36C24225Q0325 0006.docx
DOCX document 90 KB Posted
- Solicitation number
- 36C24225Q0325
About this file
This document is an Amendment (0006) to a federal solicitation for electrical distribution system maintenance services for the VA New Jersey Healthcare System's Lyons and East Orange campuses. The solicitation (36C24225Q0325) is 100% set-aside for Service-Disabled Veteran-Owned Small Businesses, covering comprehensive electrical maintenance and testing of complex electrical infrastructure including substations, switchgears, transformers, and distribution systems across multiple campus buildings.
The contract spans a base period from May 1, 2025 to April 30, 2026, with four one-year option periods extending through April 30, 2030. Key maintenance requirements include annual preventive maintenance, triennial switchgear maintenance, infrared scanning, and detailed testing of electrical components at both campuses. The amendment extends the offer submission deadline to 3:00 PM EST on Thursday, April 17, 2025, and clarifies that previously mentioned test results for the Lyons Facility are not available. The primary service codes are J059 for electrical equipment maintenance, with a NAICS code of 238210 for electrical contractors.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C24225Q0325 0005.docx | DOCX document | |
| 2020 C Vault 1 Line.pdf | ||
| 10-8-20 - VA LYONS ARC FLASH.pdf | ||
| 2020 B Vault 1 Line.pdf | ||
| 36C24225Q0325 0004.docx | DOCX document | |
| 2020 One Lines Arc Flash.pdf | ||
| 36C24225Q0325 0003.docx | DOCX document | |
| 36C24225Q0325 0002.docx | DOCX document | |
| 36C24225Q0325_1 corrected.docx | DOCX document | |
| 36C24225Q0325 Electrical Distro NJ 0001 Site Visit Amendment.pdf | ||
| 36C24225Q0325_1.docx | DOCX document |
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
5. PROJECT NUMBER (if applicable)
CODE
7. ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER
3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE OF PAGES
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO.
1. CONTRACT ID CODE
FACILITY CODE
CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office.
is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER
16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30
PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer) Network Contracting Office 2 Department of Veterans Affairs Samuel S . Stratton VA Medical Center 113 Holland Avenue (2-90NCA) Albany NY 12208-3410 Department of Veterans Affairs Samuel S . Stratton VA Medical Center Network Contracting Activity 113 Holland Avenue (2-90NCA) Albany NY 12208-3410 To all Offerors/Bidders
36C24225Q0325
X X X ** HOUR & DATE for Receipt of Offers is EXTENDED to: 04-17-2025 15:00 EDT See CONTINUATION Page X This amendment 0006 is issued to further update the Statement of Work and the Pricing Schedule. Please refer to the attached updated SOW and Pricing Schedule. Additionally, a previous amendment indicated that test results were available for the Lyons Facility. This was indicated in error and these results are not available. All available schematics have been provided via amendment 0004. The offer due date is extended to 3:00pm EST on Thursday April 17, 2025. To be considered for award, submit your offer and acknowledgement of solicitation amendments to michael.estep2@va.gov no later than 3:00pm EST on Thursday April, 17 2025.
Joseph Cellino Contracting Officer
CONTINUATION PAGE
A.1 PRICE/COST SCHEDULE
ITEM INFORMATION
| ITEM NUMBER |
| DESCRIPTION OF SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 0.00 |
| HR |
| __________________ |
| __________________ |
Electrical Distribution System Preventive Maintenance and Testing (Triennial) - East Orange Campus. This includes the sub CLINs below (xxxxAA-xxxxAS) .Pricing should be provided for the parent CLIN. Sub CLINs marked N/A need not be separately priced Contract Period: Base POP Begin: 05-01-2025 POP End: 04-30-2026 PRINCIPAL NAICS CODE: 238210 - Electrical Contractors and Other Wiring Installation Contractors PRODUCT/SERVICE CODE: J059 - Maintenance, Repair, and Rebuilding of Equipment - Electrical and Electronic Equipment Components
0001AA
| 0.00 |
| N/A |
| __________________ |
| __________________ |
26KV Substation – Outdoor Yard (Normal Hours) a. Clean and inspect all Porcelain Insulators
b. (13) Clean and inspect Overhead Switches
c. (4) Gas Circuit Breakers, Doble, Timing Oil Samples, Inspect Controls
d. (2) 5000 KVA Station Transformers Doble, Megger, Ratio, Oil Samples (a) Screen & (b) DGA
e. (2) 26 KV Metering Transformers Contract Period: Base POP Begin: 05-01-2025 POP End: 04-30-2026
PRODUCT/SERVICE CODE: J059 - Maintenance, Repair, and Rebuilding of Equipment - Electrical and Electronic Equipment Components
0001AB
| 0.00 |
| N/A |
| __________________ |
| __________________ |
Main Substation – 4.16 KV Switchgear (Normal Hours except Breakers which must be tested while each substation is being worked on.) a. (56) Over Current Relays
b. (6) Differential Relays
c. (12) 5 KV Breakers, FPE 5 KV Air Breakers
d. (1) Battery Bank and Charger Contract Period: Base POP Begin: 05-01-2025 POP End: 04-30-2026
PRODUCT/SERVICE CODE: J059 - Maintenance, Repair, and Rebuilding of Equipment - Electrical and Electronic Equipment Components
0001AC
| 0.00 |
| N/A |
| __________________ |
| __________________ |
Vault A Normal Switchgear (AN) (Off Hours Nights) a. (1) Feeder Breaker 4.16KV included in the Substation scope
b. (11) Low Voltage Breakers (Clean, Test and Calibrate)
c. (1) 1000 KVA Oil Filled Transformer
d. (1) High Voltage (HV) Switch
e. (3) 150 KVA 480/208 Transformers in A Vault Contract Period: Base POP Begin: 05-01-2025 POP End: 04-30-2026
PRODUCT/SERVICE CODE: J059 - Maintenance, Repair, and Rebuilding of Equipment - Electrical and Electronic Equipment Components
0001AD
| 0.00 |
| N/A |
| __________________ |
| __________________ |
Vault - A Emergency Switchgear (AE) (Off Hours) a. (1) Feeder Breaker 4.16KV included in the Substation scope
b. (17) Low Voltage Breakers (Clean, Test and Calibrate)
c. (1) 1000 KVA Oil Filled Transformer
d. (1) High Voltage (HV) Switch
e. (2) 208/120V 9 KVA Transformers
f. (1) 208/120V 118 KVA Transformer
g. (3) Generator protective Relays
h. (1) 112.5 KVA 208/480V Transformer for ER Contract Period: Base POP Begin: 05-01-2025 POP End: 04-30-2026
PRODUCT/SERVICE CODE: J059 - Maintenance, Repair, and Rebuilding of Equipment - Electrical and Electronic Equipment Components
0001AE
| 0.00 |
| N/A |
| __________________ |
| __________________ |
Vault B Normal Switchgear (BN) (Off Hours Nights) a. (1) Feeder Breaker 4.16KV included in the Substation scope
c. (1) 1000 KVA Oil Filled Transformer
d. (1) High Voltage (HV) Switch Contract Period: Base POP Begin: 05-01-2025 POP End: 04-30-2026
PRODUCT/SERVICE CODE: J059 - Maintenance, Repair, and Rebuilding of Equipment - Electrical and Electronic Equipment Components
0001AF
| 0.00 |
| N/A |
| __________________ |
| __________________ |
Vault B Emergency Switchgear (BE) (Off Hours Nights) a. (1) Feeder Breaker 4.16KV included in the Substation scope
b. (14) Low Voltage Breakers (Clean, Test and Calibrate)
c. (1) 1000 KVA Oil Filled Transformer
d. (1) High Voltage (HV) Switch
e. (8) 208/230V 93 KVA Transformer (Elevator Mechanical)
f. (1) 13KVA Transformer Contract Period: Base POP Begin: 05-01-2025 POP End: 04-30-2026
PRODUCT/SERVICE CODE: J059 - Maintenance, Repair, and Rebuilding of Equipment - Electrical and Electronic Equipment Components
0001AG
| 0.00 |
| N/A |
| __________________ |
| __________________ |
Vault C Normal Switchgear (CN) (Off Hours Nights) a (1) Feeder Breaker 4.16KV included in the Substation scope
b. (25) SQ D NW, LV Breakers (Clean, Test and Calibrate)
c. (1) 1000/1333 KVA Dry Type Transformer w/ Fans
d. (1) High Voltage (HV) Switch
e. (7) 208/480 150 KVA Transformers (C-132)
f. (1) 208/480 300KVA Temp MRI Transformer (C-132) Contract Period: Base POP Begin: 05-01-2025 POP End: 04-30-2026
PRODUCT/SERVICE CODE: J059 - Maintenance, Repair, and Rebuilding of Equipment - Electrical and Electronic Equipment Components
0001AH
| 0.00 |
| N/A |
| __________________ |
| __________________ |
Vault C Emergency Switchgear 2 (CN2) (Off Hours Saturday) a. (1) Feeder Breaker 4.16KV included in the Substation scope
b. (7) Molded Case Breakers (Clean, Test and Calibrate)
c. (1) 1500 KVA Dry Type Transformer
d. (1) High Voltage (HV) Switch
e. (1) 208/480V Transformer for the OR MCC
f. (2) 22.5 KVA 480/208/120V Transformers in PHB
g. (6) 15KVA 480/208/120V Transformers in the E-109 closets
h. (1) 480/208/120 Transformer in 6-E-109
i. ORMCC motor control center (16) buckets in Chiller plant
j. (1) 4.16KV Transfer Switch near main substation Contract Period: Base POP Begin: 05-01-2025 POP End: 04-30-2026
PRODUCT/SERVICE CODE: J059 - Maintenance, Repair, and Rebuilding of Equipment - Electrical and Electronic Equipment Components
0001AJ
| 0.00 |
| N/A |
| __________________ |
| __________________ |
Vault C Emergency Switchgear (CE) (Off Hours Nights) This switchgear has been replaced with a new Square D QUD6 Switchboard!!!
