This document is an Air Balancing and Testing Report for an Endoscopy facility located in East Orange, New Jersey, prepared by National Air Filter's Testing & Balancing Division in March 2022. The report comprehensively details airflow measurements, equipment specifications, and performance metrics for multiple air handling and exhaust systems, including Air Handling Unit AH-1 and Exhaust Fans EF-1 and EF-2. Key technical specifications include a total supply air volume of 3,365 CFM for AH-1, with actual air changes per hour (AC/H) ranging from 8.0 to 49.1 across different rooms, and room pressurization details showing negative or positive pressure relationships between adjacent spaces. The exhaust fans (EF-1 and EF-2) have actual exhaust volumes of 842 CFM and 1,389 CFM respectively, operating at different static pressures and electrical parameters, with both fans located on the roof and serving the Endoscopy area.

View the file

Other files

File Type Posted
Bldg 1 - SPD Area 1st floor Redacted.pdf PDF
23019 VA Lyons Pharmacy Renovations Equipment Schedule.pdf PDF
Bldg 135 - Pharmacy_Redacted.pdf PDF
23019 VA Lyons Pharmacy Renovations BUILDG 53.pdf PDF
Bldg 3 and 4 - Negative Pressure Rooms_Redacted.pdf PDF
23019 VA Lyons Pharmacy Renovations BUILDG 3.pdf PDF
36C24225Q0581 0004.docx DOCX document
Bldg 53 - Pharmacy_Redacted.pdf PDF
1-H6 FIRST FLOOR PLAN-HVAC SPD BUILDING NO. 1.pdf PDF
Bldg 3 - Pharmacy_Redacted.pdf PDF
H-7 MECHANICAL SCHEDULES..pdf PDF
H-801 HVAC SCHEDULES.pdf PDF
H-801 H-801 1.pdf PDF
36C24225Q0581 0003.docx DOCX document
M-6 EQUIPMENT SCHEDULES BUILDING NO. 7.pdf PDF
7-H11 SCHEDULES.pdf PDF
M-701.pdf PDF
Morgue AHU schedule.pdf PDF
DRAWING 9 - H-1 PARTIAL SECOND FLOOR PLAN HVAC DUCTWORK NEW WORK.pdf PDF
DRAWING 10 - H-2 PARTIAL SECOND FLOOR PLAN HVAC DUCTWORK NEW WORK.pdf PDF
DRAWING 6 -Endoscopy.pdf PDF
DRAWING 4 - 561-18-107A 2-MH1000.pdf PDF
DRAWING 11.pdf PDF
DRAWING 19 - M-6 PARTIAL SECOND FLOOR PLAN MECHANICAL NEW WORK.pdf PDF
DRAWING 21 - Pages from 561-10-102 100- Final Drawings Revised 10-18-16.pdf PDF
DRAWING 14 -HPSC0008.pdf PDF
DRAWING 18 - M-5 PARTIAL SECOND FLOOR PLAN MECHANICAL NEW WORK.pdf PDF
DRAWING 15 - M-1 FLOOR ROOF PLANS DETAILS BUILDING NO. 7.pdf PDF
DRAWING 20 - Morgue Supply and Exhaust Air.pdf PDF
DRAWING 3 - 561-10-102 Mod -5 Drawings 06-18-20.pdf PDF
DRAWING 17 - M-3 FLOOR - ROOF PLANS DETAILS BUILDING NO. 7.pdf PDF
DRAWING 16 -M-2 FLOOR - ROOF PLANS DETAILS BUILDING NO. 7.pdf PDF
DRAWING 2 - 1-H-8 MORGUE B FLOOR WING C DEMOLITION - SHEETMETAL.pdf PDF
DRAWING 12 - Histology Exhaust Air.pdf PDF
DRAWING 13 -Histology-Supply Air.pdf PDF
DRAWING 5 - 561-18-107A Pharmacy Upgrade MH1000.pdf PDF
DRAWING 8 - Gamma Cam.pdf PDF
DRAWING 1 - 1-H4 FLOOR PLAN LEVEL A WING B.pdf PDF
DRAWING 7.pdf PDF
36C24225Q0581 0002.docx DOCX document
852.219-75-VA-NOTICE-OF-LIMITATIONS-ON-SUBCONTRACTING-CERTIFICATE-OF-COMPLIANCE-FOR-SERVICES-AND-CONSTRUCTION.doc DOC document
Certification of Compliance with the Limitations on Subcontracting.docx DOCX document
36C24225Q0581 0001.pdf PDF
Attachment 2 Tailored FAR 52.212-1 Instructions to Offerors Commercial Products and Commercial Services.pdf PDF
Attachment 3 Tailored 52.212-2 Evaluation - Commercial Products and Commercial Services.pdf PDF
36C24225Q0581_2.docx DOCX document
Service Contract Act WD -2015-4211 - ESSEX.pdf PDF
Service Contract Act WD - 2015-4209 - SOMERSET.pdf PDF
Attachment 1 - 36C24225Q0581 - Combined Synopsis Solicitation Commercial Products and Commercial Services.pdf PDF
Show all 49

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

NATIONAL AIR FILTER

ROOM MIN AC/H ACTUAL SUPPLY EXHAUST ROOM ROOM

TYPE REQUIRED AC/H (CFM) (CFM) VOLUME PRESSURE

ENDOSCOPY 192 10.0 10.7 101 451 2520 cu' NEG TO ALL

CLEAN-UP 192D 6.0 49.1 557 390 680 cu'

