About this file

This document provides details on a federal solicitation for site preparation and installation of x-ray equipment at the Emergency Department of the Veterans Affairs Medical Center in Buffalo, New York. The solicitation number is 36C24222B0041 and was issued by the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 2. Proposed responses are due May 15th, 2022 and award is anticipated to be made on July 15th, 2022. The scope of work involves site preparation and installation of new x-ray equipment, with no further product or service requirements specified.

View the file

Other files

File Type Posted
36C24222B0041 0006.docx DOCX document
36C24222B0041 0005.docx DOCX document
S02 Wage Determination - Erie.pdf PDF
36C24222B0041 0004.docx DOCX document
528-19-104 ED DEPT VA BUFFALO Final Bid Submission X-Ray Specifications (1).pdf PDF
Sign-in sheet Walkthrough_2022_07_22_10_51_23_910.pdf PDF
528-19-104 RFI Log (bid)1.xlsx XLSX spreadsheet
36C24222B0041 0003.docx DOCX document
36C24222B0041 0002.docx DOCX document
P07 Wage Determination.pdf PDF
36C24222B0041 0001.docx DOCX document
36C24222B0041_1.docx DOCX document
Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

A

6/

/2

:3 9:

P

M

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

Phase

ARCHITECT OF RECORD STAMPCONSULTANTS

321 4 5 6 7 8 9 10

U.S. Department of Veterans Affairs

LIST OF DRAWINGS

PROJECT CONTACT DIRECTORY

LOCATION MAP

CONTRACT SPECIALIST CONTRACTING OFFICER REPRESENTATIVE (COR) ARCHITECT / MEP/FP & STRUCTURAL ENGINEERS acela architects + engineers, pc 2633 Moravian Avenue Allentown, PA 18103

Joseph L. Herman, AIA, NCARB, LEED AP Cell: (610) 417-7850 jherman@acela-ae.com

APPROVALS

PROJECT INFORMATION

ACELAJLH

C

U s e rs

\a k a n u s k y \D o c u m e n ts

\5 -1

-1

E

D D

E P

T V

A B

U F

F A

L O r2

X

-R a y C

M a k a n u s k y V

B N

S Y

.r v t

GI101

COVER SHEET

3/22/2022

BUFFALO VA MEDICAL CENTER

528-19-104X-RAY RENOVATION

BUFFALO VA MEDICAL CENTER

100% FINAL BID SUBMISSION

3495 BAILEY AVENUE BUFFALO, NY 14215

Thomas Heldwein Thomas.Heldwein@va.gov Cell: (716)349-3962

Tanya Baldwin Tanya.Baldwin@va.gov (716)862-7461 ext. 22443

X-RAY RENOVATION

PROJECT #: 528-19-104

Approved by Medical Center Director Approved by Director of Facility Management Service

Approved by Project COR Approved by Medical Director

Approved by Infection Control Approved by Safety Officer

Approved by Project CO

21-USDVA-04

VA WESTERN NEW YORK

HEALTHCARE SYSTEM,

BUFFALO VA CAMPUS

ARCHITECTURAL ELEMENTS

AE101 1ST FLOOR NEW WORK PLANS

GENERAL CONTRACT

GC101 1ST FLOOR ICRA CONTROL PLAN

GC102 LEAD SHIELDING DETAILS

GENERAL INFORMATION

GI101 COVER SHEET

GI102 GENERAL INFORMATION

GI201 1ST FLOOR LIFE SAFETY PLAN

ARCHITECTURAL DEMOLITION

AD101 1ST FLOOR DEMOLITION PLANS

INTERIOR FINISH ELEMENTS

AI101 1ST FLOOR FINISH PLANS

ARCHITECTURAL EQUIPMENT

AQ101 1ST FLOOR EQUIPMENT PLAN

AQ102 SIEMENS EQUIPMENT PLANS

AQ103 SIEMENS EQUIPMENT PLANS

AQ104 SIEMENS EQUIPMENT PLANS

AQ105 SIEMENS EQUIPMENT PLANS

AQ106 SIEMENS EQUIPMENT PLANS

FIRE PROTECTION

F101 1ST FLOOR FIRE PROTECTION DEMOLITION AND NEW WORK PLANS

MECHANICAL

M101 1ST FLOOR MECHANICAL DEMOLITION AND NEW WORK PLAN

ELECTRICAL

E001 ELECTRICAL ABBREVIATIONS, NOTES AND LEGENDS

E101 1ST FLOOR POWER DEMOLITION AND NEW WORK PLAN

E201 1ST FLOOR LIGHTING DEMOLITION AND NEW WORK PLAN

E301 ELECTRICAL SINGLE-LINE DIAGRAM AND DETAILS

HAZARDOUS ABATEMENT

HA101 1ST FLOOR ABATEMENT PLAN

STRUCTURAL

SF101 STRUCTURAL FRAMING PLANS, SECTIONS, AND DETAILS

Revisions: Date: NY LIC. NO.:

043141

CENTER LINE

DETAIL INDICATOR

DIMENSION LINE

DRAWING BLOCK TITLE, TYPICAL

BUILDING SECTION INDICATOR

TYPICAL DETAIL INDICATOR

FURNITURE, FIXTURE, & EQUIPMENT INDICATOR

EXISTING ROOM TAG - ROOM NAME AND NUMBER

EXISTING COLUMN TAG

ARCHITECTURAL KEYNOTE TAG

WALL OR PARTITION TYPE

FIRE EXTINGUISHER CABINET

CORNER GUARD

NORTH ARROW

CG

FEC

DETAIL NUMBER

SHEET WHERE

DRAWN

XX-XX

1"

XX-XX

CL

XX-XX

x'-x" SPOT ELEVATION

1 REVISION

REVISION CLOUD

BREAK LINE

DD ROOM TAG - ROOM NAME AND NUMBER

X

View Name 1/8" = 1'-0"

Room name

Room name

NEW DOOR / OPENING TAG

ELEVATION INDICATOR

EXISTING DOOR OPENING TAG

E###

N

P N

X REFLECTED CEILING KEYNOTE TAG

Room name

150 SF

LIFE SAFETY ROOM TAG - ROOM NAME, NUMBER AND AREA

X# INTERIOR SIGNAGE TAG

# WINDOW TAG

X RESTROOM ACCESSORY TAG

WOOD

WOOD FINISH

ALUMINUM

STEEL

EARTH

GYPSUM - PLASTER

MASONRY - CONCRETE BLOCK

RIGID INSULATION

BATT INSULATION

PLYWOOD

CONCRETE

EXISTING CONSTRUCTION TO REMAIN

EXISTING CONSTRUCTION TO BE REMOVED

& AND

@ AT

C CENTERLINE

# NUMBER

AB ANCHOR BOLT

ABV ABOVE

ACT ACOUSTIC CEILING TILE

AD AREA DRAIN

ADA AMERICANS WITH

DISABILITIES ACT

ADJ ADJUSTABLE

AFF ABOVE FINISHED FLOOR

AHU AIR HANDLING UNIT

AIA AMERICAN INSTITUTE OF

ARCHITECTS

ALUM ALUMINUM

ALT ALTERNATE

AP ACCESS PANEL

APPROX APPROXIMATE

ARCH ARCHITECTURAL

AUTO AUTOMATIC

AVG AVERAGE

BD BOARD

BLDG BUILDING

BLK BLOCK

BM BEAM

BOT BOTTOM

BRG BEARING

BEL BELOW

BR BUMPER RAIL

BRK BRICK

CAB CABINET

CB CATCH BASIN

CEM CEMENT

CCT CUBICLE CURTAIN TRACK

CG CORNER GUARD

CI CAST IRON

CIP CAST IN PLACE

CJ CONTROL JOINT

CT CERAMIC TILE

CLG CEILING

CL CLOSET

COL COLUMN

CONC CONCRETE

CONF CONFERENCE

CONT CONTINUOUS

CPT CARPET

CU CUBIC

DBL DOUBLE

DEMO DEMOLITION

DEPT DEPARTMENT

DET DETAIL

DF DRINKING FOUNTAIN

DIA DIAMETER

DIM DIMENSION

DISP DISPENSER

DN DOWN

DO DOOR OPENING

DOZ DOZEN

DP DAMPPROOFING

DR DOOR

DWG DRAWING

DWGS DRAWINGS

DWR DRAWER

E EAST

EA EXHAUST AIR, EACH

EL ELEVATION

ELEV ELEVATION

ELEC ELECTRICAL

EMER EMERGENCY

ENCL ENCLOSURE

ENGR ENGINEER

EP ELECTRICAL PANELBOARD

EQ EQUAL

EQUIP EQUIPMENT

EWC ELECTRIC WATER COOLER

EWS EYE WASH STATION

EXP EXPANSION

EJ EXPANSION JOINT

EXIST EXISTING

EXT EXTERIOR

FA FIRE ALARM

FB FACE BRICK

FD FLOOR DRAIN

FDC FIRE DEPARTMENT

CONNECTION

FDN FOUNDATION

FE FIRE EXTINGUISHER

FEC FIRE EXTINGUISHER

CABINET

FF FINISH FACE

FHC FIRE HOSE CABINET

FIN FINISH

FLR FLOOR

FLUOR FLUORESCENT

FO __ FACE OF __

FOC FACE OF CONCRETE

FOS FACE OF STUD

FOW FACE OF WALL

FPRF FIREPROOF(ING)

FR FIRE RATING, FRAME

FRMG FRAMING

FS FULL SIZE

FT FOOT OR FEET

FTG FOOTING

FUR FURRING

FUT FUTURE

GC GENERAL CONTRACTOR

GA GAUGE

GAL GALLON

GALV GALVANIZED

GALV STL GALVANIZED STEEL

GB GRAB BAR

GC GENERAL CONTRACTOR

GD GUARD

GL GLASS

GND GROUND

GR GRADE

GWB GYPSUM WALLBOARD

GYP BD GYPSUM WALLBOARD

HB HOSE BIBB

HC HOLLOW CORE

HD HEAD

HDWR HARDWARE

HDWD HARDWOOD

HT HEIGHT

HNDRL HANDRAIL

HM HOLLOW METAL

HMD HOLLOW METAL DOOR

HMF HOLLOW METAL FRAME

HR HANDRAIL

HO HOLD OPEN

HORIZ HORIZONTAL

HP HIGH POINT

HR HOUR

HVAC HEATING, VENTILATION, AIR

CONDITIONING

IBC INTERNATIONAL BUILDING CODE

ID IDENTIFICATION, INSIDE

DIAMETER / DIMENSION

IN INCH

INCL INCLUDE(D)