a. (1) Feeder Breaker 4.16KV included in the Substation scope
b. (1) High Voltage (HV) Switch
c. (1) 300KVA 208/480V Transformer for the MRI
d. (3) 150KVA 208/480V Transformers
e. (16) SQ D Type NTN LV Breakers (clean, test and calibrate)
f. (4) SQ D Type NWN LV Breakers
g. (1) 500KVA Dry Type Transformer 4160/201.120V no fans Contract Period: Base POP Begin: 05-01-2025 POP End: 04-30-2026
PRODUCT/SERVICE CODE: J059 - Maintenance, Repair, and Rebuilding of Equipment - Electrical and Electronic Equipment Components
0001AK
| 0.00 |
| N/A |
| __________________ |
| __________________ |
Building 15 (Outdoor Shed) (Off Hours Saturday) a. MCC-15 Motor Control Center
b. Switchboard NP 1200amp normal panel
c. MDP-15 800amp 208/120V
d. Generator DP 1200amp emergency panel 408/277V
e. ATS 15-L 480/277V
f. ATS 15-H 480/277V
g. Dry Transformer TX-15B 300KVA 480/208/120V
h. Oil filled transformer TX-15B 750KVA 4160/480/120V I. (1) Feeder Breaker 4.16KV included in the Substation scope Contract Period: Base POP Begin: 05-01-2025 POP End: 04-30-2026
PRODUCT/SERVICE CODE: J059 - Maintenance, Repair, and Rebuilding of Equipment - Electrical and Electronic Equipment Components
0001AL
| 0.00 |
| N/A |
| __________________ |
| __________________ |
Chiller Plant Switchgear (DN) (Off hours Saturday) a. (1) Feeder Breaker 4.16KV included in the Substation scope
b. (1) Switchboard 1200A Main Breaker
c. (1) 1000 KVA Dry Type Transformer
d. (2) High Voltage Switch
e. (1) 4.16KV Transfer Switch by the main substation
f. (5) MCC DN (19) buckets
g. (3) 4.16KVA Chiller contactors Contract Period: Base POP Begin: 05-01-2025 POP End: 04-30-2026
PRODUCT/SERVICE CODE: J059 - Maintenance, Repair, and Rebuilding of Equipment - Electrical and Electronic Equipment Components
0001AM
| 0.00 |
| N/A |
| __________________ |
| __________________ |
Boiler Plant (Bldg. 8) (Off hours Saturday) a. (1) 500 KVA Oil Filled Transformer
b. (1) Transfer Switch
c. (4) MDPS Molded Case Breakers
d. (6) MCCN Normal Buckets.
e. (9) MCCE Emergency Buckets
f. (5) Panel EP2 Breakers
g. (1) Feeder Breaker 4.16KV included in the Substation scope Contract Period: Base POP Begin: 05-01-2025 POP End: 04-30-2026
PRODUCT/SERVICE CODE: J059 - Maintenance, Repair, and Rebuilding of Equipment - Electrical and Electronic Equipment Components
0001AN
| 0.00 |
| N/A |
| __________________ |
| __________________ |
Research Lab Area (Bldg. 7) (Off Hours Saturday)
a. (1) HV Switch
b. (1) 1000 KVA Oil Filled Transformer
c. (1) Normal Load Center
d. (1) SBS 4000A Breaker
e. (1) SBS 2000A Breaker
f. (14) 400 -800A Breakers
g. (2) Transfer Switches
h. (1) Emergency MDP
i. (1) Feeder Breaker 4.16KV included in the Substation scope
j. MCC7 (17) Buckets
k. MCCE7 (17) buckets
l. MCCE7A (19) buckets Contract Period: Base POP Begin: 05-01-2025 POP End: 04-30-2026
PRODUCT/SERVICE CODE: J059 - Maintenance, Repair, and Rebuilding of Equipment - Electrical and Electronic Equipment Components
0001AP
| 0.00 |
| N/A |
| __________________ |
| __________________ |
Transfer Switches (Off Hours) a. ATS-B/C in C-132
b. ATS-C/B # 1 in C-132
c. ATS # 2 in C-132
d. OR-C ATS1 in C-132 Contract Period: Base POP Begin: 05-01-2025 POP End: 04-30-2026
PRODUCT/SERVICE CODE: J059 - Maintenance, Repair, and Rebuilding of Equipment - Electrical and Electronic Equipment Components
0001AQ
| 0.00 |
| N/A |
| __________________ |
| __________________ |
Bldg 17 (Off hours) a. (1) 45 KVA 480V/208/120V transformer
POP Begin: 05-01-2025 POP End: 04-30-2026
PRODUCT/SERVICE CODE: J059 - Maintenance, Repair, and Rebuilding of Equipment - Electrical and Electronic Equipment Components
0001AR
| 0.00 |
| N/A |
| __________________ |
| __________________ |
Vault C (CN1) (This will be done the same time as CE they are on the same 4160 breaker) a. (1) HV Switch
b. (1) 4160/208/120V 1.000KVA oil filled transformer Contract Period: Base POP Begin: 05-01-2025 POP End: 04-30-2026
PRODUCT/SERVICE CODE: J059 - Maintenance, Repair, and Rebuilding of Equipment - Electrical and Electronic Equipment Components
0001AS
| 0.00 |
| N/A |
| __________________ |
| __________________ |
Bldg. 5: (1) 1,125KVA 4160/208/120V transformer. (Off hours)
POP Begin: 05-01-2025 POP End: 04-30-2026
PRODUCT/SERVICE CODE: J059 - Maintenance, Repair, and Rebuilding of Equipment - Electrical and Electronic Equipment Components
| 0.00 |
| HR |
| __________________ |
| __________________ |
Annual Preventative maintenance all transformers both inside and outside of all buildings to include Infra-Red Scanning - East Orange Campus. Refer to 2.1 in the Statement of Work.
POP Begin: 05-01-2025 POP End: 04-30-2026
PRODUCT/SERVICE CODE: J059 - Maintenance, Repair, and Rebuilding of Equipment - Electrical and Electronic Equipment Components
| 0.00 |
| HR |
| __________________ |
| __________________ |
Annual Preventative maintenance all transformers both inside and outside of all buildings to include Infra-Red Scanning - Lyons Campus. Refer to 2.2 in the SOW.
