RFI 008 - Black Mastic at Radiators - Response.pdf

PDF 112 KB Posted

Attached to
F108--36C242-25-AP-2553 | 528-25-3-4895-0056 Buffalo VAMC 625B Abatement & Demo (VA-25-00065537)
Solicitation number
36C24225B0026
Issued by

About this file

This document is a Request for Information (RFI) Response from the VA Western New York Healthcare System's Facilities Engineering department, specifically addressing RFI 008 for the Unit 9C Renovations project. The RFI focuses on black mastic in radiator recesses, with Note AA-1 on sheet AA-103 stating that no insulation shall remain in the recessed radiator cavities, and if removal is not possible, the insulation should be encapsulated with paint or a cementitious coat. The document clarifies that ACM (Asbestos Containing Material) pipe insulation is already designated for removal on AA drawings. The response indicates no contractual change is required and is simply a clarification of the existing project scope, with no action needed from the VA Contracting Officer at this time.

View the file

Other files

Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

VA WESTERN NEW YORK HEALTHCARE SYSTEM

FACILITIES ENGINEERING

BUFFALO VA MEDICAL CENTER | 3495 BAILEY AVENUE, BUFFALO, NY 14215 | (716) 834‐9200

RFI RESPONSE

Project Number:

Project Name: Unit 9C Renovations

RFI Number: 008

RFI Topic: Black Mastic in Radiator Recess

Contract Number:

Vendor:

Contracting Specialist:

Date: 20 Dec 2023

SOURCE

RFI 008

RESPONSE

Note AA‐1 on sheet AA‐103 states no insulation shall remain ant the recessed radiator cavities. If it can not be removed, please encapsulate with either paint or a cementitious coat.

ACM pipe insulation is already being called out for removal on AA drawings.

RECOMMENDATION

No contractual change required.

PROPOSED SOW

Not applicable – clarification of existing scope.

REQUESTED ACTIONS

VA Contracting Officer: No action required at this time.

SUBMITTED BY

Contracting Officer Representative