INSUL INSULATION

INT INTERIOR

INV INVERT

JAN JANITOR

JST JOIST

JT JOINT

KP KICK PLATE

KO KNOCKOUT

L LENGTH

LAB LABORATORY

LAM LAMINATE

LAV LAVATORY

LBS POUND

LED LIGHT EMITTING DIODE

LF LINEAR FEET

LH LEFT HAND

LIN LINEAR

LIQ LIQUID

LKR LOCKER

LG LONG

LL LEAD LINED

LLV LONG LEG VERTICAL

LP LOW POINT

LRG LARGE

LT LIGHT

LT WT LIGHTWEIGHT

LVR LOUVER

MATL MATERIAL

MAS MASONRY

MAX MAXIMUM

MECH MECHANICAL

MTL METAL

MFR MANUFACTURER

MH MANHOLE

MIN MINIMUM

MISC MISCELLANEOUS

MO MASONRY OPENING

MP MOP PLATE

MTD MOUNTED

N NORTH

NA NOT APPLICABLE

NEC NATIONAL ELECTRICAL CODE

NEG NEGATIVE

NFC NATIONAL FIRE CODE

NFPA NATIONAL FIRE PROTECTION

ASSOCIATION

NIC NOT IN CONTRACT

NO NUMBER

NOM NOMINAL

NTS NOT TO SCALE

OA OVERALL

OC ON CENTER

OD OUTSIDE DIAMETER / DIMENSION

OFF OFFICE

OH OPPOSITE HAND

OPNG OPENING

OPP OPPOSITE

OH OVERHEAD

OZ OUNCE

PAV PAVING

PC PRECAST CONCRETE

PL PLATE

PLAM PLASTIC LAMINATE

PLAS PLASTER

PLYWD PLYWOOD

PLBG PLUMBING

PMF PREMOLDED FILLER

PR PAIR

PT POINT

PTN PARTITION

QT QUARRY TILE

R RADIUS, RISER

RA RETURN AIR

RAD RADIUS

RB RESILIENT BASE, RUBBER

BASE

RD ROOF DRAIN

RL ROOF LEADER

REF REFERENCE

REFR REFRIGERATOR

REQ'D REQUIRED

REV REVISION

RFI REQUEST FOR

INFORMATION

RFP REQUEST FOR PROPOSAL

RH RIGHT HAND

RM ROOM

RO ROUGH OPENING

S SOUTH

SA SUPPLY AIR

SAN SANITARY

SC SOLID CORE

SCHED SCHEDULE

SECT SECTION

SH SPRINKLER HEAD

SHT SHEET

SIM SIMILAR

SM SMOKE

SPEC SPECIFICATION

SPKR SPEAKER

SQ SQUARE

STA STATION

STD STANDARD

STO STORAGE

STL STEEL

SS STAINLESS STEEL

STOR STORAGE

STRUCT STRUCTURAL

SUSP SUSPENDED

SYM SYMMETRICAL

SYS SYSTEM

T TREAD

TEL TELEPHONE

TEMP TEMPERED

T&G TONGUE AND GROOVE

THK THICK

TOC TOP OF CONCRETE

TOP TOP OF PAVEMENT

TOS TOP OF STEEL

TOW TOP OF WALL

TV TELEVISION

TYP TYPICAL

UNFIN UNFINISHED

UON UNLESS OTHERWISE

NOTED

VB BAPOR BARRIER

VERT VERTICAL

VCT VINYL COMPOSITION TILE

VIF VERIFY IN FIELD

VTR VET THRU ROOF

W WEST

W/ WITH

WD WOOD

W/O WITHOUT

WP WATERPROOF

WT WEIGHT

WWF WELDED WIRE FRAME

NOTE: ALL ABBREVIATIONS SHOWN MAY NOT

BE USED ON THIS PROJECT. CERTAIN

COMMON ABBREVIATIONS MAY NOT BE

SHOWN.

1. ALL DIMENSIONS OF NEW PARTITIONS/BARRIERS SHALL BE TAKEN TO FACE OF STUD. DIMENSIONS TO EXISTING WORK SHALL BE TAKEN TO

FACE OF FINISH SURFACE

2. DO NOT SCALE DRAWINGS. DRAWINGS ARE CONCEPTUAL PLANS

3. THE WORK OF THE CONTRACTOR SHALL INCLUDE ALL LABOR AND MATERIALS FOR ALL TRADES CONCERNED FOR COMPLETING THE PROJECT

IN ACCORDANCE WITH THE DRAWINGS AND SPECIFICATIONS

4. THE CONTRACTOR SHALL PROCURE, COMPLETE AND APPLY FOR ALL PERMITS AS REQUIRED TO CONSTRUCT THE PROJECT

5. THE CONTRACTOR SHALL BE FAMILIAR WITH THE CONTRACT DOCUMENTS. THE CONTRACTOR MUST ALSO VISIT THE SITE TO BE ACQUAINTED

WITH THE CONDITIONS AFFECTING THE WORK

6. WORKMANSHIP. ALL WORK TO BE FIRST RATE, HIGH QUALITY, AND ACCOMPLISHED IN A WORKMANLIKE MANNER BY SKILLED CRAFTSMEN

USING ACCEPTED PRACTICES AND METHODS APPROPRIATE TO THE TRADE INVOLVED

7. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE DAILY CLEANING UP OF THE WORK AREA. THE AREA SHALL BE CLEANED EACH DAY AND TRASH SHALL BE DISPOSED OF AT THE END OF EACH DAY. AT THE END OF THE PROJECT, THE CONTRACTOR SHALL CLEAN THE WORK AREA THOROUGHLY. CLEANING IS TO BE CONFIRMED BY THE COR AND / OR THE INFECTION CONTROL NURSE

8. ALL WORK SHALL BE GUARANTEED FOR ONE YEAR FROM THE TIME OF ACCEPTANCE BY THE OWNER UNLESS OTHERWISE NOTED IN THE

SPECIFICATIONS

9. ALL PLUMBING WORK SHALL CONFORM TO THE ADOPTED EDITION OF THE INTERNATIONAL PLUMBING CODE. INSTALL ALL WATER, WASTE AND VENT PIPING IN ACCORDANCE WITH ALL APPLICABLE CODES. REVIEW DRAWINGS AND PROVIDE ALL WORK FOR A COMPLETE AND OPERABLE SYSTEM, INCLUDING ALL INCIDENTALS, REQUIRED BY CODE AGENCIES AND LOCAL GOVERNING BODIES. CODES INCLUDE, BUT ARE NOT

LIMITED TO:

VA PLUMBING DESIGN GUIDE - 2021

10. PRIOR TO START OF CONSTRUCTION, CONTRACTOR SHALL VERIFY ALL BUILDING CONDITIONS, COORDINATE ALL DIMENSIONS IN FIELD AND

VERIFY ALL LOCATIONS OF UTILITIES IN THE FIELD

11. ALL HEATING, VENTILATING AND AIR CONDITIONING WORK SHALL CONFORM TO THE ADOPTED EDITION OF THE INTERNATIONAL MECHANICAL AND ENERGY CODES (AS APPLICABLE), STATE CODES, AND ANY REQUIREMENTS OF THE LOCAL AUTHORITIES HAVING JURISDICTION.

CODES INCLUDE, BUT ARE NOT LIMITED TO:

NFPA 101 - 2021

NFPA 70 - 2020

NFPA 90A - 2021

NFPA 99 - 2021

NFPA 101 - 2021

VA HVAC DESIGN GUIDE - 2021

13. THE COMPLETE ELECTRICAL SYSTEM AND INSTALLATION SHALL COMPLY AND CONFORM TO ALL ADOPTED CODES, REGULATIONS OF THE NATIONAL ELECTRICAL CODE AS WELL AS TO ALL STATE AND LOCAL LAWS, ORDINANCES AND CODES. CODES INCLUDE, BUT ARE NOT

LIMITED TO:

NFPA 70 - 2021

NFPA 101 - 2021

VA ELECTRICAL DESIGN GUIDE - 2019

VA ELECTRICAL DESIGN MANUAL FOR REPLACEMENT HOSPITALS, CLINICAL ADDITIONS, ENERGY CENTERS, AND LABORATORY

BUILDINGS - 2015

VA LIGHTING DESIGN MANUAL - 2022

VA RADIOLOGY DESIGN MANUAL - 2008

VA PHYSICAL SECURITY DESIGN MANUAL FOR LIFE SAFETY PROTECTED FACILITIES - 2021

14. THE COMPLETE FIRE PROTECTION SYSTEM AND INSTALLATION SHALL COMPLY AND CONFORM TO ALL ADOPTED CODES, REGULATIONS OF THE NATIONAL FIRE PROTECTION CODE AS WELL AS TO ALL STATE AND LOCAL LAWS, ORDINANCES AND CODES. CODES INCLUDE, BUT ARE NOT

LIMITED TO:

NFPA 101 - 2021

NFPA 13 - 2022

NFPA 72 - 2022

VA FIRE PROTECTION DESIGN GUIDE - 2021

1. SPACES AROUND THE PROJECT AREAS WILL BE OCCUPIED DURING PERFORMANCE OF WORK. IMMEDIATE AREAS OF ALTERATIONS WILL BE VACATED. ALL CONTRACTOR WORK WILL BE PERFORMED DURING NORMAL DAYTIME WORKING HOURS UNLESS INDICATED. ALL TEMPORARY SYSTEM SHUTDOWNS WILL OCCUR DURING 2ND SHIFT OR WEEKENDS AND COORDINATED AND APPROVED BY THE PROJECT COR. LONG TERM

LOCK-OUT / TAG-OUT WILL BE DONE DURING NORMAL WORKING HOURS

2. BEFORE STARTING WORK WITHIN AN OCCUPIED AREA, THE CONTRACTOR WILL BE RESPONSIBLE TO SET-UP TEMPORARY/PERMANENT CONSTRUCTION/ICRA BARRIERS WITH ANTEROOM AND MAINTAIN NEGATIVE AIR PRESSURE. ALL TEMPORARY CONSTRUCTION BARRIERS OUTSIDE THE INDICATED CONSTRUCTION PHASE AREA WILL BE REMOVED AT THE CONCLUSION OF THE WORK SHIFT. THE CONTRACTOR WILL BE RESPONSIBLE TO CLEAN AND PREPARE THE AREA TO BE OCCUPIED BY MEDICAL CENTER STAFF AND PATIENTS. CLEANING IS TO BE

CONFIRMED BY COR AND / OR THE INFECTION CONTROL NURSE

3. DIMENSIONS SUPERSEDE DRAWINGS. DO NOT SCALE PLANS. DIMENSIONS ARE TO THE FACE OF EXISTING MATERIALS UNLESS OTHERWISE NOTED. DIMENSIONS AND ELEVATIONS SHALL BE VERIFIED AT THE SITE BEFORE PROCEEDING WITH THE WORK. NOTIFY THE ARCHITECT IMMEDIATELY OF ANY DISCREPANCIES. THE CONTRACTOR SHALL VERIFY ALL EXISTING CONDITIONS, DIMENSIONS, AND MATERIALS REQUIRED FOR THE CONTRACTED WORK. REPORT ALL DISCREPANCIES TO ARCHITECT PRIOR TO FABRICATIONS AND ERECTION