POP Begin: 05-01-2025 POP End: 04-30-2026
PRODUCT/SERVICE CODE: J059 - Maintenance, Repair, and Rebuilding of Equipment - Electrical and Electronic Equipment Components
| 0.00 |
| HR |
| __________________ |
| __________________ |
Electrical Distribution System Preventive Maintenance and Testing (Triennial) -Lyons Campus. This includes the sub CLINs below (xxxxAA-xxxxAY) .Pricing should be provided for the parent CLIN. Sub CLINs marked N/A need not be separately priced
POP Begin: 05-01-2025 POP End: 04-30-2026
PRODUCT/SERVICE CODE: J059 - Maintenance, Repair, and Rebuilding of Equipment - Electrical and Electronic Equipment Components
0004AA
| 0.00 |
| N/A |
| __________________ |
| __________________ |
| Bldg 1: | |
| • | Transformer KVA 750-1200 Amp-120/208 Volts 3 Phase |
| • | Switch Board |
| • | Sub Breaker-Oil 433 Gal |
Contract Period: Base POP Begin: 05-01-2025 POP End: 04-30-2026
PRODUCT/SERVICE CODE: J059 - Maintenance, Repair, and Rebuilding of Equipment - Electrical and Electronic Equipment Components
0004AB
| 0.00 |
| N/A |
| __________________ |
| __________________ |
| Bldg 2: | |
| • | Transformer KVA 500-1200 Amp-120/208 Volts 3 Phase |
| • | Switch Board |
| • | Sub Breaker-Oil 279 Gal. |
Contract Period: Base POP Begin: 05-01-2025 POP End: 04-30-2026
PRODUCT/SERVICE CODE: J059 - Maintenance, Repair, and Rebuilding of Equipment - Electrical and Electronic Equipment Components
0004AC
| 0.00 |
| N/A |
| __________________ |
| __________________ |
| Bldg. 3 | |
| • | Transformer KVA 1500-1200 Amp-480/277 Volts 3 Phase |
| • | Switch Board |
| • | Sub Breaker-Oil 355 Gal. |
Contract Period: Base POP Begin: 05-01-2025 POP End: 04-30-2026
PRODUCT/SERVICE CODE: J059 - Maintenance, Repair, and Rebuilding of Equipment - Electrical and Electronic Equipment Components
0004AD
| 0.00 |
| N/A |
| __________________ |
| __________________ |
| Bldg. 4 | |
| • | Transformer KVA 500-1200 Amp-120/208 Volts 3 Phase |
| • | Switch Board |
| • | Sub Breaker-Oil 279 Gal. |
Contract Period: Base POP Begin: 05-01-2025 POP End: 04-30-2026
PRODUCT/SERVICE CODE: J059 - Maintenance, Repair, and Rebuilding of Equipment - Electrical and Electronic Equipment Components
0004AE
| 0.00 |
| N/A |
| __________________ |
| __________________ |
| Bldg. 5 | |
| • | Transformer KVA 225-1200 Amp-120/208 Volts 3 Phase |
| • | Switch Board |
| • | Sub Breaker-Oil 218 Gal. |
Contract Period: Base POP Begin: 05-01-2025 POP End: 04-30-2026
PRODUCT/SERVICE CODE: J059 - Maintenance, Repair, and Rebuilding of Equipment - Electrical and Electronic Equipment Components
0004AF
| 0.00 |
| N/A |
| __________________ |
| __________________ |
| Bldg. 6 | |
| • | Transformer KVA 750-1200 Amp-120/208 Volts 3 Phase |
| • | Switch Board |
| • | Sub Breaker-Oil 405 Gal. |
Contract Period: Base POP Begin: 05-01-2025 POP End: 04-30-2026
PRODUCT/SERVICE CODE: J059 - Maintenance, Repair, and Rebuilding of Equipment - Electrical and Electronic Equipment Components
0004AG
| 0.00 |
| N/A |
| __________________ |
| __________________ |
| Bldg. 7 | |
| • | Transformer KVA 500-1200 Amp-120/208 Volts 3 Phase |
| • | Switch Board |
| • | Sub Breaker-Oil 279 Gal. |
Contract Period: Base POP Begin: 05-01-2025 POP End: 04-30-2026
PRODUCT/SERVICE CODE: J059 - Maintenance, Repair, and Rebuilding of Equipment - Electrical and Electronic Equipment Components
0004AH
| 0.00 |
| N/A |
| __________________ |
| __________________ |
| Bldg. 8 | |
| • | Transformer KVA 500-1200 Amp-120/208 Volts 3 Phase |
| • | Switch Board |
| • | Sub Breaker-Oil 279 Gal. |
Contract Period: Base POP Begin: 05-01-2025 POP End: 04-30-2026
PRODUCT/SERVICE CODE: J059 - Maintenance, Repair, and Rebuilding of Equipment - Electrical and Electronic Equipment Components
0004AJ
| 0.00 |
| N/A |
| __________________ |
| __________________ |
| Bldg. 9 | |
| • | Transformer KVA 500-1200 Amp-120/208 Volts 3 Phase |
| • | Switch Board |
| • | Sub Breaker-Oil 225 Gal. |
Contract Period: Base POP Begin: 05-01-2025 POP End: 04-30-2026
PRODUCT/SERVICE CODE: J059 - Maintenance, Repair, and Rebuilding of Equipment - Electrical and Electronic Equipment Components
0004AK
| 0.00 |
| N/A |
| __________________ |
| __________________ |
| Bldg. 10 | |
| • | Transformer KVA 225-1200 Amp-120/208 Volts 3 Phase |
| • | Switch Board |
| • | Sub Breaker-Oil 225 Gal. |
Contract Period: Base POP Begin: 05-01-2025 POP End: 04-30-2026
PRODUCT/SERVICE CODE: J059 - Maintenance, Repair, and Rebuilding of Equipment - Electrical and Electronic Equipment Components
0004AL
| 0.00 |
| N/A |
| __________________ |
| __________________ |
| Bldg. 11 | |
| • | Transformer KVA 225-1200 Amp-120/208 Volts 3 Phase |
| • | Switch Board |
| • | Sub Breaker-Oil 218 Gal. |
Contract Period: Base POP Begin: 05-01-2025 POP End: 04-30-2026
PRODUCT/SERVICE CODE: J059 - Maintenance, Repair, and Rebuilding of Equipment - Electrical and Electronic Equipment Components
0004AM
| 0.00 |
| N/A |
| __________________ |
| __________________ |
| Bldg. 13 | |
| • | Transformer KVA 225-1200 Amp-120/208 Volts 3 Phase |
| • | Switch Board |
| • | Sub Breaker-Oil 218 Gal. |
Contract Period: Base POP Begin: 05-01-2025 POP End: 04-30-2026
PRODUCT/SERVICE CODE: J059 - Maintenance, Repair, and Rebuilding of Equipment - Electrical and Electronic Equipment Components
0004AN
| 0.00 |
| N/A |
| __________________ |
| __________________ |
| Bldg. 14 | |
| • | Transformer KVA 500-1200 Amp-120/208 Volts 3 Phase |
| • | Switch Board |
| • | Sub Breaker-Oil 500 Gal. |
Contract Period: Base POP Begin: 05-01-2025 POP End: 04-30-2026
PRODUCT/SERVICE CODE: J059 - Maintenance, Repair, and Rebuilding of Equipment - Electrical and Electronic Equipment Components
0004AP
| 0.00 |
| N/A |
| __________________ |
| __________________ |
| Bldg. 15 | |
| • | Transformer KVA 1000-1200 Amp-480/277 Volts 3 Phase |
| • | Switch Board |
| • | Sub Breaker-Oil 418 Gal. |
Contract Period: Base POP Begin: 05-01-2025 POP End: 04-30-2026
PRODUCT/SERVICE CODE: J059 - Maintenance, Repair, and Rebuilding of Equipment - Electrical and Electronic Equipment Components
0004AQ
| 0.00 |
| N/A |
| __________________ |
| __________________ |
| Bldg. 16 | |
| • | Transformer KVA 300-1200 Amp-120/208 Volts 3 Phase |
| • | Switch Board |
| • | Sub Breaker-Oil 234 Gal. |
Contract Period: Base POP Begin: 05-01-2025 POP End: 04-30-2026
PRODUCT/SERVICE CODE: J059 - Maintenance, Repair, and Rebuilding of Equipment - Electrical and Electronic Equipment Components
0004AR
| 0.00 |
| N/A |
| __________________ |
| __________________ |
| Bldg. 54 | |
| • | Transformer KVA 300-1200 Amp-120/208 Volts 3 Phase |
| • | Switch Board |
