This document contains a solicitation for repair work at the Syracuse VA Medical Center in Syracuse, New York. The solicitation seeks contractors to provide all labor, equipment, materials and supervision necessary to repair existing access roads and sidewalks for a project valued between $500,000 and $1,000,000. Contractors must be registered in the System for Award Management database and have an Experience Modification Rate equal to or less than 1.0 to be eligible for award. A pre-bid site visit was held on June 16, 2020 and requests for information were due by June 23, 2020. Bids for the work must be submitted by July 14, 2020 in electronic format only. The work is to be completed in accordance with the provided drawings, specifications and scope of work. The soliciting agency is the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 2.

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

5. PROJECT NUMBER (if applicable)

CODE

7.

ADMINISTERED BY

2. AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER

3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE OF

PAGES

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED

BPA NO.

1. CONTRACT ID CODE

FACILITY CODE

CODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE

OF YOUR

ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV. 11/2016)

is required to sign this document and return ___________ copies to the issuing office.

is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERE

D CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES

SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

RESULT IN REJECTION OF YOUR

OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendmen t, and is received prior to the opening hour and date specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

Contractor

16C. DATE SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED

STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER

16A. NAME AND TITLE OF

CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 30

PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF

SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer) 528A7-18-729 Department of Veterans Affairs Network Contracting Office 02 800 Irving Ave Bldg 2 Rm D02 Syracuse NY 13210 Department of Veterans Affairs Network Contracting Office 02 800 Irving Ave Bldg 2 Rm D02 Syracuse NY 13210 To all Offerors/Bidders

36C24220B0041

X X X

14 JULY 2020 0930 - ELECTRONIC ONLY

X Purpose of this amendment is to incorporate: add'l work, RFI Answers, extend bid date and add site visit A.) Incorporate Amendment 0001 attachment B.) Incorporate RFI Question and Answers- attached C.) Incorporate Specification revision dated 6-23-20- attached D.) Incorporate Construction Plans 12 thru 16- attached E.) Incorporate site visit attendance sheet- attached F.) Change bid date from 7 July to read 14 July - ELECTRONIC BIDS ARE ONLY ACCEPTED to sand ra.fisher3@va.gov G.) Incorporate an additional site visit 1 JULY 2020 RSVP REQUIRED: sandra.fisher3@va.gov or 315-466-8362 H.) All other terms and conditions remain unchanged

RFI Question and Answers for 3CC242-20-B-0041 Project: 528A7-18-729 Repair Existing Access Road and Sidewalks

1. Do you have the sign in sheet from the Site Visit?

Attached

2. Also is there a bid sheet with quantities?

This is bid as 1 JB

3. There is no laydown area on the drawings specified.

The contractor will be given a laydown area on the southeast corner of the VA Parking Garage. Approximate size for 2-3 small pieces of equipment. Approximate size 20’ x 25’. All debris is to be removed daily from VA Property.

4. Are there any inclement weather delays built into the schedule? If weather impacts the ability to perform in 120 days will extensions be granted?

There is no anticipated extension for work to be performed but will be entertained if the need arises.

5. Drawing CS102 calls for granite curbing to be replaced. CS103 the drawing states granite curbing but the legend / symbol calls for concrete curbing. Please clarify.

Replace all Curbing with Granite Curb as called out on drawings. To match existing

6. There's significant sidewalk work to be done in front of the Emergency Circle (Entrance FFE 492.02). Are these areas able to be completely closed? If not, please advise how work is to be completed in these areas or if temporary walk-ways are to be provided in these areas.

Drawing CS117 details a Phasing Plan that Contractors are required to follow. While in each phase, Contractors are to provide access and walk arounds as outlined in the drawings. None of these areas will be completely shut down. See notes on Phasing Plan CS117

7. Please provide catch basin fill detail

For quoting Purposes, use detail #14 on drawing CS114 for setting Catch Basins

8. Work along the back access road, phases B&C in particular, call for work to be completed in (1) weekend. There is an excessive amount of work to be done in these areas as with all the material to be removed, trench drain work, grading, new stone, and repaving. It's seemingly unfeasible to be completed in one weekend. Can these areas be left as compacted stone and work done over multiple weekends?

Phase B is the only phase that needs to be completed in one weekend. This is due to the fact that this area is our main loading dock area and cannot be replaced during the week. Roadway areas that are slated for complete removal can be left graded, compacted for short period of time.