4. IT IS SOLELY THE CONTRACTOR'S RESPONSIBILITY TO FOLLOW ALL APPLICABLE SAFETY CODES AND REGULATIONS DURING ALL PHASES OF CONSTRUCTION. ALL CONSTRUCTION WORK SHALL BE PERFORMED IN CONTRACTOR'S RESPONSIBILITY TO DETERMINE CONSTRUCTION PROCEDURES AND SEQUENCE AND TO INSURE THE SAFETY OF THE BUILDING AND ITS COMPONENT PARTS DURING CONSTRUCTION SHALL PROVIDE ADEQUATE SHORING AND BRACING DURING DEMOLITION AND CONSTRUCTION TO SUPPORT LOADS. SUCH MATERIAL SHALL BE REMOVED AT THE COMPLETION OF WORK AND SHALL REMAIN THE CONTRACTOR'S PROPERTY AFTER THE COMPLETION OF THE PROJECT

5. DO NOT CUT AND PATCH STRUCTURAL ELEMENTS IN A MANNER THAT WOULD REDUCE THEIR LOAD CARRYING CAPACITY OR LOAD-DEFLECTION RATIO. LOCATIONAL RESTRICTIONS ON ACHRONING TO STRUCTURAL MEMBERS ARE AS FOLLOWS:

A. ALL STRUCTURAL (HORIZONTAL AND VERTICAL) BEAMS ARE ENCASED IN CONCRETE

B. DAMAGE TO CONCRETE AROUND STRUCTURAL BEAMS IS TO BE REPORTED TO THE COR FOR REPAIR C. ATTACHMENTS ARE TO BE MADE TO THE FLOOR DECK, NOT TO THE BOTTOM OR SIDES OF BEAMS

D. NO FLOOR BORING CAN BE DONE WITHIN 6" OF THE CONCRETE BEAM SURROUNDS

E. DURING DEMOLITION, ANY EXISTING ATTACHMENTS SHOULD BE CUT FLUSH AND LEFT IN PLACE, MINIMIZING ANY CHANCE OF

DAMAGE TO CONCRETE ENCASEMENT

6. WHERE EXISTING CONSTRUCTION, EQUIPMENT, ETC. IS REQUIRED TO BE REMOVED, RESTORE EXPOSED FINISHES OF CUT AND PATCHED AREAS AND EXTEND FINISH RESTORATION INTO ADJOINING CONSTRUCTION IN A MANNER THAT WILL ELIMINATE EVIDENCE OF PATCHING AND REFINISHING. CUT EXISTING CONSTRUCTION USING METHODS LEAST LIKELY TO DAMAGE ELEMENTS TO BE RETAINED OR ADJOINING CONSTRUCTION. WHERE INDICATED TO REMOVE FINISHES, REMOVE SO TOTALLY, FROM PLANE TO PLANE, TREAT REMAINING SUBSURFACE TO

RECEIVE NEW FINISHES DESIGNATED

7. WHERE EXISTING CONSTRUCTION, EQUIPMENT, ETC. SHOWN TO BE RELOCATED SHALL BE COORDINATED BY THE CONTRACTOR WITH THE VA PRIOR TO START OF WORK IN EACH AREA. THE VA WILL REMOVE ALL ITEMS OF SALVAGEABLE VALUE, INCLUDING BUT NOT LIMITED TO DOORS, HARDWARE, MOVEABLE EQUIPMENT NOT ALREADY DESIGNATED FOR REINSTALLATION/REUSE, PRIOR TO CONTRACTOR COMMENCING WORK

8. WHERE EXISTING PARTITIONS HAVE BEEN REMOVED OR NEW SERVICES PENETRATE EXISTING SURFACES, THE OPENINGS SHALL BE PATCHED

TO MATCH THE EXISTING ADJACENT SURFACES FINISH, TEXTURE AND SHEEN

9. IN GENERAL, WHEREVER SERVICES ARE REMOVED, THE OPENINGS SHALL BE PATCHED TO MATCH THE EXISTING ADJACENT SURFACES FINISH TEXTURE AND SHEEN. WHERE REMOVAL OF EXISTING CONSTRUCTION, PIPING, DUCTWORK AND OTHER ITEMS CREATES OPENINGS IN THE WALLS, FLOORS OR CEILINGS, PATCH OPENINGS IMMEDIATELY WITH THE SAME MATERIALS AS ADJACENT CONSTRUCTION. MAINTAIN THE REQUIRED FIRE RATING. SEE MEP DRAWINGS FOR ADDITIONAL INFORMATION. FILL IN ALL EXISTING OPENINGS THAT ARE NOT TO REMAIN, UNLESS OTHERWISE NOTED. FINISH TO MATCH FINISH OF ADJACENT SURFACE

10. WHERE CODED NOTE DESIGNATIONS ARE SHOWN AS "TYP" OR "TYPICAL" IT IS INTENDED THAT THE NOTE GENERALLY REFERS TO ALL SIMILAR

ITEMS OR SURFACES

11. A HAZARDOUS MATERIALS SURVEY WAS CONDUCTED BY THE ARCHITECT OF RECORD. A HAZARDOUS MATERIALS SURVEY WAS SUPPLIED TO THE VA. THE RESULTS OF THE SAMPLES TAKEN ARE INCLUDED WITHIN THE CONSTRUCTION DOCUMENTS. IT IS THE CONTRACTORS RESPONSIBILITY TO TAKE PROTECTIVE MEASURES FOR ITS WORKERS PRIOR TO THE BEGINNING OF ANY RENOVATION OR DEMOLITION WORK.

IF ANY OTHER SUSPECT MATERIALS ARE NOTED, THE CONTRACTOR IS TO REPORT THEM TO THE COR AND ARCHITECT OF RECORD PRIOR TO

START OF WORK

12. AFTER COMPLETION OF DEMOLITION, SCHEDULE A WALK-THROUGH WITH THE COR AND ARCHITECT FOR REVIEW OF EXISTING CONDITIONS

13. PATCH AND FIRE STOP EXISTING ABANDONED PENETRATIONS THROUGH THE CONCRETE FLOORS AND WALLS

14. UNLESS OTHERWISE NOTED, ANY REMOVAL OF HVAC, PLUMBING OR ELECTRICAL IS TO BE 'BACK TO SOURCE' AND THE DISTANCE / LOCATION

MAY NOT BE TO SCALE ON THE DRAWINGS

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS

321 4 5 6 7 8 9 10

ACELAJLH

C U s e rs \a k a n u s k y \D o c u m e n ts

\5

-1

-1

E D

D E

P T

V

A B

U F

F A

L O r2

X

-R a y C

M a k a n u s k y V

B N

S Y

.r v t

/1

/2

:4

:3

A

M

GI102

GENERAL INFORMATION

3/22/2022

BUFFALO VA MEDICAL CENTER

528-19-104X-RAY RENOVATION100% FINAL BID SUBMISSION

PARTIALLY SPRINKLERED

21-USDVA-04

ARCHITECTURAL SYMBOLS MATERIAL LEGENDARCHITECTURAL ABBREVIATIONS

GENERAL NOTES - NEW CONSTRUCTION

GENERAL NOTES - GENERAL CONDITIONS

PET / CT

HOT LAB

INJECTION

CORRIDOR

CONTROL

ROOM

OFFICE OFFICE

OFFICE

EXAM EXAM

EXAM

EXAM

EXAM

PHARMACY

TELE HEALTH

101-E 102-E

EQUIP.

ALCOVE

CORRIDOR

WAITING

141D

144-E139-E138-E 143-E

CORRIDOR

137-E

136-E135-E

132-E

134-E

133-E

132-E1

131-E130-E129-E

146D-1

100E-18

126-E127-E128-E 101-A

125-E 124-E

123-E

100E-17

100A-5

104-A

100A-4

101A-1

102-1

100A-1

100-A

148D-1

147D-1149-D

154-D153-D152-D151-D

146-A146A-1

101-5

WAITING AREA

101-A

RECEPTION

103-A

RECEPTION

102-A NURSE'S

AREA

106-A

TRIAGE

101-A

TRIAGE

102-A

FAX/COPY

108-A

MEN'S

ROOM

110-A

WOMEN'S

ROOM

109-A

LAV.

108-A1

PHARMACY

CONSULT #2

107-A

ELEC.

113E-1

NURSES

STATION

UTILITY

LOBBY

100A-2

101-4

OFFICE

141-A

PHARMACY

CONSULT #1

140-A

138-A

136-A

137-A

100A-9

135-A

134-A

133-A

132-A

131-A 130-A

129-A

128-A

127-A

126-A

125-A

124-A

123-A

122-A 121-A 120-A 119-A 118-A 117-A 116-A

100A-8

CORRIDOR

#24

101-3

101-1

101-2135-B

101-D

100A-3

106-3 106-2

105-1

106-1

120-1

128 122 124 125

126130

114113112

110 117 118

136-B

103-2

110-2

110-1

103-1

138C-3

138C-2

138-C

139-C

100C-1

115-B

101-C 100C-4

100-C

102-C

103-C

104-C

105-C

106-C

107C-6

107C-7107-C 107C-8

107C-1 111C-5

111C-11

11C-7

111C-1111C-8

100C-4

110-C110C-1

100C-2

111C-2

111C-3

111C-6

111C-10 100C-5

111C-4

112C-1

112-C

100C-6

107C-4

107C-5

107C-2

107C-3

111C-9

113C-2

113C-1 113-C 114-C 116-C

138C-1 137-C

136-C

135-C

134-C

133-C

132-C

131-C

130-C

129-C

128-C

126-C

125-C

124-C

123-C

100C-3

122-C

120-C

EXISTING AREA

EXISTING AREA

EXISTING AREA

EXISTING AREA

CORRIDOR

.2"/OCC

CODE MIN:

PROVIDED:

44"

108"

1"

NOT INCLUDED IN THIS CONTRACT

NOT INCLUDED IN THIS CONTRACT

NOT INCLUDED IN THIS CONTRACT

NOT INCLUDED IN THIS CONTRACT

ELEV. ELEV. ELEV. ELEV. ELEV.

ELEV.ELEV.ELEV.ELEV.ELEV.

ELEV.

ELEV.

STAIR NO.6

326 SF

X-RAY

104D

54 SF

X-RAY

CONTROL ROOM

104D-1

TREATMENT #1

128D TREATMENT #2

129D

TREATMENT #3

130D TREATMENT #4

131D

TREATMENT #5

132D

STAIR

#6

STAFF

RESTROOM

126D

LOUNGE /

CONFERENCE

127D1

OBSERVATION #9

124D

CLEAN UTILITY

122D

NOURISH

108D

FAST-TRACK EXAM

109D

FAST-TRACK EXAM

110D

FAST-TRACK EXAM

111D

STAIR

#15

OBSERVATION

112D

OBSERVATION

113D

SOCIAL WORK

114D

DIRECTOR

OFFICE

115D

CORRIDOR

INTERN OFFICE

117D

STORAGE

118D

SOILED UTILITY

120D

RESTROOM

121D

CORRIDOR

NURSE'S STATION

127D

TRIAGE

106D

AMBULANCE BAY

DECON STORAGE

ISOLATION

STORAGE

133D1

RESTROOM

134D

PSYCH.