| • | Sub Breaker-Oil 405 Gal |
Contract Period: Base POP Begin: 05-01-2025 POP End: 04-30-2026
PRODUCT/SERVICE CODE: J059 - Maintenance, Repair, and Rebuilding of Equipment - Electrical and Electronic Equipment Components
0004AS
| 0.00 |
| N/A |
| __________________ |
| __________________ |
| Bldg. 53 | |
| • | Transformer KVA 300-1200 Amp-120/208 Volts 3 Phase |
| • | Switch Board |
| • | Sub Breaker-Oil 370 Gal |
Contract Period: Base POP Begin: 05-01-2025 POP End: 04-30-2026
PRODUCT/SERVICE CODE: J059 - Maintenance, Repair, and Rebuilding of Equipment - Electrical and Electronic Equipment Components
0004AT
| 0.00 |
| N/A |
| __________________ |
| __________________ |
| Bldg. 57 | |
| • | Transformer KVA 300-1200 Amp-120/208 Volts 3 Phase |
| • | Switch Board |
| • | Sub Breaker-Oil 133 Gal. |
Contract Period: Base POP Begin: 05-01-2025 POP End: 04-30-2026
PRODUCT/SERVICE CODE: J059 - Maintenance, Repair, and Rebuilding of Equipment - Electrical and Electronic Equipment Components
0004AU
| 0.00 |
| N/A |
| __________________ |
| __________________ |
| Bldg. 118 | |
| • | Transformer KVA 300-1200 Amp-120/208 Volts 3 Phase |
| • | Switch Board |
| • | Sub Breaker-Oil 279 Gal. |
Contract Period: Base POP Begin: 05-01-2025 POP End: 04-30-2026
PRODUCT/SERVICE CODE: J059 - Maintenance, Repair, and Rebuilding of Equipment - Electrical and Electronic Equipment Components
0004AV
| 0.00 |
| N/A |
| __________________ |
| __________________ |
| Bldg. 135 | |
| • | Transformer KVA 300-1200 Amp-120/208 Volts 3 Phase |
| • | Switch Board |
| • | Sub Breaker-Oil 282 Gal |
Contract Period: Base POP Begin: 05-01-2025 POP End: 04-30-2026
PRODUCT/SERVICE CODE: J059 - Maintenance, Repair, and Rebuilding of Equipment - Electrical and Electronic Equipment Components
0004AW
| 0.00 |
| N/A |
| __________________ |
| __________________ |
Bldg. 136 Exterior Northeast End:
| • | Transformer KVA 300-1200 Amp-120/208 Volts 3 Phase |
| • | Switch Board |
| • | Sub Breaker-Oil 282 Gal |
Exterior northeast End:
| • | Transformer KVA 300-1200 Amp-120/208 Volts 3 Phase |
| • | Switch Board |
| • | Sub Breaker-Oil 390 Gal. |
Interior West End (2):
| • | Transformer KVA 300-1200 Amp-120/208 Volts 3 Phase |
| • | Switch Board |
| • | Sub Breaker-Oil 554 Gal. |
Exterior East South End:
| • | Transformer KVA 300-1200 Amp-120/208 Volts 3 Phase |
| • | Switch Board |
| • | Sub Breaker-Oil 554 Gal. |
Contract Period: Base POP Begin: 05-01-2025 POP End: 04-30-2026
PRODUCT/SERVICE CODE: J059 - Maintenance, Repair, and Rebuilding of Equipment - Electrical and Electronic Equipment Components
0004AX
| 0.00 |
| N/A |
| __________________ |
| __________________ |
| Bldg. 141 | |
| • | Transformer KVA 300-1200 Amp-120/208 Volts 3 Phase |
| • | Switch Board |
| • | Sub Breaker-Oil 244 Gal |
Contract Period: Base POP Begin: 05-01-2025 POP End: 04-30-2026
PRODUCT/SERVICE CODE: J059 - Maintenance, Repair, and Rebuilding of Equipment - Electrical and Electronic Equipment Components
0004AY
| 0.00 |
| N/A |
| __________________ |
| __________________ |
| Bldg 143 (Left Side): | |
| • | SERNO 994111-A1 |
| • | KVA 1500/2000 |
| • | 3 Phase |
(Right Side)
| • | SERNO 5889159 60 |
| • | KVA 1500 |
| • | 3 Phase |
Contract Period: Base POP Begin: 05-01-2025 POP End: 04-30-2026
PRODUCT/SERVICE CODE: J059 - Maintenance, Repair, and Rebuilding of Equipment - Electrical and Electronic Equipment Components
| 0.00 |
| HR |
| __________________ |
| __________________ |
Electrical Distribution System Preventive Maintenance and Testing (Triennial) - East Orange Campus. This includes the sub CLINs below (xxxxAA-xxxxAS) .Pricing should be provided for the parent CLIN. Sub CLINs marked N/A need not be separately priced Contract Period: Option 1 POP Begin: 05-01-2026 POP End: 04-30-2027
PRODUCT/SERVICE CODE: J059 - Maintenance, Repair, and Rebuilding of Equipment - Electrical and Electronic Equipment Components
1001AA
| 0.00 |
| N/A |
| __________________ |
| __________________ |
26KV Substation – Outdoor Yard (Normal Hours) a. Clean and inspect all Porcelain Insulators
c. (4) Gas Circuit Breakers, Doble, Timing Oil Samples, Inspect Controls
d. (2) 5000 KVA Station Transformers Doble, Megger, Ratio, Oil Samples (a) Screen & (b) DGA
e. (2) 26 KV Metering Transformers Contract Period: Option 1 POP Begin: 05-01-2026 POP End: 04-30-2027
PRODUCT/SERVICE CODE: J059 - Maintenance, Repair, and Rebuilding of Equipment - Electrical and Electronic Equipment Components
1001AB
| 0.00 |
| N/A |
| __________________ |
| __________________ |
Main Substation – 4.16 KV Switchgear (Normal Hours except Breakers which must be tested while each substation is being worked on.) a. (56) Over Current Relays
c. (12) 5 KV Breakers, FPE 5 KV Air Breakers
d. (1) Battery Bank and Charger Contract Period: Option 1 POP Begin: 05-01-2026 POP End: 04-30-2027
PRODUCT/SERVICE CODE: J059 - Maintenance, Repair, and Rebuilding of Equipment - Electrical and Electronic Equipment Components
1001AC
| 0.00 |
| N/A |
| __________________ |
| __________________ |
Vault A Normal Switchgear (AN) (Off Hours Nights) a. (1) Feeder Breaker 4.16KV included in the Substation scope
c. (1) 1000 KVA Oil Filled Transformer
d. (1) High Voltage (HV) Switch
e. (3) 150 KVA 480/208 Transformers in A Vault Contract Period: Option 1 POP Begin: 05-01-2026 POP End: 04-30-2027
PRODUCT/SERVICE CODE: J059 - Maintenance, Repair, and Rebuilding of Equipment - Electrical and Electronic Equipment Components
1001AD
| 0.00 |
| N/A |
| __________________ |
| __________________ |
Vault - A Emergency Switchgear (AE) (Off Hours) a. (1) Feeder Breaker 4.16KV included in the Substation scope
c. (1) 1000 KVA Oil Filled Transformer
d. (1) High Voltage (HV) Switch
e. (2) 208/120V 9 KVA Transformers
f. (1) 208/120V 118 KVA Transformer
g. (3) Generator protective Relays
h. (1) 112.5 KVA 208/480V Transformer for ER Contract Period: Option 1 POP Begin: 05-01-2026 POP End: 04-30-2027
PRODUCT/SERVICE CODE: J059 - Maintenance, Repair, and Rebuilding of Equipment - Electrical and Electronic Equipment Components
1001AE
| 0.00 |
| N/A |
| __________________ |
| __________________ |
Vault B Normal Switchgear (BN) (Off Hours Nights) a. (1) Feeder Breaker 4.16KV included in the Substation scope
c. (1) 1000 KVA Oil Filled Transformer
d. (1) High Voltage (HV) Switch Contract Period: Option 1 POP Begin: 05-01-2026 POP End: 04-30-2027
PRODUCT/SERVICE CODE: J059 - Maintenance, Repair, and Rebuilding of Equipment - Electrical and Electronic Equipment Components
1001AF
| 0.00 |
| N/A |
| __________________ |
| __________________ |
Vault B Emergency Switchgear (BE) (Off Hours Nights) a. (1) Feeder Breaker 4.16KV included in the Substation scope
