36C24222B0041_1.docx
DOCX document 127 KB Posted
- Solicitation number
- 36C24222B0041
About this file
This document outlines a federal solicitation for site preparation work related to emergency department x-ray equipment replacement at a Department of Veterans Affairs medical center. Key details include a project number of 528-19-104 located at the Buffalo VA Medical Center, with a project magnitude between $100,000 and $250,000. The work scope involves site preparation, demolition, hazardous material abatement, and installation of new x-ray equipment in coordination with Siemens as a consultant. The solicitation provides bidding instructions, requirements for bid guarantees and bonds, representations and certifications, and general contract terms. It also specifies requirements for site visits, questions from offerors, and proposal submission deadlines of July 19, 2022 for electronic bids and materials.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C24222B0041 0006.docx | DOCX document | |
| 36C24222B0041 0005.docx | DOCX document | |
| S02 Wage Determination - Erie.pdf | ||
| 36C24222B0041 0004.docx | DOCX document | |
| 528-19-104 ED DEPT VA BUFFALO Final Bid Submission X-Ray Specifications (1).pdf | ||
| Sign-in sheet Walkthrough_2022_07_22_10_51_23_910.pdf | ||
| 528-19-104 RFI Log (bid)1.xlsx | XLSX spreadsheet | |
| 36C24222B0041 0003.docx | DOCX document | |
| 36C24222B0041 0002.docx | DOCX document | |
| P07 Wage Determination.pdf | ||
| 528-19-104 ED DEPT VA BUFFALO Final Bid Submission X-Ray Drawings.pdf | ||
| 36C24222B0041 0001.docx | DOCX document |
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1. SOLICITATION NUMBER
2. TYPE OF SOLICITATION
3. DATE ISSUED
PAGE OF PAGES
4. CONTRACT NUMBER
5. REQUISITION/PURCHASE REQUEST NUMBER
6. PROJECT NUMBER
7. ISSUED BY
CODE
8. ADDRESS OFFER TO
a. NAME
b. TELEPHONE NUMBER (Include area code) (NO COLLECT CALLS)
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying number, date) 12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES," indicate within how many calendar days after award in Item 12B.)
12b. CALENDAR DAYS
13. ADDITIONAL SOLICITATION REQUIREMENTS:
STANDARD FORM 1442 (REV. 8/2014)
STANDARD FORM 1442
Prescribed by GSA-FAR (48 CFR) 52.236-1(d)
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair)
SOLICITATION
SOLICITATION
IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.
9. FOR INFORMATION
CALL:
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
SEALED BID (IFB)
NEGOTIATED (RFP)
11. The Contractor shall begin performance within ____________ calendar days and complete it within calendar days after receiving award, notice to proceed. This performance period is mandatory negotiable. (See _____________________________).
YES
NO
a.
Sealed offers in original and ___________________copies to perform the work required are due at the place specified in Item 8 by _____________ (hour) local time _____________________ (date). If this is a sealed bid solicitation, offers must be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, the date and time offers are due.
b.
An offer guarantee is, is not required.
c.
All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
d.
Offers providing less than _______________________ calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.
36C24222B0041 X 06-08-2022 528-22-3-4192-0044 528-19-104 Department of Veterans Affairs Network Contracting Office (NCO) 2 2875 Union Road Suite 3500 Cheektowaga
NY
14227 Tanya Baldwin Department of Veterans Affairs Network Contracting Office (NCO) 2 2875 Union Road, Suite 3500 Cheektowaga
NY
14227
BALDWIN, TANYA
N/A Contractor shall provide all labor, equipment, materials, and supervision necessary to perform all work required for the Site Prep Emergency Department X-Ray Equipment project in accordance with (IAW) all drawings, specifications, and the scope of work. This project is located at the Buffalo New York Veterans Hospital at 3495 Bailey Avenue in Buffalo, 14215.
Project magnitude: between $100,000 and $250,000. The NAICS code is 236220. Small Business size standard is $39.5.
As set forth in 38 U.S.C 8127 the requirement is a 100% setaside to Service Disabled Veteran Owned Small Business.
See VAAR 852.219-10, Notice of Total Service-Disabled Veteran Owned Small Business Set-Aside of this VERIFIED by the Department of Veterans Affairs Center for Verification and Evaluation (CVE) at time of submission of bid and at time of award. Failure to be both VERIFIED by CVE and VISIBLE in VetBiz prior to contract award will result in the bidder's proposal being deemed non-responsive. All offerors are urged to contact the CVE and submit the required documents to obtain CVE verification of their SDVOSB status if they have not already done so.
In accordance with FAR 52.204-7, System for Award Management (SAM), prospective contractors shall be registered in the SAM database prior to award of a contract or agreement.
See full solicitation text for information related to pre-bid site visit, requests for information, bidding materials, and public bid opening.
Note: In accordance with FAR 36.209 and VAAR 836.209, an A/E firm cannot be awarded any construction contract for which it provided design services unless approved by the head of the agency.
The site visit is schedule on Thursday, June 16, 2022 at 11:00A.M at the Buffalo NY VAMC.
X X 52.211-10 X 13:00
EDT
07-19-2022 X
14. NAME AND ADDRESS OF OFFEROR
15. TELEPHONE NUMBER
16. REMITTANCE ADDRESS
CODE
FACILITY CODE
17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of the solicitation, if this offer is accepted by the Government in writing within __________ calendar days after the date offers are due.
AMOUNTS
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
AMENDMENT
NUMBER
DATE.