POS TO 2-192F

POS TO 2-192

BRONCOSCOPY 192F 10.0 22.6 559 842 2232 cu' NEG TO ALL

ENDO 192B 10.0 13.9 583 71 2520 cu' POS TO ALL

ENDO 192E 6.0 10.4 None 118 680 cu' NEG TO ALL

ENDOSCOPY 192G 10.0 13.7 539 80 2358 cu' POS TO ALL

TOILET 192C 6.0 10.3 None 88 512 cu' NEG TO ALL

TOILET 192K 6.0 13.0 None 80 368 cu' NEG TO 2-192G

TOILET 192L 6.0 16.5 None 101 368 cu' NEG TO CORRIDOR

STORAGE 192M 6.0 8.0 204 None 1530 cu' POS TO CORRIDOR

AIRFLOWS AND AIR CHANGE RATES

7112Z1-2

National Air Filter PAGE 4

Testing & Balancing Division

Air Moving Equipment Test Sheet

Date: March 2022

Job Name: ENDOSCOPY Address: EAST ORANGE, N.J.

Unit No. AH-1

Location 2-192H

Manufacturer CARRIER

Model No. 39LC10HA-EP3AEJ-A9 Service ENDOSCOPY

Operating

Conditions Specified Actual Specified Actual Specified Actual Specified Actual

Total CFM NA 3365

Return Air CFM - -

O.S.A. C.F.M. NA 3365

Total Static

Pressure - 3.28"

Suction

Pressure - -1.51"

Discharge

Pressure - +1.77"

Fan Sheave - BX75HX13-16

Motor Sheave - 1VP60X1-1/8

Belts - BX35

Motor Frame - 184T

H.P. - 5.0

Voltage 208 208

Phase 3 3

RPM Motor 1735 1750

Rated Running Rated Running Rated Running Rated Running

Amperage 14.0 13.8

RPM Fan 1312 1278

Final Sheave Pos. NA CL 90%

Comments:

7112Z1-4

National Air Filter Testing & Balancing Division

Diffuser & Grille Test Sheet

Date: March 2022 Project Name: ENDOSCOPY Address: East Orange, NJ

Room Outlet Code Size Effective TEST RESULTS No. No. Area FPM CFM

AH-1 SUPPLY

ZONE #1

192G 1 S 24X24 1.0 539 539 192F 2 S 24X24 1.0 559 559 192D 3 S 24X24 1.0 557 457 192B 4 S 24X24 1.0 484 484

192 5 S 24X24 1.0 101 101

192B 4A S 24X24 1.0 99 99

ZONE #2

CORR 6 S 24X24 1.0 298 298

CORR 7 S 24X24 1.0 227 227

CORR 8 S 24X24 1.0 297 297

192M 9 S 24X24 1.0 204 204

REMARKS:

7112Z1-6

National Air Filter PAGE 8

Testing & Balancing Division

Exhaust Fan Report

Date: March 2022

Job Name: ENDOSCOPY Address: EAST ORANGE, N.J.

Fan Tag EF-1 EF-2 Location ROOF ROOF Service ENDOSCOPY ENDOSCOPY

Manufacturer GREENHECK GREENHECK Model 100HP-5-X 140-7-X

FAN DATA

Design CFM NA NA Actual CFM 842 1389 Design RPM NA NA Actual RPM 2584 2112 S.P. Design NA NA

S.P. Actual 0.59" 0.42" Suction Press -0.59" -0.42"

Discharge Press - - Sheave Size AK283 AK4634

Belt Size AX19 AX24

MOTOR DATA

HP Des/Act NA / NA NA / 3/4 Motor Frame NA 56

Design RPM NA 1745 Actual RPM 1734 1735 Sheave Size 4.0" VP56"

Sheave Position CL 60% CL 100%

ELECTRICAL DATA

Volts Design NA NA Volts Actual 208 208

Amps Design NA NA Amps Actual 2.0 2.9

7112Z1-8

National Air Filter Testing & Balancing Division

Diffuser & Grille Test Sheet

Date: March 2022

Project Name: ENDOSCOPY Address: East Orange, NJ

Room Outlet Code Size Effective TEST RESULTS No. No. Area FPM CFM

EF-1

2-192F 1 E 12X12 1.0 842 842

EF-2

ZONE #1

2-192D 1 E 12X12 1.0 390 390

2-192 2 E 12X12 1.0 451 451

2-192C 3 E 6X6 1.0 88 88

2-192B 4 E 12X12 1.0 71 71

ZONE #2

2-192L 5 E 6X6 1.0 101 101

2-192K 6 E 6X6 1.0 80 80

2-192G 7 E 12X12 1.0 80 80

2-192E 8 E 12X12 1.0 118 118

REMARKS:

7112Z1-10

7112Z1-CVR {ENDOSCOPY}
A I R B A L A N C E R E P O R T
EAST ORANGE, NEW JERSEY
ENDOSCOPY
FLOOR 2B AHU-1, EF-1, EF-2
7112Z1-SUM
EXECUTIVE SUMMARY
7112Z1-2
Sheet1
7112Z1-3
7112Z1-4
A
7112Z1-5
7112Z1-6
A
7112Z1-7
7112Z1-8
A
7112Z1-9
7112Z1-10
A
7112Z1-11
ADM 870 M05623 EXP 062022
ALNOR EBT731636019 03152023
AMPROBE SN 131200204 EXP 07272022
TACHOMETER SN 136B509P EXP 07272022
NAF NEBB EXP 03312022

File details come from the government source that posted it. Updated .