c. (1) 1000 KVA Oil Filled Transformer
d. (1) High Voltage (HV) Switch
e. (8) 208/230V 93 KVA Transformer (Elevator Mechanical)
f. (1) 13KVA Transformer Contract Period: Option 1 POP Begin: 05-01-2026 POP End: 04-30-2027
PRODUCT/SERVICE CODE: J059 - Maintenance, Repair, and Rebuilding of Equipment - Electrical and Electronic Equipment Components
1001AG
| 0.00 |
| N/A |
| __________________ |
| __________________ |
Vault C Normal Switchgear (CN) (Off Hours Nights) a (1) Feeder Breaker 4.16KV included in the Substation scope
c. (1) 1000/1333 KVA Dry Type Transformer w/ Fans
d. (1) High Voltage (HV) Switch
e. (7) 208/480 150 KVA Transformers (C-132)
f. (1) 208/480 300KVA Temp MRI Transformer (C-132) Contract Period: Option 1 POP Begin: 05-01-2026 POP End: 04-30-2027
PRODUCT/SERVICE CODE: J059 - Maintenance, Repair, and Rebuilding of Equipment - Electrical and Electronic Equipment Components
1001AH
| 0.00 |
| N/A |
| __________________ |
| __________________ |
Vault C Emergency Switchgear 2 (CN2) (Off Hours Saturday) a. (1) Feeder Breaker 4.16KV included in the Substation scope
c. (1) 1500 KVA Dry Type Transformer
d. (1) High Voltage (HV) Switch
e. (1) 208/480V Transformer for the OR MCC
f. (2) 22.5 KVA 480/208/120V Transformers in PHB
g. (6) 15KVA 480/208/120V Transformers in the E-109 closets
h. (1) 480/208/120 Transformer in 6-E-109
i. ORMCC motor control center (16) buckets in Chiller plant
j. (1) 4.16KV Transfer Switch near main substation Contract Period: Option 1 POP Begin: 05-01-2026 POP End: 04-30-2027
PRODUCT/SERVICE CODE: J059 - Maintenance, Repair, and Rebuilding of Equipment - Electrical and Electronic Equipment Components
1001AJ
| 0.00 |
| N/A |
| __________________ |
| __________________ |
Vault C Emergency Switchgear (CE) (Off Hours Nights) This switchgear has been replaced with a new Square D QUD6 Switchboard!!!
b. (1) High Voltage (HV) Switch
c. (1) 300KVA 208/480V Transformer for the MRI
d. (3) 150KVA 208/480V Transformers
e. (16) SQ D Type NTN LV Breakers (clean, test and calibrate)
f. (4) SQ D Type NWN LV Breakers
g. (1) 500KVA Dry Type Transformer 4160/201.120V no fans Contract Period: Option 1 POP Begin: 05-01-2026 POP End: 04-30-2027
PRODUCT/SERVICE CODE: J059 - Maintenance, Repair, and Rebuilding of Equipment - Electrical and Electronic Equipment Components
1001AK
| 0.00 |
| N/A |
| __________________ |
| __________________ |
Building 15 (Outdoor Shed) (Off Hours Saturday) a. MCC-15 Motor Control Center
c. MDP-15 800amp 208/120V
d. Generator DP 1200amp emergency panel 408/277V
e. ATS 15-L 480/277V
f. ATS 15-H 480/277V
g. Dry Transformer TX-15B 300KVA 480/208/120V
h. Oil filled transformer TX-15B 750KVA 4160/480/120V I. (1) Feeder Breaker 4.16KV included in the Substation scope Contract Period: Option 1 POP Begin: 05-01-2026 POP End: 04-30-2027
PRODUCT/SERVICE CODE: J059 - Maintenance, Repair, and Rebuilding of Equipment - Electrical and Electronic Equipment Components
1001AL
| 0.00 |
| N/A |
| __________________ |
| __________________ |
Chiller Plant Switchgear (DN) (Off hours Saturday) a. (1) Feeder Breaker 4.16KV included in the Substation scope
c. (1) 1000 KVA Dry Type Transformer
d. (2) High Voltage Switch
e. (1) 4.16KV Transfer Switch by the main substation
f. (5) MCC DN (19) buckets
g. (3) 4.16KVA Chiller contactors Contract Period: Option 1 POP Begin: 05-01-2026 POP End: 04-30-2027
PRODUCT/SERVICE CODE: J059 - Maintenance, Repair, and Rebuilding of Equipment - Electrical and Electronic Equipment Components
1001AM
| 0.00 |
| N/A |
| __________________ |
| __________________ |
Boiler Plant (Bldg. 8) (Off hours Saturday) a. (1) 500 KVA Oil Filled Transformer
c. (4) MDPS Molded Case Breakers
d. (6) MCCN Normal Buckets.
e. (9) MCCE Emergency Buckets
f. (5) Panel EP2 Breakers
g. (1) Feeder Breaker 4.16KV included in the Substation scope Contract Period: Option 1 POP Begin: 05-01-2026 POP End: 04-30-2027
PRODUCT/SERVICE CODE: J059 - Maintenance, Repair, and Rebuilding of Equipment - Electrical and Electronic Equipment Components
1001AN
| 0.00 |
| N/A |
| __________________ |
| __________________ |
Research Lab Area (Bldg. 7) (Off Hours Saturday)
b. (1) 1000 KVA Oil Filled Transformer
c. (1) Normal Load Center
d. (1) SBS 4000A Breaker
e. (1) SBS 2000A Breaker
f. (14) 400 -800A Breakers
g. (2) Transfer Switches
h. (1) Emergency MDP
i. (1) Feeder Breaker 4.16KV included in the Substation scope
j. MCC7 (17) Buckets
k. MCCE7 (17) buckets
l. MCCE7A (19) buckets Contract Period: Option 1 POP Begin: 05-01-2026 POP End: 04-30-2027
PRODUCT/SERVICE CODE: J059 - Maintenance, Repair, and Rebuilding of Equipment - Electrical and Electronic Equipment Components
1001AP
| 0.00 |
| N/A |
| __________________ |
| __________________ |
Transfer Switches (Off Hours) a. ATS-B/C in C-132
c. ATS # 2 in C-132
d. OR-C ATS1 in C-132 Contract Period: Option 1 POP Begin: 05-01-2026 POP End: 04-30-2027
PRODUCT/SERVICE CODE: J059 - Maintenance, Repair, and Rebuilding of Equipment - Electrical and Electronic Equipment Components
1001AQ
| 0.00 |
| N/A |
| __________________ |
| __________________ |
Bldg 17 (Off hours) a. (1) 45 KVA 480V/208/120V transformer
POP Begin: 05-01-2026 POP End: 04-30-2027
PRODUCT/SERVICE CODE: J059 - Maintenance, Repair, and Rebuilding of Equipment - Electrical and Electronic Equipment Components
1001AR
| 0.00 |
| N/A |
| __________________ |
| __________________ |
Vault C (CN1) (This will be done the same time as CE they are on the same 4160 breaker) a. (1) HV Switch
Contract Period: Option 1 POP Begin: 05-01-2026 POP End: 04-30-2027
PRODUCT/SERVICE CODE: J059 - Maintenance, Repair, and Rebuilding of Equipment - Electrical and Electronic Equipment Components
1001AS
| 0.00 |
| N/A |
| __________________ |
| __________________ |
Bldg. 5: (1) 1,125KVA 4160/208/120V transformer. (Off hours)
POP Begin: 05-01-2026 POP End: 04-30-2027
PRODUCT/SERVICE CODE: J059 - Maintenance, Repair, and Rebuilding of Equipment - Electrical and Electronic Equipment Components
| 0.00 |
| HR |
| __________________ |
| __________________ |
Annual Preventative maintenance all transformers both inside and outside of all buildings to include Infra-Red Scanning - East Orange Campus. Refer to 2.1 in the Statement of Work.
POP Begin: 05-01-2026 POP End: 04-30-2027
PRODUCT/SERVICE CODE: J059 - Maintenance, Repair, and Rebuilding of Equipment - Electrical and Electronic Equipment Components
| 0.00 |
| HR |
| __________________ |
| __________________ |
Annual Preventative maintenance all transformers both inside and outside of all buildings to include Infra-Red Scanning - Lyons Campus. Refer to 2.2 in the SOW.