20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER 20b. SIGNATURE 20c. OFFER DATE
21. ITEMS ACCEPTED:
22. AMOUNT
23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN
ITEM
25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
10 U.S.C. 2304(c)( 41 U.S.C. 3304(a) (
26. ADMINISTERED BY
27. PAYMENT WILL BE MADE BY
PHONE:
FAX:
28. NEGOTIATED AGREEMENT
29. AWARD
Your Contractor agrees offer on this solicitation is hereby accepted as to the items listed. This to furnish and deliver all items or perform all work requirements identified award consummates the contract, which consists of (a) the Government on this form and any continuation sheets for the consideration stated in solicitation and your offer, and (b) this contract award. No further cont-this contract. The rights and obligations of the parties to this contract ractual document is necessary.
shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.
30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31a. NAME OF CONTRACTING OFFICER
TO SIGN
30b. SIGNATURE 30c. DATE 31b. UNITED STATES OF AMERICA 31c. AWARD DATE
BY
OFFER
AWARD
STANDARD FORM 1442 (REV. 8/2014) BACK
(Include ZIP Code) (Include area code) (Include only if different than Item 14.)
(Insert any number equal to or greater than the minimum requirement stated in Item 13d. Failure to insert any number means the offeror accepts the minimum in Item 13d.)
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each) (Type or print) (4 copies unless otherwise specified) (Type or print) (Type or print) (Contractor is required to sign this document and return _______ copies to issuing office.)
(Contractor is not required to sign this document.)
(Must be fully completed by offeror) (To be completed by Government)
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
528-3620162-4192-854200 Non-Recurring Ma-3220 Buildings and Facilities--23NRNR000 Department of Veterans Affairs Network Contracting Office (NCO) 2 2875 Union Road Suite 3500 Cheektowaga
NY
14227 Tungsten Network https://www.tungsten-network.com/ customer-campaigns/veteransaffairs/
X Tanya Baldwin Contracting Officer
Table of Contents
| PART I - THE SCHEDULE | 1 | |
| SECTION A - SOLICITATION/CONTRACT FORM | 1 | |
| A.1 SF 1442 SOLICITATION, OFFER, AND AWARD (Construction, Alteration, or Repair) | 1 | |
| A.2 SF 1442 SOLICITATION, OFFER, AND AWARD (CONSTRUCTION, ALTERATION, OR REPAIR)– BACK | 2 | |
| 1 | General Information | 6 |
| 1.1 | Location | 6 |
| 1.2 | Purpose | 6 |
| 1.3 | Scope | 6 |
| 1.3.1 | Site Conditions, As-Built and Record Documents | 7 |
| 1.3.2 | Quality Assurance/Quality Control Plan | 7 |
| 1.3.3 | Hazardous Materials | 8 |
| 1.3.4 | Personal Protective Equipment (PPE) | 8 |
| 1.4 | Approach | 8 |
| 1.4.1 | General | 8 |
| 1.4.2 | Phasing | 8 |
| 1.5 | Site Information | 8 |
| 1.5.1 | Safety | 8 |
| 1.5.2 | Access | 8 |
| 1.5.3 | Photography | 9 |
| 2 | Applicable Documents | 9 |
| 2.1 | Government Documents | 9 |
| 2.2 | Veterans Health Administration Western New York Documents | 9 |
| 2.3 | Non-Government Publications | 10 |
| 2.4 | Order of Precedence | 10 |
| 2.5 | Records Management | 10 |
| 3 | Requirements | 11 |
| 3.1 | General | 11 |
| 3.1.1 | Status Updates | 11 |
| 3.1.2 | Meetings | 12 |
| 3.1.2.1 | Meeting Scheduling | 12 |
| 3.1.2.2 | Meeting Agenda | 12 |
| 3.1.2.3 | Meeting Presentation Materials | 12 |
| 3.1.2.4 | Meeting Minutes | 12 |
| 3.2 | Construction | 13 |
| 3.2.1 | Kick-off Meeting and Site Survey | 13 |
| 3.2.2 | Submittals | 13 |
| 3.2.3 | Preconstruction Conference | 13 |
| 3.2.4 | General Construction | 14 |
| 3.2.5 | Status Meetings | 14 |
| 4 | Verification | 15 |
| 5 | Delivery | 15 |
| 5.1 | Technical POC | 15 |
| 5.2 | Schedule and Submittals | 15 |
| 6 | Government Furnished Information, Materials, & Equipment | 16 |
| INFORMATION REGARDING BIDDING MATERIAL, BID GUARANTEE AND BONDS | 25 | |
| INSTRUCTIONS, CONDITIONS AND OTHER STATEMENTS TO BIDDERS/OFFERORS | 28 | |
| A.3 52.222-5 CONSTRUCTION WAGE RATE REQUIREMENTS—SECONDARY SITE OF THE WORK (MAY 2014) | 29 | |
| A.4 52.222-23 NOTICE OF REQUIREMENT FOR AFFIRMATIVE ACTION TO ENSURE EQUAL EMPLOYMENT OPPORTUNITY FOR CONSTRUCTION (FEB 1999) | 29 | |
| A.5 52.225-10 NOTICE OF BUY AMERICAN REQUIREMENT—CONSTRUCTION MATERIALS (MAY 2014) | 30 | |
| A.6 52.228-1 BID GUARANTEE (SEP 1996) | 31 | |
| A.7 52.228-17 INDIVIDUAL SURETY—PLEDGE OF ASSETS (BID GUARANTEE) (FEB 2021) | 32 | |
| A.8 52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995) ALTERNATE I (FEB 1995) | 32 | |
| A.9 52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998) | 33 | |
| A.10 VAAR 852.228-72 ASSISTING SERVICE-DISABLED VETERAN-OWNED AND VETERAN-OWNED SMALL BUSINESSES IN OBTAINING BONDS (DEC 2009) | 33 | |
| REPRESENTATIONS AND CERTIFICATIONS | 35 | |
| 3.1 52.204-8 ANNUAL REPRESENTATIONS AND CERTIFICATIONS (JAN 2022) (JUL 2020) (DEVIATION) | 35 | |
| 3.2 52.204-24 REPRESENTATION REGARDING CERTAIN TELECOMMUNICATIONS AND VIDEO SURVEILLANCE SERVICES OR EQUIPMENT (NOV 2021) | 39 | |