9. Are all the sidewalks 100% owned by the VA, or does the City of Syracuse and/or Syracuse University own any areas? If not 100% owned by the VA, what authorizations / permits will be required, and would the VA or contractor be responsible for obtaining authorizations / permits? Correspondingly, what about the signage and parking meters located on the areas marked for repair; will special authorizations or permits be required for removal and reinstall? Will the VA or contractor be responsible for coordinating and obtaining authorizations / permits?

The City of Syracuse owns some of the Sidewalks. The successful Contractor will be required to coordinate all activities associated with this Including but not limited to parking space closures, sidewalk closings and obtaining any permits or authorizations for the sidewalks that the City of Syracuse owns.

10. Are the parking spots located on Irving Avenue allowed to be blocked off during construction? Will any permits be required?

See answer to question 9 above.

11. There are other ongoing exterior projects at the VA, including new signage being installed across the campus and the DAV entrance project were mentioned , what impact will they have on this project? Will one project have priority over another?

There are several outside ongoing projects at the Syracuse VA Facility. The successful Contractor will need to phase this work in an efficient manner as to not tie up areas for longer than necessary to meet contract obligations. One project does not have priority over the other.

12. During the walk through it was mentioned that the air inlets will need to be covered during construction.

Yes, as per the specifications, most of the construction area is classified as hazard level 1. However, due to the close proximity of the air louvers to construction work area, Contractors are required to treat this area as Hazard Level 2 and will be required to protect these systems from ingesting dust and debris.

13. During the walk through it was brought up if it was the Contractor’s responsibility to re-set all the existing manhole lids and rings to elevation?

Yes, the Roadway details see the elevations of both the roadway and all the lids and rings. Yes, it is the Contractors responsibility.

14. During the walk through it was brought up that some of the Sidewalks grades may not be to NYS DOT Guidelines?

Yes, After the Site Walk Through, the Architect/Engineering Firm addressed the (5) areas of concern. Addendum #1 addresses these issues. Please review Addendum #1 for details.

15. During the walk through it was brought up that if the City of Syracuse requires addition work for Design Changes that the Contractors would be responsible?

Changes that are required due to an unforeseen condition will require a Request for Proposal (RFP) from the VA to the KTR. These changes would be made via a change order to the contract. The Contractors would not be responsible if the changes are necessary.

16. Does the City of Syracuse have to approve the Drawings and Design Plan?

No, this Syracuse VAMC is considered Federal Property.

17. What is the depth of the Pavement Milling? Drawings and Specifications do not show this detail.

Assume 2” Pavement Milling and new 2” Wear Course.

18. Has the City of Syracuse been notified of the work that is being requested.

No see question # 16

19. Will the contractor be responsible for any design changes that the City of Syracuse makes after bid in regards to the ADA ramps.

The City of Syracuse can not make changes to a Federal Contract but if there are changes that need to be made the VA will review and determine the best course of action. The Contractors are not required to fund the changes if the design is changed to the contract and an unforeseen condition.

20. Who is responsible to pay all permits with the City.

See Question # 9

21. Something about pavers near the fence being replaced to match the height of the new concrete. I am not sure what is meant by this

See Notes on drawings regarding RAN Replace As Needed

22. The corner near stadium place and Van Buren Street needs to me reworked.

This work was addressed in Amendment #1

23. Are the brick pavers at the fence along the access road to be replaced?

See Question #21

24. Can they bring subcontractors on site to review the area prior to bid? Do we need second site visit?

There will be a second site visit 1 July at 0930 meeting outside the Emergency Department. YOU MUST RSVP with the Contracting Officer . Sandra.Fisher3@va.gov or 315-466-8362

25. What is the payrate? Davis Bacon rates apply and are included in the solicitation

Where are the contractors allowed to park?

In Specifications, you are allowed (1) Parking Space on VA Property. Contractor Employees required to find their own parking arrangements

26. Should the front concrete be removed from the contract and put into the other front entrance project because of the DAV Entrance? Who is going to pay for the fence to be taken down and put back up?

No quote this project to the drawings and Specifications. Fence relocation is not in this project scope.

See attached document: 528A7-18-729_Construction_Plans_12_thru_16.

See attached document: 36242-20-B-0041 Amendment 0001 25 June 2020.

See attached document: 528A7-18-729_Specifications Revised 6-23-20.

See attached document: Walk Through Attendance Sheet.