POP Begin: 05-01-2026 POP End: 04-30-2027
PRODUCT/SERVICE CODE: J059 - Maintenance, Repair, and Rebuilding of Equipment - Electrical and Electronic Equipment Components
| 0.00 |
| HR |
| __________________ |
| __________________ |
Electrical Distribution System Preventive Maintenance and Testing (Triennial) -Lyons Campus. This includes the sub CLINs below (xxxxAA-xxxxAY) .Pricing should be provided for the parent CLIN. Sub CLINs marked N/A need not be separately priced
POP Begin: 05-01-2026 POP End: 04-30-2027
PRODUCT/SERVICE CODE: J059 - Maintenance, Repair, and Rebuilding of Equipment - Electrical and Electronic Equipment Components
1004AA
| 0.00 |
| N/A |
| __________________ |
| __________________ |
| Bldg 1: | |
| • | Transformer KVA 750-1200 Amp-120/208 Volts 3 Phase |
| • | Switch Board |
| • | Sub Breaker-Oil 433 Gal |
Contract Period: Option 1 POP Begin: 05-01-2026 POP End: 04-30-2027
PRODUCT/SERVICE CODE: J059 - Maintenance, Repair, and Rebuilding of Equipment - Electrical and Electronic Equipment Components
1004AB
| 0.00 |
| N/A |
| __________________ |
| __________________ |
| Bldg 2: | |
| • | Transformer KVA 500-1200 Amp-120/208 Volts 3 Phase |
| • | Switch Board |
| • | Sub Breaker-Oil 279 Gal. |
Contract Period: Option 1 POP Begin: 05-01-2026 POP End: 04-30-2027
PRODUCT/SERVICE CODE: J059 - Maintenance, Repair, and Rebuilding of Equipment - Electrical and Electronic Equipment Components
1004AC
| 0.00 |
| N/A |
| __________________ |
| __________________ |
| Bldg. 3 | |
| • | Transformer KVA 1500-1200 Amp-480/277 Volts 3 Phase |
| • | Switch Board |
| • | Sub Breaker-Oil 355 Gal. |
Contract Period: Option 1 POP Begin: 05-01-2026 POP End: 04-30-2027
PRODUCT/SERVICE CODE: J059 - Maintenance, Repair, and Rebuilding of Equipment - Electrical and Electronic Equipment Components
1004AD
| 0.00 |
| N/A |
| __________________ |
| __________________ |
| Bldg. 4 | |
| • | Transformer KVA 500-1200 Amp-120/208 Volts 3 Phase |
| • | Switch Board |
| • | Sub Breaker-Oil 279 Gal. |
Contract Period: Option 1 POP Begin: 05-01-2026 POP End: 04-30-2027
PRODUCT/SERVICE CODE: J059 - Maintenance, Repair, and Rebuilding of Equipment - Electrical and Electronic Equipment Components
1004AE
| 0.00 |
| N/A |
| __________________ |
| __________________ |
| Bldg. 5 | |
| • | Transformer KVA 225-1200 Amp-120/208 Volts 3 Phase |
| • | Switch Board |
| • | Sub Breaker-Oil 218 Gal. |
Contract Period: Option 1 POP Begin: 05-01-2026 POP End: 04-30-2027
PRODUCT/SERVICE CODE: J059 - Maintenance, Repair, and Rebuilding of Equipment - Electrical and Electronic Equipment Components
1004AF
| 0.00 |
| N/A |
| __________________ |
| __________________ |
| Bldg. 6 | |
| • | Transformer KVA 750-1200 Amp-120/208 Volts 3 Phase |
| • | Switch Board |
| • | Sub Breaker-Oil 405 Gal. |
Contract Period: Option 1 POP Begin: 05-01-2026 POP End: 04-30-2027
PRODUCT/SERVICE CODE: J059 - Maintenance, Repair, and Rebuilding of Equipment - Electrical and Electronic Equipment Components
1004AG
| 0.00 |
| N/A |
| __________________ |
| __________________ |
| Bldg. 7 | |
| • | Transformer KVA 500-1200 Amp-120/208 Volts 3 Phase |
| • | Switch Board |
| • | Sub Breaker-Oil 279 Gal. |
Contract Period: Option 1 POP Begin: 05-01-2026 POP End: 04-30-2027
PRODUCT/SERVICE CODE: J059 - Maintenance, Repair, and Rebuilding of Equipment - Electrical and Electronic Equipment Components
1004AH
| 0.00 |
| N/A |
| __________________ |
| __________________ |
| Bldg. 8 | |
| • | Transformer KVA 500-1200 Amp-120/208 Volts 3 Phase |
| • | Switch Board |
| • | Sub Breaker-Oil 279 Gal. |
Contract Period: Option 1 POP Begin: 05-01-2026 POP End: 04-30-2027
PRODUCT/SERVICE CODE: J059 - Maintenance, Repair, and Rebuilding of Equipment - Electrical and Electronic Equipment Components
1004AJ
| 0.00 |
| N/A |
| __________________ |
| __________________ |
| Bldg. 9 | |
| • | Transformer KVA 500-1200 Amp-120/208 Volts 3 Phase |
| • | Switch Board |
| • | Sub Breaker-Oil 225 Gal. |
Contract Period: Option 1 POP Begin: 05-01-2026 POP End: 04-30-2027
PRODUCT/SERVICE CODE: J059 - Maintenance, Repair, and Rebuilding of Equipment - Electrical and Electronic Equipment Components
1004AK
| 0.00 |
| N/A |
| __________________ |
| __________________ |
| Bldg. 10 | |
| • | Transformer KVA 225-1200 Amp-120/208 Volts 3 Phase |
| • | Switch Board |
| • | Sub Breaker-Oil 225 Gal. |
Contract Period: Option 1 POP Begin: 05-01-2026 POP End: 04-30-2027
PRODUCT/SERVICE CODE: J059 - Maintenance, Repair, and Rebuilding of Equipment - Electrical and Electronic Equipment Components
1004AL
| 0.00 |
| N/A |
| __________________ |
| __________________ |
| Bldg. 11 | |
| • | Transformer KVA 225-1200 Amp-120/208 Volts 3 Phase |
| • | Switch Board |
| • | Sub Breaker-Oil 218 Gal. |
Contract Period: Option 1 POP Begin: 05-01-2026 POP End: 04-30-2027
PRODUCT/SERVICE CODE: J059 - Maintenance, Repair, and Rebuilding of Equipment - Electrical and Electronic Equipment Components
1004AM
| 0.00 |
| N/A |
| __________________ |
| __________________ |
| Bldg. 13 | |
| • | Transformer KVA 225-1200 Amp-120/208 Volts 3 Phase |
| • | Switch Board |
| • | Sub Breaker-Oil 218 Gal. |
Contract Period: Option 1 POP Begin: 05-01-2026 POP End: 04-30-2027
PRODUCT/SERVICE CODE: J059 - Maintenance, Repair, and Rebuilding of Equipment - Electrical and Electronic Equipment Components
1004AN
| 0.00 |
| N/A |
| __________________ |
| __________________ |
| Bldg. 14 | |
| • | Transformer KVA 500-1200 Amp-120/208 Volts 3 Phase |
| • | Switch Board |
| • | Sub Breaker-Oil 500 Gal. |
Contract Period: Option 1 POP Begin: 05-01-2026 POP End: 04-30-2027
PRODUCT/SERVICE CODE: J059 - Maintenance, Repair, and Rebuilding of Equipment - Electrical and Electronic Equipment Components
1004AP
| 0.00 |
| N/A |
| __________________ |
| __________________ |
| Bldg. 15 | |
| • | Transformer KVA 1000-1200 Amp-480/277 Volts 3 Phase |
| • | Switch Board |
| • | Sub Breaker-Oil 418 Gal. |
Contract Period: Option 1 POP Begin: 05-01-2026 POP End: 04-30-2027
PRODUCT/SERVICE CODE: J059 - Maintenance, Repair, and Rebuilding of Equipment - Electrical and Electronic Equipment Components
1004AQ
| 0.00 |
| N/A |
| __________________ |
| __________________ |
| Bldg. 16 | |
| • | Transformer KVA 300-1200 Amp-120/208 Volts 3 Phase |
| • | Switch Board |
| • | Sub Breaker-Oil 234 Gal. |
Contract Period: Option 1 POP Begin: 05-01-2026 POP End: 04-30-2027