| GENERAL CONDITIONS | 42 | |
| 4.1 52.204-19 INCORPORATION BY REFERENCE OF REPRESENTATIONS AND CERTIFICATIONS (DEC 2014) | 42 | |
| 4.2 52.204-23 PROHIBITION ON CONTRACTING FOR HARDWARE, SOFTWARE, AND SERVICES DEVELOPED OR PROVIDED BY KASPERSKY LAB AND OTHER COVERED ENTITIES (NOV 2021) | 42 | |
| 4.3 52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984) ALTERNATE I (APR 1984) | 43 | |
| 4.4 52.217-9 OPTION TO EXTEND THE TERM OF THE CONTRACT (MAR 2000) | 43 | |
| 4.5 52.219-28 POST-AWARD SMALL BUSINESS PROGRAM REREPRESENTATION (SEP 2021) | 44 | |
| 4.6 52.222-35 EQUAL OPPORTUNITY FOR VETERANS (JUN 2020) | 47 | |
| 4.7 52.225-9 BUY AMERICAN—CONSTRUCTION MATERIALS (NOV 2021) | 47 | |
| 4.8 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998) | 51 | |
| 4.9 52.222-36 EQUAL OPPORTUNITY FOR WORKERS WITH DISABILITIES (JUN 2020) | 52 | |
| 4.10 52.233-2 SERVICE OF PROTEST (SEP 2006) | 53 | |
| 4.11 VAAR 852.219-10 VA NOTICE OF TOTAL SERVICE-DISABLED VETERAN-OWNED SMALL BUSINESS SET-ASIDE (JUL 2019) (DEVIATION) | 55 | |
| 4.12 VAAR 852.219-74 LIMITATIONS ON SUBCONTRACTING—MONITORING AND COMPLIANCE (JUL 2018) | 57 | |
| 4.13 VAAR 852.219-77 VA NOTICE OF LIMITATIONS ON SUBCONTRACTING—CERTIFICATE OF COMPLIANCE FOR SERVICES AND CONSTRUCTION (SEP 2021) (DEVIATION) | 57 | |
| 4.14 VAAR 852.232-72 ELECTRONIC SUBMISSION OF PAYMENT REQUESTS (NOV 2018) | 59 | |
| 4.15 VAAR 852.236-71 SPECIFICATIONS AND DRAWINGS FOR CONSTRUCTION (APR 2019) | 60 | |
| 4.16 VAAR 852.236-79 CONTRACTOR PRODUCTION REPORT (APR 2019) | 61 | |
| 4.17 VAAR 852.236-80 SUBCONTRACTS AND WORK COORDINATION (APR 2019) | 62 | |
| 4.18 VAAR 852.242-70 GOVERNMENT CONSTRUCTION CONTRACT ADMINISTRATION (OCT 2020) | 62 | |
| 4.19 VAAR 852.243-70 CONSTRUCTION CONTRACT CHANGES—SUPPLEMENT (SEP 2019) | 63 | |
| 4.20 VAAR 852.270-1 REPRESENTATIVES OF CONTRACTING OFFICERS (JAN 2008) | 65 |
Construction Scope of Work Siemens X-ray Equipment Installation Project 528-19-104
General Information
1.1 Location
Work performed under this scope will be for and conducted within VA Western New York Healthcare System (VAWNYHS) at the Buffalo VA Medical Center (VAMC) located at 3495 Bailey Avenue Buffalo, NY 14215 under VA Project Number 528-19-104.
1.2 Purpose
The purpose of this effort is to replace nuclear medical equipment used in the emergency department at the Buffalo VAMC in accordance with the construction documents developed under contract 528C10169.
The Buffalo VAMC requires a Contractor to perform construction work necessary to accomplish this goal.
1.3 Scope
The scope of construction work is fully described in the construction documents (drawings and specifications). Additional administrative and management related requirements are described in Section 2.5: Records Management Contractor shall treat all deliverables under the contract as the property of the U.S. Government for which the Government Agency shall have unlimited rights to use, dispose of, or disclose such data contained therein as it determines to be in the public interest.
Contractor shall not create or maintain any records that are not specifically tied to or authorized by the contract using Government IT equipment and/or Government records.
Contractor shall not retain, use, sell, or disseminate copies of any deliverable that contains information covered by the Privacy Act of 1974 or that which is generally protected by the Freedom of Information Act.
Contractor shall not create or maintain any records containing any Government Agency records that are not specifically tied to or authorized by the contract.
The Government Agency owns the rights to all data/records produced as part of this contract.
The Government Agency owns the rights to all electronic information (electronic data, electronic information systems, electronic databases, etc) and all supporting documentation created as part of this contract. Contractor must deliver sufficient technical documentation with all data deliverables to permit the agency to use the data.
Contractor agrees to comply with Federal and Agency records management policies, including those policies associated with the safeguarding of records covered by the Privacy Act of 1974. These policies include the preservation of all records created or received regardless of format (paper, electronic, etc.) or mode of transmission (email, fax, etc.) or state of completion (draft, final, etc.).
No disposition of documents will be allowed without the prior written consent of the Contracting Officer. The Agency and its contractors are responsible for preventing the alienation or unauthorized destruction of records, including all forms of mutilation. Willful and unlawful destruction, damage or alienation of Federal records is subject to the fines and penalties imposed by 18 U.S.C. 2701. Records may not be removed from the legal custody of the Agency or destroyed without regard to the provisions of the agency records schedules.