HOLDING

SOILED

UTILITY

137D

TRAUMA

138D

WAITING

139D

REGISTRATION

140D

DOOR

.2"/OCC

CODE MIN:

PROVIDED:

32"

32"

1"

CORRIDOR

.2"/OCC

CODE MIN:

PROVIDED:

44"

96"

1"

DOOR

.2"/OCC

CODE MIN:

PROVIDED:

32"

40"

27"

E60

E60

E

E

E90

E90 E90

E90

E

E

E90

E

E90

E

90STAIR

#11

E90

E

E90

E

STAIR

#13

STAIR

#12

E90

E

E90

E

E90

E

E90

E

STAIR

#10

STAIR

#9 E90

E90

E90

E90

STAIR

#14

E90 E90

E90 E90

E90

E90

E

E

STAIR

#1

E90

E90

E90

E90

E90

E90

STAIR

#5

E90

E90

E90

E90

STAIR

#8

E90

E90

E

E

STAIR

#7

E90

E90

E

E

STAIR

#4

STAIR

#3

STAIR

#2

E90

E90

E90

E90

E

E

E90

E90

E

E

147D

146D

145D

ELECTRICAL

135E-1

E90

E

E

E90

E90E90 E90

E90

E90

E90

E

E90

E90

E90 E90

E90

E

E90

E90

E90

E

ESM

ESM

E S

M

E S

M

E S

M

WING 'A'

WING 'D'

WING 'B'

WING 'C'

E S

M

ESM

ESM

ESM

TO EXIT C = 204'

EXIT A

EXIT B

EXIT C

EXIT D

EXIT E

EXIT F

C O

M M

O N P

A

TH

0'

TO EXIT D = 135'

GENERAL NOTES

A. PARTITIONS SHALL BE TYPE A1 UNLESS NOTED OTHERWISE

B. REFER TO SPECIFICATIONS AND PARTITION TYPE SCHEDULE FOR ADDITIONAL NOTES

C. NEW PARTITIONS ARE DIMENSIONED TO FACE OF METAL STUD OR MASONRY UNLESS

NOTED OTHERWISE

D. EXISTING PARTITIONS ARE DIMENSIONED TO FINISH FACE UNLESS NOTED OTHERWISE

FIRE RATING LEGEND

SYMBOL

(NUMBER SHOWS OPENING RATING)

BARRIER OPENING RATING

EXISTINGEXISTING

NOTE: FOR SCHEDULED OPENINGS WHERE SMOKE AND FIRE SEPARATIONS

COINCIDE,THE MORE STRINGENT FIRE RATING SHALL APPLY

FIRE EXTINGUISHER

E60E60

E90E90

EXIT LIGHT SIGNAGE

INDICATES COMMON PATH OF TRAVEL TO

POINT OF DECISION

INDICATES PATH OF TRAVEL TO POINT OF EXIT

(FROM COMMON PATH OF TRAVEL)

EXIT CAPACITIES LEGEND

DOORS

DOOR

.2"/OCC

CODE MIN:

PROVIDED:

32"

WIDTH PER OCCUPANT (2021 NFPA 101 TABLE 7.3.3.1)

OCCUPANTS (AREA/OCC. LOAD FACTOR)

MIN WIDTH (0.2" X OCC.)

CODE MIN (2021 NFPA 101 7.2.1.2.3.2)

CLEARANCE PROVIDED

CLEARANCE SHOWN W/ DOOR OPEN 90° BETWEEN STOP & OPEN DOOR FACE

CORRIDORS

WIDTH PER OCCUPANT (2021 NFPA TABLE 7.3.3.1)

OCCUPANTS (AREA/OCC. LOAD FACTOR)

MIN WIDTH (0.2" X OCC.)

CODE MIN (2021 NFPA 39.2.3.2)

CLEARANCE PROVIDED

CLEARANCE SHOWN BETWEEN FACE OF WALLS

STAIRS

WIDTH PER OCCUPANT (2021 NFPA TABLE 7.3.3.1)

OCCUPANTS (AREA/OCC. LOAD FACTOR)

MIN WIDTH (0.3" X OCC.)

CODE MIN (7.2.2.2.1.2)

CLEARANCE PROVIDED

* 2021 NFPA TABLE 7.2.2.2.1.1(b) EXISTING STAIRS

CORRIDOR

.2"/OCC

CODE MIN:

PROVIDED:

44"

STAIR

.3"/OCC

CODE MIN:

PROVIDED:

36" *

TRAVEL DISTANCE LIMITS

OCCUPANCY DISTANCE

COMMON PATH OF TRAVEL (2021 NFPA 21.2.5.2) 100'

DEAD END (2021 NFPA 21.2.5.3) 20'

TRAVEL DISTANCE LIMIT (2021 NFPA 21.2.6.2.1) 300'

* TRAVEL DISTANCES ARE FOR SPRINKLERED BUILDINGS

B

B

B

(2021 NFPA 101, TABLE 7.3.1.2 OCCUPANT LOAD FACTOR)

OCCUPANT LOAD FACTORS

SPACE FUNCTION SF/OCC

ASSEMBLY 15 NET

BUSINESS 150 GROSS

STORAGE 500 GROSS

DESIGN CODE

2021 NFPA 101 LIFE SAFETY CODE

CHAPTER 6: CLASSIFICATION OF OCCUPANCY AND HAZARD OF CONTENTS

6.1.6 AMBULATORY HEALTH CARE (EXISTING), CHAPTER 21

CHAPTER 21: EXISTING AMBULATORY HEALTHCARE OCCUPANCIES

OCCUPANCY SEPARATIONS (6.1.14.4; TABLE 6.1.14.4.1)

(EXISTING)

FIRE SUPPRESSION

PARTIALLY SPRINKLERED (EXISTING)

CONSTRUCTION TYPE

NFPA 101 2021 TABLE (20.1.6.1)

FIRE RESISTANCE RATINGS

COLUMN/BEAMS/GIRDERS

INTERIOR NON-BEARING WALLS (20.1.6.4)

MEANS OF EGRESS CAPACITY

AREA OF WORK SF/PERSON OCC. LOAD

GROSS AREA = 380 S.F. (EXISTING)

HEALTHCARE = 380 S.F. / 150 = 2.53 = 3

TOTAL OCCUPANCY LOAD = 3

THE DISTANCE FROM EXITS MAY BE A MINIMUM OF ONE-THIRD THE DIAGONAL DISTANCE

BUILDING SIZE

TOTAL BLDG. AREA: (EXISTING)

SIZE OF EACH ROOM IN PROPOSED WORK

FIRST FLOOR:

X-RAY & CONTROL ROOM 380 SF (EXISTING)

BUILDING HEIGHT

EXISTING BUILDING HEIGHT (BUILDING 1) = 11 STORIES ABOVE GRADE

EXIT ENCLOSURES/PASSAGEWAYS (7.1.3.2.1)

(EXISTING)

SHAFT ENCLOSURES (8.6.5)

(EXISTING)

EXIT ACCESS CORRIDORS (20.3.6.1)

(EXISTING)

CORRIDOR WIDTH (20.2.3.2)

(EXISTING)

DEAD END CORRIDORS (20.2.5.3)

(EXISTING)

SMOKE COMPARTMENTS (20.3.7.2)

(EXISTING)

SMOKE BARRIERS (20.3.7.6; 8.5)

(EXISTING)

HAZARDOUS AREA PROTECTION (20.3.2; 8.7.1.1)

(EXISTING)

20.2.6.2.1 TRAVEL DISTANCES

150' MAXIMUM

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS

321 4 5 6 7 8 9 10

ACELAJLH

C U s e rs \a k a n u s k y \D o c u m e n ts

\5

-1

-1

E D

D E

P T

V

A B

U F

F A

L O r2

X

-R a y C

M a k a n u s k y V

B N

S Y

.r v t

/1

/2

:4

:4

A

M

GI201

1ST FLOOR LIFE SAFETY PLAN

3/22/2022

BUFFALO VA MEDICAL CENTER

528-19-104X-RAY RENOVATION100% FINAL BID SUBMISSION

PARTIALLY SPRINKLERED

21-USDVA-04

1/16" = 1'-0"1

FIRST FLOOR LIFE SAFETY PLAN

LIFE SAFETY CODE INFORMATION

PRECAUTIONS DURING CONSTRUCTION

1. EXECUTE WORK BY METHODS TO MINIMIZE RAISING DUST FROM CONSTRUCTION OPERATIONS

2. IMMEDIATELY REPLACE A CEILING TILE DISPLACED FOR VISUAL INSPECTION

3. PROVIDE ACTIVE MEANS TO PREVENT AIRBORNE DUST FROM DISPERSING INTO ATMOSPHERE

4. WATER MIST WORK SURFACES TO CONTROL DUST WHILE CUTTING DRY WALL FOR BARRIERS

5. SEAL UNUSED DOORS WITH DUCT TAPE IN THE CONSTRUCTION AREA

6. BLOCK OFF AND SEAL AIR VENTS IN THE CONSTRUCTION AREA

7. PLACE DUST MAT AT ENTRANCE AND EXIT OF WORK AREA

8. REMOVE OR ISOLATE HVAC SYSTEM IN AREA WHERE WORK IS BEING DONE TO PREVENT

CONTAMINATION OF DUCT SYSTEM

9. REMOVE CONSTRUCTION WASTE DAILY

10. PROVIDE TEMPORARY 1 HR. FIRE BARRIER PARTITIONS AS INDICATED AND SEAL UNUSED DOORS AT PERIMETER OF THE WORK AREA WITH PAINTER'S TAPE TO SEAL AREA FROM NON-WORK AREA BEFORE

CONSTRUCTION BEGINS

11. MAINTAIN NEGATIVE AIR PRESSURE WITHIN WORK SITE UTILIZING HEPA FILTER EQUIPPED AIR FILTRATION UNITS. COORDINATE LOCATION OF WINDOW AND ABOVE FLOOR PENETRATIONS WITH COR.

SPACE SHALL BE CONTINUOUSLY MONITORED BY MANOMETER. BALL IN THE WALL IS NOT ACCEPTABLE.

PATCH FLOOR PENETRATION AND REPLACE WINDOW GLAZING AFTER CONSTRUCTION AS REQUIRED

TO MATCH EXISTING

12. CONTAIN CONSTRUCTION WASTE BEFORE TRANSPORT IN TIGHTLY COVERED CONTAINERS OR BY COVERING IN PLASTIC AND SEALING WITH DUCT TAPE. REMOVE WASTE DAILY EITHER AFTER 5 PM AND

BEFORE 7 AM

13. USE ROUTE AGREED UPON BY THE ICRA TEAM AND COR FOR TRANSPORT OF TRANSPORT CONTAINERS

THROUGH THE FACILITY

14. SEAL HOLES, PIPES, CONDUITS, AND PUNCTURES AIRTIGHT AND/OR FIRE SEAL AS REQUIRED

15. CONSTRUCT AN AIRTIGHT ONE-HOUR RATED ANTEROOM AND REQUIRE ALL PERSONNEL TO PASS THROUGH THIS ROOM SO THEY CAN BE VACUUMED USING HEPA VACUUM CLEANER BEFORE LEAVING WORK SITE; OR WEAR PAPER COVERALLS THAT ARE REMOVED EACH TIME THEY LEAVE THE WORK SITE

16. ALL PERSONNEL ENTERING WORK SITE ARE REQUIRED TO WEAR SHOE COVERS. SHOE COVERS MUST

BE CHANGED EACH TIME THE WORKER EXITS THE WORK AREA THROUGH THE ANTEROOM

17. WORK OUTSIDE THE PRIMARY WORK AREA (AREA OF CONTAINMENT) WILL BE PERFORMED WITHIN A FIRE-RATED PLASTIC ENCLOSURE WITH NEGATIVE AIR HEPA FILTER SYSTEM TO CONTROL DUST.