PRODUCT/SERVICE CODE: J059 - Maintenance, Repair, and Rebuilding of Equipment - Electrical and Electronic Equipment Components
1004AR
| 0.00 |
| N/A |
| __________________ |
| __________________ |
| Bldg. 54 | |
| • | Transformer KVA 300-1200 Amp-120/208 Volts 3 Phase |
| • | Switch Board |
| • | Sub Breaker-Oil 405 Gal |
Contract Period: Option 1 POP Begin: 05-01-2026 POP End: 04-30-2027
PRODUCT/SERVICE CODE: J059 - Maintenance, Repair, and Rebuilding of Equipment - Electrical and Electronic Equipment Components
1004AS
| 0.00 |
| N/A |
| __________________ |
| __________________ |
| Bldg. 53 | |
| • | Transformer KVA 300-1200 Amp-120/208 Volts 3 Phase |
| • | Switch Board |
| • | Sub Breaker-Oil 370 Gal |
Contract Period: Option 1 POP Begin: 05-01-2026 POP End: 04-30-2027
PRODUCT/SERVICE CODE: J059 - Maintenance, Repair, and Rebuilding of Equipment - Electrical and Electronic Equipment Components
1004AT
| 0.00 |
| N/A |
| __________________ |
| __________________ |
| Bldg. 57 | |
| • | Transformer KVA 300-1200 Amp-120/208 Volts 3 Phase |
| • | Switch Board |
| • | Sub Breaker-Oil 133 Gal. |
Contract Period: Option 1 POP Begin: 05-01-2026 POP End: 04-30-2027
PRODUCT/SERVICE CODE: J059 - Maintenance, Repair, and Rebuilding of Equipment - Electrical and Electronic Equipment Components
1004AU
| 0.00 |
| N/A |
| __________________ |
| __________________ |
| Bldg. 118 | |
| • | Transformer KVA 300-1200 Amp-120/208 Volts 3 Phase |
| • | Switch Board |
| • | Sub Breaker-Oil 279 Gal. |
Contract Period: Option 1 POP Begin: 05-01-2026 POP End: 04-30-2027
PRODUCT/SERVICE CODE: J059 - Maintenance, Repair, and Rebuilding of Equipment - Electrical and Electronic Equipment Components
1004AV
| 0.00 |
| N/A |
| __________________ |
| __________________ |
| Bldg. 135 | |
| • | Transformer KVA 300-1200 Amp-120/208 Volts 3 Phase |
| • | Switch Board |
| • | Sub Breaker-Oil 282 Gal |
Contract Period: Option 1 POP Begin: 05-01-2026 POP End: 04-30-2027
PRODUCT/SERVICE CODE: J059 - Maintenance, Repair, and Rebuilding of Equipment - Electrical and Electronic Equipment Components
1004AW
| 0.00 |
| N/A |
| __________________ |
| __________________ |
Bldg. 136
| • | Transformer KVA 300-1200 Amp-120/208 Volts 3 Phase |
| • | Switch Board |
| • | Sub Breaker-Oil 282 Gal |
Exterior northeast End:
| • | Transformer KVA 300-1200 Amp-120/208 Volts 3 Phase |
| • | Switch Board |
| • | Sub Breaker-Oil 390 Gal. |
Interior West End (2):
| • | Transformer KVA 300-1200 Amp-120/208 Volts 3 Phase |
| • | Switch Board |
| • | Sub Breaker-Oil 554 Gal. |
Exterior East South End:
| • | Transformer KVA 300-1200 Amp-120/208 Volts 3 Phase |
| • | Switch Board |
| • | Sub Breaker-Oil 554 Gal. |
Contract Period: Option 1 POP Begin: 05-01-2026 POP End: 04-30-2027
PRODUCT/SERVICE CODE: J059 - Maintenance, Repair, and Rebuilding of Equipment - Electrical and Electronic Equipment Components
1004AX
| 0.00 |
| N/A |
| __________________ |
| __________________ |
| Bldg. 141 | |
| • | Transformer KVA 300-1200 Amp-120/208 Volts 3 Phase |
| • | Switch Board |
| • | Sub Breaker-Oil 244 Gal |
Contract Period: Option 1 POP Begin: 05-01-2026 POP End: 04-30-2027
PRODUCT/SERVICE CODE: J059 - Maintenance, Repair, and Rebuilding of Equipment - Electrical and Electronic Equipment Components
1004AY
| 0.00 |
| N/A |
| __________________ |
| __________________ |
| Bldg 143 (Left Side): | |
| • | SERNO 994111-A1 |
| • | KVA 1500/2000 |
| • | 3 Phase |
(Right Side)
| • | SERNO 5889159 60 |
| • | KVA 1500 |
| • | 3 Phase |
Contract Period: Option 1 POP Begin: 05-01-2026 POP End: 04-30-2027
PRODUCT/SERVICE CODE: J059 - Maintenance, Repair, and Rebuilding of Equipment - Electrical and Electronic Equipment Components
| 0.00 |
| HR |
| __________________ |
| __________________ |
Electrical Distribution System Preventive Maintenance and Testing (Triennial) - East Orange Campus. This includes the sub CLINs below (xxxxAA-xxxxAS) .Pricing should be provided for the parent CLIN. Sub CLINs marked N/A need not be separately priced Contract Period: Option 2 POP Begin: 05-01-2027 POP End: 04-30-2028
PRODUCT/SERVICE CODE: J059 - Maintenance, Repair, and Rebuilding of Equipment - Electrical and Electronic Equipment Components
2001AA
| 0.00 |
| N/A |
| __________________ |
| __________________ |
26KV Substation – Outdoor Yard (Normal Hours) a. Clean and inspect all Porcelain Insulators
c. (4) Gas Circuit Breakers, Doble, Timing Oil Samples, Inspect Controls
d. (2) 5000 KVA Station Transformers Doble, Megger, Ratio, Oil Samples (a) Screen & (b) DGA
e. (2) 26 KV Metering Transformers Contract Period: Option 2 POP Begin: 05-01-2027 POP End: 04-30-2028
PRODUCT/SERVICE CODE: J059 - Maintenance, Repair, and Rebuilding of Equipment - Electrical and Electronic Equipment Components
2001AB
| 0.00 |
| N/A |
| __________________ |
| __________________ |
Main Substation – 4.16 KV Switchgear (Normal Hours except Breakers which must be tested while each substation is being worked on.) a. (56) Over Current Relays
c. (12) 5 KV Breakers, FPE 5 KV Air Breakers
d. (1) Battery Bank and Charger Contract Period: Option 2 POP Begin: 05-01-2027 POP End: 04-30-2028
PRODUCT/SERVICE CODE: J059 - Maintenance, Repair, and Rebuilding of Equipment - Electrical and Electronic Equipment Components
2001AC
| 0.00 |
| N/A |
| __________________ |
| __________________ |
Vault A Normal Switchgear (AN) (Off Hours Nights) a. (1) Feeder Breaker 4.16KV included in the Substation scope
c. (1) 1000 KVA Oil Filled Transformer
d. (1) High Voltage (HV) Switch
e. (3) 150 KVA 480/208 Transformers in A Vault Contract Period: Option 2 POP Begin: 05-01-2027 POP End: 04-30-2028
PRODUCT/SERVICE CODE: J059 - Maintenance, Repair, and Rebuilding of Equipment - Electrical and Electronic Equipment Components
2001AD
| 0.00 |
| N/A |
| __________________ |
| __________________ |
Vault - A Emergency Switchgear (AE) (Off Hours) a. (1) Feeder Breaker 4.16KV included in the Substation scope
c. (1) 1000 KVA Oil Filled Transformer
d. (1) High Voltage (HV) Switch
e. (2) 208/120V 9 KVA Transformers
f. (1) 208/120V 118 KVA Transformer
g. (3) Generator protective Relays
h. (1) 112.5 KVA 208/480V Transformer for ER Contract Period: Option 2 POP Begin: 05-01-2027 POP End: 04-30-2028
PRODUCT/SERVICE CODE: J059 - Maintenance, Repair, and Rebuilding of Equipment - Electrical and Electronic Equipment Components
2001AE
| 0.00 |
| N/A |
| __________________ |
| __________________ |