Contractor is required to obtain the Contracting Officer’s approval prior to engaging in any contractual relationship (sub-contractor) in support of this contract requiring the disclosure of information, documentary material and/or records generated under, or relating to, this contract. The Contractor (and any sub-contractor) is required to abide by Government and Agency guidance for protecting sensitive and proprietary information.
Requirements. A brief overview of the construction work is included below:
Site work to prepare area for:
New x-ray table from Siemens Full demolition and abatement of existing x-ray table, drop ceiling, and flooring.
Installation of new x-ray equipment working with Siemens as a consultant of contractor (plumbing, mechanical, HVAC, insulation, electrical, etc.).
Site restoration as required for the x-ray room.
It will be the consultants responsibility to interface with each equipment manufacturer/vendor’s representative POC to coordinate equipment layout and infrastructure requirements. Vendor contract information will be provided at the time of award.
1.3.1 Site Conditions, As-Built and Record Documents
Although the VA makes every effort to keep drawings current to existing conditions, changes and updates are sometimes not recorded. It is therefore the Contractor’s responsibility to perform field investigation and verify of the accuracy of the drawings with the actual conditions.
The contractor shall check existing conditions at the project site prior to bidding.
1.3.2 Quality Assurance/Quality Control Plan
The Contractor is responsible for reviewing the work done by any subcontractors that the Contractor has hired to assist with the completion of this SOW. The Contractor must provide the Government with a Quality Assurance/Quality Control (QA/QC) Plan that documents the methods, processes, procedures that are going to be implemented by the Contractor to validate the work their subcontractors perform.
1.3.3 Hazardous Materials
Hazardous material removal is required for this project. See abatement drawings and specification for more details.
1.3.4 Personal Protective Equipment (PPE)
The Contractor is responsible for obtaining/providing, inspecting, and maintaining any required Personal Protective Equipment (PPE) and access equipment (lifts, scaffolding, etc...) necessary to perform services identified in this SOW.
1.4 Approach
1.4.1 General
This Scope of Work has been broken down into general requirements that are applicable to the entire contract and the specific construction effort:
General (Section 3.1) Construction (Section 3.2) The bidding Contractor(s) will have to conduct a brief pre award site survey of the campus. This will be arranged through the contracting officer and conducted as a group or individually as per the contracting officer.
1.4.2 Phasing
This project is not phased. The contractor will need to coordinate with equipment supplier after demolition and prior to starting room final renovation.
1.5 Site Information
1.5.1 Safety
All Contractor personnel working onsite at the Medical Center will be required to attend a 1 hour Buffalo VAMC site specific safety training class. This class will be held on site and will be taught by a member of the Buffalo VAMC safety office. Attendance to this class and proof of the 10 hour OSHA requirement will allow Contractor personnel to obtain a photo ID badge from the Buffalo VAMC Police. All Contractor personnel shall wear this badge above the waist at all time while on the Buffalo VAMC campus. Participation in this class is mandatory and must be done prior to the commencement of work on-site. The training and the badge will be valid for 3 years from the date of issue.
If this training has been completed previously (as evidenced by a valid Buffalo VAMC Contractor Photo ID) then no repeat training will be required until the printed expiration date. Personnel must attend the safety training class to renew an existing badge.
1.5.2 Access
Although the VAWNYHS campuses are public facilities, access to facility maintenance areas, electrical areas, mechanical areas, roof access, and certain other portions of the medical facility are restricted from the general public. Accessing these areas may require advance notice, pre-approval, and scheduling to gain entry.
All visits and access requests to the VAWNYHS under this scope of work shall be coordinated through the Contracting Officer Representative (COR).
1.5.3 Photography
PG-18-1: MASTER CONSTRUCTION SPECIFICATIONS, Section 01 00 00 (General Requirements - 528-19-104), Article 1.31 requires the contractor to obtain the services of a professional photographer to document the entire construction process.
As a reminder, it is VHA policy to respect the privacy of all persons (e.g., Veterans, patients, residents, members of the VHA workforce, and visitors) consistent with the needs of operating a national health care system. Privacy protections on VHA premises vary according to the needs and purposes of different types of areas, the persons included, and the purpose of the production and use of photographs, digital images, and video or audio recordings (excerpt from VHA Directive 1078).
The Contractor shall ensure that any photographs taken do NOT include any VHA patients, members of the VHA workforce, or visitors to the VAMC facility.
Applicable Documents The following documents are applicable to this Scope of Work (SOW) to the extent specified herein. While every effort has been made to ensure the completeness of this list, document users are cautioned that they must meet all specified requirements of documents cited in sections 2.5 of this SOW, whether or not they are listed here.
1.6 Government Documents
The following directives, guides, handbooks, and drawings form a part of this document to the extent specified herein. Unless otherwise specified, the latest revisions available shall be used.
Copies of construction related Department of Veterans Affairs directives, guides, and handbooks are available from the Office of Construction and Facilities Management website:
http://www.cfm.va.gov/til/index.asp
DEPARTMENT OF VETERANS AFFAIRS
DIRECTIVES
| 1078 |
| PRIVACY OF PERSONS REGARDING PHOTOGRAPHS, DIGITAL IMAGES, AND VIDEO OR AUDIO RECORDINGS |
1.7 Veterans Health Administration Western New York Documents The following drawings and documents form a part of this document to the extent specified herein.
Documents identified as “AS MODIFIED FOR VA PROJECT 528-19-104” are base VA documents that have been tailored to the needs of this specific effort. While the base VA documents are available on the Office of Construction and Facilities Management website listed above, the Contractor shall use the modified version listed below, NOT the base document. Copies of these documents are available from the KO, COR, or Technical POC.
VA WESTERN NEW YORK HEALTHCARE SYSTEM, BUFFALO VA MEDICAL CENTER
DRAWINGS
PG-18-1: MASTER CONSTRUCTION SPECIFICATIONS, SECTION 00 01 15 LIST OF DRAWING SHEETS (AS MODIFIED FOR VA PROJECT 528-19-104) lists all drawings for this construction effort.