ENCLOSURE TO BE CONSTRUCTED AND REMOVED DAILY AS REQUIRED BY THE COR. CONTRACTOR TO

SANITIZE WORK AREA PRIOR TO REMOVING PLASTIC CONTAINMENT AREA

GC101

A

WAITING

139D

REGISTRATION

140D

WAITING

141D

CORRIDOR

TRIAGE

106D

CORRIDOR

145-D

C

LEA

R

5'-0"

TD1

T1

EXISTING WALL OR

CONSTRUCTION BARRIER

EXISTING OR

ICRA DOOR

PROVIDE STICKY WALK-OFF MAT

(TYP. EACH SIDE OF DOOR)

PN

N

GENERAL AREA OF WORK

EXISTING IT CLOSET 138-E

EXISTING ELECTRICAL

PANEL 'BPH-1'

(BASEMENT)

LINE OF FINISHED FLOOR, SEE ROOM FINISH

SCHEDULE FOR FLOOR & BASE TYPE

FACE OF EXISTING WALL

3 5/8" METAL STUDS @ 16" O.C., TYPICAL

(1) LAYER 5/8" TYPE 'X' GYPSUM

BOARD BOTH SIDES

SECTION

PLAN

T1

/8

1-HR RATED

FIRE CAULK IN ACCORDANCE WITH UL 419

ASSEMBLY: UL-U419

STC: 48

NOTE: ANY PENETRATIONS THROUGH PARTITION ARE TO BE FIRE CAULKED

TEMPORARY CONSTRUCTION BARRIER

CONTINUOUS METAL STUD BOTTOM TRACK

SET IN CONTINUOUS BEAD OF SEALANT.

CONTINUOUS 3 1/2" SOUND

ATTENUATION BATTS AS SCHEDULE

CONTINUOUS METAL HORIZONTAL BRIDGING

CHANNEL @ MID HEIGHT, TYPICAL

FIRE CAULK IN ACCORDANCE WITH UL 419

METAL STUD FRAMING W/ 5/8" TYPE 'X'

GYPSUM BOARD, ONE SIDE

TYPE 'X' GYPSUM BOARD BOTH SIDES

RUBBER BASE. SEE FINISH SCHEDULE

BOTH SIDES

LINE OF CEILING SYSTEM, SEE ROOM

FINISH SCHEDULE FOR TYPE & HEIGHT

GLAZING PANEL REMOVAL

EXISTING EXTERIOR WALL CONSTRUCTION TO REMAIN

EXISTING EXTERIOR GLAZING PANEL TO BE

REMOVED FROM EXISTING WINDOW SYSTEM

PRIOR TO START OF ABATEMENT. GC TO

STORE GLAZING PANEL IN A SAFE LOCATION

UNTIL WORK IS COMPLETE AND REPLACE TO

IT'S EXISTING CONDITION. IF DAMAGED, GC

WILL REPLACE TO MATCH EXISTING

EXISTING ALUMINUM FRAME TO

REMAIN

HEPA EXHAUST

EXISTING WALL CONSTRUCTION TO

REMAIN

PROVIDE HEPA FILTRATION EXHAUST

DUCTING THROUGH NEW TEMPORARY

PLYWOOD PANEL

EXISTING ALUMINUM FRAME TO

REMAIN

PROVIDE 3/4" FIRE TREATED PLYWOOD

PANEL WITHIN EXISTING ALUMINUM FRAME

NOTE:

1. GENERAL CONTRACTOR TO LOCATE

PER QUANTITIES REQUIRED.

PROVIDE DUCT SEALING TAPE AROUND

PENETRATION (TYPICAL)

EXTERIORINTERIOR

EXTERIOR

INTERIOR

(NEGATIVE SPACE)

PORTION OF EXISTING LEAD LINED

INTERIOR PARTITION IS TO BE

REMOVED AS REQUIRED TO ALLOW

FOR TEMPORARY DUCTING

PENETRATION. PREP OPENING FOR

LEAD LINING REPAIR WHEN COMPLETE

STANDARD HM FRAME FOR

DRYWALL

PERIMETER CAULK BOTH

SIDES

CERAMIC TILE FINISH

WHERE REQUIRED

WIDTH

METAL STUD

DRYWALL, THICKNESS SINGLE

OR DOUBLE AS REQUIRED

DOUBLE STUDS BACK TO BACK

JAMB ANCHORS

J1 H1

DOOR TYPE NOTES:

1. ALL 'B' LABELED DOORS WILL HAVE A 90 MINUTE RATING.

2. ALL 'C' LABELED DOORS WILL HAVE A 45 MINUTE RATING.

TYPE 'F'

TYPE 1

(HM IN GWB)

H

W

T Y

P

J1

H1

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS

321 4 5 6 7 8 9 10

ACELAJLH

C U s e rs \a k a n u s k y \D o c u m e n ts

\5

-1

-1

E D

D E

P T

V

A B

U F

F A

L O r2

X

-R a y C

M a k a n u s k y V

B N

S Y

.r v t

/1

/2

:4

:3

A

M

GC101

1ST FLOOR ICRA CONTROL PLAN

3/22/2022

BUFFALO VA MEDICAL CENTER

528-19-104X-RAY RENOVATION100% FINAL BID SUBMISSION

PARTIALLY SPRINKLERED

21-USDVA-04

ICRA CONTROL POLICY

1/4" = 1'-0"1

1ST FLOOR - ICRA PARTITION PLAN

3/4" = 1'-0"A

STICKY WALK-OFF MAT DETAIL

FIRST FLOOR KEY PLAN

KEY NOTES - ICRA

NUMBER DESCRIPTION

1 HIGH EFFICIENCY PARTICULATE AIR-EQUIPPED (HEPA) FILTRATION MACHINE RATED AT 95% CAPTURE OF 0.3 MICRONS

INCLUDING POLLEN, MOLD SPORES, AND DUST PARTICLES

2 HEAVY DUTY, FLEXIBLE STEEL REINFORCED HEPA EXHAUST DIRECTLY VENTED TO EXTERIOR

3 REMOVE PORTION OF EXISTING LEAD LINED FURRING PARTITION & EXTERIOR GLAZING BEYOND. INSTALL PLYWOOD WITH

SEALED EXHAUST PORT. SEE B/GC101 FOR DETAIL

4 EXISTING SUPPLY & RETURN DUCTING IS TO BE SEALED OFF FOR INFECTION CONTROL THROUGHOUT DEMOLITION &

CONSTRUCTION

1 1/2" = 1'-0"B

TYPICAL HEPA FILTRATION THROUGH WINDOW DETAIL

DOOR AND FRAME SCHEDULE ICRA

DOOR NO.

DOOR FRAME

FIRE

RATING

HARDWARE

SET (HW) KICK PLATE REMARKS DOOR NO.

SIZE

TYPE MATERIAL TYPE MATERIAL

DETAIL

WIDTH HEIGHT THICKNESS HEAD JAMB SILL

TD1 3'-0" 7'-0" 1 3/4" F WD 1 HM H1 J1 - C T01 - - TD1

DOOR JAMBS DOOR TYPESDOOR FRAMES

4x PIPE∅

8" MIN.

EXISTING LEAD-LINED GYPSUM BOARD PARTITION

NEW LEAD SHIELDING WITH 2" WIDE

OVERLAP. LEAD SHIELDING EQUAL TO

THICKNESS IN WALL.

EXISTING IN-WALL MOUNTED DEVICE

REMOVED FROM WALL, OPENING

VARIES. REFER TO DEMO DRAWINGS

NEW 5/8" GYPSUM BOARD WITH LEAD

SHIELDING. LEAD SHIELDING EQUAL TO

THICKNESS IN WALL.

NEW LEAD SHIELDING WITH 2" WIDE

OVERLAP. LEAD SHIELDING EQUAL TO

THICKNESS IN WALL.

O P

E N

IN

G

V A

R

IE

S

"2

V A

R

IE

S

2" VARIES 2"

OPENING

ELEVATION SECTION

ELEVATION SECTION

SHIELDED ROOM

SIDE

LEAD-LINED GYPSUM BOARD

NEW LEAD SHIELDING WITH 2" WIDE

OVERLAP. NEW LEAD SHIELDING EQUAL

TO THICKNESS IN WALL

NEW IN-WALL MOUNTED DEVICE, AS

REQUIRED BY ARCH/MEP/EQUIP

DRAWINGS

NEW LEAD SHIELDING AROUND ALL

SIDES OF BOX/OPENING. LEAD SHIELDING

EQUAL TO THICKNESS IN WALL

NEW LEAD SHIELDING WITH 2" WIDE

OVERLAP. NEW LEAD SHIELDING EQUAL

TO THICKNESS IN WALL

O P

E N

IN

G

V A

R

IE

S

PIPE

X

P

IP

E D

IA

P

IP

E

LEAD SHIELDING EQUAL TO

THICKNESS IN WALL. WRAP

AROUND CIRCUMFERENCE

OF PIPE.

PIPE OR CONDUIT

LEAD-LINED GYPSUM BOARD

4x LARGEST

DIMENSION OF

DUCT

NOTE: ALL PENETRATION AT

LEAD WALLS TO BE SHIELDED

LEAD SHIELDING EQUAL TO LEAD SHIELDING

REQUIRED FOR WALL. WRAP AROUND ALL

SIDES OF DUCT WITH 2" LAPS AS REQUIRED

LA

R

G E

S T

D

IM

E

N S

IO

N

O F

D

U C

T

SHIELDED ROOM

SIDE

SHIELDED ROOM

SIDE

4x LARGEST

DIMENSION OF

DUCT

LEAD-LINED GYPSUM BOARD

LEAD SHIELDING EQUAL TO LEAD SHIELDING

REQUIRED FOR WALL. WRAP AROUND ALL

SIDES OF DUCT WITH 2" LAPS AS REQUIRED

FINISH FLOOR SURFACE. REFERENCE

FINISH SCHEDULE. INSTALL FLOOR FINISH

AS PER MANUFACTURER'S WRITTEN

INSTRUCTIONS FOR INSTALLATION ON LEAD

FLOOR.

NEW LEAD (THICKNESS TO MATCH

EXISTING) GLUED TO EXISTING CONCRETE

SURFACE. LEVEL AND PREP CONCRETE

AS REQUIRED. PAINT CONCRETE WITH

EPOXY PAINT.

2" LEAD LAP

EXISTING CONCRETE FLOOR

LEVEL FLOOR ABOVE LEAD AS

REQUIRED WITH FLOOR LEVELER.

TAPER FLASHING AT DOOR OPENINGS

LEAD (THICKNESS TO MATCH EXSITING) WRAP

AROUND CIRCUMFERENCE OF PIPE, CONTINUOUS

THROUGH FLOOR PENETRATION

PIPE, SIZE VARIES

4x

D

IA

P

IP

E

GALVANIZED IRON SLEEVE

C O

N C

S

LA

B

V

A R

IE

S

CLAMP.

4x

D

IA

P

IP

E

SHIELDED ROOM

SIDE

FOLD LEAD SHIELDING OVER

CABINET ATTACHMENT AS

SHOWN

5/8" GYPSUM BOARD WITH 1/8"

LEAD SHIELDING

CABINET / ACCESSORY

METAL STRAPPING AS

REQUIRED

LEAD DETAIL - INFILL OPENINGLEAD DETAIL - NEW DEVICE

LEAD DETAIL - PIPE PENETRATION

LEAD DETAIL - DUCT PENETRATION LEAD DETAIL - PIPE FLOOR PENETRATIONLEAD DETAIL - FLOOR

LEAD DETAIL -CABINET/ACCESSORY

WALL ATTACHMENT

5/8" GYPSUM BOARD WITH 1/8"

LEAD SHIELDING

NEW LEAD (THICKNESS TO MATCH

EXISTING) ATTACHED TO FACE OF

EXISTING MASONRY WALLS. WRAP LEAD

AROUND AS SHOWN. CONTINUE LEAD

FROM FLOOR TO 6" ABOVE LEAD

CEILING. TYPICAL AT ALL HAT

CHANNELS SUPPORTING GWB WITH

LEAD SHIELDING.

SHIELDED ROOM

SIDE

LEAD DETAIL - LEAD GYPSUM

BOARD FURRING

7/8" VERTICAL METAL HAT FURRING @ 16" O.C.

EXIST MASONRY CONSTRUCTION

/1

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS

321 4 5 6 7 8 9 10

ACELAJLH

C U s e rs \a k a n u s k y \D o c u m e n ts

\5

-1

-1

E D

D E

P T

V

A B

U F

F A

L O r2

X

-R a y C

M a k a n u s k y V

B N

S Y

.r v t

/1

/2

:4

:3

A

M

GC102

LEAD SHIELDING DETAILS

3/22/2022

BUFFALO VA MEDICAL CENTER

528-19-104X-RAY RENOVATION100% FINAL BID SUBMISSION

PARTIALLY SPRINKLERED

21-USDVA-04

3" = 1'-0"1

TYPICAL LEAD SHIELDING DETAILS

Revisions: Date: NY LIC. NO.:

043141

VHAWNYHELDWT

Text Box No lead expected / required for floor shielding

VHAWNYHELDWT

Highlight

VHAWNYHELDWT

Highlight

VHAWNYHELDWT

Highlight

SCOPE OF ABATEMENT WORK. REFER TO KEY NOTES, GENERAL

NOTES AND SUMMARY OF MATERIALS FOR ADDITIONAL

INFORMATION

THREE (3) STAGE PERSONAL DECONTAMINATION UNIT. INSTALL AT

CONTAINMENT WORK AREAS AS REQUIRED

CLEAN ROOM

SHOWER ROOM

EQUIPMENT / DIRTY ROOM

PATH OF TRAVEL

AREA GENERALLY NOT IN SCOPE OF WORK

1. FURNISH ALL LABOR, MATERIALS, EQUIPMENT AND SERVICES NECESSARY FOR THE REMOVAL AND DISPOSAL OF ASBESTOS-CONTAINING MATERIALS AS NOTED INCLUDING THE REMOVAL OF ALL NON

ASBESTOS-CONTAINING MATERIALS SUCH AS VINYL AND CERAMIC FLOORING, AND ANY

DEMOLITION, REMOVAL AND DISPOSAL NECESSARY TO EXPOSE ASBESTOS CONTAINING

MATERIALS AND DEBRIS INCLUDING ALL REQUIRED PREPARATION, CLEANING, ENCAPSULATION

AND DECONTAMINATION IN ACCORDANCE WITH ALL REGULATORY AGENCY REQUIREMENTS AND

THE PROJECT PLANS AND SPECIFICATIONS.

2. IF SUSPECTED ASBESTOS OR HAZARDOUS MATERIAL IS ENCOUNTERED DURING CONSTRUCTION, THE CONTRACTOR SHALL STOP WORK IMMEDIATELY, AND NOTIFY THE OWNER/ARCHITECT IN

WRITING, PRIOR TO CONTINUING WORK.

3. INSTALL CRITICAL BARRIERS AND WARNING SIGNS TO ESTABLISH ABATEMENT WORK AREAS PRIOR

TO THE START OF REMOVAL AND DISPOSAL OF HAZARDOUS MATERIALS PER THE PROJECT

SPECIFICATIONS.

4. INSTALL NEGATIVE AIR MACHINE FOR LOCAL EXHAUST VENTILATION BASED ON SITE CONDITIONS, BEST PRACTICES, AND SPECIFICATIONS. CONFIGURE AND PLACE NEGATIVE AIR MACHINES AS

NEEDED TO MAXIMIZE AIR MOVEMENT AND TO ACHIEVE FOUR (4) AIR CHANGES PER HOUR.

COORDINATE NEGATIVE AIR DISCHARGE LOCATIONS TO EXHAUST OUTSIDE OF BUILDING.

5. INSTALL FULL CONTAINMENT INCLUDING THREE STAGE PERSONAL DECONTAMINATION UNIT.

6. FOR MATERIALS REPORTED TO CONTAIN <1% ASBESTOS, FOLLOW OSHA REQUIREMENTS FOR

MATERIALS WITH 1% OR LESS ASBESTOS, INCLUDING WET HANDLING, CLEAN UP, DISPOSAL IN LEAK

TIGHT CONTAINERS, AND AN EXPOSURE ASSESSMENT.

7. FLAKING AND PEELING LEAD BASED PAINT ON SURFACES TO REMAIN SHALL BE REMOVED,

STABILIZED, AND ENCAPSULATED PRIOR TO CONTINUATION OF WORK.

8. AN ASBESTOS AND LEAD BASED PAINT SURVEY REPORT FOR THE ENTIRE AREA IS INCLUDED IN THE

SPECIFICATIONS.

9. EXISTING HVAC SYSTEM IS TO BE SHUT DOWN AND SEALED OFF AT ROOM DURING DEMOLITION

AND CONSTRUCTION TO PREVENT DUST AND HAZARDOUS MATERIALS FROM TRAVELING THROUGH

VENTILATION.

PET / CT

CORRIDOR

CONTROL ROOM

CONFERENCE

BREAK ROOM

COUNTER

TOILET

STORAGE

X-RAY

104D

X-RAY

CONTROL

ROOM

104D-1

DECONTAMINATION

UNIT

PET / CT

CORRIDOR

CONTROL

ROOM

OFFICE

101-E 102-E

137-E

136-E

132-E

133-E

131-E130-E129-E

146D-1

147-D

100E-18

126-E127-E128-E

101-A

125-E 124-E

123-E

100E-17

104-A

100A-4

101A-1

102-1

100A-1

100-A

148D-1

147D-1149-D

154-D153-D152-D151-D

135E-1

LOBBY

100A-2

101-3

101-D

100A-3

106-3 106-2

105-1

106-1

120-1

122 124

STAIR NO.1

ELEV. ELEV. ELEV. ELEV. ELEV.

ELEV.ELEV.ELEV.ELEV.ELEV.

ELEV.

ELEV.

STAIR NO.14

REGISTRATION

140D

WAITING

139D

IT

VENDING

TRIAGE

106D

NOURISH

109D

FAST-TRACK EXAM

110D

FAST-TRACK EXAM

111D

NURSE'S STATION

127D TREATMENT #1

128D

TREATMENT #2

129D

TREATMENT #3

130D

TREATMENT #4

131D

TREATMENT #5

132D

AMBULANCE BAY

STORAGE

STAFF

RESTROOM

126D

STAIR

#6

STORAGE

133D1

ISOLATION

TRAUMA

138D

SOILED UTILITY

137D

PSYCH.

HOLDING

136 RESTROOM

134D

PET / CT

CORRIDOR

CONTROL

ROOM

OFFICE

101-E 102-E

EQUIP.

ALCOVE

CORRIDOR

144-E139-E 143-E

CORRIDOR

137-E

136-E

132-E

134-E

133-E 132-E1

131-E130-E129-E

146D-1

100E-18

126-E127-E128-E

101-A

125-E 124-E

123-E

100E-17

104-A

100A-4

101A-1

102-1

100A-1

100-A

148D-1

147D-1149-D

154-D153-D152-D151-D

100A-2

101-3

101-D

106-3 106-2

105-1

106-1

120-1

122 124

126130

ELEV. ELEV. ELEV. ELEV. ELEV.

ELEV.ELEV.ELEV.ELEV.ELEV.

ELEV.

ELEV.

PN

N

GENERAL AREA OF WORK

EXISTING IT CLOSET 138-E

EXISTING ELECTRICAL

PANEL 'BPH-1'

(BASEMENT)

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS

321 4 5 6 7 8 9 10

ACELAJLH

C U s e rs \a k a n u s k y \D o c u m e n ts

\5

-1

-1

E D

D E

P T

V

A B

U F

F A

L O r2

X

-R a y C

M a k a n u s k y V

B N

S Y

.r v t

/2

/2

:3

:4

A

M

HA101

1ST FLOOR ABATEMENT PLAN

3/22/2022

BUFFALO VA MEDICAL CENTER

528-19-104X-RAY RENOVATION100% FINAL BID SUBMISSION

PARTIALLY SPRINKLERED

21-USDVA-04

ABATEMENT KEY NOTES

NUMBER DESCRIPTION

1 REMOVE RECESSED DOWNLIGHT WIRING WHIPS IN ACCORDANCE WITH THE SPECIFICATIONS, ALL APPLICABLE FEDERAL, STATE, AND

LOCAL REGULATIONS AND THE APPROVED HAZARD ABATEMENT PLAN

2 REMOVE 12X12 VAT FLOOR TILE AND MASTIC. ESTABLISH FULL CONTAINMENT WITH NEGATIVE PRESSURE EXHAUST TO REMOVE ASBESTOS CONTAINING MASTIC IN ACCORDANCE WITH THE SPECIFICATIONS, ALL APPLICABLE FEDERAL, STATE, AND LOCAL

