RA 69 Roof Layouts-VA.pdf
PDF 26 KB Posted
- Attached to
- Z1DA--528A8-20-801 ROOF REPLACEMENT-RESTORATION
- Solicitation number
- 36C24220B0048
About this file
This document includes a roof plan drawing and specifications for a federal contract opportunity to replace and restore a roof. The contract opportunity is a 100% set-aside for Service-Disabled Veteran Owned Small Businesses to replace the roof at the VA Western New York Healthcare System in Albany, NY. The project magnitude is estimated between $250,000 and $500,000, and the NAICS code is 238160. The solicitation requires registration in the System for Award Management and adherence to social distancing protocols for any pre-bid site visits or the teleconference bid opening. Prior design services for the project by a bidder require agency head approval to be eligible for award.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 01 RA 40 Ambulatory Surgery (OR).jpg | JPG image | |
| 02 RA 49 Over Dentistry (at Areaway 14).jpg | JPG image | |
| 03 RA 51 Kitchen Area.jpg | JPG image | |
| 36C24220B0048 0001.docx | DOCX document | |
| 04 RA 69 Respiratory Therapy (Bldg 26).jpg | JPG image | |
| S02 - Davis-Bacon Act WD NY20200002.pdf | ||
| S02 - Spec - Preparation - Rehab and Built-Up.pdf | ||
| S02 - 36C24220B0048_Solicitation.pdf | ||
| S02 - Roof Layout Drawings and Plans.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AC RAISED
BREATHER
CHIMNEY
ACT CORE
DRY CORE
WET CORE
DAMP CORE
TRACE CORE
CAPPED CURB
ELEVATED CURB
DRAIN
DUCTWORK
HATCH COVER
LADDER
MECH UNIT
PIPE
PITCH PAN
POWER UNIT
POWER VENT
DAMP PROBE
DRY PROBE
WATER
COOLING
TOWER
A C DB E F G H I J K L M N O P Q R S
SOIL STACK
WATER TOWER
SKYLIGHT
Stratton VA Hospital Albany, NY Roof 69 Roof Plan DRAWN BY:Peter Hamilton
DATE: December 18-2019
SCALE 1" = 20'
AC CURB
WET PROBE
NIC
NIC
NICNIC
70'
47'
22'
42'
27'
21'
6'
DETAILS
1 BASE FLASHING
2 GRAVEL STOP
Existing Roof Composition
• Gravel surface and flood coat
• 3 ply cold process built up roof
• ½” wood fiber cover board
• Tapered polyisocyanurate insulation (4” at core location)
• Metal deck
VHAALNCOLLIM
Rectangle
VHAALNCOLLIM
Rectangle
File details come from the government source that posted it. Updated .