SPECIFICATIONS (AS MODIFIED FOR VA PROJECT 528-19-104)
PG-18-1: MASTER CONSTRUCTION SPECIFICATIONS, SECTION 00 01 10 TABLE OF CONTENTS (AS MODIFIED FOR VA PROJECT 528-19-104) lists all relevant and modified construction specifications for this construction effort.
1.8 Non-Government Publications
All work shall be accomplished in strict accordance with the latest codes and standards. The Contractor shall follow any/all applicable standards and codes, including, but not limited to applicable NFPA standards, NEC, JCAHO, OSHA, ANSI, ASHRAE, and any other codes.
1.9 Order of Precedence
In the event of a conflict between the text of this document and the references cited herein, the text of this document takes precedence. Nothing in this document, however, supersedes applicable laws and regulations unless a specific exemption has been obtained.
1.10 Records Management
Contractor shall treat all deliverables under the contract as the property of the U.S. Government for which the Government Agency shall have unlimited rights to use, dispose of, or disclose such data contained therein as it determines to be in the public interest.
Contractor shall not create or maintain any records that are not specifically tied to or authorized by the contract using Government IT equipment and/or Government records.
Contractor shall not retain, use, sell, or disseminate copies of any deliverable that contains information covered by the Privacy Act of 1974 or that which is generally protected by the Freedom of Information Act.
Contractor shall not create or maintain any records containing any Government Agency records that are not specifically tied to or authorized by the contract.
The Government Agency owns the rights to all data/records produced as part of this contract.
The Government Agency owns the rights to all electronic information (electronic data, electronic information systems, electronic databases, etc) and all supporting documentation created as part of this contract. Contractor must deliver sufficient technical documentation with all data deliverables to permit the agency to use the data.
Contractor agrees to comply with Federal and Agency records management policies, including those policies associated with the safeguarding of records covered by the Privacy Act of 1974. These policies include the preservation of all records created or received regardless of format (paper, electronic, etc.) or mode of transmission (email, fax, etc.) or state of completion (draft, final, etc.).
No disposition of documents will be allowed without the prior written consent of the Contracting Officer. The Agency and its contractors are responsible for preventing the alienation or unauthorized destruction of records, including all forms of mutilation. Willful and unlawful destruction, damage or alienation of Federal records is subject to the fines and penalties imposed by 18 U.S.C. 2701. Records may not be removed from the legal custody of the Agency or destroyed without regard to the provisions of the agency records schedules.
Contractor is required to obtain the Contracting Officer’s approval prior to engaging in any contractual relationship (sub-contractor) in support of this contract requiring the disclosure of information, documentary material and/or records generated under, or relating to, this contract. The Contractor (and any sub-contractor) is required to abide by Government and Agency guidance for protecting sensitive and proprietary information.
Requirements The Contractor shall provide personnel, material, services, and facilities to perform, accomplish, and deliver the required services detailed in this scope of work.
1.11 General
This section contains general information that is applicable for the duration of the contract (i.e. applies to all Parts of this effort).
1.11.1 Status Updates
The Contractor shall prepare and submit periodic status reports throughout the duration of the contract. The reporting period will begin at Notice to Proceed. The contents of status reports shall include but is not limited to the following information/topics:
Summary and Current Status of Project Progress Accomplished (for the previous month) Progress Anticipated (for the next three months) Submittal Status (approved and rejected) Updated Schedule Problems Encountered and Anticipated Technical, Schedule, and Cost Risk Assessment Risk Mitigation Strategy Financial Data (i.e. allocated funding, obligations, expenditures, etc.)
Status reports may be organized in Contractor specified format. Status reports will be supplied as a digital product to the Government in a Microsoft Word compatible format (*.DOC, *.DOCX) or Portable Document Format (*.PDF). Status reports shall be submitted via email to the KO and COR by the 5th business day of every month.
1.11.2 Meetings
Several different meeting are identified under this contract. Information contained within this section is relevant to all meetings identified in this contract. Any meeting specific details can be located in its respective section of this SOW.
1.11.2.1 Meeting Scheduling
All meetings identified within this SOW are to be coordinated and scheduled with the COR. See Section 1.5.2 and Section 5.1 for more details.
1.11.2.2 Meeting Agenda
The Contractor shall provide a meeting agenda 5 business days prior to the scheduled date of the meeting.
Meeting agendas may be organized in Contractor specified format. Meeting agendas will be supplied as a digital product to the Government in a Microsoft Word compatible format (*.DOC, *.DOCX) or Portable Document Format (*.PDF). Meeting agendas shall be submitted via email to the COR.
1.11.2.3 Meeting Presentation Materials
Any required presentation materials (e.g. handouts, slide presentation, design information, drawings, schedules, cut sheets, etc…) shall be provided to the Government at the same time as the meeting agenda.
Meeting presentation materials may be organized in Contractor specified format. Meeting presentation materials will be supplied as a digital product to the Government in a Microsoft Office compatible format (*.DOC, *.DOCX, *.PPT, *.PPTX), Portable Document Format (*.PDF), or AutoCAD (*.DWG, *.DXF) as applicable to the specific document and meeting.
While email is acceptable method to receive this information, note that the VA has a size restriction for attachments on email. No email can be sent or received by the VA that is larger than 5MB. If meeting presentation materials are larger than this size, the Contractor must determine an alternate method to submit the required materials by the due date (e.g. FTP website, optical digital media, etc…).
1.11.2.4 Meeting Minutes
The Contractor shall provide meeting minutes to document the discussion had during the meeting. The contents of meeting minutes shall include but is not limited to the following information/topics:
Meeting attendees Narrative to describe contents of meeting (will likely mirror the meeting agenda) List of action items (for both the Government and the Contractor) Presentation materials used during the meeting should be included as enclosures Meeting minutes may be organized in Contractor specified format. Meeting minutes will be supplied as a digital product to the Government in a Microsoft Word compatible format (*.DOC, *.DOCX) or Portable Document Format (*.PDF).
The Contractor shall provide draft meeting minutes within 5 business days of the meeting. The Government will review and provide comments back to the Contractor within 3 business days of receipt of the draft meeting minutes. The Contractor shall finalize the meeting minutes and submit the final meeting minutes to the Government within 3 business days of receipt of Government comments.
1.12 Construction
The Contractors scope of work for Construction shall include, but is not limited to the following:
1.12.1 Kick-off Meeting and Site Survey
The Contractor shall conduct a kick-off meeting at the VAMC. During the kick-off meeting the Contractor shall address their plan to meet the design intent, review the schedule, and review their plan to address any risks associated with the effort.
This meeting shall comply with the terms of Section 3.1.2 of this SOW.
See section 5.2 for the timing of this meeting.
In conjunction with the Kick-off Meeting, the Contractor shall survey the existing test panels and boiler plant area to assess current site conditions and assemble existing as-built documents.
Site surveys shall be conducted in accordance with Section 1.5.2.
1.12.2 Submittals
In accordance with the terms of PG-18-1 MASTER CONSTRUCTION SPECIFICATIONS; SECTION 01 33 23 SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES (528-19-104), the contractor shall provide submittals and shop drawings for review prior to starting work.
A submittal log has been generated for this effort and represents a list of the minimum required submittals based upon the current construction documents. Although every attempt has been made to ensure that this list is complete, additional submittals not listed may be required.
1.12.3 Preconstruction Conference
Once the submittals have been approved, the Contractor shall attend a Preconstruction Conference. This meeting will be a follow-up to the Kick-off Meeting and Site Survey. In preparation for this meeting the Contractor shall submit:
An updated work plan that adds additional details based upon approved submittal information.
A site safety plan specific to this effort and location.
OSHA traing records and date(s) for VA site safety attendance.
A list of any remaining submittals to be provided with planned dates.
Revised or new Activity Hazard Analysis (AHA) based on approved submittals Refined Schedule of Values (SOV) showing detailed breakdown of work to be invoiced.
Any additional clarifying details about the work to be performed that have been updated bases upon the approved submittals.
Any action items resulting from this meeting shall be addressed prior to ordering any materials or beginning the actual construction work.
This meeting shall comply with the terms of Section 3.1.2 of this SOW and the terms of PG-18-1 MASTER CONSTRUCTION SPECIFICATIONS; SECTION 01 35 26 SAFETY REQUIREMENTS (528-19-104); Article 1.6 Preconstruction Conference.
See section 5.2 for the timing of this meeting.
1.12.4 General Construction
The Contractors scope of work for General Construction shall include, but is not limited to, the procedures outlined in PG-18-1: MASTER CONSTRUCTION SPECIFICATIONS (528-19-104).
Work includes, but not limited to, all labor, material, equipment and supervision to perform the required demolition, modification, construction, and/or installation of the walk-in coolers and freezers and their subsystems as described in the drawings, specifications, and this SOW.
1.12.5 Status Meetings
The Contractor shall attend periodic status meetings with the VA to discuss construction progress, submittals, and RFIs during the course of the project. The construction phase is anticipated to be no longer than 8 months. This time estimate excludes the time required to perform the preparatory administrative work (e.g. plans, schedules, submittals, etc...)
Status meetings will commence after the Preconstruction Conference is held (section 3.2.3). Status meetings shall be held every two weeks for the remainder of the effort. At a minimum, status meeting attendees shall be the VAMC COR and one person from the prime Contractor. Additional personnel may be invited to the meeting as required.
As part of the last status meeting the resurvey of the site will be conducted (see PG-18-1: MASTER CONSTRUCTION SPECIFICATIONS, Section 01 00 00 (General Requirements - 528-19-104), Article 1.8, Paragraph C).
The Contractor and/or Sub Contractor shall provide meeting minutes in accordance with the terms of Section 3.1.2.
Verification Final functional verification of the installed equipment shall be conducted jointly before final acceptance of the constructed product. The groups that will participate in the verification process include:
· Prime Contractor
· Subcontractor (as applicable)
· VA Engineering These functional tests will be based upon manufacturer data and will be checked against VA regulatory requirements as applicable.
All equipment installed will be subject to these tests. For any equipment that does not pass the functional verification test, the Contractor shall troubleshoot the issue and determine if the root cause of the problem.
If the root cause is the result of the construction work, the Contractor shall repair and/or replace the faulty construction work and any subsequently damaged equipment at no additional cost to the Government.
If the root cause is the result of faulty equipment (manufacturer defect), the Contractor shall coordinate with the fabricator to repair and/or replace the faulty equipment and any subsequently damaged equipment at no additional cost to the Government.
Delivery
1.13 Technical POC
The Contractor shall coordinate all visits and meetings with and provide the required quantity of submittals to Thomas Heldwein
VA Western New York Healthcare System
Buffalo VA Medical Center
3495 Bailey Avenue
Buffalo, NY 14215
| Phone: |
| (716) 834-9200 x25385 |
| Cell: |
| (716) 349-3962 |
| Email: |
| Thomas.heldwein@va.gov |
1.14 Schedule and Submittals
The Period of Performance for the total effort will not exceed 360 calendar days.
Independent of the not to exceed period of performance, the Contractor shall comply with the individual relative and absolute timelines identified in this SOW.
The Contractor is responsible for submitting a detailed schedule in accordance with PG-18-1 MASTER CONSTRUCTION SPECIFICATIONS; SECTION 01 32 16.15, PROJECT SCHEDULES (528-19-104). This schedule must include all administrative work (preparatory as well as any permitting or shutdown requests), and must also show associated predecessor and successor logic associated with all tasks performed under this contract.
Government Furnished Information, Materials, & Equipment The government shall supply the following information:
All Buffalo VAMC drawings and modified program guides and specifications from section 2.2.
Siemens SOW related to this contract. Subvendor contact for recommended subvendors to be provided by Siemens for coordination of all efforts.
Government Furnished Materials (GFM) and Government Furnished Equipment (GFE) are not required and will not be provided for this effort.
Safer Federal Workforce Task Force COVID-19 Workplace Safety: Guidance for Federal Contractors and Subcontractors Updated November 10, 2021
Introduction
On September 9, President Biden announced his Path Out of the Pandemic: COVID-19 Action Plan. One of the main goals of this science-based plan is to get more people vaccinated.
As part of that plan, the President signed Executive Order 14042, Ensuring Adequate COVID Safety Protocols for Federal Contractors, (“the order”) which directs executive departments and agencies, including independent establishments subject to the Federal Property and Administrative Services Act, 40 U.S.C. § 102(4)(A), to ensure that covered contracts and contract-like instruments include a clause (“the clause”) that the contractor and any subcontractors (at any tier) shall incorporate into lower-tier subcontracts. This clause shall specify that the contractor or subcontractor shall, for the duration of the contract, comply with all guidance for contractor or subcontractor workplace locations published by the Safer Federal Workforce Task Force (“Task Force”), provided that the Director of the Office of Management and Budget (“OMB”) approves the Task Force Guidance (the or this “Guidance”) and determines that the Guidance, if adhered to by covered contractors, will promote economy and efficiency in Federal contracting.
The actions directed by the order will ensure that parties who contract with the Federal Government provide COVID-19 safeguards in workplaces with individuals working on or in connection with a Federal Government contract or contract-like instrument. These workplace safety protocols will apply to all covered contractor employees, including contractor or subcontractor employees in covered contractor workplaces who are not working on a Federal Government contract or contract-like instrument. These safeguards will decrease the spread of SARS-CoV-2, the virus that causes COVID-19, which will decrease worker absence, reduce labor costs, and improve the efficiency of contractors and subcontractors performing work for the Federal Government.
Pursuant to this Guidance, and in addition to any requirements or workplace safety protocols that are applicable because a contractor or subcontractor employee is present at a Federal workplace, Federal contractors and subcontractors with a covered contract will be required to conform to the following workplace safety protocols:
1. COVID-19 vaccination of covered contractor employees, except in limited circumstances where an employee is legally entitled to an accommodation;
2. Compliance by individuals, including covered contractor employees and visitors, with the Guidance related to masking and physical distancing while in covered contractor workplaces; and
3. Designation by covered contractors of a person or persons to coordinate COVID-19 workplace safety efforts at covered contractor workplaces.
The order also sets out a process for OMB and the Safer Federal Workforce Task Force to update the Guidance for covered contractors, which the Task Force will consider doing based on future changes to Centers for Disease Control and Prevention (“CDC”) COVID-19 guidance and as warranted by the circumstances of the pandemic and public health conditions. It also sets out a process for the Federal Acquisition Regulatory Council (“FAR Council”) to implement such protocols and guidance for covered Federal procurement solicitations and contracts subject to the Federal Acquisition Regulation (“FAR”) and for agencies that are responsible for covered contracts and contract-like instruments not subject to the FAR to take prompt action to ensure that those covered contracts and contract-like instruments include the clause, consistent with the order.
Covered contractors shall adhere to the requirements of this Guidance. The Director of OMB has, as authorized by Executive Order 14042, approved this Guidance and has, an exercise of the delegation of authority (see 3 U.S.C. § 301) under the Federal Property and Administrative Services Act determined that this Guidance will promote economy and efficiency in Federal contracting if adhered to by Government contractors and subcontractors. The Director has published such determination in the Federal Register.
Definitions Community transmission – means the level of community transmission as set forth in the CDC COVID-19 Data Tracker County View.
Contract and contract-like instrument – has the meaning set forth in the Department of Labor’s proposed rule, “Increasing the Minimum Wage for Federal Contractors,” 86 Fed. Reg. 38,816, 38,887 (July 22, 2021). If the Department of Labor issues a final rule relating to that proposed rule, this term shall have the meaning set forth in that final rule.
That proposed rule defines a contract or contract-like instrument as an agreement between two or more parties creating obligations that are enforceable or otherwise recognizable at law. This definition includes, but is not limited to, a mutually binding legal relationship obligating one party to furnish services (including construction) and another party to pay for them. The term contract includes all contracts and any subcontracts of any tier thereunder, whether negotiated or advertised, including any procurement actions, lease agreements, cooperative agreements, provider agreements, intergovernmental service agreements, service agreements, licenses, permits, or any other type of agreement, regardless of nomenclature, type, or particular form, and whether entered into verbally or in writing. The term contract shall be interpreted broadly as to include, but not be limited to, any contract within the definition provided in the FAR at 48 CFR chapter 1 or applicable Federal statutes. This definition includes, but is not limited to, any contract that may be covered under any Federal procurement statute. Contracts may be the result of competitive bidding or awarded to a single source under applicable authority to do so. In addition to bilateral instruments, contracts include, but are not limited to, awards and notices of awards; job orders or task letters issued under basic ordering agreements; letter contracts; orders, such as purchase orders, under which the contract becomes effective by written acceptance or performance; exercised contract options; and bilateral contract modifications. The term contract includes contracts covered by the Service Contract Act, contracts covered by the Davis-Bacon Act, concessions contracts not otherwise subject to the Service Contract Act, and contracts in connection with Federal property or land and related to offering services for Federal employees, their dependents, or the general public.
Contractor or subcontractor workplace location – means a location where covered contract employees work, including a covered contractor workplace or Federal workplace.
Covered contract – means any contract or contract-like instrument that includes the clause described in Section 2(a) of the order.
Covered contractor – means a prime contractor or subcontractor at any tier who is party to a covered contract.
Covered contractor employee – means any full-time or part-time employee of a covered contractor working on or in connection with a covered contract or working at a covered contractor workplace. This includes employees of covered contractors who are not themselves working on or in connection with a covered contract.
Covered contractor workplace – means a location controlled by a covered contractor at which any employee of a covered contractor working on or in connection with a covered contract is likely to be present during the period of performance for a covered contract. A covered contractor workplace does not include a covered contractor employee’s residence.
Federal workplace – means any place, site, installation, building, room, or facility in which any Federal executive department or agency conducts official business, or is within an executive department or agency’s jurisdiction, custody, or control.
Fully vaccinated – People are considered fully vaccinated for COVID-19 two weeks after they have received the second dose in a two-dose series, or two weeks after they have received a single-dose vaccine. There is currently no post-vaccination time limit on fully vaccinated status; should such a limit be determined by the Centers for Disease Control and Prevention, that limit will be considered by the Task Force and OMB for possible updating of this Guidance.
For purposes of this Guidance, people are considered fully vaccinated if they have received COVID-19 vaccines currently approved or authorized for emergency use by the U.S. Food and Drug Administration (Pfizer-BioNTech, Moderna, and Johnson & Johnson [J&J]/Janssen COVID-19 vaccines) or COVID-19 vaccines that have been listed for emergency use by the World Health Organization (e.g., AstraZeneca/Oxford). More information is available at Interim Clinical Considerations for Use of COVID-19 Vaccines | CDC.
Clinical trial participants from a U.S. site who are documented to have received the full series of an “active” (not placebo) COVID-19 vaccine candidate, for which vaccine efficacy has been independently confirmed (e.g., by a data and safety monitoring board), can be considered fully vaccinated two weeks after they have completed the vaccine series. Currently, the Novavax COVID-19 vaccine meets these criteria. More information is available at the CDC website here.
Mask – means any mask that is consistent with CDC recommendations as set forth in Types of Masks and Respirators | CDC. This may include the following: disposable masks, masks that fit properly (snugly around the nose and chin with no large gaps around the sides of the face), masks made with breathable fabric (such as cotton), masks made with tightly woven fabric (i.e., fabrics that do not let light pass through when held up to a light source), masks with two or three layers, masks with inner filter pockets, and filtering facepiece respirators that are approved by the National Institute for Occupational Safety and Health or consistent with international standards. The following do not constitute masks for purposes of this Guidance: masks with exhalation valves, vents, or other openings; face shields only (without mask); or masks with single-layer fabric or thin fabric that does not block light.
Guidance Covered contractors are responsible for ensuring that covered contractor employees comply with the workplace safety protocols detailed below. Covered contractor employees must also comply with agency COVID-19 workplace safety requirements while in Federal workplaces.
Consistent with applicable law, agencies are strongly encouraged to incorporate a clause requiring compliance with this Guidance into contracts that are not covered or directly addressed by the order because the contract is under the Simplified Acquisition Threshold as defined in section 2.101 of the FAR or is a contract or subcontract for the manufacturing of products. Agencies are also strongly encouraged to incorporate a clause requiring compliance with this Guidance into existing contracts and contract-like instruments prior to the date upon which the order requires inclusion of the clause.
1. Vaccination of covered contractor employees, except in limited circumstances where an employee is legally entitled to an accommodation
Covered contractors must ensure that all covered contractor employees are fully vaccinated for COVID-19, unless the employee is legally entitled to an accommodation. Covered contractor employees must be fully vaccinated no later than January 18, 2022. After that date, all covered contractor employees must be fully vaccinated by the first day of the period of performance on a newly awarded covered contract, and by the first day of the period of performance on an exercised option or extended or renewed contract when the clause has been incorporated into the covered contract.
A covered contractor may be required to provide an accommodation to covered contractor employees who communicate to the covered contractor that they are not vaccinated against COVID-19 because of a disability (which would include medical conditions) or because of a sincerely held religious belief, practice, or observance. A covered contractor should review and consider what, if any, accommodation it must offer. Requests for “medical accommodation” or “medical exceptions” should be treated as requests for a disability accommodation.
Should a Federal agency have an urgent, mission-critical need for a covered contractor to have covered contractor employees begin work on a covered contract or at a covered workplace before becoming fully vaccinated, the agency head may approve an exception for the covered contractor—in the case of such limited exceptions, the covered contractor must ensure these covered contractor employees are fully vaccinated within 60 days of beginning work on a covered contract or at a covered workplace. The covered contractor must further ensure that such employees comply with masking and physical distancing requirements for not fully vaccinated individuals in covered workplaces prior to being fully vaccinated.
The covered contractor must review its covered employees’ documentation to prove vaccination status. Covered contractors must require covered contractor employees to show or provide their employer with one of the following documents: a copy of the record of immunization from a health care provider or pharmacy, a copy of the COVID-19 Vaccination Record Card (CDC Form MLS-319813_r, published on September 3, 2020), a copy of medical records documenting the vaccination, a copy of immunization records from a public health or State immunization information system, or a copy of any other official documentation verifying vaccination with information on the vaccine name, date(s) of administration, and the name of health care professional or clinic site administering vaccine. Covered contractors may allow covered contractor employees to show or provide to their employer a digital copy of such records, including, for example, a digital photograph, scanned image, or PDF of such a record.
The covered contractor shall ensure compliance with the requirements in this Guidance related to the showing or provision of proper vaccination documentation.
Covered contractors are strongly encouraged to incorporate similar vaccination requirements into their non-covered contracts and agreements with non-covered contractors whose employees perform work at…