REGULATIONS, AND THE APPROVED HAZARD ABATEMENT PLAN

3 HIGH EFFICIENCY PARTICULATE AIR-EQUIPPED (HEPA) FILTRATION MACHINE RATED AT 95% CAPTURE OF 0.3 MICRONS INCLUDING

POLLEN, MOLD SPORES, AND DUST PARTICLES

4 HEAVY DUTY, FLEXIBLE STEEL REINFORCED HEPA EXHAUST DIRECTLY VENTED TO EXTERIOR

5 REMOVE PORTION OF EXISTING LEAD LINED FURRING PARTITION & EXTERIOR GLAZING BEYOND. INSTALL PLYWOOD WITH SEALED

EXHAUST PORT. SEE B/GC101 FOR DETAIL

6 EXISTING SUPPLY & RETURN DUCTING IS TO BE SEALED OFF FOR INFECTION CONTROL THROUGHOUT DEMOLITION & CONSTRUCTION

7 WATER SUPPLY FOR DECONTAMINATION UNIT IS TO TAP OFF OF EXISTING SUPPLY LINES WITHIN CORRIDOR. DO NOT CONNECT WITHIN

AREA OF ABATEMENT SCOPE

8 MATERIALS ARE TO BE DOUBLE BAGGED & TRANSPORTED IN COVERED BINS TO THE ELEVATORS. CONTRACTOR IS TO TAKE COVERED

BINS DOWN TO BASEMENT AND OUT TO WING-C LOADING DOCK

LEGEND - ABATEMENT

SUMMARY OF MATERIALS TO BE ABATED

DESCRIPTION CATEGORY QUANTITY

RECESSED DOWNLIGHT WIRING WHIPS NON-FRIABLE 16 LIGHT FIXTURES (48 SF APPROXIMATELY)

12X12 VINYL ASBESTOS TILE & ASSOCIATED

MASTIC

- 380 SF OF FLOOR TILE & ASSOCAITED MASTIC

ABATEMENT GENERAL NOTES

1/8" = 1'-0"1

FIRST FLOOR ASBESTOS / LEAD ABATEMENT PLAN FIRST FLOOR KEY PLAN

1. REFER TO SPECIFICATIONS SECTION 024119 - SELECTIVE DEMOLITION FOR ADDITIONAL REQUIREMENTS AND INFORMATION

2. PROJECT SCOPE LINE IS INDICATED FOR GENERAL INTENT ONLY. ADDITIONAL DEMOLITION WILL BE REQUIRED OUTSIDE OF THIS LINE.

ARCHITECTURAL DEMOLITION DRAWINGS ARE FOR SCHEMATIC PURPOSES. CONTRACTOR SHALL COORDINATE ALL DEMOLITION WITH THE ENTIRE SET OF CONTRACT DOCUMENTS FOR FULL SCOPE OF DEMOLITION WORK REQUIRED FOR THE PROJECT. DEMOLITION BACK TO

SOURCE IS REQUIRED

3. EXISTING CONDITIONS SHOWN ON THESE DRAWINGS ARE NOT GUARANTEED TO BE COMPLETE. THE CONTRACTOR SHALL VERIFY ALL EXISTING CONDITIONS, DIMENSIONS AND MATERIALS REQUIRED FOR THE CONTRACTED WORK. REPORT ALL DISCREPANCIES TO ARCHITECT

PRIOR TO FABRICATION, ERECTION AND/OR INSTALLATION

4. COORDINATE ALL NEW PENETRATIONS AND/OR OPENINGS WITH OTHER ASSOCIATED TRADES

5. THE OWNER MAY SELECT AND TAG ITEMS FOR DEMOLITION TO BE SALVAGED. THE CONTRACTOR SHALL REMOVE SELECTED ITEMS FROM

SCOPE OF WORK AND DELIVER TO THE OWNER'S LOCATION WITHIN THE EXISTING FACILITY

6. CONTRACTOR SHALL PROVIDE HEPA FILTERED NEGATIVE AIR MACHINE(S) TO MAINTAIN NEGATIVE PRESSURE TO SCOPE OF WORK AREA ENSURING NO DUST WILL BE TRANSFERRED TO OCCUPIED AREAS. PROVIDE VISUAL PRESSURE MONITORING DEVICE AT DUST PROOF

BARRICADE TO CONFIRM PRESSURE

7. THE FACILITY'S EXISTING SMOKE AND FIRE SUPPRESSION SYSTEM SHALL REMAIN IN OPERATION DURING THE ENTIRE CONSTRUCTION PHASE.

ILSM ALLOWS FOR 8 HOUR SHUTDOWNS OF ALARMS WHICH ARE COVERED PRIOR TO WORK. FIRE SUPRESSION NEEDS TO BE STRICTLY COORDINATED FOR ANY 8 HOUR SHUTDOWN AND THE AREA OF WORK NEEDS TO BE PHYSICALLY MONITORED DURING SHUTDOWNS

8. ALL DEMOLITION WORK BEING DONE OUTSIDE OF TEMPORARY PARTITIONS IS TO BE APPROPRIATELY SEALED OFF TO PREVENT THE TRANSMISSION OF DUST AND DEBRIS AND MINIMIZE DISRUPTION TO VISITORS, RESIDENTS AND STAFF. COORDINATE LOCATION OF BARRIERS

WITH COR AND INFECTION CONTROL TEAM

9. PREPARE ALL ADJACENT SURFACES TO RECEIVE NEW CONSTRUCTION AND SCHEDULED FINISH. EXISTING WALLS SHOWN TO BE REMOVED SHALL BE DEMOLISHED COMPLETELY. THIS INCLUDES THE REMOVAL OF REINFORCEMENT, SOFFITS, DOORS, WINDOWS, FRAMES AND OVERHEAD BRACING. COORDINATE WITH MECHANICAL AND ELECTRICAL FOR DISCONNECTION AND REMOVAL OF EXISTING UTILITIES AND

DEVICES LOCATED WITHIN AREAS SCHEDULED TO BE DEMOLISHED

10. SOME ITEMS MAY BE INDICATED IN THE DEMOLITION DRAWINGS AND DEMOLITION NOTES WHICH ARE NOT NECESSARILY DEMOLITION WORK BUT ARE INCLUDED TO DESCRIBE THE OVERALL SCOPE OF THE PROJECT AND TO AID IN THE DEMOLITION COORDINATION. THE CONTRACTOR IS RESPONSIBLE FOR ALL WORK REQUIRED TO COMPLETE THE INTENDED WORK OF THE OVERALL PROJECT

11. FLOORING DEMOLITION INCLUDES THE REMOVAL OF EXISTING FLOOR FINISHES, INCLUDING VCT, SHEET VINYL, CERAMIC TILE, QUARRY TILE, CARPET AND OTHER FINISHES, GROUTS, MASTICS AND SETTING BEDS COMPLETE TO EXISTING CONCRETE FLOOR SLAB OR OTHER SUBSTRATE READY FOR NEW FLOOR FINISHES. FLOOR PREP SHALL BE BY THE INSTALLING CONTRACTOR

12. REMOVE MISCELLANEOUS ITEMS WITHIN LIMITS OF DEMOLITION. COORDINATE WITH OWNER ANY ITEMS TO BE SALVAGED

13. DEMOLITION OF CEILINGS INCLUDES GRID, TILE, SUPPORTS, SOFFITS AND RELATED ITEMS, UNLESS NOTED OTHERWISE. COORDINATE WITH ELECTRICAL WORK ON REMOVAL OF LIGHTS, CONDUIT, TIES, SUPPORTS AND RELATED WIRING. COORDINATE WITH MECHANICAL ON REMOVAL

OF DIFFUSERS GRILLS, AND RELATED DUCTWORK EQUIPMENT CONTAINED THEREIN

14. PLUG ABANDONED FLOOR OPENINGS WITH NEW CONCRETE. PLUG SHALL MATCH EXISTING SLAB DEPTH AND BE STRUCTURALLY SOUND TO

CARRY FLOOR LOAD OF 100 LBS. / SQ. FT. UNLESS NOTED OTHERWISE

15. ALL FIRE RATED ASSEMBLIES (COLUMNS, SHAFTS, WALLS, ETC.) SHALL BE MAINTAINED OR BE RELOCATED / PATCHED. MATCH EXISTING FIRE

RATING UNLESS NOTED OTHERWISE

16. REMOVE EXISTING DOORS, FRAMES, SIDELIGHTS, ANCHORS, THRESHOLDS AND HARDWARE AS INDICATED WITHIN LIMITS OF CONSTRUCTION.

PATCH AND REPAIR WALL AND FLOOR TO MATCH EXISTING. OWNER SHALL HAVE THE RIGHT TO SALVAGE ANY AND ALL DOORS AND HARDWARE. CONTRACTOR SHALL VERIFY DOORS FOR SALVAGE OR RELOCATION PRIOR TO COMMENCING DEMOLITION

17. PROTECT EXISTING FINISHED WORK & EQUIPMENT WHICH IS TO REMAIN IN AREAS OF DEMOLITION WORK

18. AFTER THE REMOVAL OF ICRA WALLS, CLEAN AND PATCH EXISTING WALLS AND CEILINGS EFFECTED BY CONSTRUCTION AND MATCH EXISTING

FINISHES

X-RAY

104D

X-RAY

CONTROL ROOM

104D-1

TRIAGE

106D

CORRIDOR

1A

PN

N

GENERAL AREA OF WORK

EXISTING IT CLOSET 138-E

EXISTING ELECTRICAL

PANEL 'BPH-1'

(BASEMENT)

A

A

B

A

C

X-RAY

CONTROL ROOM

104D-1

X-RAY

104D

A

A

D

D

E

F

F

TRIAGE

106D

CORRIDOR

G

EXISTING CONSTRUCTION TO REMAIN. PATCH AS

REQUIRED BY THE SPECIFICATIONS WITHIN THE

CONTRACT AREA.

AREA GENERALLY NOT INCLUDED IN CONTRACT

EXISTING ACOUSTICAL CEILING TILE SYSTEM TO BE

REMOVED

EXISTING LIGHT FIXTURE(S) TO BE REMOVED. SEE

ELECTRICAL DRAWINGS.

EXISTING MECHANICAL GRILLES TO BE REMOVED.

GC TO MODIFY MECHANICAL SYSTEM AS REQUIRED.