Vault B Normal Switchgear (BN) (Off Hours Nights) a. (1) Feeder Breaker 4.16KV included in the Substation scope
c. (1) 1000 KVA Oil Filled Transformer
d. (1) High Voltage (HV) Switch Contract Period: Option 2 POP Begin: 05-01-2027 POP End: 04-30-2028
PRODUCT/SERVICE CODE: J059 - Maintenance, Repair, and Rebuilding of Equipment - Electrical and Electronic Equipment Components
2001AF
| 0.00 |
| N/A |
| __________________ |
| __________________ |
Vault B Emergency Switchgear (BE) (Off Hours Nights) a. (1) Feeder Breaker 4.16KV included in the Substation scope
c. (1) 1000 KVA Oil Filled Transformer
d. (1) High Voltage (HV) Switch
e. (8) 208/230V 93 KVA Transformer (Elevator Mechanical)
f. (1) 13KVA Transformer Contract Period: Option 2 POP Begin: 05-01-2027 POP End: 04-30-2028
PRODUCT/SERVICE CODE: J059 - Maintenance, Repair, and Rebuilding of Equipment - Electrical and Electronic Equipment Components
2001AG
| 0.00 |
| N/A |
| __________________ |
| __________________ |
Vault C Normal Switchgear (CN) (Off Hours Nights) a (1) Feeder Breaker 4.16KV included in the Substation scope
c. (1) 1000/1333 KVA Dry Type Transformer w/ Fans
d. (1) High Voltage (HV) Switch
e. (7) 208/480 150 KVA Transformers (C-132)
f. (1) 208/480 300KVA Temp MRI Transformer (C-132) Contract Period: Option 2 POP Begin: 05-01-2027 POP End: 04-30-2028
PRODUCT/SERVICE CODE: J059 - Maintenance, Repair, and Rebuilding of Equipment - Electrical and Electronic Equipment Components
2001AH
| 0.00 |
| N/A |
| __________________ |
| __________________ |
Vault C Emergency Switchgear 2 (CN2) (Off Hours Saturday) a. (1) Feeder Breaker 4.16KV included in the Substation scope
c. (1) 1500 KVA Dry Type Transformer
d. (1) High Voltage (HV) Switch
e. (1) 208/480V Transformer for the OR MCC
f. (2) 22.5 KVA 480/208/120V Transformers in PHB
g. (6) 15KVA 480/208/120V Transformers in the E-109 closets
h. (1) 480/208/120 Transformer in 6-E-109
i. ORMCC motor control center (16) buckets in Chiller plant
j. (1) 4.16KV Transfer Switch near main substation Contract Period: Option 2 POP Begin: 05-01-2027 POP End: 04-30-2028
PRODUCT/SERVICE CODE: J059 - Maintenance, Repair, and Rebuilding of Equipment - Electrical and Electronic Equipment Components
2001AJ
| 0.00 |
| N/A |
| __________________ |
| __________________ |
Vault C Emergency Switchgear (CE) (Off Hours Nights) This switchgear has been replaced with a new Square D QUD6 Switchboard!!!
b. (1) High Voltage (HV) Switch
c. (1) 300KVA 208/480V Transformer for the MRI
d. (3) 150KVA 208/480V Transformers
e. (16) SQ D Type NTN LV Breakers (clean, test and calibrate)
f. (4) SQ D Type NWN LV Breakers
g. (1) 500KVA Dry Type Transformer 4160/201.120V no fans Contract Period: Option 2 POP Begin: 05-01-2027 POP End: 04-30-2028
PRODUCT/SERVICE CODE: J059 - Maintenance, Repair, and Rebuilding of Equipment - Electrical and Electronic Equipment Components
2001AK
| 0.00 |
| N/A |
| __________________ |
| __________________ |
Building 15 (Outdoor Shed) (Off Hours Saturday) a. MCC-15 Motor Control Center
c. MDP-15 800amp 208/120V
d. Generator DP 1200amp emergency panel 408/277V
e. ATS 15-L 480/277V
f. ATS 15-H 480/277V
g. Dry Transformer TX-15B 300KVA 480/208/120V
h. Oil filled transformer TX-15B 750KVA 4160/480/120V I. (1) Feeder Breaker 4.16KV included in the Substation scope Contract Period: Option 2 POP Begin: 05-01-2027 POP End: 04-30-2028
PRODUCT/SERVICE CODE: J059 - Maintenance, Repair, and Rebuilding of Equipment - Electrical and Electronic Equipment Components
2001AL
| 0.00 |
| N/A |
| __________________ |
| __________________ |
Chiller Plant Switchgear (DN) (Off hours Saturday) a. (1) Feeder Breaker 4.16KV included in the Substation scope
c. (1) 1000 KVA Dry Type Transformer
d. (2) High Voltage Switch
e. (1) 4.16KV Transfer Switch by the main substation
f. (5) MCC DN (19) buckets
g. (3) 4.16KVA Chiller contactors Contract Period: Option 2 POP Begin: 05-01-2027 POP End: 04-30-2028
PRODUCT/SERVICE CODE: J059 - Maintenance, Repair, and Rebuilding of Equipment - Electrical and Electronic Equipment Components
2001AM
| 0.00 |
| N/A |
| __________________ |
| __________________ |
Boiler Plant (Bldg. 8) (Off hours Saturday) a. (1) 500 KVA Oil Filled Transformer
c. (4) MDPS Molded Case Breakers
d. (6) MCCN Normal Buckets.
e. (9) MCCE Emergency Buckets
f. (5) Panel EP2 Breakers
g. (1) Feeder Breaker 4.16KV included in the Substation scope Contract Period: Option 2 POP Begin: 05-01-2027 POP End: 04-30-2028
PRODUCT/SERVICE CODE: J059 - Maintenance, Repair, and Rebuilding of Equipment - Electrical and Electronic Equipment Components
2001AN
| 0.00 |
| N/A |
| __________________ |
| __________________ |
Research Lab Area (Bldg. 7) (Off Hours Saturday)
b. (1) 1000 KVA Oil Filled Transformer
c. (1) Normal Load Center
d. (1) SBS 4000A Breaker
e. (1) SBS 2000A Breaker
f. (14) 400 -800A Breakers
g. (2) Transfer Switches
h. (1) Emergency MDP
i. (1) Feeder Breaker 4.16KV included in the Substation scope
j. MCC7 (17) Buckets
k. MCCE7 (17) buckets
l. MCCE7A (19) buckets Contract Period: Option 2 POP Begin: 05-01-2027 POP End: 04-30-2028
PRODUCT/SERVICE CODE: J059 - Maintenance, Repair, and Rebuilding of Equipment - Electrical and Electronic Equipment Components
2001AP
| 0.00 |
| N/A |
| __________________ |
| __________________ |
Transfer Switches (Off Hours) a. ATS-B/C in C-132
c. ATS # 2 in C-132
d. OR-C ATS1 in C-132 Contract Period: Option 2 POP Begin: 05-01-2027 POP End: 04-30-2028
PRODUCT/SERVICE CODE: J059 - Maintenance, Repair, and Rebuilding of Equipment - Electrical and Electronic Equipment Components
2001AQ
| 0.00 |
| N/A |
| __________________ |
| __________________ |
Bldg 17 (Off hours) a. (1) 45 KVA 480V/208/120V transformer
POP Begin: 05-01-2027 POP End: 04-30-2028
PRODUCT/SERVICE CODE: J059 - Maintenance, Repair, and Rebuilding of Equipment - Electrical and Electronic Equipment Components
2001AR
| 0.00 |
| N/A |
| __________________ |
| __________________ |
Vault C (CN1) (This will be done the same time as CE they are on the same 4160 breaker) a. (1) HV Switch
Contract Period: Option 2 POP Begin: 05-01-2027 POP End: 04-30-2028
PRODUCT/SERVICE CODE: J059 - Maintenance, Repair, and Rebuilding of Equipment - Electrical and Electronic Equipment Components
2001AS
| 0.00 |
| N/A |
| __________________ |
| __________________ |
Bldg. 5: (1) 1,125KVA 4160/208/120V transformer. (Off hours)
POP Begin: 05-01-2027 POP End: 04-30-2028
PRODUCT/SERVICE…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .