300 KVA

120/208V

300 KVA

120/208V

225 KVA

120/208V

750 KVA

480 V

500 KVA

12.5 KV

500 KVA

120/208V

LOAD BANK

TRANSFORMER

25 KVA

120/240V

MAIN SERVICE SWITCH GEAR

WEST LOOP

E A

S T

L O

O P

EAST LOOP

LS9LS8

LS7

LS6LS5LS4LS3LS2LS1

LS13LS12LS11

LS10

LS14

LS15

LS16

LS17LS18

T6

T18-2

T2-1 T7

T16-2

T9

T13

T8T3 T5T4

225 KVA

480V/277V

T2-2

T17-1

T1-1

T11

T18-1

T16-1

T1-2

T17-2

T15

T14

T10

T12

20A

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

E001

One Line Diagram

A

AS-BUILT

Office of

Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

ELECTRICAL

MAINTENANCE

Bath, NY

528A6-17-637

Building Number

8/11/17 Mortensen Steve W.Revisions: Date:

NOTE:

USERS OF THESE DRAWINGS ARE RESPONSIBLE FOR VERIFYING

EXISTING DIMENSIONS AND CONDITIONS IN THE FIELD

o n e e i g h t h i n c e f o o t t h r e e i n c h e o t o n e a n d o n e h a l f i n c h e o t o n e i n c e f o o t t h r e e q u a r t e r s i n o t o a l f i n o t t h r e e e i g h t h s i n c e f o o t o n e q u a r t e r i n c e f o o t

One Line Diagram

LEGEND

PAD-MOUNTED LOOP SWITCH UNIT

PAD-MOUNTED SWITCH AND FUSE UNIT

TRANSFORMER WITH INTEGRAL FUSING

TRANSFORMER

BUILDING IDENTIFICATION NUMBER

CB CIRCUIT BREAKER

INDICATES SWITCHES TO BE OPENED FOR LOOP GENERATOR OPERATIONS.

INDICATES SWITCHES TO BE CLOSED FOR LOOP GENERATOR OPERATIONS.

INDICATES SWITCHES OPEN FOR ALL STANDARD OPERATIONS.

Numerous changes from power outage on 3/2/18. 3/7/18

File details come from the government source that posted it. Updated .