SEE MECHANICAL DRAWINGS

SPRINKLER HEAD TO BE REMOVED - REFER TO

ENGINEERING DRAWINGS

AREA GENERALLY NOT INCLUDED IN CONTRACT

A

B

C

C

E

E

A

D

D

A

F

F

F

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS

321 4 5 6 7 8 9 10

ACELAJLH

C U s e rs \a k a n u s k y \D o c u m e n ts

\5

-1

-1

E D

D E

P T

V

A B

U F

F A

L O r2

X

-R a y C

M a k a n u s k y V

B N

S Y

.r v t

/1

/2

:4

:1

A

M

AD101

1ST FLOOR DEMOLITION PLANS

3/22/2022

BUFFALO VA MEDICAL CENTER

528-19-104X-RAY RENOVATION100% FINAL BID SUBMISSION

PARTIALLY SPRINKLERED

21-USDVA-04

GENERAL DEMOLITION NOTES

1/4" = 1'-0"1

1ST FLOOR - DEMOLITION PLAN

FIRST FLOOR KEY PLAN

1/4" = 1'-0"2

1ST FLOOR - DEMOLITION RCP

LEGEND - DEMOLITION PLAN

LEGEND - DEMOLITION REFLECTED CEILING PLAN

DEMOLITION KEY NOTES - FLOOR PLAN

NUMBER DESCRIPTION

1 DEMOLISH ALL FLOORING, WALL BASE, CASEWORK, AND WALL FINISHES IN THEIR ENTIRETY. EXISTING FURNITURE IS TO BE REMOVED, GC IS TO CONFIRM WITH PROJECT COR WHAT ITEMS ARE TO BE SALAVGED. SEE ENGINEERING DRAWINGS FOR

COORDINATION WITH OTHER TRADES

1A EXISTING SLAB IS TO BE PREPPED FOR NEW FLOORING. SLAB IS TO BE LEVELED AS REQUIRED WITHIN 3/16" OVER 3'-0" AS REQUIRED BY X-RAY MANUFACTURER. TAKE CARE TO PROTECT EXISTING LEAD LINING AT THE FLOOR SLAB AS REQUIRED

2 REMOVE EXISTING X-RAY UNIT & ASSOCIATED EQUIPMENT INCLUDING CEILING MOUNTED DEVICES. PREPARE TO RECEIVE NEW UNIT

& COORDINATING EQUIPMENT

3 EXISTING WALL MOUNTED LAVATORY IS TO REMAIN & BE PROTECTED DURING DEMOLITION & CONSTRUCTION

4 REMOVE EXISTING UPS UNITS FOR EXISTING UNIT. REFER TO ELECTRICAL DEMOLITION PLANS FOR MORE INFORMATION

5 REMOVE EXISTING CONTROL MODULE FOR EXISTING X-RAY UNIT. REFER TO ELECTRICAL PLANS FOR MORE INFORMATION

6 REMOVE EXISTING JUNCTION BOX FOR EXISTING X-RAY UNIT. REFER TO ELECTRICAL PLANS FOR MORE INFORMATION

7 REMOVE EXISTING ELECTRICAL RACEWAY & PREP WALL TO RECEIVE NEW FINISH

8 REMOVE EXISTING ELECTRICAL EQUIPMENT FOR EXISTING X-RAY UNIT. REFER TO ELECTRICAL DRAWINGS FOR MORE INFORMATION

9 EXISTING MECHANICAL UNIT IS TO REMAIN & BE PROTECTED DURING DEMOLITION & CONSTRUCTION. HVAC SYSTEM IS TO BE SHUT

DOWN DURING DEMOLITION & CONSTRUCTION.

DEMOLITION RCP KEY NOTES

NUMBER DESCRIPTION

A EXISTING GYPSUM BOARD SOFFIT IS TO REMAIN & BE PROTECTED DURING DEMOLITION & CONSTRUCTION

B EXISTING UNISTRUT SYSTEM IS TO BE MODIFIED FOR NEW CEILING HEIGHT - REFER TO NEW WORK PLANS

FOR NEW CEILING HEIGHT

C EXISTING PATIENT LIFT IS TO BE REMOVED & SALVAGED FOR RE-USE IN NEW CONSTRUCTION

D EXISTING HVAC SYSTEM IS TO BE SHUT DOWN DURING DEMOLITION & CONSTRUCTION. EXISTING SUPPLY &

RETURN DUCTING IS TO BE SEALED OFF FOR INFECTION CONTROL THROUGHOUT DEMOLITION &

CONSTRUCTION. LINEAR DIFFUSERS ARE TO BE REMOVED & SALVAGED FOR RE-USE IN NEW CEILING. REFER

TO NEW WORK PLANS FOR NEW CEILING INFORMATION.

E EXISTING X-RAY UNIT RAIL SYSTEM IS TO BE REMOVED IN ITS ENTIRETY

F EXISTING ACOUSTICAL GRID & TILES ARE TO BE REMOVED THROUGHOUT

G EXISTING INDICATOR LIGHT IS TO REMAIN & BE PROTECTED DURING DEMOLITION & CONSTRUCTION

ARCHITECTURAL FINISHES DEMOLITION

ROOM NAME

ROOM

NUMBER FLOOR FINISH

WALL BASE

FINISH WALL FINISH CEILING FINISH MATERIAL TO BE ABATED

X-RAY 104D 12X12 VAT TILE VINYL COVE PAINT 2X2 ACT TILE RECESSED DOWNLIGHT

WIRING WHIPS & 12X12 VAT

TILE W/ MASTIC

X-RAY CONTROL

ROOM

104D-1 12X12 VAT TILE VINYL COVE PAINT 2X2 ACT TILE & GWB

SOFFITS

RECESSED DOWNLIGHT

WIRING WHIPS & 12X12 VAT

TILE W/ MASTIC

X

1 1/2" = 1'-0"A

EXISTING CONDITION PHOTOS - X-RAY

X-RAY

104D

X-RAY

CONTROL ROOM

104D-1

'-6

3'-9"

3'-11"

6"

AE101

CORRIDOR

SF101

SF101

PN

N

GENERAL AREA OF WORK

EXISTING IT CLOSET 138-E

EXISTING ELECTRICAL

PANEL 'BPH-1'

(BASEMENT)

AT-1

7'-7 1/2"

A

B

C

AT-1

7'-7 1/2"

AT-1

7'-7 1/2"

D

D

D

D

AT-1

9'-6"

X-RAY

104D

X-RAY

CONTROL ROOM

104D-1

CORRIDOR

AE101

TYP.

F

SF101

NEW 2x2 ACOUSTICAL CEILING TILE TO BE

PLACED IN EXISTING GRID SYSTEM

SPRINKLER HEAD

SUPPLY AIR GRILLE

RECESSED LINEAR LIGHT FIXTURE

AREA OF WORK NOT INCLUDED IN CONTRACT

AREA TO BE KEPT CLEAR OF CEILING FIXTURES & OTHER

NON-SYSTEM ITEMS THAT MAY PROJECT DOWNWARD

FROM THE CEILING

LINEAR DIFFUSER - REFER TO MECHANICAL DRAWINGS

FOR MORE INFORMATION

EXISTING CONSTRUCTION TO REMAIN. PATCH AS

REQUIRED FOR NEW FINISHES IF INDICATED ON

FINISH SCHEDULE.

AREA OF WORK NOT INCLUDED IN CONTRACT

EXISTING WALL MOUNTED LAVATORY

NEW COUNTER

EXISTING GLAZING SYSTEM

TO REMAIN - FRAME TO BE

PAINTED (P-4)

OPEN

BEYOND

AE101

(S-1) SOLID SURFACE

COUNTERTOP

POWDER-COATED HEAVY DUTY

WORKSURFACE BRACKET; WHITE.

SPACE BASED ON MANUFACTURER'S

RECOMMENDATION

/2

SOLID SURFACE COUNTERTOP

ATOP PLYWOOD SUBSTRATE

2'-6"

CUTOUT FOR GROMMETS

(GROM-1) AS REQUIRED. REFER

TO PLAN FOR LOCATION /

QUANTITY

POWDER COATED SUPPORT

BRACKET (BR-1) - SPACED AS

RECOMMENDED BY

MANUFACTURER

1. REFER TO CEILING PLAN FOR CEILING HEIGHTS AND REFER TO LEGEND FOR CEILING

TYPES.

2. WHERE THE LIGHTS AND ACCESSORIES ARE SHOWN TO BE RECESSED IN CEILING

TILES, THEY SHALL BE CENTERED OR EDGE ALIGNED IN THE CEILING TILES, AS

INDICATED GRAPHICALLY, UNLESS NOTED OTHERWISE.

3. REFER TO ELECTRICAL DRAWINGS FOR LIGHT FIXTURE DESCRIPTIONS AND ALL CEILING

MOUNTED ELECTRICAL DEVICES.

4. REFER TO MECHANICAL DRAWINGS FOR DIFFUSER DESCRIPTIONS AND ALL CEILING

MOUNTED MECHANICAL DEVICES.

5. REFER TO TECHNOLOGY DRAWINGS FOR IDENTIFICATION AND DESCRIPTION OF

CEILING MOUNTED TECHNOLOGY EQUIPMENT.

6. CEILING HEIGHT DIMENSIONS SHOWN ON REFLECTED CEILING PLAN AND DETAILS ARE

FROM FINISH FLOOR TO FINISH CEILING.

7. UNLESS NOTED OTHERWISE, LIGHT FIXTURES SHALL BE LOCATED AS SHOWN ON THE

REFLECTED CEILING PLANS.

8. WHERE LIGHT FIXTURES, DEVICES AND ACCESSORIES ARE SHOWN TO BE RECESSED IN

CEILING TILES, THEY SHALL BE CENTERED IN THE CEILING TILES UNLESS NOTED

OTHERWISE.

9. PROVIDE ACCESS PANELS AS REQUIRED BY APPLICABLE CODES AND AS REQUIRED

FOR MECHANICAL, ELECTRICAL, AND PLUMBING EQUIPMENT. ACCESS PANELS LOCATED

IN FINISHED AREAS SHALL BE PAINTED TO MATCH ADJACENT SURFACES. LOCATIONS

SHALL BE REVIEWED WITH THE ARCHITECT PRIOR TO PROCEEDING WITH THE

INSTALLATION.

10. ALL GYPSUM. BOARD CEILINGS AND SOFFITS ARE TO BE PAINTED - REFER TO FINISH

PLANS FOR SPECIFICATION INFORMATION.

11. NO MECHANICAL EQUIPMENT IN THE CEILING CAVITY REQUIRING NORMAL

MAINTENANCE SHALL BE INSTALLED ABOVE A GYPSUM. BOARD CEILING. NOTIFY

ARCHITECT IF ANY SUCH ITEMS ARE INDICATED ABOVE GYPSUM. BOARD CEILINGS.

12. EXIT SIGNS AND SMOKE DETECTORS LOCATED IN HARD CEILINGS SHALL BE CENTERED

IN CORRIDORS AND LOCATED A DISTANCE OF 1’-0” FROM WALL TO THE CENTER OF THE

FIXTURE UNLESS NOTED OTHERWISE. LOCATE EXIT SIGNS AS REQUIRED BY THE

AUTHORITY HAVING JURISDICTION.

13. SOFFITS AND BULKHEADS SHALL BE LATERALLY BRACED TO RESIST HORIZONTAL

MOVEMENT.

14. CONTRACTOR SHALL COORDINATE ALL TYPES OF FIXTURES WITH ELECTRICAL

DRAWINGS. FIXTURES SHOWN ON ARCHITECTURAL DRAWINGS ARE FOR REFERENCE

ONLY AND ARE INDICATED FOR LOCATION ONLY.

15. PROVIDE AND INSTALL NEW LIGHT FIXTURES, SENSING AND OTHER DEVICES AS

INDICATED: SEE ELECTRICAL DRAWINGS FOR ADDITIONAL REQUIREMENTS.

16. PROVIDE AND INSTALL HVAC DIFFUSERS AND RETURN GRILLS AS INDICATED: SEE

MECHANICAL DRAWINGS FOR ADDITIONAL REQUIREMENTS.

17. PROVIDE AND INSTALL SPRINKLER HEAD LOCATIONS AS INDICATED: SEE FIRE

PROTECTION DRAWINGS FOR…

This is the start of the file's text. The full file is on GovTribe.